    Executive Presentation

    DRAFT August 2009

    Proposed 2010-2014 MTA Capi t a l Program

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    2/18

    1

    Vision Embodied in Twenty Year Needs

    Rebuild the system: assess and respond to needs ofthousands of infrastructure assets

    Expand the System: deliver strategic enhancements to Eliminate limitations in the system which produce

    overcrowding and long travel times Provide transit access:

    unconstrained by institutional barriers with a minimum number of transfers which uses one fare card region-wide and is supported by real time information

    Genesis of Proposed Draft 2010-2014 Capital Program

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    3/18

    2

    Proposed Draft 2010-2014 Capital Program:

    Assess and Respond to Needs of Thousands of Infrastructure Assets

    Infrastructure of the MTA Network

    Rolling Stock: Nearly 9,000 subway and commuter rail cars and 6,000 buses

    Stations: 700 NYC Transit and Commuter Railroad station Track: 1,960 milesenough to reach from New York to Santa Fe,

    NM Mainline Switches: 3,259supporting the complex network of rail service branches

    and express and local transit service Signal Blocks: 14,850controlling over 9,000 trains a day with nearly 5

    million passengers Fiber Optic Cable: Over 975 milesenough to reach from New York to St.

    Louis, MO Power Substations: 524using more than enough power annually to light the city of

    Buffalo for a year Third Rail: 1,271 milesenough to reach from New York to Lincoln, NE

    Pump Rooms: 301pumping 17 million gallons of water each day Vent Plants: 197clearing air in tunnels during emergencies B&T Structures: 368,940 tons of steel and 3.9 million cubic yards of concrete B&T Bridge Cables: 49,368 feet, containing 181,900 miles of wireenough to circle the

    Earth over 3times

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    4/18

    3

    Strategic Enhancements Delivered: 2010-2029

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    5/18

    4

    Strategic Enhancements Delivered: 2010-2029

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    6/18

    5

    Proposed Draft 2010-2014 Capital Program

    Focus on Two Priorities

    Rebuild the System Preserve Vital Fundamentals Repair and replace with smart investments

    Expand the System Respond to Historic Highs in Ridership Support Anticipated Regional Growth in

    Global Economy

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    7/18

    6

    Proposed Draft 2010-2014 Capital Program

    325MTA Bus

    $650MTA Wide Security/Safety Program

    $400Interagency: Police/Planning/Business Service Center

    $25,572Total 2010-2014 CPRB Program

    5,739Network Expansion Projects

    $18,783Core 2010-2014 Subtotal

    1,839Metro-North Railroad2,758Long Island Rail Road

    $13,861New York City Transit

    $ 2,508MTA Bridges and Tunnels Core Capital Program(not subject to CPRB Approval)

    Core Program Investments($ in Millions)

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    8/18

    7

    Proposed Draft 2010-2014 Capital Program

    $18,168Total 2010-2014 Funds Currently Projected

    600Asset Sales/Pay-As-You-Go Capital/Other Internal Sources

    $9,912Funding Gap

    225Federal Security

    160MTA Bus Federal and City Match

    2,508Bridges and Tunnels Dedicated Funds

    6,000MTA Bonds

    500City Capital Funds

    8,175Federal FormulaFunding Currently Projected

    $28,080Total 2010-2014 Proposed Program Costs

    Funding($ in Millions)

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    9/18

    8

    Proposed Draft 2010-2014 Capital Program

    *Includes MTA Bus

    Station Rehabilitation / Renewal / Component Repair/ADA

    Implementation of Smart Card

    Ongoing Track, Structures and Vent Plant Replacements

    NYC Transit* - Smart Investments in State of Good Repair andNormal Replacement

    New Jamaica Depot and other Maintenance Facility Rehabilitation

    SGR signal upgrades plus completion of CBTC Flushing for fasterQueens service

    Nearly 2,800 buses -- 273 for growth

    Includes 118 buses for Bus Rapid Transit

    Over 500 subway / SIR cars -- including 123 for service expansion in

    Queens and Manhattan

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    10/18

    9

    Proposed Draft 2010-2014 Capital Program

    Catch up on structural repair: final phase of Atlantic Ave Viaduct, six

    bridge replacements/renewals, critical repairs and bridge paintingsystemwide, and continued East River Tunnel Fire & Life Safety efforts

    Shop reconfiguration and Life Cycle Maintenance infrastructureinvestments, and Diesel Locomotive Shop upgrades

    Other operations and capacity improvements: first phase of double trackmain line from Ronkonkoma to Central Islip, fare collection / smart cardimprovements

    Signal Improvements: next phase of Centralized Train Control in Jamaica,Positive Train Control readiness investments

    Normal replacement of substations in Queens and Nassau County andone new substation in Queens County to support fleet growth needs

    Long Island Railroad Getting Ready for ESA and Growth

    Over a third of the program dedicated to support ESA service growth: newrail cars, two new yards, additional track capacity in Great Neck and

    Massapequa, reconfiguring Jamaica

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    11/18

    10

    Proposed Draft 2010-2014 Capital Program

    Increased station investments, including New Haven Line stations fromMount Vernon East up to Harrison, and Fare Collection / Smart Cardinvestments.

    Significant Grand Central Terminal investments, including the Trainshedstructure and Water Conveyance utility improvements

    Comprehensive station communications and signal infrastructureinvestments real time information including train tracking, and PositiveTrain Control readiness investments

    Almost ninety percent of program continues state-of-good-repair and normalreplacement focus, including ongoing Track and Structures renewal work

    Next phase of Harmon Shop and Yard Replacement

    Increased power upgrade investments, including Bridge-23 substationconstruction

    Continued Strategic Intermodal Facilities and Transit-Oriented Development

    Rail Cars to replace NHL M-2s with M-8 cars (completes 300-car joint

    purchase with CDOT begun in 05-09) and up to 72 replacement/growth carsfor East of Hudson service demands

    Metro North Railroad Continuing Priority Initiatives

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    12/18

    11

    Support for Business Service Center implementation

    Planning Studies, including completion of Tappan Zee Bridge Rail Study,jointly with NYS Department of Transportation and NYS Thruway Authorityand Regional Bus Analysis

    MTA Police Investments

    District Offices in Staten Island and Nassau County

    Police radio investment

    MTA Interagency Investments

    Capital Security and Safety Program

    Continuing Capital Security Investments

    Capital Safety to comply with new Federal mandate for Positive Train Control

    Proposed Draft 2010-2014 Capital Program

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    13/18

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    14/18

    13

    Current Network Expansion Projects

    LIRR East Side AccessLIRR East Side Access

    Second Avenue SubwaySecond Avenue Subway

    Phase OnePhase One

    7 LineLine

    West Side ExtensionWest Side Extension

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    15/18

    14

    $13,168$5,739$7,429Total

    29120091Miscellaneous

    6976970ESA Rolling Stock and Liability Reserve

    4014010Regional Investments

    4,4511,4872,964Second Avenue Subway

    7,328$2,954$4,347East Side Access

    Project

    Total

    2010-2014

    Proposed

    Current

    FundingExisting capacity expansions

    in millions

    Proposed Draft 2010-2014 Capital Program

    Complete ESA and SAS($ in Millions)

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    16/18

    15

    Second Avenue Subway UnderwayProposed Draft 2010-2014 Capital Program:

    New Network Expansion Initiatives

    Queens BoulevardCorridor Evaluation

    Staten Island Corridors -North Shore and West Shore Evaluations

    Tappan-Zee CorridorEvaluation

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    17/18

    16

    Capital Program Management Controls

    Proposed Draft 2010-2014 Capital Program

    Conduct sufficiency reviews of scopes, budgets and schedules

    Perform risk reviews of all large complex contracts covering the areas of: requirements; design and pre-construction; project delivery; early construction with a focus on geotechnical/utility/environmental risks; mid-range construction; and start-up/substantial completion of construction.

    Monitor management conformance with mitigation strategies and processes andevaluate the timeliness and effectiveness of implementation.

    Implement web-based Capital Program dashboard to allow easy access by thepublic to the proposed projects with status of budgets, scopes and schedules

    Implement a mentoring program to increase the participation of small business

    enterprises

  • 8/14/2019 Draft Proposed 2010-2014 MTA Capital Program Executive Pr

    18/18

    17

    Conclusion

    The Proposed Draft 2010-2014 Capital Program fulfills

    MTAs mission to protect and enhance the regionstransportation legacy by continuing its ongoingcommitment to:

    Rebuild its infrastructure, and

    Expand the system to meet the future growth needs of theregion.