4
NW 5TH AVE NW IRVING ST NW HOYT ST NW GLISAN ST NW FLANDERS ST NW EVERETT ST NW DAVIS ST NW COUCH ST W BURNSIDE ST NW PARK AVE NW 8TH AVE NW BROADWAY NW 6TH AVE NW 4TH AVE SW OAK ST SW STARK ST SW WASHINGTON ST SW ALDER ST SW BROADWAY SW 6TH AVE SW 5TH AVE SW 4TH AVE SW 3RD AVE SW 2ND AVE SEGMENT 1 DOWNTOWN • NW Irving & NW 5th to SE 8th Ave LEGEND 0 50’ 100’ 200’ I-205 SE Cesar Chavez Blvd SE 122nd Ave SE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy SE 11th/12th Ave N Bus Staon Proposed Design Elements Business Access Transit Lane (BAT) Protected Bicycle Facility Sidewalk/Island Median Access Control Signal Improvement New Pedestrian Crossing Signal Downtown Stop Driveway Closure Downtown Bus Route Right-of-Way Acquision Integrated 1 By-pass Integrated 2 Pass-through Integrated 3 Rear Access Bus Staon Types 1 2 3 Island 1 Intersecon Island 2 Mid-block 4 5 Island 3 Rear Access 6 New Pedestrian Crossing Signal Outer Division Mul-Modal Safety Project Improvements Median Access Control Bioswale Tree Removed Property Line Temporary Construcon Easement 2a 1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c 4d 1c 1b 1a OPEN HOUSE November 2017

DOWNTOWN N N Ave - TriMet · SE 11th/12th Ave SE Cesar Chavez Blvd SE 82nd Ave I-205 SE 122nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy N µ ^ }v Proposed Design Elements Business

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOWNTOWN N N Ave - TriMet · SE 11th/12th Ave SE Cesar Chavez Blvd SE 82nd Ave I-205 SE 122nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy N µ ^ }v Proposed Design Elements Business

NW 5TH AVE

NW

IRV

ING

ST

NW

HO

YT

ST

NW

GLI

SA

N S

T

NW

FLA

ND

ER

S S

T

NW

EV

ER

ETT

ST

NW

DA

VIS

ST

NW

CO

UC

H S

T

W B

UR

NS

IDE

ST

NW PARK AVE

NW 8TH AVE

NW BROADWAY

NW 6TH AVE

NW 4TH AVE

SW O

AK S

T

SW S

TAR

K ST

SW W

ASH

ING

TON

ST

SW A

LDER

ST

SW BROADWAY

SW 6TH AVE

SW 5TH AVE

SW 4TH AVE

SW 3RD AVE

SW 2ND AVE

SEGMENT 1DOWNTOWN • NW Irving & NW 5th to SE 8th AveLEGEND

0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

N

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c 4d

1c

1b

1a

OPEN HOUSE November 2017

Page 2: DOWNTOWN N N Ave - TriMet · SE 11th/12th Ave SE Cesar Chavez Blvd SE 82nd Ave I-205 SE 122nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy N µ ^ }v Proposed Design Elements Business

SW

CLA

Y S

T

SW L

INC

OLN

ST

SW 4TH AVE

SW

OA

K S

T

SW

STA

RK

ST

SW

WA

SH

ING

TON

ST

SW

ALD

ER

ST

SW

MO

RR

ISO

N S

T

SW

YA

MH

ILL

ST

SW

TA

YLO

R S

T

SW

SA

LMO

N S

T

SW

MA

IN S

T

SW

MA

DIS

ON

ST

SW

JE

FFE

RS

ON

ST

SW

CO

LUM

BIA

ST

SW

MIL

L S

T

SW

MA

RK

ET

ST

SW

MO

NTG

OM

ER

Y S

T

SW

HA

RR

ISO

N S

T

SW

HA

LL S

T

SW

CO

LLE

GE

ST

SW

JA

CK

SO

N S

T

SW BROADWAY

SW 6TH AVE

SW 5TH AVE

SW 4TH AVE

SW 3RD AVE

SW BROADWAY

SW 6TH AVE

SW 5TH AVE

SW 4TH AVE

SW 3RD AVE

SW 6TH AVE

SW 5TH AVE

SEGMENT 1DOWNTOWN • NW Irving & NW 5th to SE 8th AveLEGEND

0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

N

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c 4d

1c

1b

1a

OPEN HOUSE November 2017

Page 3: DOWNTOWN N N Ave - TriMet · SE 11th/12th Ave SE Cesar Chavez Blvd SE 82nd Ave I-205 SE 122nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy N µ ^ }v Proposed Design Elements Business

TILI

KUM

CR

OSS

ING

SOUT

H W

ATER

FRON

T /

SW M

OODY

STA

TION

HARBOR VIADUCTSW LINCOLN ST

SW N

AITO

PKW

Y

SW 1

ST A

VE

SW 4TH

AVE

SW HARRISON ST

SW HALL ST

SW COLLEGE ST

SW JACKSON ST

SW 6TH

AVE

SW 5TH

AVE

SW MOODY AVE

SEGMENT 1DOWNTOWN • NW Irving & NW 5th to SE 8th AveLEGEND

0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

N

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2a1d 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c 4d1b

1c

1a

OPEN HOUSE November 2017

Page 4: DOWNTOWN N N Ave - TriMet · SE 11th/12th Ave SE Cesar Chavez Blvd SE 82nd Ave I-205 SE 122nd Ave SE 148th Ave SE 182nd Ave NW Eastman Pkwy N µ ^ }v Proposed Design Elements Business

SE

8TH

AV

E

SE

7TH

AV

E

SE SHERMAN ST

SE GRANT ST

SE CARUTHERS ST

SE DIVISION PL

SE

8TH

AV

E

SE

7TH

AV

E

SE

6TH

AV

E

SE

4H

AV

E

SE WATER ST

TILIKUM CROSSING

TILIKUM CROSSING

OMSI STATION

SE

14T

H A

VE

SE

13T

H A

VE

SE

12T

H A

VE

SE

11T

H A

VE

SE

10T

H A

VE

SE DIVISION ST

SE

9TH

AV

ES

E 9

TH A

VE

SEGMENT 1DOWNTOWN • NW Irving & NW 5th to SE 8th AveLEGEND

N0 50’ 100’ 200’

I-205SE Cesar Chavez Blvd SE 122nd AveSE 82nd Ave SE 148th Ave SE 182nd Ave NW Eastman PkwySE 11th/12th Ave

Integrated 2 Pass-through Station Type2

Bus Station

Proposed Design Elements

Business Access Transit Lane (BAT)Protected Bicycle FacilitySidewalk/Island

Median Access Control

Signal Improvement

New Pedestrian Crossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Downtown Stop

Driveway ClosureDowntown Bus Route

Right-of-Way Acquisition

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Integrated 1 By-passIntegrated 2 Pass-throughIntegrated 3 Rear Access

Bus Station Types

1

2

3

Island 1 IntersectionIsland 2 Mid-block

4

5Island 3 Rear Access6

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

New Pedestrian Crossing Signal

Outer Division Multi-Modal Safety Project Improvements LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

Median Access Control

Bioswale

Tree Removed

Property Line

Temporary Construction Easement

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

LEGEND of improvements during DTP

Proposed Bus StationProposed Business Access and Transit (BAT) LaneProposed Protected Bicycle FacilityProposed Sidewalk / IslandProposed Median Access Control

ProposedSignalImprovements

ProposedPedestrianCrossing Signal

Proposed Use of Existing Stop onthe Portland Transit Mall

Proposed Bus Route in DowntownPortland and Downtown Gresham

Proposed BioswaleRight-of-Way AcquisitionTemporary Construction Easement

Tree Removed

Driveway Removed

LEGEND of improvements during ODMMSP

Proposed Median Access Control

Property Line

ProposedPedestrianCrossing Signal

2

2

2a 2b 2c 2d 2e 3a 3b 3c 3d 3e 3f 3g 4a 4b 4c 4d1b 1d1c

1a

OPEN HOUSE November 2017