DOE Consolidated Audit Program

Don Dihel,CHMM

Portsmouth/Paducah Project Office2015 Paducah Site Status Report

September 15, 2014ASP 2015 Workshop

Page 2: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 2

Site Background

• 3,556 acres total• > 500 structures / facilities• 4 main process buildings• 1,760 process components

• Groundwater source contamination• Soils remediation• Future D&D • Pump-and-Treat optimization

Page 3: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 3

• Paducah enrichment and support facilities were leased to USEC Inc. in 1994.

• In April 2014, USEC stopped enrichment operations.• In August 2014, USEC formally submitted a letter to PPPO

announcing its intention to return its leased facilities, including PAL, back to DOE.

Page 4: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 4

Paducah Gaseous Diffusion Plant Contractors

• Swift and Staley Team• Teaming partners of Swift and Staley Mechanical,

Wastren Advantage, Incorporated, and Northwind.• Responsible for Facility Support Services at the Paducah

Gaseous Diffusion Plant in Paducah, Kentucky. • Contract ended March 2015, but extended.• Won contract for 3rd time. Awaiting Notice To Proceed

to start 60 day transition to new contract.

Page 5: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 5

Paducah Gaseous Diffusion Plant Contractors

• Flour Federal Services (FFS)• Teaming partners of Fluor, Los Alamos Technical

Associates, and Chicago Bridge & Iron.• FFS is responsible for the management, integration and

execution of the deactivation and post-GDP shutdown remediation activities at the Paducah site.

• FFS is assumed responsibilities for enrichment and support facilities in October, 2014.

• FFS supports DOECAP.

Page 6: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 6

Project Scope

PERIOD 1Task Order

Implementation Period

PERIOD 2De-Lease Planning &

Transfer Period

NTPTransfer of

GDP

End of Current Remediation

Contract

End of Task Order

Deactivation Project Timeline

July 2014

July 2017

October 2014

July 2015

PERIOD 4Post-GDP Shutdown Environmental Remediation Services

Period

PERIOD 3Facility Deactivation & Infrastructure Optimization Period

Futu

re D

&D

Page 7: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 7

Accomplishments

Deactivation and Environmental Remediation• Drained, packaged, and shipped lube oil from process buildings some

of which will be reused as a cleaning agent.• Began removal of R-114 refrigerant from the gaseous diffusion plant

for safer deposit removal activities.• Two of the ten systems that will remove uranium deposits from the

gaseous diffusion plant, the first of their kind, are on site.• Completed switchyard consolidation to better suit the changing needs

of the plant site. • Identified 11 facilities for D&D to support footprint reduction.• Deep soil mixing to remove TCE contamination from soil is more than

50% complete.

Page 8: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 8

C-410/420 Demolition

• Demolition of the 116,000-square-foot C-410/420 Feed Plant was completed on May 14, 2015.

• 2,600 panels of cement asbestos siding and 9,000 feet of pipe are among the more 4,700 tons of waste safely removed prior to demolition.

Page 9: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 9

C-410/420 Demolition

Constructed in 1956 the C-410/420 Feed Plant was used to produce uranium hexafluoride (UF6) for uranium enrichment in the plants cascades.

• The 85-foot tall Feed Plant began demolition in 2011 with the ~30,000-square-foot Eastern-Third. Crews had to remove system piping and other equipment prior to the final stages of demolition in 2014.

Page 10: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 10

C-410/420 Demolition

• Wastes were loaded into 114 rail-cars and shipped to Clive, UT, including over 110,000-square-feet of building material.

• The amount of waste generated from decontamination and demolition would cover one football field 15 feet deep.

Page 11: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 11

C-410/420 Demolition

20062006 20152015

Page 12: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 12

Fissile Deinventory

• Developed program to handle fissile material as part of the fissile deinventory project.

• Over 100 people were trained to safely remove fissile material in facilities that have ceased operations.

• Almost 230 pieces of fissile waste from the C-720 Maintenance and Stores building have been removed. 162 total containers of waste have been generated.

Page 13: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 13

Waste Management

FY15 Waste Management

• Dispositioned more than 160,000 gallons of lube oil from the process buildings

• Dispositioned more than 25,000 gallons of PCB transformer oil from Building C-337

• Developed four authorization limit packages for offsite treatment/disposition of lube oil and PCB transformer oil; and

• Performed a paper and site Audit of the Veolia Incinerator Facility in Port Arthur, Texas.

Page 14: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 14

FY 2016 Planned Work

• Continue Uranium Deposit Removal • Continue Deactivation:

• Refrigerant • Lube Oil• Utility Optimization• Small, unused facility D&D

• Pump-and-Treat Operations • Southwest and Northeast Plumes• Regulatory documentation of the On-site Waste Disposal Option• Waste Management and Removal from several facilities and areas

Page 15: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 15

Waste Generation

• The lube oil removal project has shipped almost 200 tons of waste offsite in tanker trucks.

• An additional 160 tons of PCB oil from PCB transformers have been remove and shipped offsite in containers.

• Removal of theses wastes are crucial to moving forward with future D&D activities.

Containers Volume (ft3) Volume (m3) Weight (lbs) Weight (tons)

Waste Generated 485 59,617 1,688 1,967,549 984

Waste Shipped Offsite 80 38,003 1,076 1,536,105 768

Waste Disposed in C-746-U 19 10,260 291 142,819 71

Page 16: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 16

TSDs used by Paducah

• Diversified Scientific Services, Inc., Kingston, TN• Energy Solutions, Clive, UT• Materials and Energy Corporation, Oak Ridge, TN• Clean Harbors Eldorado, Eldorado, AR• Clean Harbors Deer Park, Deer Park, TX• Waste Control Specialists, Andrews, TX

Page 17: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 17

• During FY 2015, the Paducah site provided support for the following TSD audits:o Don Dihel – EnergySolutions, Bear Creek, TN

Waste Control Specialists, Andrews, TX

o During FY 2016, the Paducah site anticipates supporting the following TSD audits: o Don Dihel – EnergySolutions, Bear Creek, TN

Waste Control Specialists, Andrews, TXo Lisa Turner – two audits - TBD

Paducah Support for DOECAP

17

Page 18: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 18

Analytical Outlook

FY 2015 FY 2016 FY 2017 TotalOperational Samples 740 4,500 3,300 8,540

Environmental Remediation Samples* 5,200 5,200 5,400 15,800

Total 5,940 9,700 8,700 24,340

* Environmental Remediation Samples will continue to be shipped offsite for analysis.

Page 19: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 19

Approved Labortories

• ALS Laboratory Group Utah, Salt Lake City, UT• GEL, LLC, Charleston, SC• Materials and Chemistry Laboratory, Inc., Oak Ridge,

TN• Microbac Tennessee, Johnson City, TN• ALS Environmental Laboratory, Ft. Collins, CO• TestAmerica St. Louis, Earth City, MO• Southwest Research Institute, San Antonio, TX• Shealy Environmental Services, West Columbia, SC

Page 20: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 20

• During FY 2015, the Paducah site provided support for the following laboratory audits:o Lisa Crabtree – GEL and TestAmerica, Earth City, MO.o Kelly Layne – GEL and TestAmerica, Earth City, MO.o Don Dihel – TestAmerica, Earth City, MO.o Cara Mills – MCL, Oak Ridge, TN

• During FY 2016, the Paducah site anticipates supporting the following laboratory audits: o Don Dihel–One audits – TBDo Lisa Crabtree–Two audits –TBDo Kelly Layne–Two audits – TBDo Cara Mills – Two audit - TBD

Paducah Support for DOECAP

20

Page 21: DOE Consolidated Audit Program Don Dihel, CHMM Portsmouth/Paducah Project Office 2015 Paducah Site Status Report September 15, 2014 ASP 2015 Workshop

www.energy.gov/EM 21

Laboratory Participants Lead 1

QA2

ORG3

InO4

Rad5

LIMS6

HRMM7

GEO8

AQT9

NDA

Lisa Crabtree X X

Kelly Layne X

Tom Hines (DOE) X

Cara Mills X

Don Dihel (DOE) AIT X X X X

TSD Participants Lead 1QA

2S&A

3WO

4EC/P

5RAD

6I/CS

7TRAN

Lisa Turner X

Don Dihel (DOE) AIT X X X X X X X

DOECAP Auditor Qualification

21