Dre
es &
Som
mer
_110
5/24
00/w
dn/
E
Group operating result 20102010201020102010Drees & Sommer GroupAnnual Report 2010
Dre
es &
Som
mer
_110
5/24
00/w
dn/
E
Group operating result 20102010201020102010Drees & Sommer GroupAnnual Report 2010
Profit & loss statement
1. Sales
2. Change in work in progress
3. Other operating income
4. Expenditure for purchased services
5. Personnel expenses
a) Wages and salaries
b) Social security costs and pension fund
6. Depreciation
7. Other operating expenses
8. Income from shareholdings
9. Income from other securities and from long-term loans
10. Interest and similar expenses
11. Operatingresult
12. Extraordinary expenditure
13. Taxes on income and earnings
14. Other taxes
15. Netincome
16. Profit owing to external shareholders (regional Managing Directors)
17. Profit brought forward
18. Changes in equity as the result of purchase or sale of own shares
19. Groupbalancesheetprofit
114,511,369
25,903,216
6,121,128
28,353,678
73,738,021
65,995,788
7,742,233
3,132,494
28,380,933
53,010
627,314
430,022
5,260,776
71,682
146,535,713
133,605,127
250,302
13,180,888
111,742
5,332,458
7,736,688
64,360
1,805,903
–2,456,142
7,150,809
(in Euros)
Sales in € million
109.7 120.4 136.9 145.6 146.5
2006 2007 2008 2009 2010
Operating result in € million
9.5 11.1 12.3 12.4 13.2
2006 2007 2008 2009 2010
Balance sheet
A.Fixedassets
I. Intangible assets
1. EDP software, licenses
2. Good will resulting from capital consolidation
II. Tangible assets
1. Other assets, operating equipment, fixtures and fittings
III. Financial assets
1. Shareholdings
2. Other securities lending
B. Currentassets
I. Inventories
1. Work in progress
./. Advances received
II. Receivables and other assets
1. Trade receivables
2. Receivables from shareholdings
3. Other assets
III. Securities
1. Other securities
IV. Checks, cash on hand, cash in banks
C. Prepaidexpenses(other)
D. Prepaidtaxes
Balancesheettotal
4,740,726
751,188
3,989,538
4,162,489
4,162,489
6,984,986
2,004,071
4,980,915
0
101,907,960
101,907,960
27,675,617
22,723,949
292,170
4,659,498
290,977
290,977
25,535,251
219,740
1,165,000
70,774,784
Assets (in Euros)
A.Equity
I. Subscribed capital
Less nominal value of own shares
II. Capital reserves
III. Revenue reserves
IV. Net income
V. Change in equity due to exchange rate difference
VI. Minority interests
B. Accruals
1. Accruals for pensions
2. Provisions for taxation
3. Other accruals
C. Liabilities
1. Payments received on account of orders
2. Trade payables
3. Liabilities to shareholdings
4. Other liabilities
D. Deferredincome(other)
Balancesheettotal
6,074,336
–373,794
10,002,332
98,104
7,150,809
–213,739
54,919
22,792,967
4,639,233
5,064,311
20,869,683
30,573,227
85,682
10,969,525
32,433
6,163,452
17,251,091
157,500
70,774,784
Liabilities (in Euros)
146.5Sales in € million
13.2Operating result in € million
32%Equity ratio
1,125Employees
32Offices
Group operating result 2010
Profit&lossstatementGroup sales grew by just under €1 million to €146.5 million (prior year €145.6 million). Expenditure
increased by €0.4 million during the year under report to €133.6 million (prior year €133.2 million).
The operating result increased by €0.8 million to €13.2 million, net income was €7.7 million.
BalancesheetThe transfer of the balance sheet profit of €7.2 million results – with subscribed capital, capital
reserves and revenue reserves – in equity of €22.8 million. The equity ratio is 32 percent.
The accruals for pensions, taxation and remuneration have increased by €4.7 million to €30.6
million. On the other hand, liabilities, such as trade payables to suppliers and subcontractors
and payments received on account of orders have fallen by €29.7 million to €17.3 million.
This results in a balance sheet total for 2010 of €70.8 million (prior year €104.0 million).
The reduction is largely attributable to the passing of the (German) Accounting Law Modernisation
Act (BilMoG).
Report of the Supervisory Board
Report of the Executive Board
40 years of Drees & Sommer
Highlights from current projects
– Infrastructure and urban development
– Optimization of established properties
– New construction projects
Offices and Managing Directors
Photo credits
Imprint
2
3
6
10
12
26
50
82
90
91
20102010
2 3
During fiscal 2010, the Supervisory
Board reviewed the management of the
Aktiengesellschaft (stock corporation)
by the Executive Board and constantly
monitored business activities through
written and oral reports of the Executive
Board.
The annual financial statement sub-
mitted by the Executive Board for fiscal
2010 has been examined following
accounting undertaken by Wirtschafts-
treuhand GmbH. No causes for objection
were found and the annual financial
statement was certified as accurate
without reservation. In keeping with
this, examination of the annual financial
statement by the Supervisory Board
raises no cause for objection.
The Supervisory Board approves the
annual financial statement submitted by
the Executive Board and it was thereby
adopted on May 20, 2011. The Supervisory
Board approves the management report.
Report of the Supervisory Board
Chairman of the Supervisory Board
Prof. Dr. Hans Sommer
2010 result and outlookIn 2010, group sales totaled €146.5
million, slightly above prior year
(€145.6 million). As a result of the
focus on profitable activities, the
operating result was increased by
€0.8 million to €13.2 million. (prior
year €12.4 million). This positive
develop-ment in 2010 is partially the
result of an improvement in the market
situation, but above all attributable
to a service range tailored to our
national and international clientele.
International business now accounts
for 30 percent of total sales, whereby
project management continues to make
up the lion’s share at nearly 80 percent.
Engineering and Real Estate Manage-
ment account for some 20 percent. The
operating result was achieved by 1,125
employees in 2010.
For business year 2011, Drees & Sommer
will again strive to achieve moderate
growth while at the same time undertak-
ing a project to further increase efficiency
Report of the Executive Board
Executive Board and Partners (from left to right)
Gabriele Walker-Rudolf
Dierk Mutschler
Peter Tzeschlock
and quality. To achieve this aim, the
Group intends to further extend its
innovation lead and to expand network-
ing of its wide-ranging competencies.
Competent employees: Drees & Sommer vocational training conceptHighly qualified employees are the
foundation of our success, for which
reason we have substantially increased
our investment in vocational training.
All operational employees are
taught specific basic knowledge by
their experienced colleagues in the
Drees & Sommer ‘Vocational Training
Academy’. We have created the
‘Professional’ program, an E-learning
platform that makes the expertise of
experienced employees available to
all employees in a clearly structured
way. And for top managers we have the
advanced ‘Excellence’ program.
More profit through increased efficiency in 2010 – and a good outlook for 2011
4 5
Decisive action to saveUrgent action required –
reactive
Lean back and relaxLittle action required –
inactive
Speedy actionTargeted action required –
strategic
Observe carfullySelective action required –
proactive
Opportunities in the energy sector Long before the major nuclear crisis in
Japan, Drees & Sommer had been
engaging in reducing energy consump-
tion and in alternative energy generation.
The catastrophe in Japan will result in
a huge increase in the urgency of this
debate in 2011. The calls to simply
switch off nuclear power plants cannot
be treated seriously as long as there
are no clear alternatives and there is
no political consensus for their imple-
mentation. The basic components are
clear in principle:
– Reduction of energy consumption
– Central electricity generation by wind
and solar plants, and possibly by
coal- and gas-fired power stations
with carbon neutralization
– Cables from wind farms and solar
arrays to consumers
– Establishment of storage capacity
for generated current
– Decentralized electricity generation
Drees & Sommer is active both in the
area of reducing the energy consumption
of buildings (Green Building, DGNB) and
of industrial plant, as well as in expand-
ing the electricity grid (page 12). Also,
research is being undertaken into the
use of excess current to produce hydrogen
and into the conversion of carbon
emissions.
Our consulting and management services
are currently being optimized to cover
the entire range of electricity generation,
distribution and storage.
Portfolio carbon management for CO2 reductionIn future, the energy efficiency of whole
portfolios will have to be assessed –
particularly in the area of residential
construction. Drees & Sommer’s port-
folio carbon management services offer
a realizable strategy for the reduction
of carbon emissions during property
refurbishment.
Optimizing established properties In the near future, established buildings
will account for some 70 percent of
construction work. For this reason we
assume that optimization of established
properties will continue to dominate the
property industry over coming years.
Drees & Sommer offers a comprehensive
consulting package for property owners
in this area:
– Precise determination of life cycle costs,
including rehabilitation measures
– Property value analysis: Establishing
the market value for various levels of
rehabilitation over 10 years
– Comparison of book value and market
value
Numerous clients already rely on
Drees & Sommer competence in the
area of technical construction and
commercial property valuation and
consulting (pages 26 to 47).
High-rise competence The Group has numerous reference
projects in the areas of high-rise
construction and revitalization, with
competence in project management
as well as in Green Building design
and general technology planning. The
focus here is on optimal interaction
between facade and building services
with the aim of achieving economical
solutions with the lowest possible
energy consumption and the assessment
of Green Building certification options
(pages 26, 34 and 46).
International competence in the pharmaceutical industry In 2010, Drees & Sommer has been
supporting the B. Braun pharmaceutical
group with its international expansion
using its expertise in pharmaceutical
industry properties. B. Braun has estab-
lished or is planning new subsidiaries
in Argentina, Brazil, Indonesia, Spain,
Switzerland, Peru and Vietnam. One
of the largest projects currently being
managed is the new F. Hoffmann-La
Roche headquarters building in Basel.
When completed, it will be the highest
building in Switzerland and will accom-
modate some 2,000 employees by the
end of 2015 (pages 62 and 74).
Health Care – a market of the future The demands on buildings in the
health-care sector continue to increase.
Off-the-shelf buildings are a thing of the
past. Today, every new medical building
and every clinic modernization is a
unique and highly complex project.
Architectural and engineering expertise
is required in addition to medical know-
ledge. In a fiercely competitive environ-
ment, the combination of function and
economy is of decisive importance to
maintain operational leeway when later
working under extreme cost pressure.
Commercial properties An increasing number of commercial
properties need to be refurbished in
order to remain competitive in the
marketplace. A current example is the
revitalization of the Gerngross depart-
ment store in Vienna (page 28). Vienna’s
largest department store is moving with
the times, presenting itself in restored
glory following extensive renovation.
Drees & Sommer successfully supported
Gerngross CityCenter throughout the
modernization project.
Increasing efficiency: Process consulting Drees & Sommer process consulting is
an interdisciplinary expertise covering
the full range of services. The experts
pursue a holistic consulting approach.
All processes within a company or a
project are exactly coordinated, so
that processes interact seamlessly to
enhance efficiency. As an example,
Drees & Sommer experts are working
on the establishment of a modern car
factory for Fiat in Kragujevac, Serbia
(page 40).
Heading north: Drees & Sommer Nordic The establishment of Drees & Sommer
Nordic in the Danish capital Copenhagen
in 2010 aims at better penetration
of Scandinavia and the Baltic states.
Drees & Sommer has already established
itself in this area with studies in connec-
tion with the Fehmarn Belt Bridge as
well as with feasibility studies and due
diligence projects. There is particularly
strong potential in the public sector.
The subsidiary also aims to acquire major
orders particularly in the clinic sector.
6 7
That the ‘garage company’ founded in
1970 would – within 40 years – become
an enterprise with over 1,000 employees
and more than 30 offices was not some-
thing the two founders Gerhard Drees
and Hans Sommer were focusing on
at the time. On September 16, 2010 the
Drees & Sommer Group celebrated its
40th anniversary with simultaneous
client events at 14 German and inter-
national offices. This once again made it
clear that the Drees & Sommer spirit is
very much alive even after four decades.
Since the company’s foundation it has
handled approx. 10,000 projects with a
construction volume of €95 billion. The
ownership structure of Drees & Sommer AG
(stock corporation) founded in 1992
comprises eight non-active and 29 active
shareholders – the so-called Partners –
who manage the company today. The
shareholders are organized as a consor-
tium, which is represented by its chair-
person in the Annual General Meeting.
Three of the 29 active Partners – Peter
Tzeschlock, Dierk Mutschler and Gabriele
Walker-Rudolf – make up the Executive
Board. Hans Sommer is Chair of the
Supervisory Board and also a Partner.
As Managing Directors, the remaining
25 Partners are responsible for the
operational sites and expert teams.
1970s: Foundation phase At the beginning of the 1970s,
Drees & Sommer was able to achieve
much more exact scheduling using
the new method of critical path analysis,
allowing economic construction proc-
esses to be planned with confidence.
This was supplemented by precise cost
and budget planning using the cost
element method, which has been set
down in DIN 276 since the 1980s.
40 yearsDrees & Sommer
Partners (from left to right)
Prof. Dr. Friedrich Hensler
Wolfgang Beck
Thomas Jaißle
Bernhard Unseld
Ralph Scheer
Jörg Ewald-Lincke
Matthias Schulle
Stefan Heselschwerdt
Rino Woyczyk
Jörg Zirlewagen
Prof. Dr. Thomas Bohn
Phillip Goltermann
Frank Reuther
Steffen Sendler
8 9
Partners (from left to right)
Marc Schömbs
Alexander Scheidler
Sascha Kilb
Markus Weigold
Hans-Peter Holler
Hanns Ludwig Fiechtner
Dr. Jürgen Laukemper
Roland Huber
Martin Lutz
Thomas Hofbauer
Prof. Dr. Michael Bauer
Even in this early phase, offices were
established in Düsseldorf (1973), Munich
and Cologne (1978) as well as project
offices in Saudi Arabia and Qatar.
1980s: Company organization The company’s lead in software-based
schedule and cost planning led to signi-
ficant growth in the 1980s. The engineers
also started to look more closely at build-
ing operation, optimizing the so-called
building utilization costs. This resulted in
the facility management consulting service.
Profitability consulting developed from
increased sensitivity to energy costs.
management for infrastructure measures.
By the end of the 1990s, Drees & Sommer
already had over 500 employees.
The new century Since the turn of the century, international
investors have increasingly replaced
‘conventional’ principals. There was a
huge increase in the use of the ROI
approach and trade with huge property
packages, triggering a boom in technical
due diligence in 2007. Public private
partner projects required the calculation
of life cycle costs over the entire life of
the building. At the same time sustain-
At the end of the 1980s, the company
had grown to 180 employees. Organiza-
tional structures were created to do
justice to continued growth and the
increasing number of offices. 1988
saw the introduction of a system –
still in use today – where the Partners
manage the individual offices as entre-
preneurs based on enterprise-wide
guidelines, naturally taking regional
practices into account. At the same time,
a bonus system was established for all
employees and the Drees & Sommer
Corporate Philosophy was developed,
laying down the company’s core values
ability became a key issue. As
one of the first in the marketplace,
Drees & Sommer developed com-
prehensive economical solutions for
sustainable building, reduction of
energy consumption, and energy
optimization of established buildings.
In this way, the company is undertaking
pioneering work in the area of Green
Building, including being a founding
member of the German Sustainable
Building Council (DGNB).
Currently the focus is on the economical
optimization of established properties,
and guidelines for client relations,
internal collaboration, and employees’
personal responsibility.
1990s: Accelerated growth During this period, Drees & Sommer
undertook user consulting, coordination
with authorities and the management
of architectural competitions for ever
more complex projects. Increasingly, the
requirements of as yet unknown users
and alternative use options had to be
anticipated and integrated into planning.
New services were created in the form
of development management and project
as increasingly principals and investors
have to turn their attention to existing
buildings and take steps to bring their
properties in line with the current state
of the art to enhance their marketability.
For the future, Drees & Sommer is
working on ‘industry-based solutions’,
that is, processes, management and
consulting services specifically tailored
to the needs of individual industries.
10 11
Infrastructure & urban development– Offshore grid connections, German North Sea
– Lake PHOENIX, Dortmund
– Freeway tunnel, Luxembourg
– State Garden Festival Hemer
Optimization of established properties– Trianon, Frankfurt
– Gerngross CityCenter, Vienna
– Stuttgart schools
– MesseTurm, Frankfurt
– Chiemgau-Arena, Ruhpolding
– Fiat factory, Serbia
– Städel Museum, Frankfurt
– Deutsche Bank Towers, Frankfurt
New construction projects– Heilbronn Education Campus
– Brandenburg City Clinic
– Rhein-Galerie Ludwigshafen
– Lidl Germany
– B. Braun, international
– Südwestrundfunk, Stuttgart
– ZVO headquarters, Ostholstein
– ratiopharm arena, Ulm
– Roche Building 1, Basel
– Mercedes-Benz factory, Hungary
12
16
20
22
26
28
32
34
36
40
42
46
50
54
56
60
62
66
68
72
74
78
Highlights from current projects
12 13
Legislators in Germany have recognized
the potential of wind power, in particular
of offshore wind farms. The German
Federal Government’s energy concept
provides for 35 percent of electricity
consumption to be covered by renewable
resources by 2020. Over the following
decades, this share is to continue to rise,
reaching 80 percent in 2050.
Wind power will play a key role in the
expansion of ‘renewables’ (see graphic
on right). But there is only very limited
space for wind farms on land and their
profitability – even in elevated areas
of the highlands or on the coast – is
relatively limited. So what better than
to go where wind and weather come
together: on the open sea.
Bringing the electricity of the future safely to the consumer Generating power off the coast is one
thing. Getting it as safely as possibly to
consumers on the mainland – and with
minimum transmission loss – is quite
another. The first challenge here is the
transmission lines themselves, which
PROJECT MANAGEMENT FOR OFFSHORE GRID CONNECTIONS
are often up to 200 kilometers long and
which, when transmitting alternating
current, are not good conductors. For
this reason, the current is converted into
direct current on a floating converter
platform. A relatively new technology
called high-voltage direct current (HVDC)
transmission then takes it from there to
a transformer station on land, where it is
converted back into three-phase current
before being fed into the grid. This is a
clear demonstration of how offshore wind
power depends on a well-functioning
infrastructure on land.
Water power, total
Gig
awat
t
Jahr
Land-based wind power Offshore wind power Bio mass, total Photovoltaics
Collection and safe transmission of offshore power
Generating wind power on the open sea places the maximum demands on people, material and management. And the same challenges apply to low-loss transmission to consumers. Since 2010, as a member of a consortium, Drees & Sommer has been supporting the planning and realization of grid connections for wind farms in the North Sea.
Sour
ce: S
RU –
Sac
hver
stän
dige
nrat
für
Um
wel
tfra
gen,
„W
ege
zur
100
% e
rneu
erba
ren
Stro
mve
rsor
gung
“,
Sond
ergu
tach
ten
Janu
ary
2011
(con
dens
ed v
ersi
on)
The potential for renewables is enormous, with offshore wind power, in particular, promising high growth rates
14 15
connection. The Drees & Sommer
expert team for infrastructure manage-
ment undertakes important tasks
such as schedule management, cost
planning & tracking, and risk manage-
ment. In addition, the experts are
responsible for contract and supplemen-
tary claim management, the so-called
Change Request process, as well as for
documentation of the projects.
In view of the great challenges involved,
proper management of risks, contracts
and supplementary claims is of great
importance. For example, special approval
requirements have to be met for laying
marine cable through the Wadden Sea
National Park, as construction is only
permitted there at certain times of the
year. Nature is a constant – but some-
times very unpredictable – companion.
The experts must take the weather risk
into account and allow adequate time
buffers when drawing up and tracking
schedules, particularly for the construction
of platforms and cable-laying at sea.
In view of the offshore wind power
project boom, the same applies to the
limited availability of machines and other
resources, such as cable-laying ships.
Experience, expertise, manpower: nothing convinces like performanceThe clients were convinced above all by
Drees & Sommer’s long-term ex-
perience with the control of major
projects and demonstrated methodo-
logical competence. The high level
of specialist qualifications of the
company’s employees was also
impressive. The fact that the entire
consortium showed exceptional team
spirit and motivation from day one
was another positive.
“The chemistry is right” – this has
been demonstrated by first positive
results. In an analysis undertaken
immediately after starting work,
Drees & Sommer was able to identify
important potential for optimizing
organization of the project.
Wind, waves and weather: Even with a calm sea and sunshine, the project demands peak performance from all involved Cable laying from a special ship
PROJECT MANAGEMENT FOR OFFSHORE GRID CONNECTIONS
ClientTenneT Offshore GmbH, Bayreuth/Lehrte
Project duration September 2010 – December 2013
Key project data Grid connection systems, each comprising:– Three-phase marine cable (connection OWP)– Offshore platform– Converters and switchgear (Offshore/onshore)– DC marine cable (HVDC)– DC terrestrial cable (HVDC)– Operations control system– Grid control system
Drees & Sommer services– Schedule planning and tracking– Cost planning and tracking – Risk management– Contract and supplementary claims management, Change request– Documentation
Value-add achieved for client – Rapid teambuilding for required capacities – Numerous highly qualified Drees & Sommer personnel for comprehensive multi-project management– Optimization of project organization and processes
Specialists support specialists: mastering challenges together TenneT TSO GmbH – together with its
Bayreuth-based sister company TenneT
Offshore GmbH – has taken on the
complex task of connecting the offshore
systems to the German extra-high
voltage grid. With some 750 employees,
it is responsible for the operation,
maintenance and further development
of the transmission network at the
voltage levels 220 kV and 380 kV. Even
in geographical terms this is, literally,
a very broad field. The network they
manage ranges from the coast in the
north to Bavaria in the south – and has
a length of over 10,700 km.
As the responsible network operator
in the North Sea area, the company is
legally required to establish and operate
grid connections offshore wind farms.
This includes wide-ranging tasks from
concept development and planning to
construction and operation of lines at
sea and their connection to the grid on
land. In the summer of 2010, TenneT
got further support on board for these
tasks.
Together with its consortium partners,
the specialists from Drees & Sommer
have been supporting the customer by
providing comprehensive project control
services since September 2010. The
consortium is focused on establishing
four grid connections: BorWin2, DolWin1,
HelWin1 and SylWin1, which are located
75 and 160 kilometers off the eastern or
northern Frisian coast – and together will
collect, convert and transmit power from
over 600 wind turbines. Together they
will generate some 11.8 million megawatt
hours per year and supply approx. three
million homes with offshore power.
Scheduling with an eye on the weather chart The consortium’s project control
personnel are directly integrated into
each project team. The joint goal of
all involved is the control of the prime
contractors commissioned and the
successful establishment of the grid
16 17
Neighbourhood development: Bringing people and nature back into town
Drees & Sommer is successfully supporting the client with the PHOENIX See (Lake PHOENIX) project in Dortmund, which involves the redevelopment of a former coal mine site. Efficient organization and preparation for one of Europe’s largest earth-moving projects is ensuring smooth progress, and an architectural fair has offered a diverse range of architectural styles.
The fact that “times, they are a-changing”
has always been evident between the
Rhine, Lippe and Ruhr rivers, as indus-
trial change has molded life in the region
for centuries. This dynamic is particularly
apparent in the south of Dortmund,
where one of Europe‘s largest urban
development projects is changing the
face of the city. For 150 years and over
many generations, the character of the
district of Hörde was determined by
heavy industry: In the mid-19th century,
production and processing of steel
began on the so-called Phoenix site.
It was the decline of Germany‘s coal
and steel industries in the 1970s that
brought this to an end. The plant was
closed in 2001 followed by the dis-
mantling of equipment and a partial
sale to China.
Dortmund seizes the opportunity The City of Dortmund seized the oppor-
tunity by purchasing the site shortly
before the turn of the century: The 100-
hectare disused site was bought back for
the people. This gave new impetus to the
idea of living and working in one place,
a visionary concept that seemed to have
been long lost. The inspiration generated
by this idea can be seen in nearly every
corner of the district.
An artificial 25-hectare lake with a
depth of up to four meters and several
islands is being created on the site of
the former Hermannshütte steel plant.
The lake will be surrounded by 42
hectares of residential and commercial
properties, including some 900 homes
for approximately 2,500 people.
REDEVELOPMENT OF A DISUSED INDUSTRIAL SITE
This will be supplemented by extensive
parklands totaling about 11 hectares with
the renatured Emscher River and Hörder
Stream taking up about 13 hectares.
The new living and working area will one
day become part of the Emscher Land-
scape Park, and is an example of the
‘green’ structural change taking place in
the region formerly dominated by heavy
industry.
Coordination of the planning and approval processes Clearly the preparation and execution
of such a fundamental change of use
for an entire district is a mammoth task.
Initially, it posed substantial problems
for those responsible, namely the
PHOENIX See Entwicklungsgesellschaft
mbH and the Emscher River Association.
This is where the Drees & Sommer
infrastructure specialists came into the
picture in November 2005. The expert
team helped the principals to achieve
their goals and to master the associated
organizational challenges. Since then –
as project controller – the company has
been coordinating the activities of two
principals, numerous authorities, funding
institutions, planners, consultants, and
numerous contractors, including about
40 engineering firms and consultants.
The construction-related tasks were
almost as challenging. Following dis-
mantling, demolition, remediation and
safety work, the experts managed all
foundation and hydraulic engineering
tasks. At the same time, civil engineering
works such as a weir system and bridges,
A 25-hectare lake and extensive parklands will shape the future of the former PHOENIX West coal mine site
and building construction projects –
including a phosphate elimination
plant to minimize the nutrient content
of the waters – had to be undertaken.
Another task was the construction of
the complete infrastructure with roads,
paths, squares and parklands.
Site logistics for a lake larger than Hamburg’s Inner Alster Earthworks for the lake – which will
one day be larger than Hamburg’s Inner
Alster – resulted in huge quantities of
excavated material: Over a million cubic
meters of soil had to be transported to
the correct location with over 300,000
dump-truck trips. To do this, the
Drees & Sommer expert team established
the organizational parameters from
the very beginning and undertook
“Drees & Sommer provided us
with outstanding support.”
Ursula Klischan, Managing Director of PHOENIX See Entwicklungsgesellschaft mbH at EXPO Real 2010
1918
comprehensive site logistics through-
out the entire construction period.
At peak periods, over 150 major pieces
of equipment – such as excavators,
bulldozers, rollers and all types of
transport vehicles – were in operation
on the extensive site.
Timely completion of the demanding
schedule is an important condition for
the award of subsidies. Professional
cost and subsidy management is
required, as the project is being subsi-
dized by the state of North Rhine-West-
falia, the German Federal Government
and the EU. To guarantee the efficient
application of funds, Drees & Sommer
is also undertaking comprehensive
supplementary claim management.
Marketing and architectural fair The lake has been filling with water
since autumn 2010, gradually giving
an idea of the future shape of the huge
site. With the support of established
Drees & Sommer experts for develop-
ment management, marketing of the
new home sites is progressing apace
in parallel with the visible progress of
construction on the site.
In November 2009, Drees & Sommer
organized an innovative architectural
fair called “Building on Lake Phoenix”
which received a great deal of attention
from both the public and experts. Some
50 architects – mostly from the region –
presented designs for homes to be
built on sites around the lake. Upmarket
detached and duplex homes with
striking architecture are to be built on
a good 200 sites on the site’s southern
slope. Nearly all homesites on this
southern slope have already been sold,
with construction to begin from mid
2011. The remaining 140 sites on the
southern shore will be marketed at a
further architectural fair in 2011.
The specialists hosted a creative work-
shop with architects and communi-
cations agencies for the planned
commercial and service buildings on
the southern and western shores of
the lake. The event was an immediate
success, with large areas sold to
investors. So gradually, life is returning
to the former industrial wasteland.
Clients– PHOENIX See Entwicklungsgesellschaft mbH, Dortmund – Emscher River Association, Essen
Key project data– Lake PHOENIX total area: 100 ha– Residential component: 29 ha– Commercial component: 13 ha– Emscher River/Hörder Stream: 13 ha– Public parkland: 11 ha– Public roads, paths and areas: 12 ha– Communal facilities etc.: 5 ha– Cost: Approx. €240 million net
Schedule – Remediation: 2005 – 2009– Dismantling: 2008– Excavation of lake: 2007 – 2009– Earthworks: 2007 – 2011– Civil engineering works for lake & Emscher River: 2008 – 2010– Bridges, weir system, port: 2009 – 2010– Flooding of lake: 2010 – 2011– Construction management planning: 2006 – 2011– Urban development on Lake PHOENIX site: From 2009– Integration into existing, partially adapted external infrastructure: From 2010
Drees & Sommer services– Project control– Project management– Management of creative workshop for commercial buildings – Management of architectural competition for residential buildings – Development management with marketing support
Value-add achieved for client– “Temporary construction department” to ease burden on clients – Cost transparency – Successful subsidy management – Numerous ideas as a result of architectural fair – Public acceptance – Marketing support
Designs for commercial and service buildings on the lake were presented at a creative workshop at the same time as rapidly proceeding construction work
REDEVELOPMENT OF A DISUSED INDUSTRIAL SITE
20 21
Pushing the envelope:Infrastructure management by Drees & Sommer
Can you push a road tunnel under an existing railway track? The Drees & Sommer experts have proved that – with engineering expertise and professional management – nearly anything is possible.
INFRASTRUCTURE PROJECT IN THE HEART OF EUROPE
A well-developed transport infrastructure
is essential in densely populated and
economically powerful central Europe.
For this reason, the Roads Department
in Luxembourg (Administration des Ponts
et Chaussées) is gradually expanding
its freeway network and – as part of the
extension of the A4 to France – is also
providing access to the disused industrial
site in Belval.
The entire project involves a series of
subprojects such as the rerouting of the
national road, the laying of an oxygen
pipeline, and the construction of a
750-meter long freeway tunnel (Liaison
Micheville) through Belval using a partial
cut-and-cover process. A later project will
link this tunnel to the freeway junction
at Lankëlz. The key purpose of the tunnel
is to direct cross-border traffic between
Luxembourg and France away from the
villages of Esch-sur-Alzette and Sanem.
Push: A heavy load on strong shoulders A complex infrastructure project of this
nature demands professional manage-
ment, above all to ensure that budget
and schedules are adhered to. With a
long track record of experience in this
area, Drees & Sommer convinced the
government principal of its expertise and
supported the entire project professional-
ly from the beginning. In addition to
specialist expertise, the experts were
able to present a portfolio of successfully
completed local projects.
A special challenge for the project parti-
cipants was the routing of the freeway
under a key railway line. The process
by which the necessary tunnel is ‘simply’
pushed under the tracks is known through-
out Europe as Autofonçage® (tunnel
jacking), but never before has it been
undertaken with a weight of 20,000
tonnes, equivalent to 16,000 medium-
size cars.
The first step in the process is to dig a
rough pit with stable sloping side walls.
As the tunnel section is positioned, the
sides of the pit are further excavated
across the entire width of the structure to
form vertical walls. As the structure slides
into place, it immediately supports the
vertical pit walls. This process is repeated
for the entire insertion length – in this
case 59 meters (see illustration above).
The operation was a complete success:
The tracks only had to be closed for some
72 hours, after which the rail traffic could
resume its schedule.
Huge responsibility – from cost controlling to waste disposal Since 2006, Drees & Sommer has been
responsible for project control and cost
controlling of the €166 million project
and has successfully coordinated
cooperation between the two govern-
ment agencies – the Roads Department
and the Railway Department (CFL) –
and the companies involved in the
tunnel jacking consortium, Giorgetti/
Tralux and Freyssinet. A particular
difficulty was that the site was partially
contaminated as the result of earlier
use for railway infrastructure systems.
Despite the demanding parameters,
traffic is expected to flow along the
new freeway from 2014.
Client Roads Department/Administration des Ponts et Chaussées, Luxembourg
Project duration Phase 1 and 2February 2006 – December 2011
PlannerSchroeder & Associés, Luxplan, Luxembourg
Key project data – 750 m freeway tunnel, 120 m road tunnel, approx. 2 km services gallery with high-voltage lines – Approx. 5 km road construction, approx. 3.5 km freeway construction, approx. 80 m freeway bridge– Cost (Phases 1 + 2): €166.5 million net
Drees & Sommer services– Project control – Project documentation– Cost controlling – Supplementary claims management
Value-add achieved for client – Specific Drees & Sommer expertise for technical and financial issues – Successful execution of a complex project as a result of expert control – Adherence to budget thanks to effective controlling – Relieving client burden
Tunnel jacking using the Autofonçage® technique, here with a 120 m road tunnel
Illus
trat
ion
prov
ided
by
Schr
oede
r &
Ass
ocié
s, L
uxem
bour
g
Road tunnel approx. 120 m
Freeway tunnel approx. 750 m
22 23
Drees & Sommer successfully undertook project control for the State Garden Festival in Hemer. Transformation of the development site of more than 30 hectares into the garden festival grounds was accompanied by extensive infrastructure measures.
MULTIPROJECT MANAGEMENT FOR 85 INDIVIDUAL PROJECTS
Up until October 2010, State Garden
Festival visitors were able to enjoy flower
beds, themed gardens and architectural
highlights at the 300,000 square meter
site in Hemer in North Germany’s
Sauerland. What started with the motto
“The magic of transformation” with the
award of the festival to the City of Hemer
in 2007 was successfully realized with
the opening of the State Garden Festival
in April 2010.
Management of 85 individual projectsWorking in consortium with Herbstreit
Landschaftsarchitekten (landscape
architects), Drees & Sommer undertook
project management for some 85
individual projects. These included the
installation of telecommunications
systems, extensive road works, and the
design and construction of open spaces
and public squares. The principal –
Landesgartenschau Hemer 2010 GmbH –
together with the City of Hemer, also had
numerous older buildings renovated for
use as offices, public amenities, commer-
cial and service premises.
Extensive construction work was
designed to strengthen the residential
and urban center function of downtown
Hemer, giving it a new character and
profile. The concept for the State Garden
Festival’s outdoor areas also had to take
intended later use into account. Focal
points were the new Cultural Quarter
with a multipurpose hall, city terraces
and a ‘Felsenpark’ (rock park) directly
connected to the nature reserve.
The experts had to work to a tight
schedule of only 20 months. During the
execution of the project, the City of
Hemer awarded additional contracts to
Drees & Sommer.
Additional subprojects – initially
outside the scope of the overall control
contract – also added to increasing the
scope of construction work and project
control services from €36 to €51 million,
albeit without any extension of the
project duration: The opening date of
April 17, 2010 was set in concrete.
Many thanks for the flowers:State Garden Festival open on schedule
BU
Zig-Zag WayJüberg Tower
Stairway to Heaven
Garden of Movement
Shrubbery
Park of Senses City Mosaic
Skate park
Rock Balcony
Sea of Rocks
Maze
Hedge Gallery
City Terraces
Rose Garden
Lawn Stairway
Gardner’s Market
Ever-changing flowers / Blossom Magic
Water Playground
Flower Hall
Rocks Adventure path
Rock Park
An overview of the site shows the complexity and spatial integration of projects subject to Drees & Sommer multiproject management
The Drees & Sommer experts also controlled workflow for the new multipurpose hall
24 25
Control of interfaces The coordination and control of inter-
faces to the individual projects was
a special challenge for the project
managers. In addition to project control,
planning had to take the implementation
of urban-development infrastructure
measures into account: Many projects
were undertaken in parallel and many
had to be completed before other infra-
structure measures could commence.
For this reason, the project managers
also controlled the execution of sub-
projects with the planners involved and
the integration of development sites
into the existing infrastructure.
To allow active intervention to counter
disruption of project execution, the per-
tinent interfaces for all planning phases
were identified and constantly updated.
Drees & Sommer kept a daily close eye
on schedules, costs and quality to ensure
early detection and rectification of any
critical situations. This comprehensive
multiproject management ensured
smooth execution of the overall project
taking all parameters into account.
Integration of military sitesWith many years of experience in the
redevelopment of former military sites,
Drees & Sommer was able to support the
principal with all aspects of conversion.
The integration of the old barrack site
into the ‘Felsenmeer’ (Sea of Rocks) –
a nature reserve declared in 1968 –
was completed as planned, as the results
of the soil analysis and additional
feasibility studies gave the go-ahead
for the next planning stages.
Transparent interface coordination and
detailed project communication meant
that the principal had a comprehensive
overview of the status of the individual
projects at all times. Despite the un-
favorable weather conditions in Winter
2009/2010 and the resultant delays,
Drees & Sommer was able to ensure the
timely completion of this major project.
The State Garden Festival far exceeded
expectations: Instead of the anticipated
500,000 visitors, 1,050,326 people
made their way to Hemer, setting a new
attendance record for a State Garden
Festival.
The previously inaccessible ‘Felsenmeer’ (Sea of Rocks) nature reserve has been successfully. opened up with architecturally sophisticated infrastructure
MULTIPROJECT MANAGEMENT FOR 85 INDIVIDUAL PROJECTS
ClientLandesgartenschau Hemer 2010 GmbH and the City of Hemer
Consortium partnerHerbstreit Landschaftsarchitekten, Bochum
Architectgeskes.hack Landschaftsarchitekten, Berlin
Project durationAugust 2008 – January 2011
Key project data – Development site: 30 ha– Difference in elevation: 92 m– Total budget: Approx. €51 million
Drees & Sommer services– Site development – Project control in accordance with AHO/DVP*– Project management
Value-add achieved for the client – Adherence to schedule and budget forecast cost thanks to professional project control
* AHO German Fee Structure Commission of Engineers’ and Architects’ Associations and Chambers/DVP German Association of Project Controllers
26 27
LEED Gold for Trianon
On the Frankfurt property market, the name Trianon is a guarantee of quality. In future, it will also be associated with low operating costs, ecological sustainability and high user comfort. With the support of Drees & Sommer, the building has achieved LEED Gold Green Building certification, thus substantially strengthening its position on the market.
CERTIFICATION AND MARKETING OF AN ESTABLISHED PROPERTY
A coherent overall concept is essential
if you want to be a leading player in the
market for commercial Green Buildings.
For sustainability certification, the
relationship between costs, consumption
and needs of people working in the
building have to be taken into account.
This applies particularly to established
properties for which adequate rating
systems have only recently become avail-
able thanks to special criteria developed
by popular Green Labels. A successful
methodology requires a combination of
careful analysis of the property and the
selection of the right optimization meas-
ures. This requires long-term practical
experience with this type of building
as well as up-to-date theoretical know-
ledge about the current status of Green
Building research.
Innovative Green Building management by established experts The Trianon building is managed by
argoneo, an asset management company
active throughout Europe with numerous
well-known properties in its portfolio.
argoneo has set a clear goal for the 186-
meter high Trianon in Frankfurt’s banking
district: High tenant satisfaction is to
be ensured for the future – and the
building will continue to be marketed as
an extremely attractive office address.
As an innovation leader in the area
of Green Building – with extensive
experience in high-rise and established
buildings – Drees & Sommer was able
to win Trianon as a client. Since June
2009, they have been jointly striving to
achieve a Gold LEED for Existing Build-
ings rating. In 2011, Trianon will be the
first established building in Germany
to achieve the Gold rating of this special
LEED variant developed for existing
buildings.
Assess, optimize, monitor The certification process began with
a fundamental energy assessment
of the property. This initial analysis
was undertaken by an experienced
Drees & Sommer expert team. Based
on the results, a strategy for further
action was developed. As part of this,
Drees & Sommer is currently securing
the necessary evidence and calculations
for certification and ensuring LEED-
compliant documentation.
During the actual preparatory phase for
certification – which lasts approximately
one year – the experts turn their attention
to the optimization of building operation.
To do this, they examine numerous pro-
cesses in the Trianon, such as material
flows with regard to the use of office
materials or waste disposal. In order to
be able to optimize effectively, the
building’s energy consumption is being
monitored with state-of-the-art tools.
An energy pass – but above all a Gold-
rated LEED certificate – will help the
Trianon to attract the level of attention
a building of this calibre deserves. In
particular, this will bring home the fact
that the Trianon is a building which is a
joy for operators and users alike.
Client Geschäftshaus am Gendarmenmarkt GmbH,represented by argoneo Real Estate GmbH
Project duration June 2009 – December 2011
ArchitectsNovotny Mähner Assoziierte, HPP International, Albert Speer & Partner
Key project data– Height: 186 m, 45 levels, 4 basement levels– GFA: Approx. 85,000 m²
Drees & Sommer services – Green Building management– Energy pass– Green Building certification
Value-add achieved for client– High user comfort – Low energy costs – Sustainable image – Green Building certification will be achieved with Gold-rated LEED– Strengthening of market position – Enhanced tenant loyalty – Optimized operational processes
Thanks to Drees & Sommer, Trianon in Frankfurt’s banking district remains an attractive address
Photo: © Chris Kister, www.ckister.de
28 29
Vienna’s largest department store is moving with the times and, following extensive refurbishment, has been restored to its former glory. Drees & Sommer successfully accompanied the Gerngross CityCenter during this modernization project.
Built in the 1960s, the current Gerngross
building is located directly on Vienna’s
largest shopping boulevard, the Maria-
hilfer Straße. As the tradition-steeped
department store was no longer meeting
modern requirements for profitability
and functionality, the site owner DEKA
Immobilien Investment GmbH decided
to carry out extensive refurbishment.
An architectural competition was held –
and was won by the Graz-based firm
LOVE architecture and urbanism.
Drees & Sommer came on board in
June 2008 and was commissioned
to undertake project control.
Optimization of existing propertyThe interior was to be upgraded to
improve the economic success of the
department store by providing it with
a contemporary image. As a result,
the atrium was completely redesigned
RETAIL RENOVATION DURING FULL OPERATION
and building services equipment
and elevators renewed. Thermal rehabili-
tation – including the installation of
high-grade windows – contributed to the
optimization of energy consumption.
To prevent financial losses, the owner
decided to undertake the reconstruction
with the shopping center in full operation.
The challenges for the project team
involved providing access to the indi-
vidual stores while at the same time
ensuring the safety of customers
and users and avoiding any negative
impact on neighbouring infrastructure.
Based on these complex parameters,
Drees & Sommer developed a detailed
construction process plan for each
floor and construction phase.
As a result of its contemporary image with a striking facade the tradition-steeped department store is once again a highlight on the Mariahilfer Straße
Gerngross department store: comprehensive modernization for shopper magnet
30 31
Professional tenant management A maximum of four months was avail-
able for each floor for construction,
including tenants moving out and back
in. Drees and Sommer coordinated all
measures closely with the center
management, who represented the
tenants’ interests, and with the general
planner. In a masterful logistical achieve-
ment, existing tenants were moved to
temporary space during remodeling.
As part of the complete revitalization,
the building was fitted with a new
thermal facade, including the externally
suspended metal facade.
Another challenge was the inner-city
location on Vienna’s largest shopping
boulevard. The planning of a complete
building site directly next to the subway
and limited working hours that did
not allow noisy night work, also had
an impact on construction execution.
Green Label certification by Drees & Sommer In addition to project control,
Drees & Sommer also looked after
technical tenant coordination and
Green Building certification in accord-
ance with the EU label. The client
specifically wanted a sustainable
approach, as this reflects not only
market needs but also customer ex-
pectations.
In addition to ecological and social
considerations, certification was
primarily aimed at profitability, for
example through the reduction of
building operating costs. Initially, a
Green Building Quick Check for LEED,
BREEAM and DGNB was carried out,
with the decision finally being made
in favor of EU Green Building certifi-
cation and BREEAM.
Successful cooperation Following completion of the remodeling,
the Gerngross CityCenter accommodates
shopping arcades, services facilities and
various food & beverage concepts in an
area of 30,000 square meters. The cost of
the shopping center upgrade totaled €30
million plus €10 million for tenant fitout.
The client explicitly highlighted the good
cooperation and successful completion
by Drees & Sommer. Since the ‘reopening’
in October 2010, the tradition-steeped
department store is once again a magnet
for shoppers in central Vienna.
ClientDEKA Immobilien Investment GmbH, Frankfurt am Main
Project duration March 2008 – December 2010
ArchitectLOVE architecture and urbanism, Graz
Key project data – Usable floor area: Approx. 30,000 m²– Project budget: €30 million net Plus €10 million tenant fitout
Drees & Sommer services – Project control – Technical tenant coordination – Green Building Quick Check– EU Green Building certification
Value-add achieved for client– Competence in retail – Smooth remodeling during full operation – Professional tenant coordination with high acceptance – Completion right on budget – Adherence to schedule – Achievement of EU-standard Green Building certification
RETAIL RENOVATION DURING FULL OPERATION
The entire facade underwent thermal rehabilitation and has been technically modernized. Individual blocks in the interior give structure to the levels.
Phot
os: ©
Indi
go –
Stu
dio
für
Wer
befo
togr
afie
32 33
Experts develop action plan for 170 schools
As part of an inventory of Stuttgart schools, Drees & Sommer inspected nearly 500 buildings. Based on the results, the specialists will define the necessary rehabilitation measures and develop an overarching strategy. The project received a large amount of media attention.
After detailed discussions, in early 2010
the Stuttgart City Council agreed a €100
million investment package for Stuttgart
schools. This followed repeated com-
plaints from students and teachers about
the state of their classrooms, gymnasiums,
and stairwells.
The city looked for a suitable service
provider to put the entire process of a
broad-based upgrade of the property
portfolio on a technically sound footing.
Drees & Sommer was the successful
bidder in a field of eleven responding to a
public invitation to tender in spring 2010.
The company was able to convince the
council of its long-term experience in
strategic property consulting and its
expertise with structures and methods
developed as a result. Other positives
included competence in economic
operation of buildings and the optimi-
zation of large property portfolios.
SYSTEMATIC INVENTORY AND OPTIMIZATION OF PROPERTIES
Cataloging defects, evaluating and prioritizing countermeasures The majority of school buildings were
built between 1950 and 1970. First up,
the expert team had to physically inspect
nearly 500 properties, systematically
recording the state of the building fabric.
In total, the experts carried out Quick
Checks on nearly one million square
meters of property, focusing not only on
building defects, but also primarily on
building services equipment deficiencies.
Following the inventory, all information
was evaluated and structured in a
database. This information formed the
basis for the development of a rehabili-
tation timetable. Taking growth plans
for the individual schools into account,
the timetable defined the relative
urgency of rehabilitation measures.
In this way, the timetable provided the
City of Stuttgart with the basis for making
decisions on necessary investments
over coming years.
An evaluation sheet helped with the prioritization of rehabilitation measures
Systematic recording of defects plays a key role during building inspections
ClientCity of Stuttgart, Construction Office
Project duration March 2010 – January 2011
Key project data– Properties inspected: 170 schools with approx. 470 buildings– Resulting database: Approx. 60,000 individual ratings– Proposed prioritized measures: Approx. 900
Drees & Sommer services– Inventory using Quick Check – Data processing – Prioritization of measures – Development of rehabilitation strategies
Value-add achieved for client – Action plan with clear rationale for policymakers– Sound basis for decisions using a systematic approach – Professionally developed, transparent database for city administration
34 35
In the 1990s the MesseTurm in Frankfurt’s Westend was the highest building in Europe. It is still a striking feature of the skyline today. And now the iconic high-rise will once again set standards for years to come with a holistic Green Building and energy efficiency concept developed by Drees & Sommer. A LEED certification is supporting the marketing of space for lease.
GREEN BUILDING CONCEPT AND CERTIFICATION FOR AN EXISTING HIGH-RISE
The market for office space in Frankfurt
is on the move. Particularly in upmarket
property locations, landlords have to
present solid arguments to convince
potential tenants of their product. Users
no longer accept ‘average’ for such key
criteria as building operation costs (the
so-called ‘second rent’), and well-being.
GLL Real Estate Partners GmbH, the
owner of the MesseTurm, was quick to
realize this. The company was proactive,
staying ahead of market trends: The
257-meter MesseTurm – completed
in 1991 – is to be future-proofed both
economically and in terms of energy
consumption by the year 2016. The
desire for a suitable overall concept for
energy optimization of the high-rise
brought the company into contact with
the specialists from Drees & Sommer.
Inventory analysis, goal definition and concept developmentDrees & Sommer experts began with a
detailed examination of the building.
The results showed that optimization
of the original planning could result in
substantial energy savings. This required
discarding the energy concept developed
when the MesseTurm was built and the
development of a totally new holistic
approach. The relationship between
individual factors impacting on energy
Sustainable optimization of existing properties: a key element for top success
ClientGLL Real Estate Partners GmbH, Munich
Project duration 2010 – 2016
ArchitectMurphy/Jahn, Chicago
Key project data– Height: 256.5 m, 63 levels– Total leasable space: Approx. 61,700 m²– Leasable space per level: Approx 1,200 m²
Drees & Sommer services– Construction management– Building services equipment planning– Energy optimization – Building simulation – Green Building management– LEED certification
Value-add achieved for client– Future-proof energy concept – Reduction of primary energy consumption by 40 %– Sustainable image – Silver LEED Green Building certification planned– Enhanced market position – Improved tenant loyalty
demand and the environmental quality
in the rooms has to be considered in new
ways. This applies to services including
heating, ventilation and air conditioning
of the building.
By 2016, Drees & Sommer will achieve
an optimum balance, maximizing user
comfort while ensuring minimum energy
consumption. At the same time, various
building services equipment innovations
will be introduced. The expert team is
working with GLL Real Estate Partners
GmbH and the MesseTurm operator GGM
Gesellschaft für Gebäude-Management
mbh, to develop a concept for the phased
introduction of energy-related moderni-
zation tailored specifically to the building.
The goal is to achieve a significant
reduction of primary energy demand
of 40 percent, thus also substantially
reducing carbon emissions. To confirm
and effectively communicate the eco-
nomic and ecological efficiency of the
MesseTurm, certification of the building
with LEED Silver for Existing Buildings is
planned for as early as 2011.
Modernization in full operation The overall context of the project is highly
demanding. Not only must government
requirements such as smoke extraction
and fire prevention regulations be taken
into account. Optimization of an existing
building – whilst allowing tenants to
continue working undisturbed – is, so to
speak, a master class in modernization.
And this is no accident. By undertaking
similar projects over past decades,
the company knows what the market
demands and has accumulated immense
practical experience. The client benefits
directly from this expertise: As an attrac-
tive location, Frankfurt’s iconic high-rise
will continue to attract upmarket tenants.
“We want to work with
Drees & Sommer to reduce
the primary energy factor by
40 percent by 2016.”
Ingo Langner, GGM Gesellschaft fürGebäude-Managament mbh, Property ManagerMesseTurm at EXPO Real 2010
36 37
Even before the starting gun, Drees & Sommer had won the race against time. Under extreme time pressure, the experts ensured that the traditional biathlon winter sports arena in Ruhpolding was once again fit for use as an international competition venue. A winner for the principal, athletes and winter sports fans.
PROJECT CONTROL FOR SPORTS FACILITIES
September 2008 was a time of cele-
bration: The municipality of Ruhpolding
in south-eastern Bavaria had just been
awarded the rights to host the 2012 IBU
Biathlon World Championship. It was
clear to the organizers, however, that
the old stadium would no longer meet
the International Biathlon Union’s
requirements for such an event. Not
only was there not enough seating for
spectators, but the competition facilities
were also not in keeping with the current
IBU guidelines. The stadium building,
the entire infrastructure, the cross-
country trails and bridges as well as
floodlighting and artificial snow ma-
chines would have to be replaced or
upgraded.
Only a short time was available, as all
work had to be completed by the end
of 2010 – a period of only ten months.
The commissioning date was set in
concrete: mid-January 2011. The reason?
The 2011 World Cup, a major inter-
national event highly popular with both
the public and the media, was to be
used as a dress rehearsal for the Biathlon
World Championship in 2012, to the
delight of fans the world over. Another
requirement was strict adherence to
the budget of €16.4 million.
Chiemgau-Arena on track for success thanks to professional project control
ClientMunicipality of Ruhpolding
Project durationNovember 2008 – December 2011
ArchitectConsortium of Sieber + Renn / Architekten and Bauingenieurgemeinschaft Trauntal Gmbh
Project budget€16.4 million net
Drees & Sommer services – Selection of planners– Master plan– Project control– Project leadhouse function
Value-add achieved for the client – Qualified master planning with expertise as the foundation for project success – Successful management of the complex approvals processes – Precise adherence to costs and schedule – Operational cost savings through use of ground water for heating and snow-making – Comprehensive relief of the client burden through competent project managers
Successful dress rehearsal: In January 2011 nearly 90,000 enthusiastic biathlon fans celebrated the 2011 World Cup with their stars in the Chiemgau- Arena.
38 39
An elegant concept from the startRight at the beginning of the project,
the Ruhpolding Municipal Council com-
missioned Drees & Sommer to develop
a master plan. In doing so, the client
consciously chose a company with
extensive experience in winter sports.
For example, the project managers were
able to demonstrate expertise from
project control of the 2005 Nordic Ski
World Cup in Oberstdorf.
Now, as then, the experts were im-
pressive in every respect. Together
with the principal and users they were
able to translate all requirements and
wishes into an elegant overall concept.
The proposed measures were coordi-
nated with subsidy providers and
approval authorities at an early stage,
leading to optimal cost and schedule
stability.
One of the many unique features
of Ruhpolding was the fact that the
construction site was located in a
water protection area, a landscape
conservation area, a nature reserve,
and a flora & fauna habitat. This meant
that further close coordination with the
appropriate regulatory authorities was
of great importance. With the support
of additional consultants and specialists,
Drees & Sommer coordinated timely
building approval involving a total of
some 30 permits. An active on-site
presence resulted in project managers
quickly establishing a rapport with all
parties involved.
Professional project organization and control To complete all construction work in
2010 and ensure completion in time
for the 2011 World Championship,
demolition began immediately after the
last day of competition in March 2010.
Drees & Sommer supported the Munici-
pality of Ruhpolding with project lead-
house functions and project control
services for all individual subprojects,
delivering systematic project organi-
zation as well as schedule and cost
planning. The professional control of the
project team and construction processes
ensured adherence both to the budget
and to the ambitious schedule. After a
construction period of only ten months,
training and competition resumed at the
Chiemgau-Arena as planned and the
2011 World Cup was successfully hosted.
The Chiemgau-Arena is now a shining
example of environmental protection
and operational cost savings: All new
buildings obtain their heat energy via
groundwater heat pumps. So bring
on the Biathlon World Championship!
Ruhpolding is very well prepared.
Master plan: Well planned is half built
Professional management enabled realization in record time: The Chiemgau-Arena was rendered fit for competitions within a few months
PROJECT CONTROL FOR SPORTS FACILITIES
40 41
Fiat: High value-add through efficient production workflow
Drees & Sommer is carrying out a project audit for a factory extension and the production launch for a new Fiat model in Kragujevac, Serbia. The factory – which dates back to the 1950s – is to be completely rehabilitated and modernized. The Fiat group is investing approximately one million Euros in car production at the new site.
With its brands Fiat, Lancia, Alfa Romeo,
Abarth and Maserati, Fiat Group Auto-
mobiles is one of the world’s top ten
automobile manufacturers. It is currently
undergoing structural change. On the
one hand, its partnership with Chrysler
should lead to synergy effects, while
on the other hand the company plans
to continue internationalization of its
brands and expansion of production
capacities in ‘low-cost countries’. In this
context, from mid-2012 the successor
model to the Fiat Idea will be manu-fac-
tured at the former Zastava plant in
Kragujevac, Serbia, managed as a joint
venture between the Serbian state and
Fiat. The factory is to be extensively
modernized for the launch of the new
model.
Investment: One billion Euros Investment of some €1 billion is planned,
resulting in a production capacity of
more than 150,000 cars per year. As
OPTIMAL CONSULTING ON FACTORY UPGRADE
part of a so-called brownfield project,
the existing factory will be completely
adapted to meeting the requirements of
“best practice” automobile production.
Following completion of construction
work, the installation of newly developed
production processes and equipment
will begin. These will set new standards
in comparison to other Fiat Group sites
worldwide and are characterized by
greater manufacturing content.
Project audit Drees & Sommer is supporting the
project by carrying out a project audit.
During the construction phase as well
as during the development & integration
of the production plant, all processes
relevant to on-schedule, within-budget
implementation to the required quality
standards will be continuously moni-
tored. Any deviations will be recorded,
and any necessary countermeasures
initiated.
The immense size of the production
halls – some of which are in a critical
condition – has to be emphasized. As
a result, substantial decontamination
work has to be carried out in parallel to
extensive remodeling and upgrading.
At the same time, it must be ensured
that production can continue unhindered
while this work is carried out.
Regular Reporting to clientThe key task of the Drees & Sommer
project team is to identify risks in the
project and to communicate these to
the client.
The Managing Director of Fiat Automo-
biles Serbia (FAS) and group manage-
ment in Turin are kept informed about
the current project status, any improve-
ment measures implemented and the
overall progress of the project in regular
order to reports. This regular reporting
by Drees & Sommer delivers a sound
basis for decisions on control measures
by both Fiat management and project
management.Drees & Sommer identifies project risks for the upgrade and expansion of the former Zastava factory in Serbia, at the same time reviewing process for the Fiat production launch
Scope of audit management by Drees & Sommer
ClientFiat Automobiles Serbia (FAS), Kragujevac
Project durationOctober 2010 – May 2012
Key project data– Production capacity over 150,000 cars– Investment volume: Approx. €1 billion
Drees & Sommer services– Audit management
Value-add achieved for client – Recommendations regarding optimal processes taking production plant and their integration into account – Identification of process risks – Support through production engineering and structural engineering expertise
Development Production Installation Startup
Energy, buildings, service
Utility supply
Press shop
Car body construction
Quality assurance
Paint shop
Logistics
Final assembly
Phase in/out 188
Interfaces for IT / product / suppliers / personnel
Organization Communication Scheduling ReportingQuality Costs
Schedules
4342
For decades, the Städel Museum in Frankfurt has attracted art-lovers from all over the world. But the building has become cramped, with many exhibits hardly ever leaving the storeroom. A great deal of effort was put into finding a solution under the motto “Frankfurt builds the new Städel Museum”. Drees & Sommer is supporting the principal by acting as project controller.
MUSEUM REDEVELOPMENT
When Johann Friedrich Städel endowed
his collection in 1815, he would never
have dreamed that it would one day con-
tain some 2,800 paintings, 600 sculp-
tures, 500 photographs and over 100,000
drawings and prints. And he would per-
haps have taken pride in the fact that –
a good 200 years later – the museum
needed its fourth extension.
But Städel’s successors have taken
action. In view of the acute shortage of
space, the Städelsche Kunstinstitut
(Städel Art Institute) is currently expand-
ing the museum, which dates back to
the 1870s. The project is being supported
by companies, foundations, private
donors and the public purse – to the tune
of some €45 million. Of this, €14 million
are being used for refurbishment of
the existing museum and €31 million for
the construction of the spectacular
underground annex, the Garden Gallery.
Project control in good hands At the explicit request of the principal,
Drees & Sommer has been acting as
project controller for the project since
the end of 2008. For the managers
responsible, the Städel Museum
extension is one of the highlights of
their careers. On the one hand, it is
about nothing less than ensuring future
generations access to an important
cultural heritage. On the other, the
experts are also stimulated by the
project’s challenges.
The strict budgetary constraint, the
short construction period and the
complex nature of the work – some of
which has to be carried out with the
museum in full operation – require total
commitment. One of the major features
of the project was high security for
numerous world-famous exhibits.
Städel Museum, Frankfurt: Refurbish-ment and expansion in full operation
200 skylights are the trademark of the expanded Städel museum. Their impact is striking, both inside and out
Vis
ualiz
atio
ns: ©
sch
neid
er+s
chum
ache
r, F
rank
furt
am
Mai
n
44 45
Sophisticated lighting and climate control The design by the architectural firm
schneider+schumacher provides
for the museum annex to be built
under the existing Städel Museum
gardens. The annex – illuminated by
195 circular skylights – will generate
2,500 square meters of exhibition
space, primarily for contemporary art.
The ceiling of the underground space
curves gently, providing a unique
spatial experience. And outside, this
curvature turns the overlying lawn
into a landscape.
An integral element of the new rooms is
a sophisticated lighting concept which
allows a seamless transition from natural
to artificial light, as well as an efficient
state-of-the-art climate control system
which includes geothermal, building
component activation, and a humidifi-
cation/dehumidification system that
guarantees an appropriate climate for
the artworks even when there are large
numbers of visitors in the gallery.
Clearly, a building site of this nature
makes very special organizational,
technical and logistical demands and
requires professional oversight:
The project controller’s tasks include
management of the tender and contract
award processes, contract management
for planning and construction services,
and interface definition.
Coordinating multiple building sites To complete the construction project in the
shortest possible time, Drees & Sommer
divided it into ten staggered phases. For
example, until March 2010, only external
construction work was undertaken. Work
monitored by the experts during this time
included the installation of 300 drilled
piles in the building pit. With the excep-
tion of the West Wing, the museum
will be closed between March 2010 and
November 2011 for work on the shell.
In the summer of 2010, refurbishment
of the neighbouring Städelschule school
started with the school in full operation.
In March 2011, Drees & Sommer handed
over the building shell of the under-
ground galleries.
In the meantime, Frankfurt awaits the
coming autumn with anticipation: From
November 2011 to February 2012 the
museum – which has been closed in the
meantime – and the new Garden
Gallery will open in stages and feature
a completely new presentation of the
collection.
MUSEUM REDEVELOPMENT
January 2011 saw completion of the breakthrough between the old and new buildings A dozen columns support the concrete roof of the Garden Gallery
Photos: © Norbert Miguletz, Frankfurt am Main
Client Städelsches Kunstinstitut, Frankfurt am Main
Project duration January 2009 – February 2012Closure: March 2010 – November 2011
Architectschneider+schumacher, Frankfurt am Main
Key project data – GFA: 4,187 m² new building, 20,157 m² old building, 6,130 m² Städelschule– Garden Hall Extension: Approx. 2,500 m² exhibition area – Total investment (gross): – Extension €31 million – Refurbishment €14 million – Städelschule €5 million
Drees & Sommer-Leistungen– Project management– CostMonitor (CoMo)– Contract management
Drees & Sommer services – Professional logistics planning with high security – Integration of planners and contract companies into complex implementation concept – Positive impact of construction work on public – Adherence to cost budget through contract award controlling using CostMonitor
46 47
COMPLETE REFURBISHMENT OF DEUTSCHE BANK TOWERS IN FRANKFURT
Exterior view of the twin towers with the entrance area created by designer and architect Mario Bellini
While retaining the external appearance
of the Deutsche Bank’s twin towers –
which have become a key landmark both
of the city of Frankfurt and of Germany
as a financial center – the existing facade
was completely replaced by a new
technically sophisticated, energy-saving
facade structure. The Milan-based de-
signer and architect Mario Bellini has
transformed the interior with a creative,
modern design concept. In particular, the
building’s light-flooded entrance area with
its space-filling sculptural sphere stands
for transparency and openness. The use
of modern energy-conserving technologies
and pioneering engineering solutions has
made it in one of the most eco-friendly
high-rise buildings in the world.
Sustainability and innovation have
been recognized by the award of two
internationally renowned Green
Building certificates. The new Deutsche
Bank towers have been awarded LEED
Platinum for New Construction and
Major Renovations and DGNB Gold for
Complete Refurbishment of Office
Buildings. Management and engineering
specialists from Drees & Sommer –
together with the Deutsche Bank
planning and project team – had the
exciting task of undertaking the eco-
logical rehabilitation of an existing
building. Together, the teams further
optimized and developed established
technical systems. In addition to this
ongoing development and optimization,
new standards were established for
the rehabilitation of high-rise office
buildings, and innovative workplace and
spatial concepts were developed and
implemented on site.
Redefining ecological standards
On February 24, 2011, the Deutsche Bank Towers were officially reopened after a three-year refurbishment period. The renovation of the towers is an innovative, sustainable and pioneering achievement which sets new standards for the refurbishment of buildings in the future.
ClientDeutsche Bank AG, Frankfurt am Main
Architects– MBA Mario Bellini Architects (Design Architect)– gmp Architekten von Gerkan, Marg und Partner (Technical Architect)
Project duration (modernization and reoccupation)December 2007 – February 2011
Key project data– Original construction period: 1979 – 1984, First occupation: 1984, Opening: February 1985– Height: 155 m– GFA: Approx. 120,000 m²– Leasable area: Approx. 75,000 m²– Workplaces: Max. 3,000
Drees & Sommer services – Project management– Contract management– Supplementary claims management– Communication management, control of public relations – Facade planning– Green Building management– Facility management invitation to tender and controlling– Building services equipment controlling
Value-add achieved for client – One-stop shop for interface-free complete refurbishment – Smooth achievement of highest Green Building certification ratings (LEED Platinum, DGNB Gold)– All deadlines punctually met and on-schedule reoccupation of building
4948
The space-filling sculptural sphere stands for transparency and openness
Global player takes responsibility It all started as the result of a special
assessment by building inspectors in
2004. As fire prevention measures had
to be upgraded, Drees & Sommer
examined various refurbishment levels
and scenarios. The Deutsche Bank
then decided to opt to vacate the entire
premises and to undertake full Green
Building renovation. Additional goals
were architectural remodeling of the
interior and better integration into the
urban environment.
Overall concept results in savings across the board Optimum coordination of all individual
measures such as the installation
of over 2,000 parallel opening windows
in the facade, a ceiling heating and
cooling system, and a custom-designed
luminaire made it possible to achieve
significant consumption savings –
and resultant cost savings – in nearly
all areas. 98 percent of all materials
removed during the refurbishment were
reused or recycled.
Following the modernization, the two
towers use 67 percent less energy for
heating and cooling – the same amount
of energy as used by 750 single-family
homes. At the same time, the power
consumption was cut by 55 percent and
water consumption was reduced by
74 percent. The water saving is achieved
by a highly efficient water management
system involving building-internal water
recycling, rainwater harvesting and the
use of water-conservation technologies.
The complete package of measures
also results in a considerable reduction
of carbon emissions. Carbon emissions
from building operations have been cut
by 55 percent and the use of renewable
energy sources for electricity means
a further 34 percent reduction, thus
achieving an 89 percent reduction in
pollution overall. The saving is equivalent
to taking 6,000 cars driving an average
of 12,000 kilometers per year off the
road. And on top of all this, there has
been a substantial increase in efficiency
and the number of workplaces has risen
from 2,500 to 3,000 while at the same
time enhancing the well-being of users.
Services made to measureIn addition to providing familiar services
such as Project management, Engineer-
ing and Green Building consulting, new
services were developed and existing
services adapted to the demands during
the course of the project.
The renovation of the Deutsche Bank Towers has resulted in an innovative, sustainable and pioneering building which sets new standards for the refurbish-ment of buildings in the future
COMPLETE REFURBISHMENT OF DEUTSCHE BANK TOWERS IN FRANKFURT
50 51
A single source for development, planning and construction management
Drees & Sommer is responsible for planning and implementing the Bildungs-campus Heilbronn (Heilbronn Education Campus) on behalf of the Dieter Schwarz Foundation. After a construction period of just one and a half years over 1,000 people will study and work there. This speedy completion was made possible by the highly efficient General Construction Management (GCM) implementation model.
Knowledge is the raw material of the
future. The acquisition and systematic
expansion of knowledge are of increasing
importance in global competition. In
Germany, private organizations are
joining state education facilities in
successfully sharing the responsibility
for teaching and research – as is the
case with the Dieter Schwarz Stiftung
(foundation), which has been promoting
education, personal development and
research since 1999. In order to promote
interdisciplinary exchange between
various disciplines and faculties, the
foundation took a far-reaching step in
2008 in deciding to establish a new
facility in the center of Heilbronn that
would – for the first time – bring teachers
and students from state and private
educational establishments together.
This vision is currently taking shape:
The so-called Bildungscampus Heilbronn.
From 2011, the German Graduate School
of Management and Law (GGS), the
Heilbronn Campus of the Baden-Wuerttem-
berg Cooperative State University (DHBW),
and the Academy for innovative Edu-
cation and Management (AIM) will occupy
four modern buildings there.
GENERAL CONSTRUCTION MANAGEMENT FOR NEW TEACHING AND RESEARCH CENTER
Communication drives knowledge –the Heilbronn Education Campus offers the ideal setting for this
“ … one-stop shopping for planning,
all cast in the same mold: That
obviously offers numerous benefits
not only for architecture, but also
for economy and, not least of all,
scheduling.”
Dr. Erhard Klotz, CEO, Dieter Schwarz Stiftung
52 53
Experience in managing complex projectsGiven the scope of the project, the
principal was looking for management
experts who could not only provide
competent consulting, but could also
control the project professionally
throughout the entire planning and
implementation phase. It is no accident
that Drees & Sommer was chosen.
Even back in the 1990s, the company’s
work on the Potsdamer Platz in Berlin
demonstrated that it can swiftly and
safely bring even highly complex major
projects to a successful conclusion.
The Dieter Schwarz Stiftung specifically
chose this expertise for the Heilbronn
Education Campus, commissioning
Drees & Sommer to control all planning
and construction processes. The
company’s management and engineering
experts are thus responsible for all
specialist planning, tendering and con-
struction management processes and,
as a subset of this, for coordinating
the interfaces to all parties involved,
including architects, construction
companies and public authorities.
But Drees & Sommer laid the ground-
work for a successful GCM project
before contracts were even awarded:
The experts have been supporting the
Heilbronn Education Campus project
since way back in 2007.
A feasibility study and a detailed site
analysis drew attention to the current
construction site in the Mannheimer
Strasse. As the next step the company
managed the architectural competition
for the buildings currently under
construction. Even at this early stage,
Drees & Sommer consulted the later
users, ensuring that the new buildings
would reflect their wishes and require-
ments.
Whether building physics or Facility management – all have a common goalWith its combined expertise, the
Drees & Sommer Group drives the
whole project using the same principle
as the Heilbronn Education Campus
itself: bringing various faculties to-
gether and using their interfaces to
ensure that they mesh productively.
With GCM, the company’s internal
specialists’ role includes the entire
web-supported project communication,
user management, building physics,
system planning, fitout, and equipment
planning as well as facility manage-
ment consulting. The latter ensures
functional and economic operation of
the three educational establishments
for years to come – long after the first
graduates of the Heilbronn Education
Campus have their diplomas and
degrees in the bag.
Work on the building shells proceeded apace in 2010 and fitout has been under way since the end of 2010.
Keeping a close eye on all key milestones and the ultimate goal: Construction process simulation for the months of April, July, September and December 2010 and visualization of the completed campus.
GENERAL CONSTRUCTION MANAGEMENT FOR NEW TEACHING AND RESEARCH CENTER
ClientDieter Schwarz Stiftung gGmbH, Neckarsulm
Project durationAugust 2008 – October 2011
ArchitectGlück + Partner, Stuttgart
Key project data– GFA: 17,100 m²– Gross volume: 73,000 m³
Schedule– Architectural competition decision: 03/2009– Building approval granted: 12/2009– Ground-breaking ceremony: 02/2010– Commissioning: September 30, 2011
Drees & Sommer services– Feasibility study – Competition organization – Project management– User management– Facility management consulting– System planning– General construction management
Value-add achieved for client – One contact for all issues – Consulting in the client’s interests – Exact adherence to budget and schedule – Optimization of building operation – High quality and economy – Client relieved of construction-related tasks
54 55
New building with clinic in full operation
To maintain its high level of patient care in the future, following on from the “New Western Annex”, Brandenburg City Clinic is building a 23,000 square meter building with over 300 beds in the second stage of its new clinic construction program. Drees & Sommer undertook project control and provided the ProjectCommunicationSystem (PCS).
PROJECT CONTROL AND PROFITABILITY CONSULTING FOR NEW CLINIC BUILDING
Rich in tradition, the hospital offers
patients state-of-the-art treatment –
from laser eye operations to computer-
aided brain surgery. New buildings
and processes have become necessary
over recent years to ensure maintenance
of this high level of care.
The principal’s goal was a fundamental
restructuring of the site. This not only
involved improvements to building fabric,
but also the consolidation of operational
processes. The particular difficulty was
that construction of the new buildings
had to be undertaken with the clinic in
full operation. A real challenge given
the 22,000 in-patients treated each year.
Project control and communication From 1998 to 2002, Drees & Sommer
had already been commissioned to
undertake project management for the
first expansion phase. As a result of their
positive experiences during the first
phase, the principal was happy to turn
to Drees & Sommer again, awarding the
company the contract for the second
phase. The company’s specialists have
been commissioned to undertake project
control and project communication.
Bridging the gap to the future of medicine: Brandenburg City Clinic’s ‘Eastern Annex”.
“The services requested of
Drees & Sommer were always
provided in the required quality
… so that we are happy to
recommend the company.”
Gabriele Wolter, Managing Director,Städtisches Klinikum Brandenburg GmbH(Brandenburg City Clinic)
Client Städtisches Klinikum Brandenburg GmbH
Project duration phase 2September 2005 – October 2011
ArchitectHeinle, Wischer und Partner Freie Architekten, Berlin
Key project data– Number of beds: 334– GFA: 22,863 m²– Gross volume: 84,702 m³– Cost: €63 million net
Drees & Sommer services– Project control – ProjectCommunicationSystem (PCS)
Value-add achieved for the client – Optimization of investment costs to the benefit of construction and fitout – Optimized supply concept with energy- efficient block-type thermal power station– Professional management of public contract award – Effective decision-making – Effective change management – Seamless cost transparency – Subsidy management for optimal utilization of budget
A temporary building was first constructed
for the current ‘Eastern Annex’ phase.
This accommodates the wards from the
buildings that had to be demolished. Over
the entire period of the project, highest
priority is being given to safe patient care,
which is only possible if all construction
processes dovetail smoothly.
Reduced investment costs Fast and reliable exchange of data and
information is a decisive benefit. For
the Eastern Annex, this was achieved
efficiently using the Drees & Sommer
proprietary online ProjectCommunication
System. As an electronic data room,
PCS stores all facts and documents
related to decisions, making them
immediately available to all project
participants.
The experts advised the principal com-
petently in particular on public contract
award, the control of planning processes,
and cost optimization. In this way, the
planning team under the guidance of
Drees & Sommer achieved investment
savings which – with the consent of
subsidy providers – allowed additional
services to be realized within the
approved budget. This made a further
contribution to optimal patient care.
An energy-efficient block-type thermal
power station is achieving further
savings in operating costs. The new
ward building is scheduled to be opened
in summer 2011.
5756
After only two years, the Rhein-Galerie in Ludwigshafen has been completed, with the development of a disused site opening up the inner city to the Rhine embankment. Drees & Sommer supported the construction project by providing controlling services during both the planning and construction phases.
CONTROLLING FOR NEW SHOPPING CENTER IN LUDWIGSHAFEN
At the beginning of 2006 the Ludwigs-
hafen City Council decided to develop
the entire site of the former customs port
under the motto “Return to the Rhine”.
A shopping center was to connect central
Ludwigshafen with the Rhine embank-
ment, at the same time enhancing the
existing range of retail outlets. The
disused site of the former customs port
was purchased by shopping center
specialist ECE. Construction was under-
taken using a cooperation model
with ECE responsible for planning and
coordination and Züblin as the general
contractor.
Controlling the construction phaseAs early as the planning phase, Union
Investment Real Estate GmbH secured
95 percent of the Rhein-Galerie through
a company acquisition, and thus took
on the role of principal. Drees & Sommer
supported the client during the purchase
phase by providing technical due
diligence for the project development,
and – prior to the start of construction –
was commissioned to undertake
controlling during the construction
phase. Given the many Union Invest-
ment Real Estate projects successfully
concluded by Drees & Sommer, there
was a sound basis for further trusting
cooperation.
Investor goals optimally met: Rhein-Galerie meets client’s highest expectations
Client Union Investment Real Estate GmbH, Hamburg
Project durationMay 2008 – September 2010
General contractor ECE Projektmanagement GmbH & Co. KG
Contractor responsible for planning and coordination Züblin AG
Key project data– GFA: 100,000 m²– Retail space: 30,000 m²– Parking: 1,400 vehicles– Investment volume: €220 million
Drees & Sommer services– Technical due diligence– Project controlling– Structural technical consulting (engineering consulting)– Support during acceptance and handover – Organizational consulting
Value-add achieved for client – Sound basis for investment decision through professional due diligence prior to start of construction– Reducing pressure on the client through representation of the principal– High quality of implementation through retail and management competence– Competent consulting on Green Label certifications
58 59
Support during acceptance inspections At the client’s request, Drees & Sommer
paid particular attention to the quality
of construction and provided support
during acceptance inspections. As a
result of this controlling, the specialists
secured the investor a high-quality
property that was awarded the DGNB
Gold preliminary certificate during
execution. The Drees & Sommer expert
team provided consultation on sustain-
ability to the client in the lead-up to the
project.
The design of the Rhein-Galerie met high
ecological standards with regard to the
drinking water and wastewater concept.
Meltwater and rainwater is fed directly
into the Rhine, thus returning it to the
natural water cycle. Not only were fixtures
with excellent water-saving ratings
selected for sanitary facilities, but the
entire shopping center was planned
using ecological and sustainable
building materials to save energy and
reduce carbon emissions.
The Rhein-Galerie provides the Rhine
embankment promenade with a city
precinct that links to the city center
through squares, food & beverage outlets
and leisure activities. It offers 30,000
square meters of retail space with 130
shops on four levels with 1.2 kilometers
of shopfront and parking for 1,400
vehicles. The membrane roof – with an
area of 25,000 square meters – is a
particularly striking feature. At night it is
illuminated with alternating white and
blue light. A self-cleaning Teflon coating
ensures that the fabric roof stays clean.
Handover to a satisfied client Through regular site visits, meetings
with the client and the prime contractor,
examination of construction related
information, and comprehensive con-
sulting provided to the principal,
Drees & Sommer made a substantial
contribution to ensuring that the
handover from ECE to Union Investment
Real Estate GmbH was completed to
the total satisfaction of all involved.
To round out the success, the Rhein-
Galerie Ludwigshafen opened on
schedule at the end of September 2010.
With its attractive architecture, the shopping center integrates harmoniously with the Rhine promenadeDrees & Sommer supervised acceptance inspections and, through regular site visits, contributed to the success of the project
CONTROLLING FOR NEW SHOPPING CENTER IN LUDWIGSHAFEN
60 61
Lidl pilot store awarded DGNB Silver
In 2009, the Lidl discount chain presented the concept for a new sustainable generation of stores. Drees & Sommer energy-conservation experts were involved in its design. The first store was opened the same year – and in 2010 it was awarded the German Sustainable Building Certificate (DGNB) with a Silver rating. The certification process was managed by Drees & Sommer.
The development of sustainable
buildings is also a trend in the retail
trade. Pioneer in this area is the Lidl
discount chain. Drees & Sommer
energy management experts developed
a concept for a new generation of stores
that are ecologically sustainable in
operation and demonstrably cut costs.
Overall, the concept reduces carbon
emissions from the new buildings by
about one third compared to previous
buildings.
Refrigeration with natural coolantsRecovery of waste heat for heating
RefrigeratorsWith natural coolants
Exterior wallsOptimized insulation Integrated system
VentilationDemand-oriented air quality
FreezersWith natural coolants
LightingOptimized lighting T5 lamp with reflector
Floor slabOptimized insulation
Lidl is successfully achieving eco-
nomic goals with the new stores,
as Drees & Sommer costed the
measures in such a way that the
investment would be particularly
quickly amortized. Lidl has also
been quick to roll out this new
concept: By the end of 2010, 47
new stores were built according
to this design. A pilot store was
opened in Hannover in November
2009 and was awarded the DGNB
Silver certificate at Expo Real.
GREEN BUILDING CERTIFICATION FOR FOOD STORES
Optimized architecture and a new technical concept The new Lidl stores have improved
thermal insulation and a more compact
structure. The main savings are made
in the interior. The building services
equipment concept combines a whole
range of effective measures. Energy
for heating, for example, is recovered
from the waste heat from refrigerated
displays.
Underfloor heating provides more
efficient heating of large areas, while
advanced air conditioning systems
use less energy than before, thanks to
heat recovery. Lighting with fluorescent
lamps and reflectors is also highly
efficient. This all results in a greater
feeling of well-being for both customers
and employees – an intended side-
effect of the above measures.
Green Building certificationDrees & Sommer experts managed
the certification of the pilot store and
the implementation of the concept
in the construction in other stores.
But Lidl and the Drees & Sommer
consultants are not resting on their
laurels.
They are planning the certification
of a so-called prototype building
specification. All buildings built in
accordance with this master plan
are then automatically awarded the
DGNB Silver certificate. In this way,
the energy-optimized “store of the
future” will be systematically applied
as the sustainability guideline for
the company.
Carbon emissions from the new generation of Lidl stores is about one third lower than previous types
The centerpiece of the new energy concept is the integrated system (left) –It controls various systems including the thermoactive floor (right)
The combination of individual measures results in a lasting reduction in consumption, allowing economic operation of the building
ClientLidl Dienstleistung GmbH & Co. KG, Neckarsulm
Project duration January 2009 – October 2010
ArchitectPB Projektentwicklung Bade, Wunstdorf
Drees & Sommer services– Energy design– Green Building management– Green Building certification
Value-add achieved for customer– 100 % saving on heat energy through recovery of waste heat – Reduced ventilation energy through modernized systems – 10 % reduction in electricity use through new lighting – 30 % reduction in carbon emissions– Economical ecological stores with greater well-being for customers and employees
6362
Ensuring quality and economy for an international player
Drees & Sommer is supporting numerous projects for B. Braun Melsungen AG as the company continues its international growth. Whether in Peru, Spain, Switzerland or at home in Germany, the success of these construction projects is secured with management expertise and the right tools.
B. Braun sets the highest standards
for the production of pharmaceuticals
and medical products in many countries.
And the company expects the same top
quality when it comes to the construction
of its factory and production buildings.
For this reason, B. Braun commissioned
Drees & Sommer to undertake project
management for numerous construction,
remodeling and extension projects. The
key goals are to achieve the same high
standard at each site and to ensure that
planning and implementation meet cost,
schedule and quality goals.
A team of pharmaceutical experts has
been devoted to this demanding task for
some time. The long-term client is pro-
fessionally supported with high levels of
commitment, dedication and enthusiasm
almost round the clock worldwide.
Peru: Cost and planning check, project controlling and reporting B. Braun is building a new industrial and
production building with a gross floor
area of some 10,400 square meters near
the Peruvian capital, Lima. Following
completion of execution planning,
B. Braun commissioned Drees & Sommer
to undertake a review of costs and
planning in order to have the soundest
possible basis for budgeting.
The cooperation between Peru, Spain
and Germany was a special feature of
the project: Because of the distances
involved, it could only take place by
telephone and using digital media
in Spanish and English. Despite difficult
circumstances, the building was com-
pleted on schedule within the budget for
which Drees & Sommer was responsible
at the end of June 2010.
INTERNATIONAL PROJECT MANAGEMENT FOR PHARMACEUTICAL BUILDINGS
Spain: Project management with PCS, reporting and schedule managementDrees & Sommer supported the
project for the construction of the annex
to the modern LIFT industrial and
production building in Rubí, Spain,
from the beginning of the construction
phase. During the course of the project,
the experts worked with the Spanish
project team and the general planner
to optimize planning following several
changes to the target budget.
The experts got up to speed on the
project by carrying out a complete review
of costings, while at the same time
integrating a complete project manage-
ment system for the already started
project. Since then, the experts have
been monitoring and controlling organi-
zation, costs and schedules, as well
as employing the web-based Project
CommunicationSystem (PCS). As a
result of excellent service delivery,
Drees & Sommer was additionally
commissioned to undertake construction
schedule management for the entire
project.
The commitment of the specialists
paid off: The first two production lines
will start operation on schedule in
spring 2011, with a third following at the
beginning of 2012. Despite extremely
tight costings with no reserves and the
exacting schedule, the project has
remained within budget.
In Lima, Drees & Sommer is supporting B. Braun with the construction of a modern production building
The LIFT production building in Rubí, Spain
64 65
Switzerland: Project check, project controlling, reportingIn June 2010, B. Braun opened the
9,000 square meter extension to its
clean room production building in
Crissier, the company’s second largest
site in Switzerland. Initially it will
house one production line. With the aid
of an initial project check, review of
existing costings and scheduling,
subsequent project controlling and
reporting to the company headquarters
in Melsungen, Drees & Sommer was
able to satisfy the client’s expectations
with regard to investment costs.
Germany: project management with PCSAt B. Braun headquarters in Melsungen
Drees & Sommer experts undertook
three important projects simultaneously.
Until August 2011, the company is
providing complete project management
and PCS for the construction of the new
the WAVE plant (Werk V) with a gross
floor area of some 43,400 square
meters. The principal is the B. Braun
Avitum division, which makes
dialysis machines and HC pumps and
requires more space for its constantly
expanding production. The goal is
to achieve an architecturally appealing
production building within a fixed
budget and timeframe.
The LIFE Nutrition (LIFE N) project is
nearly complete. It comprises six
components: the actual production
center, a “Preparation and Weighing”
building, an administrative building
with changing rooms, canteen and
two-level parking, expansion of the
power plant, a new central laboratory,
and a plant security building. Invest-
ment in the project totals €186 million.
For the “EP in LIFE N” project,
Drees & Sommer is also expanding
the production building built as
part of the LIFE N and managing the
remodeling of the “Preparation and
Weighing” area. This extension
also involves the construction of an
additional production line for the
manufacture and filling of Ecoflac®
plus infusion solution containers. The
project – with a budget of €42 million –
is scheduled to be completed in
August 2012.
INTERNATIONAL PROJECT MANAGEMENT FOR PHARMACEUTICAL BUILDINGS
In keeping with B. Braun philosophy, the WAVE plant (Werk V) combines architectural sophistication with high profitability
Extension of the clean room production building in Crissier
ClientB. Braun Melsungen AG, Melsungen
Key project data – Peru (Lima): Construction of new industrial and production building – GFA: 10,394 m² – Gross volume: 69,792 m³ – Cost: Approx. €9 million net – Completion: June 2010
– Spain (Rubí): New building and extension of the LIFT industrial and production building – GFA: 17,300 m² – Gross volume: 111,800 m³ – Cost: €20.7 + 3.8 million net – Completion: April 2011 and start of 2012
– Switzerland (Crissier): Extension of the industrial and production building – GFA: 9,095 m² – Gross volume: 64,520 m³ – Cost: Approx. €25 million net – Completion: June 2010
– Germany (Melsungen):
Construction of plant in WAVE (Werk V) – GFA: 43,400 m² – Gross volume: 214,500 m³ – Cost: Approx. €77 million net – Completion: August 2011
LIFE Nutrition (LIFE N) building complex – GFA: 52,400 m² – Gross volume: 267,800 m³ – Cost: Approx. €186 million net – Completion: May 2010
Extension of LIFE N production building – GFA: 2,584 m² – Gross volume: 25,341 m³ – Cost: Approx. €42 million net – Completion: August 2012
Drees & Sommer services– Project management– ProjectCommunicationSystem (PCS)– Cost and planning check – Contract management– Project controlling– Reporting– Construction schedule management
Value-add achieved for client – International adherence to German standards – Applied specialized pharmaceutical industry experience of construction experts – Exact adherence to budgets and schedules – High quality and profitability – Wherever you are: Effective project communication
At B. Braun headquarters in Melsungen, Hessen, Drees & Sommer is managing the construction of a new building and extension to the existing LIFE-N complex as well as the extension of the medical production building
66 67
New SWR building:Economical and functional
In the media industry, hardly anything is as important as speed and topicality. Südwestrundfunk (‘Southwest Broadcasting’, SWR) is adhering to this principle with the construction of its contemporary multipurpose office and production facility. Drees & Sommer has supported the project – which brings all SWR employees together at one location – from its inception.
Stuttgart is a city with steep roads
and many steps. Short lines of communi-
cation can be a distinct advantage.
Longer distances are more of a hindrance
in the Stuttgart basin than elsewhere,
particularly when time is of the essence.
Organizations that, like SWR, are scat-
tered across multiple sites and which
depend on rapid travel either by car and
on foot lose a lot of valuable time and
resources. What can be done?
Well equipped for the futureAfter nearly half a century of operating
in a production building in Park Berg and
at numerous other sites spread across
the city, SWR has been building a new
headquarters next to the existing Funk-
haus (broadcasting house) in the east
of Stuttgart. Two key goals are to be
achieved: Consolidating the formerly
scattered personnel at one location and
equipping them with state-of-the-art
media technology.
The building combines a range of
facilities in an area of nearly 30,000
square meters: 480 office workplaces,
several editorial rooms, three television
studios, a bi-medial studio for radio
and television, and underground
parking for 150 vehicles. Test operation
is expected to begin in autumn 2011,
allowing radio and television programs
to be produced there from the beginning
of 2012. The consolidation of various
departments in one of the most modern
media and production facilities in
Germany results in numerous economic
and functional benefits for the broad-
caster’s operations.
Feasibility study, architect selection and project control Drees & Sommer experts were involved
in the project from the word go. Amongst
other things, the expert team supported
SWR by undertaking feasibility studies
and, building on this foundation, with
the architect selection process.
Through its professional project control
during both planning and construction,
Drees & Sommer made a substantial
contribution to ensuring that – despite
difficult construction conditions and
foundation issues – the project will be
successfully completed in 2011. SWR
can serve its listeners and viewers even
better in the future and everyone will
be walking “ON AIR”.
PROJECT MANAGEMENT FOR ADVANCED MEDIA HEADQUARTERS
SWR’s new headquarters next to the Funkhaus accommodates 480 employees
From 2012, SWR will produce its radio and television programs in new offices and studios
ClientSüdwestrundfunk SWR, Stuttgart
Project duration January 2000 – May 2011
Architectstruhkarchitekten, Braunschweig
Key project data – GFA: 29,000 m²– Gross volume: 133,000 m³– Cost: €73.1 million net
Drees & Sommer services – Project management– Feasibility studies and site analyses– Architect selection process– User management – ProjectCommunicationSystem (PCS)
Value-add achieved for client – Successful balance of economy, functionality and architecture – Effective integration of technical expertise – Relieving client burden through customized services – Fast communication using web-based tools
68 69
ZVO headquarters – a building that benefits customers and employees alike
Openness, customer proximity and functionality – these were features the Zweckverband Ostholstein (ZVO, Ostholstein utilities association) wanted for its new headquarters. With the assistance of Drees & Sommer, these requirements were realized in a new building at the new location in Sierksdorf.
Whether customers or employees,
people have always been the focus of
ZVO’s work. This service provider in
the supply & disposal industry with a
history stretching back over 80 years
now has some 250 employees. And its
customers are people in the Ostholstein
region of North Germany.
Until recently, the huge distances on
the coast resulted in long drives between
locations. This not only threatened to
jeopardize customer care, but the many
trips undertaken by employees also led
to unnecessary environmental pollution
and increased costs.
The new central headquarters has clear benefits The realization in 2006 that the
situation had to be improved formed
the basis for the development. Some
four years later, the proud result stands
in the Neustädter Bucht industrial
park: the company’s modern, highly
functional new headquarters.
The complex on the new premises
comprises two dovetailed elements.
These accommodate rooms for various
uses, including offices, laboratories,
storerooms and workshops. All ZVO
PROJECT MANAGEMENT FOR NEW OFFICE BUILDING
employees relocated here in 2010. The
architecture is generous without being
ostentatious. The interior is clearly
thought through down to the last detail
of office fitout – and it is immediately
apparent that the building is designed
to promote open communication.
Friendly user-oriented new building: The functionality of the new ZVO headquarters is partially the result of well-thought-out operational zoning
ClientZweckverband Ostholstein/ZVO Holding, Sierksdorf
Project duration June 2006 – April 2010
ArchitectRKW Architektur+Städtebau, Düsseldorf
Key project data– GFA: 5,800 m²– Gross volume: 25,950 m³– Leasable area: 3,430 m² administration, 1,698 m² storerooms and workshops– Cost: €12 million net
Drees & Sommer services – Development management – Organizational consulting – Energy and Facility management consulting – Process management for VOB/VOF (German Tender Regulations for Freelance Services/Construction Work) – Project management– Technical & economic controlling– Furniture management – Document management
Value-add achieved for client – 20% more floor space than in original planning – Reduction of investment cost by approx. 10%– Reduction of labor cost through optimized processes – Exact adherence to handover deadline
70 71
“For us, the outcome is a high-quality
building completed on schedule at
a very favorable price – and one that is
also very economical to operate.”
Heiko Suhren, Director of the ZVO assocation
EntranceProcessing
Identification
Filing
Creation
Disposal
Archiving
Office
Sound support from site analysis to handover Drees & Sommer consulted with the
principal right from the initial project
idea. As part of the location optimization
analysis, the managers first examined
the profitability of the project with regard
to investment, operational and labor
costs. Then various realization options
were weighed against each other,
including, for example, the suitability of
adopting a Public private partnership
approach for the planned new building.
Organization consulting cuts costsEven before the start of actual planning,
Drees & Sommer organizational consult-
ants were able to cut the investment
cost by optimizing space requirements by
20 percent through early energy
management and Facility management
consulting. The basis for this included
the development of a flexible office
concept with an open communication
structure and minimal filing areas.
At the same time, a digital document
management system was introduced
in close cooperation with the ZVO
employees.
During the implementation phase,
Drees & Sommer managers focused
primarily on adherence to cost, schedule
and quality goals and smooth progress
of construction. And they were success-
ful: All key parameters were adhered
to and on March 24, 2010 the building
was handed over to the principal
following several years of planning
and construction. It is no accident that,
until today, the ZVO is pleased with
its new headquarters that combines
economy, sustainability and a high
degree of functionality. It is a reflection
of the company’s philosophy and its
future course.
PROJECT MANAGEMENT FOR NEW OFFICE BUILDING
Both internally and externally, the building is characterized by clear lines, open rooms and bright colors – an ambience that not only promotes the well-being of customers and employees, but is highly functional, too.
Where to? The organizational consultants used a flow map to develop a functional office concept with short lines of communication.
72 73
Drees & Sommer is coordinating the construction of a new multipurpose hall in Neu-Ulm. Built using the Public Private Partnership (PPP) model, the experts supported the cities of Ulm and Neu-Ulm with the invitation to tender, planning, construction and operation, as well as the construction phase itself.
PPP INVITATION TO TENDER AND MANAGEMENT FOR MULTIPURPOSE HALL
For over twenty years, the cities had
talked about having a joint function hall,
and in 2009 the two councils decided –
with an overwhelming majority – that
the new multipurpose facility would be
built on the Volksfestplatz (festival
ground). As the result of a change in
league requirements, the old Kuhberg-
halle was no longer suitable as a venue
for basketball games. And in addition
to ball games, the new venue is
designed to host concerts, shows and
cultural events for the whole of greater
Ulm and Neu-Ulm.
PPP consulting with detailed analysis Together with the two city councils,
Drees & Sommer developed the idea
for the construction of the hall using
the Public Private Partnership (PPP)
model. The building was realized in a
cooperative venture between local
government and a private partner.
The parameters for the bidders were
maximum construction costs totaling
€20.1 million net for the arena, operation
over a period of at least 20 years and
a maximum operating cost subsidy of
€545,000 per year from the cities. The
Drees & Sommer experts carried out a
market survey and undertook a neutral
examination of requirements. This
type of analysis of parameters shows
whether and to what degree a PPP is
actually suitable. The city councils
of Ulm and Neu-Ulm attached great
importance to ownership of the building
and to being able to influence its
operation.
Holistic support as project controller The Drees & Sommer team presented
the interim and final results to various
bodies and ensured that the milestone
plan was within the agreed timeframe.
At the end of 2009, the contract for the
planning, construction and operation
of the building for a period of at least
20 years was awarded to the Max Bögl
Group. The design for the building was
developed by Architektur Concept.
Construction work on the arena started
in mid 2010, with Drees & Sommer
undertaking project control throughout
execution. Tracking of cost increases
and cost cuts allowed additional features
to be realized, sometimes at no extra
cost. As a result of the PPP process, Max
Bögl, as long-term operator of the facility,
has a great interest in ensuring high-
quality and functional implementation
of the project. Strict implementation
requirements – such as a passive house
standard applying to several building
components, connection to district
heating, and the inclusion of a photo-
voltaic system will ensure operational
and energy cost savings.
Multipurpose hall for two cities The new multipurpose hall will accommo-
date up to 9,000 spectators and, once
completed in December 2011, will be
one of the German Federal Basketball
League’s three largest venues. The cost
for the project totals €27.6 million net.
The building includes integrated theatre
boxes, and the foyer and the business
club can be used as separate venues.
The German ratiopharm Ulm team –
member of the Federal Basketball
League – is anchor tenant of the hall.
Until the official naming, the hall had the
working title ‘Multipurpose Hall Ulm/
Neu-Ulm’, indicating the close cooperation
between the two cities. As a long-term
principal sponsor and name sponsor,
the pharmaceutical company ratiopharm
secured naming rights for the multi-
purpose hall. Since July 2010 it is now
officially known as the ‘ratiopharm
arena’, reflecting the close links between
the club and the company.
The opening is scheduled for December 6,
2011. Thanks to the trusting cooperation
and optimal consulting during the
tendering process and project execution,
Drees & Sommer has already been
awarded follow-up projects in Ulm.
ratiopharm arena:plan, build and operate
Client Cities of Ulm and Neu-Ulm:As „Multifunktionshalle Ulm/Neu-Ulm GmbH“ (MFH GmbH)
Private partnerMax Bögl Projektentwicklung GmbH & Co. KG, Neumarkt
ArchitectArchitektur Concept – Pfaffhausen und Staudte GbR, Zwickau
Construction periodMid 2010 – End 2011
Key project data– Arena: Approx. 14,000 m²– Multistory car park: 250 cars, parking lot for 700 cars – Investment cost: Approx. €27.6 million net
Drees & Sommer services PPP process with– Site analysis– Profitability forecast (Turnover and profit forecast)– Execution strategy– Market research– Pan-European invitation to tender – Prequalification (Scrutinizing suitability of bidding consortiums)– Negotiation processes– Overall controlling during the execution phase– Acceptance and handover management
Value-add achieved for client – Competent consulting based on experience with similar PPP projects – Schedule stability through milestone checks – Smooth execution thanks to specialist expertise– Reduced effort for principal through organizational processes and pre- and post-processing for various rounds of negotiation
Construction work on the new arena started mid 2010. Drees & Sommer under-took project control during execution.
The new multipurpose hall is one of the German Federal Basketball League’s three largest. It will also be used for cultural events.
74 75
F. Hoffmann-La Roche – a global player in pharmaceuticals – is consolidating its headquarters in Basel which – up to now – has been scattered across several locations in the city. A 178-meter office high-rise is being built based on plans developed by Herzog & de Meuron. Drees & Sommer has been commissioned to undertake general planning of what will be Switzerland’s highest building.
GENERAL PLANNING FOR A NEW HIGH-RISE
With this striking building, Roche is
identifying with its ‘home town’ of Basel.
The building, shaped like a right-angled
triangle, offers an auditorium, external
terraces and communication zones
on 41 levels, and accommodates some
2,000 office workplaces.
With the construction of the high-rise –
known as Bau 1 (Building 1) – the
world’s largest biotechnology company
is investing in its employees while at the
same time continuing the architectural
tradition for its headquarters by erecting
a building that is at once bold and
functional.
“No worries” package for complex requirements
“We are delighted work on this
exciting project can now start.”
Matthias M. Baltisberger, Manager, Roche Basel
76 77
The bold concept by Herzog & de Meuron continues the design idiom of existing Roche buildings
Flexible offices with generous roof terraces and communication areas contribute to the positive working environment
Improving workplace quality, minimizing land use Numerous compelling arguments spoke
in favor of consolidating the Basel
offices: Close proximity promotes
communication – a factor of key impor-
tance to a research-oriented organization.
And a modern new building allows for
a pleasant working environment that
motivates employees and promotes
creativity. Added to which, it also makes
more efficient use of space. Together
with advanced building operation, this
can save the company huge amounts
over many years.
Basel, on the other hand, benefits from
a reduction in traffic in and through the
city and at the same time – an important
factor in Switzerland – it prevents further
land use in the surrounding area. In
addition, Basel’s image will clearly benefit
from the addition of an iconic architectural
attraction that will define the city’s future
silhouette.
Professional management of complexity The client required independent project
management experts to manage the
complexity of such an extensive con-
struction project. But the experts were
not only to have specialist know-how,
but also to have sufficient personnel
resources and a suitable range of tools
at their disposal. Drees & Sommer had
previously supported the principal
successfully. With its general planning
service, the company offers a “No
worries” package to ensure the rapid,
reliable and economical execution of all
aspects of major construction projects.
In addition to the conventional
management services such as project
organization, schedule & cost con-
trolling, risk & quality management,
requirements management, docu-
mentation management and reporting,
general planning also covers the
coordination and specialist manage-
ment of all project participants. In
addition, Drees & Sommer is undertaking
planning of facade technology, building
services equipment and structural
design.
As a ‘temporary construction depart-
ment’, the professionals substantially
reduced the burden on the principal.
Following the successful meeting of key
milestones in the planning process for
the client in 2010, the City of Basel’s
Building Inspectorate granted building
approval in February 2011. The
people of Basel as well as Roche and
Drees & Sommer employees are all
looking forward to the completion of
this unique project.
GENERAL PLANNING FOR A NEW HIGH-RISE
ClientF. Hoffmann-La Roche AG, Basel
Project duration January 2009 – December 2015
ArchitectHerzog & de Meuron Architekten, Basel
Key project data– Height: 178 m, 41 levels– GFA: Approx. 72,000 m²– Gross cubage: 375,000 m³– Workplaces: Approx. 2,000, auditorium with seating for approx. 500 – Cost: Approx. CHF550 million
Drees & Sommer services– Project lead function – Project management– General planning
Value-add achieved for client– Responsible contact – All services under one roof – Design to work– Fast and economical project execution – Holistic planning
7978
Mercedes-Benz is building a new €800 million factory in Kecskemét, Hungary. New-generation compact cars are scheduled to start rolling off the assembly line there from the beginning of 2012. Drees & Sommer supported the client during the planning phase and an expert team is now on site controlling the realization of this ambitious project.
PROJECT MANAGEMENT AND ON-SITE COMPETENCE FOR NEW FACTORY
A close relationship between Mercedes-
Benz and Drees & Sommer experts,
developed over many years, gave the
client the confidence to award this
contract in 2008. Drees & Sommer has
a proven track record of expertise with
numerous projects in the auto industry
and years of experience in industrial
construction. And with a regional office
in Hungary, Drees & Sommer also has
the required local expertise. The in-house
Hungarian specialists are not only fully
conversant with the special approval
requirements in the country, but are
also acting as qualified construction
engineering interpreters for the duration
of the project.
Project management competence in Sindelfingen and Hungary The Drees & Sommer expert team
has already provided support to the
Mercedes-Benz team at its Sindelfingen
plant. There, at a very early stage of
the project in 2008, they worked with
Mercedes-Benz factory planners to
develop the layout of the new factory
and to coordinate material flows with
actual production flow, thus making a
substantial contribution to advancing
the planning.
Since 2009 the Drees & Sommer
experts for automobile and industrial
construction have been supporting
Mercedes-Benz employees with the
construction of the new factory in
Hungary. Having inhouse specialists
on site has allowed optimum co-
operation between Hungarian and
German colleagues. In this way,
Drees & Sommer has already helped
with approvals, coordination with
numerous public authorities, and pre-
qualification of construction companies.
Major Mercedes-Benz project in Hungary on the home straight
Sophisticated industrial architecture under a shining star: the paint shop with body buffer and the central administrative building
80 81
Budget, schedule and quality require-ments met The project parameters were demanding,
including a tight schedule. As Hungary
imposes mandatory quality standards,
the entire complex also had to meet the
requirements of sophisticated industrial
architecture. This was achieved through
the committed participation of the
architects involved.
The future production plant comprises
a pressing plant, weld shop including
logistics halls, a building for surface
treatment (paintshop) with body buffer,
and an assembly hall including logistics,
and associated industrial parks for
suppliers. A central building complete
with outbuildings accommodates the
administration employees. The con-
struction site has a total area of approx.
180 hectares, the entire site totals
441 hectares. The gross floor area of
the project totals more than 300,000
square meters. The factory is designed
for the production of more than 100,000
units annually and will employ some
2,500 people when completed.
Preparations ensure timely completionCareful preparation of the construction
site with sophisticated site logistics,
detailed construction process simulation
and strict time management were key
requirements for completion in the
construction period of 24 months
(six months for preparatory measures
such as land leveling and 18 months
construction time). Drees & Sommer
also supported the client by providing
its ProjectCommunicationSystem (PCS)
and CostMonitor (CoMo) tools. These
two web-based tools allow the principal
and all involved in the project to access
current cost and schedule information
at any time.
Daily updates to information and close
monitoring by Drees & Sommer will
ensure that the installation of plant and
equipment starts on schedule and that
the planned Start of Production (SOP) is
met. The first cars will leave the assembly
line in Kecskemét in the first quarter of
2012 to be handed over to their new
owners.
German and Hungarian experts on site allowed construction to progress on schedule and within budget
The new Mercedes-Benz plant in Kecskemét has a gross floor area of more than 300,000 square meters (large photo above)
PROJECT MANAGEMENT AND ON-SITE COMPETENCE FOR NEW FACTORY
ClientMercedes-Benz Manufacturing Hungary,Kecskemét
ArchitectKohlbecker | Architekten & Ingenieure, Gaggenau
Project duration– August 2008 – March 2012– Construction period: July 2009 – June 2011– Commissioning: From second half of 2011 – Start of Production (SOP): Q1 2012
Key project data– Total site area: 441 ha– Net construction area: 180 ha– GFA: more than 300,000 m²– Gross volume: over 3 million m³
Drees & Sommer services – Project control – Support for project management – ProjectCommunicationSystem (PCS)– CostMonitor (CoMo)– Project organization– Building site logistics– Construction process simulation
Value-add achieved for client – Early precise definition of project goals – Competent support during planning phase– Country-specific contract award and execution strategy – Service provision by German and Hungarian experts on site – Adherence to all cost, schedule and quality requirements – Flexible provision of services
82 83
OfficesThe following pages show our offices in alphabetical order following Stuttgart,
where the company is headquartered.
We are well acquainted with local practices in all our locations – allowing us
bring our expertise to bear to serve both local and international clients.
We are there,where our clients need us ...
8584
Offices and Managing Directors
Dipl.-Ing. Architekt Kilian Geadah
(from left) Dipl.-Ing. (FH) Bau, M. Eng. Markus WeigoldDipl.-Ing. Oliver BeckDipl.-Ing. Hanns Ludwig Fiechtner
(from left) Dipl.-Ing. (FH) Architekt, M. Eng. Christopher MatthiesDipl.-Ing. (FH) Frank Reuther
Barcelona
Drees & Sommer Espana S.L.c/Aribau, 112 4°1°08036 Barcelona, SpainPhone +34 93 451 08 39 Fax +34 93 451 63 [email protected]
Berlin
Drees & SommerBundesallee 39 – 40 a10717 BerlinPhone +49 30 254394-0Fax +49 30 [email protected]
Brussels
Drees & Sommer Belgium S.P.R.L.Avenue des Cerisiers 151030 Brussels, BelgiumPhone +32 2 73770-30Fax +32 2 [email protected]
Bremen
Drees & SommerAm Speicher XI28217 Bremen Phone +49 421 200 96 87 Fax +49 421 200 98 [email protected]
Dipl.-Ing. (FH) Bau, M. Eng. MBA Jürgen Marc Volm
Basel
Drees & Sommer SchweizRiehenstrasse 434058 Basel, SwitzerlandPhone +41 61 68303-65Fax +41 61 68303-67
Dipl.-Ing. Architekt Phillip Goltermann
(from left) Dipl.-Ing. (FH) Architekt Martin LutzProf. Dr.-Ing. Michael Bauer Dipl.-Ing. (FH) Thomas HäusserDr.-Ing. Peter Mösle
Stuttgart
Drees & SommerObere Waldplätze 1170569 StuttgartPhone +49 711 687070-0Fax +49 711 [email protected]
(from left) Prof. Dr.-Ing. Friedrich HenslerDipl.-Ing. (FH) Bau Wolfgang BeckDipl.-Ing. Mirco BeutelspacherDipl.-Ing. Bau Thomas JaißleDipl.-Ing. Ralph ScheerDipl.-Ing. (FH) Bau, MBA Patrick TheisDipl.-Ing. (FH) Bau Bernhard Unseld
(from left) Dr.-Ing. Jürgen LaukemperDipl.-Ing. (FH) Claus BürkleDipl.-Ing. Architekt & Stadtplaner, MBA Roland HuberDipl.-Ing. (FH) Bau Daniel KluckDipl.-Ing. Christopher Vagn Philipsen
Drees & SommerLiebknechtstraße 3370565 StuttgartPhone +49 711 222933-0Fax +49 711 [email protected]
Drees & SommerObere Waldplätze 1370569 StuttgartPhone +49 711 1317-0Fax +49 711 [email protected]
Dipl.-Ing. Ralph Scheer
Budapest
Drees & Sommer Hungaria Kft.Andrássy út 1211062 Budapest, HungaryPhone +43 15 335 660Fax +43 15 335 [email protected]
8786
(from left) Dipl.-Ing. (FH) Marc PorathDipl.-Ing. Andrei George GhengheaDipl.-Ing. Anton Marius Stroe
(from left) Dipl.-Ing. Frank SchulzeDipl.-Ing. Jörg Wohlfarth
Bucharest
Drees & Sommer Romania S.R.L.Str. Lt. Av. Serban Petrescu, Nr. 15, Et. 2011891 Sector 1, Bucharest, RomaniaPhone +40 31 6908-001 Fax +40 31 [email protected]
Dresden
Drees & SommerAmmonstraße 7201067 DresdenPhone +49 351 873239-0Fax +49 351 [email protected]
(from left) Dipl.-Ing. Bau Rainer PreisshofenProf. Dr.-Ing. Thomas Bohn
Dipl.-Ing., Dipl.-Wirtsch.-Ing. Jörg Ewald-Lincke
Dubai
Drees & Sommer Gulf FZ LLCDIC – Dubai Internet City Building 13, Office 116, PO Box 500 128Dubai, U.A.E.Phone +971 4 390-0448Fax +971 4 [email protected]
Düsseldorf
Drees & SommerDerendorfer Allee 640476 DüsseldorfPhone +49 211 23390-0Fax +49 211 [email protected]
Dipl.-Ing. Jörg Wohlfarth
Erfurt
Drees & SommerAnger 66 – 7399084 ErfurtPhone +49 361 59896-6410Fax +49 361 [email protected]
Dipl.-Ing. Björn Jesse
Hannover
Drees & Sommer Podbielskistraße 333 30659 Hannover Phone +49 511 2138870-0 Fax +49 511 [email protected]
(from left) Dipl.-Ing. Architekt Phillip GoltermannDipl.-Ing. Björn Jesse
Hamburg
Drees & SommerAm Sandtorkai 6820457 HamburgPhone +49 40 514944-0Fax +49 40 [email protected]
Dipl.-Ing. (FH) Hans-Peter Holler
Dipl.-Ing. Architekt Phillip Goltermann
Istanbul
Drees & Sommer Türkiye Inönü Cad 29/3 Gümüssuyu34 427 Istanbul, Turkey Phone +90 212 29284-00Fax +90 212 [email protected]
Kiel
Drees & SommerSchwedendamm 16 24143 KielPhone +49 431 9902954-10Fax +49 431 [email protected]
Dipl.-Ing. Architekt Steffen Sendler
Kiev
DS Management Partners, UkrainePereulok Muzejny 10 office 803/80401001 Kiev, UkrainePhone +38 0442535677 Fax +38 0442538492 [email protected]
(from left) Dipl.-Ing. Bau Alexander ScheidlerDipl.-Ing. (FH) Thomas HofbauerDipl.-Ing. Bau Sascha KilbDipl.-Ing. (FH) Norbert OttenDipl.-Ing. Architekt Marc Schömbs
Frankfurt
Drees & SommerSchmidtstraße 51 60326 Frankfurt am MainPhone +49 69 758077-0Fax +49 69 [email protected]
(from left) Dipl.-Ing. Bau Stefan HeselschwerdtDipl.-Ing. (FH) Matthias Schulle
(from left) Peter NielsenDipl.-Ing. Architekt Phillip Goltermann
Cologne
Drees & SommerGürzenichstraße (Eingang Kleine Sandkaul 5 a) 50667 Köln Phone +49 221 13050-0 Fax +49 221 [email protected]
Copenhagen
Drees & Sommer Nordic A/SFrederiksborggade 15, 8. OG1360 Copenhagen K, DenmarkPhone +45 45 26 90 00Fax +45 45 26 90 [email protected]
8988
Dipl.-Ing. Jörg Wohlfarth
Dipl.-Ing. Jürgen Kreisel
Milan
Drees & Sommer Italia Engineering S.r.l.Corso Garibaldi, 8620121 Milan, ItalyPhone +39 02 29062666Fax +39 02 [email protected]
Leipzig
Drees & SommerLöhrstraße 4 – 604105 LeipzigPhone +49 341 91930-0Fax +49 341 [email protected]
Moscow
OOO Drees & Sommer Project Management and Building Technologies Russland + GUS1st Volkonsky pereulok 13, building 2127473 Moscow, RussiaPhone +7 495 7375046 Fax +7 495 7376443 [email protected]
(from left) Dipl.-Ing. Architekt Steffen SendlerDipl.-Ing. Tim Comaia
(from left) Prof. Dr.-Ing. Thomas BohnDipl.-Ing. Rino WoyczykDipl.-Ing. Architekt Jörg Zirlewagen
Munich
Drees & SommerGeisenhausenerstraße 1781379 MünchenPhone +49 89 149816-0Fax +49 89 [email protected]
Dipl.-Ing. (FH) Frank Reuther
Munsbach/Luxembourg
Drees & Sommer Luxembourg SARL 6c, rue Gabriel Lippmann5365 Munsbach, LuxembourgPhone +352 261205-5550Fax +352 [email protected]
Prof. Dr.-Ing. Thomas Bohn
Nürnberg
Drees & SommerMarienstraße 890402 NürnbergPhone +49 911 240389-51Fax +49 911 [email protected]
(from left) Dipl.-Ing. Architekt Steffen SendlerDipl.-Ing. Tim Comaia
St. Petersburg
OOO Drees & Sommer Project Management and Building TechnologiesUl. Marata, 47/49, litera A, office 202190002, St. Petersburg, RussiaPhone +7 812 3334307Fax +7 812 [email protected]
Dipl.-Ing. Architekt & Stadtplaner, MBA Roland Huber
Shanghai
SBA Consulting Ltd. German Centre Shanghai (Unit 751B, Tower 3)88 Keyuan Road, Pudong Zhangjiang Hi-Tech ParkShanghai 201203, P.R. ChinaPhone +86 21 6587 7922Fax +86 21 6587 [email protected]
Dipl.-Ing. Jürgen Kreisel
Rome
Drees & Sommer Italia Engineering S.r.l.Via Piave, 6600187 Rome, Italy Phone +39 06 42020-052Fax +39 06 [email protected]
(from left) Dipl.-Ing. Architekt Steffen SzeidlDipl.-Ing. (FH) Bau Bernhard Unseld
Zurich
Drees & Sommer SchweizHardturmstrasse 1698005 Zurich, SwitzerlandPhone +41 43 366-6464 Fax +41 43 366-6463 [email protected]
Dipl.-Ing. Oliver Beck
Warsaw
Drees & Sommer Polska Sp.z.o.o.ul. Wincentego Rzymowskiego 5302-697 Warsaw, PolandPhone +48 22 5480154Fax +48 22 [email protected]
(from left) Dipl.-Ing. Ralph ScheerDipl.-Ing. Architekt Marc Guido Höhne
Vienna
Drees & Sommer ÖsterreichLothringerstraße 16, top 91030 Vienna, AustriaPhone +43 1 5335660-0Fax +43 1 [email protected]
90
Cover, contents, background pages 2 – 9© phecsone – Fotolia.com
Page 2Sandra Ickinger, Böblingen
Pages 3, 6 – 9, 10 – 11, 33, 84 – 89Sandra Schuck Fotografie, Berlin
Pages 12 – 15– © TenneT TSO GmbH– © Holger B. – Fotolia.com Pages 16 – 19 – Lake PHOENIX Entwicklungsgesellschaft/Stadt Dortmund– Lake PHOENIX, project harbour 12: Planungsgruppe Drahtler GmbH, Dortmund– Lake PHOENIX, conceptual design of family home: stegepartner Architektur und Stadtplanung, Dortmund– © Michael Kempf – Fotolia.com
Pages 20 – 21– Visualisation: Bureau Schroeder & Associés, Marc Feider– © Roman Sakhno – Fotolia.com Pages 22 – 25© Landesgartenschau Hemer 2010 GmbH– Arbos Freiraumplanung GmbH & Co. KG– Birk und Heilmeyer Architekten BDA– geskes.hack Landschaftsarchitekten– Herbstreit Landschaftsarchitekten– VEDDER + BERNDES ARCHITEKTEN BDA Pages 26 – 27 CHRIS KISTER FOTODESIGN BFF, Frankfurt, www.ckister.de
Pages 28 – 31 © Deka ImmobilienPhotos: indigo – Studio für WerbefotografieBildbearbeitung und Composing – Print – Service und Web-Design
Pages 32 – 33 © loutocky – Fotolia.com
Pages 34 – 35 – GLL GmbH & Co. MesseTurm KG– GGM Gesellschaft für Gebäudemanagement mbH
Pages 36 – 39– Gerhard Guggenbichler, MedienServiceRuhpolding– Andreas Plenk – Ap-Design– WEBDESIGN VIERLINGER Pages 40 – 41 © FIAT Group Automobiles S.p.A., Turin, Italy
Pages 42 – 45 © Städel Museum– Conceptual design: schneider+schumacher Architekturgesellschaft mbH– Photos: Norbert Miguletz
Pages 46 – 49 © Deutsche Bank Pages 50 – 53 © Glück + Partner GmbH, freie Architekten BDA
Pages 56 – 59 © ECE
Pages 60 – 61 © Lidl Dienstleistung GmbH & Co. KG, Neckarsulm
Pages 62 – 65 © B. Braun Melsungen AG
Pages 66 – 67 – Visualisation: conceptual design of struhkarchitekten Planungsgesellschaft mbH– Photo: © SWR
Pages 68 – 71 Zweckverband Ostholstein, corporate communications
Pages 72 – 73 ARC Pfaffhausen & Staudte / Steven von Collas Pages 74 – 77 © Herzog & de Meuron
Pages 78 – 81Visualisations: Kohlbecker Architekten & Ingenieure Pages 82 – 83© Daniel Fleck – Fotolia.com
Photo credits
Dre
es &
Som
mer
_110
5/24
00/w
dn/
E
Group operating result 20102010201020102010Drees & Sommer GroupAnnual Report 2010