GENERAL NOTES STANDARD SPECIFICATION ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND AIRPORT REVISED 2004 SPECIAL PROVISION AND SUPLEMENTAL SPECIFICATION PERTAINING TO THIS PROJECT, CONDITIONS OF THE CONTRACT (INT'L) FOR WORKS OF CIVIL ENGINEERS CONSTRUCTION, 2ND EDITION, PREPARED BY, F.I.D.IC. SHALL ALSO GOVERN DIMENSIONS UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS WHICH INCLUDE STATIONING, DISTANCES BETWEEN CONTROL POINTS AND ELEVATIONS ARE MESURED METERS. ALIGNMENT AND GRADE NO ALTERATION OF CHANGE IN ALIGNMENT AND GRADE SHALL BE MADE UNLESS EXISTING FIELD CONDITION SO WARRANT ONLY UPON WRITTEN ORDERED BY THE ENGINEERS AND APPROVED BY THE PROPER AUTHORITY CONCERN. CONSTRUCTION STAKES B. THE CHECKING OF CONSTRUCTION STAKES BY THE ENGINEER SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR THE CORRECTNESS THEREOF AND THE CONTRACTOR SHALL CAREFULLY PROTECTED AND PRESERVED ALL BENCH MARK, PEGS AND OTHER THING USED IN SETTING OUT THE WORK. C. IN THE CASE OF "CHARGES" OR CHANGE IN CONDITION "WHICH INVOLVES ANY CHANGES IN STAKE OUT, THE CONTRACTOR SHALL COOPERATE WITH THE ENGINEER AND FACILITATE THE PROMPT RE-ESTABLISHMENT OF THE FIELD CONTRACTOR FOR THE ALTENATIVE OF ADJUSTED WORK. A. THE CONTRACTOR WILL BE RESPONSIBLE FOR TRUE AND PROPER SETTING-OUT OF THE WORK OR IMPROVEMENT AND FOR CORRECTNESS OF POSITION, LEVEL, SLOPE AND CONTINUOUS PROFILE GRADE IN ROAD WORK. HE WILL SET CONSTRUCTION STAKES, ESTABLISHING LINES, SLOPE AND CONTINUOUS PROFILE WORK AND OTHER LINE AND BENCH MARK FOR BRIDGE WORK, GRADE IN ROAD PROTECTIVE AND NECESSARY STRUCTURES AND APPURTENANCES CULVERT WORK, AS ARE DEEMED NECESSARY FROM THE REFERENCE DATE TO BE FURNISHED BY THE ENGINEER IN WRITING SUMMARY OF QUANTITIES REPUBLIC OF THE PHILIPPINES NATIONAL CAPITAL REGION FIRST METRO MANILA ENGINEERING DISTRICT WEST BANK ROAD, MANGGAHAN FLOODWAY ROSARIO, PASIG CITY R E P U B L I C O F T H E P H I L I P P I N E S D E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S N A T I O N A L C A P I T A L R E G I O N UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY PINAGBUHATAN, PASIG CITY V I C I N I T Y M A P SHEET CONTENT: SHEET NO.: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: PREPARED BY: PROJECT/LOCATION: UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY PINAGBUHATAN, PASIG CITY AS INDICATED 1 EULOGIO V. YDIO OIC/ASST. DISTRICT ENGINEER ROBERTO S. NICOLAS DISTRICT ENGINEER LUISITO C. PONCIANO OIC-CHIEF PLANNING & DESIGN SECTION ENGINEER III WALTER N. MICOLETA ENGINEERING ASSISTANT ANTONIO J. SARDEA ENGINEER II NAME OF PROJECT/LOCATION: C:\Users\nilda\Desktop\charles updated cadd files\2013\VICINITY MAPS\PINAGBUHATAN PASIG CITY.jpg SITE 6

DPWH General Notes for ROADS

Embed Size (px)

Citation preview

Page 1: DPWH General Notes for ROADS

GENERAL NOTES

STANDARD SPECIFICATION

ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONFOR HIGHWAYS, BRIDGES AND AIRPORT REVISED 2004 SPECIALPROVISION AND SUPLEMENTAL SPECIFICATION PERTAINING TOTHIS PROJECT, CONDITIONS OF THE CONTRACT (INT'L) FOR WORKS OFCIVIL ENGINEERS CONSTRUCTION, 2ND EDITION, PREPARED BY, F.I.D.IC.SHALL ALSO GOVERN

DIMENSIONS

UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS WHICH INCLUDESTATIONING, DISTANCES BETWEEN CONTROL POINTS AND ELEVATIONSARE MESURED METERS.

ALIGNMENT AND GRADE

NO ALTERATION OF CHANGE IN ALIGNMENT AND GRADE SHALL BEMADE UNLESS EXISTING FIELD CONDITION SO WARRANT ONLYUPON WRITTEN ORDERED BY THE ENGINEERS AND APPROVED BY THEPROPER AUTHORITY CONCERN.

CONSTRUCTION STAKES

B. THE CHECKING OF CONSTRUCTION STAKES BY THE ENGINEER SHALL NOT INANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR THECORRECTNESS THEREOF AND THE CONTRACTOR SHALL CAREFULLY PROTECTEDAND PRESERVED ALL BENCH MARK, PEGS AND OTHER THING USED INSETTING OUT THE WORK.

C. IN THE CASE OF "CHARGES" OR CHANGE IN CONDITION "WHICH INVOLVESANY CHANGES IN STAKE OUT, THE CONTRACTOR SHALL COOPERATE WITH THEENGINEER AND FACILITATE THE PROMPT RE-ESTABLISHMENT OF THE FIELDCONTRACTOR FOR THE ALTENATIVE OF ADJUSTED WORK.

A. THE CONTRACTOR WILL BE RESPONSIBLE FOR TRUE AND PROPERSETTING-OUT OF THE WORK OR IMPROVEMENT AND FORCORRECTNESS OF POSITION, LEVEL, SLOPE AND CONTINUOUS PROFILEGRADE IN ROAD WORK. HE WILL SET CONSTRUCTION STAKES, ESTABLISHINGLINES, SLOPE AND CONTINUOUS PROFILE WORK AND OTHER LINE AND BENCHMARK FOR BRIDGE WORK, GRADE IN ROAD PROTECTIVE AND NECESSARYSTRUCTURES AND APPURTENANCES CULVERT WORK, AS ARE DEEMED NECESSARYFROM THE REFERENCE DATE TO BE FURNISHED BY THE ENGINEER IN WRITING

S U M M A R Y O F Q U A N T I T I E S

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

R E P U B L I C O F T H E P H I L I P P I N E SD E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S

N A T I O N A L C A P I T A L R E G I O N

UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM ATBARANGAY PINAGBUHATAN, PASIG CITY

V I C I N I T Y M A P

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

1EULOGIO V. YDIO

OIC/ASST. DISTRICT ENGINEERROBERTO S. NICOLAS

DISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

ANTONIO J. SARDEAENGINEER II

NAME OF PROJECT/LOCATION:

C:\Users\nilda\Desktop\charles updated cadd files\2013\VICINITY MAPS\PINAGBUHATAN PASIG CITY.jpg

SITE

6

Page 2: DPWH General Notes for ROADS

R E P U B L I C O F T H E P H I L I P P I N E SD E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S

N A T I O N A L C A P I T A L R E G I O N

STATIONING

EXISTING GRADE ELEVATION

DESIGN INVERT ELEVATION

20.00

19.00

18.00

17.00

0+00

020

.01

16.00

LEGEND:

-

P R O F I L E :

SCALE:HOR:VERT:

1:10001:50

P L A N :

FINISH GRADE ELEVATION 19.5

2

EL

EV

AT

IO

N

0+02

019

.93

19.4

1

0+04

019

.64

19.3

0

0+06

019

.08

19.0

3

0+08

017

.75

18.7

6

0+10

018

.42

18.4

9

0+12

017

.98

18.4

416

.98

0+14

018

.10

18.3

916

.99

0+16

018

.24

18.3

517

.04

0+18

018

.26

18.3

017

.08

SCALE:HOR:VERT:

1:10001:50

0+20

018

.29

18.2

917

.13

S1 = 0.55%S2 = 0.27%

S3 = 0.23%

15.00

EXISTING GRADE ELEVATION

EXISTING GRADE ELEVATION

FINISH GRADE ELEVATION

FINISH GRADE ELEVATION

N A P I N D A N R I V E R

G. D

EL

PIL

AR

LAP

U -

LAP

U

GA

BR

IELA

SIL

AN

G

MA

LVA

R

EXISTING BOX CULVER

VIR

GIN

IA

ELE

NIO

S

GE

OR

GIA

TAN

DA

NG

SO

RA

C-6

TA

GU

IG

TAYT

AY

BEG. OF PROJECT(DRAINAGE)STA. 0+120

END OF PROJECT(DRAINAGE/CONCRETING)

STA. 0+200

PROPOSED CHB WALL LINED CANAL

- CONSTRUCTION OF RCM FOR 24"Ø RCCP

- INSTALLATION OF 610mmØ RCCP (24"ØRCCP)

- FLOW OF WATER

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

2

BEG. OF PROJECT(CONCRETING)

STA. 0+000

CONCRETING WORKS

- CONCRETING WORKS

EULOGIO V. YDIOOIC/ASST. DISTRICT ENGINEER

ROBERTO S. NICOLASDISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

ANTONIO J. SARDEAENGINEER II

NAME OF PROJECT/LOCATION: UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM ATBARANGAY PINAGBUHATAN, PASIG CITY

6

Page 3: DPWH General Notes for ROADS

R E P U B L I C O F T H E P H I L I P P I N E SD E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S

N A T I O N A L C A P I T A L R E G I O N

STATIONING

EXISTING ELEVATION

TOP OF RIPRAP

19.00

18.00

17.00

0+00

0

16.00

LEGEND:

-

P R O F I L E :

SCALE:HOR:VERT:

1:10001:50

P L A N :

DESIGN ELEVATION

EL

EV

AT

IO

N

0+02

0

0+04

0

0+06

0

0+08

0

0+10

0

0+12

0

SCALE:HOR:VERT:

1:10001:50

15.00

N A P I N D A N R I V E R

G. D

EL

PIL

AR

LAP

U -

LAP

U

GA

BR

IELA

SIL

AN

G

MA

LVA

R

EXISTING SINGLE BARREL RCBC

VIR

GIN

IA

ELE

NIO

S

GE

OR

GIA

TAN

DA

NG

SO

RA

C-6

TA

GU

IG

TAYT

AY

BEG. OF PROJECT(RIPRAPPING)

STA. 0+000

END OF PROJECT(RIPRAPPING)

STA. 0+150

CONSTRUCTION OF GROUTED RIPRAP

- FLOW OF WATER

16.4

9

16.4

6

16.4

3

16.4

1

16.3

8

16.3

5

16.3

2

19.4

9

19.4

6

19.4

3

19.4

1

19.3

8

19.3

5

19.3

2

14.00

17.5

0

17.4

2

17.6

3

17.5

8

17.4

0

17.4

0

17.5

2

0+14

017

.67

16.2

7

EXISTING ELEVATION EXISTING ELEVATION EXISTING ELEVATION

DESIGN INVERT ELEVATION DESIGN INVERT ELEVATION DESIGN INVERT ELEVATION

S2 = 0.160%

- DESILTING WORKS

19.2

7

TOP OF RIPRAP TOP OF RIPRAP

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

3

EXISTING SINGLE BARREL RCBC

0+15

017

.75

16.2

519

.25

EULOGIO V. YDIOOIC/ASST. DISTRICT ENGINEER

ROBERTO S. NICOLASDISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

ANTONIO J. SARDEAENGINEER II

NAME OF PROJECT/LOCATION: UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM ATBARANGAY PINAGBUHATAN, PASIG CITY

6

Page 4: DPWH General Notes for ROADS

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

4

0 + 000

EXISTING GRADE ELEVATION = 20.01

CL1234 1 2 3 4

FINISH GRADE ELEVATION = 19.52

56 5 6

0 + 020

= 19.93

CL1234 1 2 3 4

= 19.41

56 5 6

0 + 040

= 19.64

CL1234 1 2 3 4

= 19.30

56 5 6

0 + 060

= 19.08

CL1234 1 2 3 4

= 19.03

56 5 6

0 + 080

= 17.75

CL1234 1 2 3 4

= 18.76

56 5 6

0 + 100

= 18.42

CL1234 1 2 3 4

= 18.49

56 5 6

0 + 120

CL1234 1 2 3 456 5 6

0 + 140

CL1234 1 2 3 456 5 6

0 + 160

CL1234 1 2 3 456 5 6

0 + 180

CL1234 1 2 3 456 5 6

0 + 200

CL1234 1 2 3 456 5 6

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 17.98= 18.44

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 16.98DESIGN INVERT ELEVATION

= 18.10= 18.39

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 16.99DESIGN INVERT ELEVATION

= 18.26= 18.30

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 17.08DESIGN INVERT ELEVATION

= 18.24= 18.35

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 17.04DESIGN INVERT ELEVATION

= 18.29= 18.29

EXISTING GRADE ELEVATIONFINISH GRADE ELEVATION

= 17.13DESIGN INVERT ELEVATION

EXISTING RCBC

EXISTING RCBC

EXISTING RCBC

EXISTING RCBC

EXISTING RCBC

16.00

17.00

18.00

19.00

20.00

21.00

16.00

17.00

18.00

19.00

20.00

21.00

16.00

17.00

18.00

19.00

20.00

21.00

16.00

17.00

18.00

19.00

20.00

21.00

17.00

18.00

19.00

20.00

21.00

16.00

15.00

17.00

18.00

19.00

20.00

16.00

15.00

EULOGIO V. YDIOOIC/ASST. DISTRICT ENGINEER

ROBERTO S. NICOLASDISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

ANTONIO J. SARDEAENGINEER II

14.00

17.00

18.00

19.00

20.00

16.00

15.00

14.00

17.00

18.00

19.00

20.00

16.00

15.00

17.00

18.00

19.00

20.00

16.00

15.00

17.00

18.00

19.00

20.00

16.00

15.00

6

Page 5: DPWH General Notes for ROADS

0 + 000

EXISTING ELEVATION = 17.50

CL1234 1 2 3 4

DESIGN INVERT ELEVATION = 16.49

Acut = 3.99

0 + 020

EXISTING ELEVATION = 17.42DESIGN INVERT ELEVATION = 16.46

Acut = 3.71

0 + 040

EXISTING ELEVATION = 17.63DESIGN INVERT ELEVATION = 16.43

Acut = 4.44

0 + 060

EXISTING ELEVATION = 17.58DESIGN INVERT ELEVATION = 16.41

Acut = 4.29

0 + 080

EXISTING ELEVATION = 17.40DESIGN INVERT ELEVATION = 16.38

Acut = 3.55

0 + 100

EXISTING ELEVATION = 17.40DESIGN INVERT ELEVATION = 16.35

Acut = 3.65

0 + 120

EXISTING ELEVATION = 17.52DESIGN INVERT ELEVATION = 16.32

Acut = 4.44

0 + 140

EXISTING ELEVATION = 17.67DESIGN INVERT ELEVATION = 16.27

Acut = 6.05

CL1234 1 2 3 4

CL1234 1 2 3 4

CL1234 1 2 3 4

CL1234 1 2 3 4

CL1234 1 2 3 4

CL1234 1 2 3 4

CL1234 1 2 3 4

0.50 5.00m 0.50 ±3.00m

PCCP (0.23m thk, 7 - DAYS)

(0.15m thk) AGGREGATE SUB BASECOURSE

EXISTING GROUTED RIPRAP

AREA TO BE DESILTED

PCCP (0.23m thk, 7 - DAYS)

(0.15m thk) AGGREGATE SUB BASECOURSE

TYPICAL SECTION

PROPOSED GROUTED RIPRAP

0.10m thk LEAN CONCRETE

ITEM 505: GROUTED RIPRAP

PROVIDE WEEP HOLES @ EVERY2.00m O.C. STAGGERED

NAPINDAN RIVER

0.70 3.30m

4.00m

EXISTING GROUTED RIPRAP

PCCP (0.15m thk, 7 - DAYS)

AGGREGATE SUB BASE COURSE

RESIDENTIALHOUSES

PROPOSED CHB WALL LINED CANAL

A

TYPICAL ROADWAY SECTIONG. DEL PILARLAPU - LAPU

GRABIELA SILANGMALVAR

TANDANG SORAVIRGINIAELENIOSGEORGIA

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

5

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

16.00

17.00

18.00

15.00

RESIDENTIALHOUSES

0 + 150

EXISTING ELEVATION = 17.75DESIGN INVERT ELEVATION = 16.25

Acut = 6.59

CL1234 1 2 3 4

16.00

17.00

18.00

15.00

19.00

19.00

19.00

19.00

19.00

19.00

19.00

19.00

19.00

EULOGIO V. YDIOOIC/ASST. DISTRICT ENGINEER

ROBERTO S. NICOLASDISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

ANTONIO J. SARDEAENGINEER II

6

Page 6: DPWH General Notes for ROADS

0.25 0.20 610mmØ RCCP 0.20 0.25

0.25

0.30

0.20

0.50

610mmØ RCCP

CONC. COVER

LIFTING HOOK

2 12 x 2 12 ANGLE BAR

12MMØ@0.25M O.C.

12mmØ @ 0.20m O.C.

24"Ø RCCP

1.50m

1.85

m

0.50 5.00m 1.50

7.00m

PCCP (0.23m thk, 7 - DAYS)

(0.15m thk) AGGREGATE SUB BASECOURSE

EXISTING GROUTED RIPRAP

B

TYPICAL ROADWAY SECTIONSTA 0 + 120 - STA 0 + 200

PROPOSED RCM w/610mmØ RCCP

NAPINDAN RIVER

0.50 5.00m 0.50

ITEM 505: GROUTED RIPRAP

PROVIDE WEEP HOLES @ EVERY2.00m O.C. STAGGERED

NAPINDAN RIVER

TYPICAL ROADWAY SECTIONSTA 0 + 010 - STA 0 +100

PCCP (0.23m thk, 7 - DAYS)

(0.15m thk) AGGREGATE SUB BASECOURSE

EXISTING GROUTED RIPRAP

0.10m thk LEAN CONCRETE

D E T A I L O F R C M ( S E C T I O N B )

0.15 0.40 0.15

0.70m

0.15

±0.60m

0.10

5 -12mmØ (LONG) w/ 12mmØHORIZONTAL BARS

6" CHB PROVIDED w/ 12mmØ HORIZONTALBARS @ EVERY 2 LAYERS

3 - 12mmØ (LONG) w/ 12mmØU - BAR @ 0.60m O.C.

SCALE: NTS

DETAIL OF CHB WALL L INED CANAL (SECTION A )

SCALE: NTS

AREA TO BE DESILTED

PCCP (0.23m thk, 7 - DAYS)

(0.15m thk) AGGREGATE SUB BASECOURSE

ITEM 505: GROUTED RIPRAP

PROVIDE WEEP HOLES @ EVERY2.00m O.C. STAGGERED

EXISTING GROUTED RIPRAP

0.50

0.50

3.00

m0.

50

1.00 0.50

1.50m

4.00

m

±3.00m 0.50

TYPICAL SECTIONL = 135.00 L.M.

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

EULOGIO V. YDIOOIC/ASST. DISTRICT ENGINEER

ROBERTO S. NICOLASDISTRICT ENGINEER

LUISITO C. PONCIANOOIC-CHIEF PLANNING & DESIGN SECTION

ENGINEER III

WALTER N. MICOLETAENGINEERING ASSISTANT

SHEET CONTENT: SHEET NO.:CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:PREPARED BY:PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OFDRAINAGE SYSTEM AT BARANGAY

PINAGBUHATAN, PASIG CITYAS INDICATED

6

EXISTING SINGLE BARREL RCBC

ANTONIO J. SARDEAENGINEER II

R E P U B L I C O F T H E P H I L I P P I N E SD E P A R T M E N T O F P U B L I C W O R K S A N D H I G H W A Y S

N A T I O N A L C A P I T A L R E G I O N

NAME OF PROJECT/LOCATION: UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM ATBARANGAY PINAGBUHATAN, PASIG CITY

6

Page 7: DPWH General Notes for ROADS

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

FIRST METRO MANILA ENGINEERING DISTRICT

WEST BANK ROAD, MANGGAHAN FLOODWAY

ROSARIO, PASIG CITY

NAME OF PROJECT/LOCATION:

UPGRADING OF ROADS/REHABILITATION OF DRAINAGE SYSTEM ATBARANGAY PINAGBUHATAN, PASIG CITY