DRAUGEN SUBSEA BOOSTER PUMP Challenges, Technology and Way of the Future Richard Tong Technology Coordinator/ Senior Subsea Processing Engineer 1 25 March 2014 Use this area for cover image (height 6.5cm, width 8cm)

DRAUGEN SUBSEA BOOSTER PUMP

  • Upload
    doantu

  • View
    250

  • Download
    2

Embed Size (px)

Citation preview

Page 1: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN SUBSEA BOOSTER PUMP

Challenges, Technology and Way of the Future

Richard Tong Technology Coordinator/ Senior Subsea Processing Engineer

1 25 March 2014

Use this area for cover image (height 6.5cm, width 8cm)

Page 2: DRAUGEN SUBSEA BOOSTER PUMP

AGENDA

•1.0 Draugen

•2.0 Draugen Subsea Booster Pump

•3.0 Project Challenges

•4.0 Shell & Subsea Boosting

•5.0 Future

25 March 2014 2

Courtesy of: Heine Schjølberg

Page 3: DRAUGEN SUBSEA BOOSTER PUMP

History and Introduction to Draugen

DRAUGEN 1.0

25 March 2014 3

Page 4: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN

25 March 2014 4

Haltenbanken area, 140km North of Kristiansund

Discovered in 1984 and production start 19.10.1993

Partners: A/S Norske Shell (Operator, 44.56%),

Petoro AS (47.88%), Chevron Norge AS (7.56%)

Water Depth ~ 250-280 m

Peak Production 225 000 bbl/day

Continuous project activity and investments underway to make Draugen a high integrity mature producer

Robust and sustainable design; fit-for-purpose for potential future 3rd party Tie- ins

Page 5: DRAUGEN SUBSEA BOOSTER PUMP

Scope & Technology, 2 Booster Pump Installations (1993, current)

DRAUGEN SUBSEA BOOSTER PUMP 2.0

25 March 2014 5

Page 6: DRAUGEN SUBSEA BOOSTER PUMP

HELICO-AXIAL PUMPS

The first subsea helico-axial pump installation was at the North Sea Draugen field by Norske Shell in 1993.

More than twenty helico-axial pumps are in operation worldwide, with more than 1,200,000 hours of run time.

6 25 March 2014

Page 7: DRAUGEN SUBSEA BOOSTER PUMP

WORLD’S FIRST MULTIPHASE SUBSEA PUMP (1993)

Contract Award: 1990 Sales: FMC Kongsberg, Norway Fabrication Pump: Framo, Norway Pump integration: FMC Kongsberg, Norway Host Type: Platform Contract Type: EPC Water Depth: 280 m (920 ft) The Draugen Subsea Well Facilities Contract was the largest subsea EPC contract in Norway at the time. All subsea installations were designed for diverless installation, operation and maintenance. The seabed pumps (i.e. system integration of FRAMO pumps) were the world’s first commercial multi-phase pump installation. The pump was installed in 1993. It ran sucessfully for 12 months (1000 operating hours) and was decomissioned and abandoned due to change in water injection strategy.

7 25 March 2014

Page 8: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN INFILL PROJECT

25 March 2014 8

Booster Pump Location

Page 9: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN INFILL PROJECT PUMPING SYSTEM

25 March 2014 9

• Reduces back pressure “seen” by wells = increased oil recovery

• Accelerated end-of-field life production

• Avoid continuous gas lift, reduces hydrate formation risk

• Offers metering of new wells coming on stream & expansion flexibility

• Tie-back distance (To Draugen): ~4 km (12” flexible)

• Ambient Temperature (seawater): 6 – 8 °C

• Design temperature (flowlines): 75 °C

• Design pressure: 220 bar

• Number of Pumps: 2

• Motor Rating: 2300 kW

• Maximum dP: 50 bar

Page 10: DRAUGEN SUBSEA BOOSTER PUMP

PUMPING SYSTEM SCOPE OF SUPPLY

25 March 2014 10

Process Control Module Topside Umbilical Termination Unit

Subsea Umbilical Termination Assembly

Page 11: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN SUBSEA PUMP: PROCESS CONTROL MODULE

25 March 2014 11

Page 12: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN SUBSEA PUMP: PUMP

25 March 2014 12

Page 13: DRAUGEN SUBSEA BOOSTER PUMP

DRAUGEN SUBSEA PUMP: PUMP STATION

25 March 2014 13

Page 14: DRAUGEN SUBSEA BOOSTER PUMP

PROJECT CHALLENGES 3.0

25 March 2014 14

3 Major Challenges Encountered by the Project and Industry

Page 15: DRAUGEN SUBSEA BOOSTER PUMP

CHALLENGE 1 - STANDARDS

25 March 2014 15

Description Focus

•Subsea Processing is novel. •>100 specifications (APIs, NORSOK, Draugen Platform Specifications & Shell Standards) •Topside specifications used on subsea processing equipment

•Active engagement with Technical Matter Experts •Early identification of deviations •Standards interpretation (how standards are read)

Page 16: DRAUGEN SUBSEA BOOSTER PUMP

CHALLENGE 2 - QUALITY

25 March 2014 16

Description Focus

•Limited production capacity of suppliers and subsuppliers •Rework required (value adding?)

•Inspection and Test Plans for major and medium risk components •Define expectation & definition of quality •Focus on finding the right balance in inspection

Page 17: DRAUGEN SUBSEA BOOSTER PUMP

CHALLENGE 3 - COST

25 March 2014 17

Description Focus

•Large number of specifications and standards are time consuming Stringent requirements for documentation and inspection

Focus on Integrity, Safety, Enviromnent Separate ”must have” from ”nice to have” Cost benefit analysis

Page 18: DRAUGEN SUBSEA BOOSTER PUMP

SHELL GLOBAL & SUBSEA BOOSTING 4.0

25 March 2014 18

Shell’s Groups Engagement with Subsea Boosting

Page 19: DRAUGEN SUBSEA BOOSTER PUMP

Single Phase Pump

0

50

100

150

200

250

0 10 20 30 40 50 60 70 80 90 100

GVF [%]

Diffe

rential P

ressu

re [b

ar]

Hybrid pump

300

350

400

WGC

0

725

1,450

2,175

2,900

3,625

4,350

5,075

Diffe

rential P

ressu

re [p

si]

Multi Phase Pump

Page 20: DRAUGEN SUBSEA BOOSTER PUMP

SUBSEA BOOSTING ENGAGEMENT

1992 2006 2013 2016 2020

SMUBS

FRAMO HIGH BOOST

FLOWSERVE

FRAMO HPHT 15 PSI

25 March 2014

Page 21: DRAUGEN SUBSEA BOOSTER PUMP

FUTURE 5.0

25 March 2014 21

What Does the Future Hold?

Page 22: DRAUGEN SUBSEA BOOSTER PUMP

22

OneSubsea Design Pressure Milestones

1990 2000 2010 2005 1995

0

5,000

10,000

15,000

1997, Lufeng 2003, Ceiba 2006, Columba E

2015

2013, JSM

2014

1998, Troll

Des

ign

Pre

ssur

e <

psi>

Page 23: DRAUGEN SUBSEA BOOSTER PUMP

23

OneSubsea motor shaft power mile stones

1990 2000 2010 2005 1995

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

2800

3000

1997, Lufeng

1998, Troll

2007, Tordis

2013, JSM

2010, Gullfaks WGC

2009, Pazflor

2006, Columba E

1999, Topacio

0

2015

3400

3200

3600

3800

Q4-2013

Sha

ft po

wer

<kW

>

Page 24: DRAUGEN SUBSEA BOOSTER PUMP

24

OneSubsea Water Depth Milestones

1990 2000 2010 2005 1995

1000 m

500 m

0 m

1500 m

2000 m

2500 m

3000 m

JSM

Azurite

Ceiba

Topacio

Troll Lufeng SMUBS

2015

Des

ign

dep

th <

m>

Julia

Page 25: DRAUGEN SUBSEA BOOSTER PUMP

SUBSEA BOOSTING INITIATIVES

25 March 2014 25

•Active screening of portfolio of assets (green and brownfield)

•Standardisation and replication initiative

•Cost optimisation (execution, scope)

•Technology Qualification Standardisation (API 17N)

•Subsea Boosting in Deepwater (15psi, high temp, high boost)

•Development of Subsea Processing Skillpool

•Establishment of Deepwater Centres of Excellence in Stavanger

Page 26: DRAUGEN SUBSEA BOOSTER PUMP

STAVANGER CENTRE OF EXCELLENCE EXECUTION

26 AS Norske Shell 25 March 2014

Strategic Location

• Contractors Expertise (Oslo, Stavanger, Bergen) • One Subsea Offices & Assembly

Yards (Bergen) • Shell Technology Norway (Oslo)

Project Execution

• Support Field Screening

• Technology Qualification (when required)

• Draugen Infill Execution

• Global Subsea Pumping Execution

Page 27: DRAUGEN SUBSEA BOOSTER PUMP

Q & A

25 March 2014 27

Page 28: DRAUGEN SUBSEA BOOSTER PUMP

Have a Safe Day

25 March 2014