doc.: IEEE 802.15-01/464r0
Submission
Slide 1 John Barr, Motorola
November, 2001Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [TG3 Opening Report 12Nov01]
Date Submitted: [12Nov01]
Source: [John Barr] Company [Motorola]Address [1303 E. Golf Road, Schuamburg, IL 60196]Voice:[+1 847 576-8706], FAX: [+1 847 576-6758], E-Mail:[[email protected]]
Re: [01453r3P802-15_TG3-November01-Meeting-Objective-and-Agenda.xls]
Abstract: [TG3 Chair Report to 802.15 WG]
Purpose: [TG3 chair report to WG to update them from the last session on all work items.]
Notice: This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.
November, 2001
John Barr, MotorolaSlide 2
doc.: IEEE 802.15-01/464r0
Submission
IEEE 802.15 Working Group for Wireless Personal Area Networks
TG3 Opening ReportNovember 2001, Austin, TX
USA
802.15
November, 2001
John Barr, MotorolaSlide 3
doc.: IEEE 802.15-01/464r0
Submission
Agenda
• Goals of November Meeting
• IEEE 802.15.3 PAR
• Status and plans for TG3
• Key November Sessions
November, 2001
John Barr, MotorolaSlide 4
doc.: IEEE 802.15-01/464r0
Submission
Goals of the November Meeting• Conference call status, including approval of any ad
hoc business• Review draft (D08) comments• Resolve comments and open issues• Create amendments document for D08 to D09• Complete drafting update to D09• Prepare WG letter ballot for D09• Prepare for Post-January sponsor ballot• Schedule RevCom if necessary
November, 2001
John Barr, MotorolaSlide 5
doc.: IEEE 802.15-01/464r0
Submission
IEEE 802.15.3 PAR• Wireless Medium Access Control (MAC) and Physical
Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN)– … wireless connectivity with fixed, portable and moving devices
within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person)
– … interoperability or coexistence with other 802.15 TG
– … coexistence with other wireless devices in conjunction with Coexistence Task Groups such as 802.15.2
– … low complexity, low cost, low power
– … >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications.
November, 2001
John Barr, MotorolaSlide 6
doc.: IEEE 802.15-01/464r0
Submission
Status and Plans for TG3
• Construction of Initial DraftGoal: MAC/PHY standard of high rate WPAN
• ScheduleGoal: Produce a Standard by 1H 2002
• Next StepsGoal: Resolve comments/issues with current task
group draft (D08), November, 2001. Working Group draft, November (D09), 2001. Sponsor ballot, January (D10), 2001.
November, 2001
John Barr, MotorolaSlide 7
doc.: IEEE 802.15-01/464r0
Submission
Recent Work• Goal: Release draft (D08) incorporating updates from
conference call and ad hoc (2) meeting and identify outstanding issues and work to be completed.
• Ad Hoc meeting in Schaumburg August 28-29• Ad Hoc meeting Rolling Meadows October 9-11• Twice (+) weekly conference calls to resolve issues
captured in 01/374r8
November, 2001
John Barr, MotorolaSlide 8
doc.: IEEE 802.15-01/464r0
Submission
Key November Sessions (01/453r3)• Monday: Vote on approval of D08. UWB Study Group
presentation. QoS resolution Monday evening.• Tuesday: Outstanding issue resolution. Complete UWB
study group proposal. Security clause issue resolution and drafting Tuesday evening.
• Wednesday: Resolution of issues, drafting, review of proposed amendments, PICS and SDL requirements. Vote on UWB study group at 802.15 working group meeting.
• Thursday : Vote on Draft amendments, vote on baseline draft. (10:30 AM).
• Thursday: Complete D09 draft, committee reports, update project plan, November-January work plan, prepare letter ballot, and WG report.