Upload
dushan-milinovich
View
218
Download
1
Tags:
Embed Size (px)
DESCRIPTION
A short list of education, skills, projects, and experiences.
Citation preview
University of Wisconsin - Madison - College of Engineering Bachelor of Science - Civil Engineering - May 1998
Experienced in the administration anddevelopment of BIM design environment from inception to completion.
Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.
University of Wisconsin - Milwaukee - School of Architecture and Urban Planning Masters of Architecture - December 2004
Harvard-Westlake Middle School (40,000 SF) – Los Angeles, CaliforniaAutoCAD project supported by Sketchup design visualization.
Revit- Used in 21 projects from marketing to construction documentsAutoCAD- Used primarily for construction documents3D Studio Max- Marketing tool and finished animationsAdobe Suite- Marketing tool and supporting graphicsSketchup- Basic pre-visualization toolMicrosoft Office - Standard of office and client communication
Burr Ridge Police Department (19,200 SF) - Burr Ridge, IllinoisCompleted Revit project, requiring a minimal RFI, Addenda, and no change-orders.
Dushan Milinovich213-864-6293
Project DraftsmanKalban Architects (Feb 2013 – present)AutoCAD drafter: maintaining standards, following redlines, modifying details
Project EngineerWilliams Construction Management (Feb 2006 - Feb 2007)Administration of construction sites, bridging communicator for architect, owner, and contractor.
Carol Stream Recreational Center (90,000 SF)- Carol Stream, IllinoisRevit project from marketing to construction docs, with close consultant involve-ment.
Independent ContractorMultiple Clients (Jan 2012 - Jan 2013)AutoCAD Specialist, Revit modeler, proficient in Adobe-Suite
profile
education
software
highlights
experience
3D Modeling recreates long lost or never built buildings. Historic buildings are a particular challenge when judging the LOD (Level of Detail), balancing complete reproduction and memory load/file size.
Revit- combining available 2D information to create model3D Studio Max - Rendering
1893 House (4,000 SF) - USASkills development: Ornamentation, Roof conditions, family creation.
Project DraftsmanKalban Architects (Feb 2013 – present)AutoCAD drafter: maintaining standards, following redlines, modifying details
Revit- Analysis tool for relating existing building with remaining original drawingsAutoCAD- Construction Documents resulting from 3D analysis
Harvard-Westlake Wang Center (34,000 SF) - Los Angeles, CaliforniaRenovation existing structure to include code compliance and new program
K:\H
AR
VA
RD
WE
STL
AK
E R
EY
NO
LDS
HA
LL\0
4 C
ON
STR
UC
TIO
N D
OC
UM
EN
TS\S
HE
ET\
HW
W_A
221.
DW
G3/
27/2
014
1:51
PM
K:\H
AR
VA
RD
WE
STL
AK
E R
EY
NO
LDS
HA
LL\0
4 C
ON
STR
UC
TIO
N D
OC
UM
EN
TS\S
HE
ET\
HW
W_A
221.
DW
G3/
27/2
014
1:51
PM
FLOOR PLAN 11/8"=1'-0"
JEFFREY M. KALBAN & ASSOCIATES
10585 Santa Monica Boulevard, Suite 160Los Angeles, Ca. 90025
Tel: 310.441.9313 Fax: 310.441.9043e-mail: [email protected]
ARCHITECTURE, INC.
DRAWING ISSUESDescriptionNo. Date
File Name:Project No.: Scale:
c Jeffrey M. Kalban & Associates
08/08/13
121000
2013
KEY MAP
700 North Faring RoadLos Angeles, California 90077
08/27/1310/25/13
C-11124
01/20/14
FLOOR PLANLEVEL NO. 3
HWW_A221.DWG AS NOTED
A2.2.1A2.2.1REF. NORTH
Independent ContractorMultiple Clients (Jan 2012 - Jan 2013)AutoCAD Specialist, Revit modeler, proficient in Adobe-Suite
Texas A&M Equine Center (50,000 SF) - College Station, TexasRevit model requiring quick turn-over for A/V contractor of the project. Used to determine effective placement of sound systems under roof structure.
Revit- MEP CoordinationAutoCAD- Original construction document files available to A/V contractor
Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.
Revit- Marketing to Construction DocumentsAutoCAD- Construction Detailing SupportAdobe Photoshop- Marketing and supporting graphics
Carol Strem Recreational Facility (89,000 SF) - Carol Stream, IllinoisCompleted Revit project requiring coordination with consultant’s Revit Structure and MEP. Used effectively as client-public pre-visualization tool with seamless transfer to construction documents.
Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.
Revit- Marketing to Construction DocumentsAutoCAD- Construction Detailing SupportAdobe Photoshop- Marketing and supporting graphics
Burr Ridge Police Department (19,200 SF) - Burr Ridge, IllinoisCompleted Revit project, requiring a minimal RFI, Addenda, and no change-orders.
FINISHED FLOOREL = 0' - 0"
T/ TOWEREL = 33' - 10 1/2"
123452
A5.1
15
A5.1
17
A5.1
25
A5.1
T/ROOFEL = 26' - 0"
24 24 24 24 24 24 24 2424
12
12
12
12
12
121212
MASONRY VENEER. STONE.
FLASHING. COPPER. 16 OZ.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
CEDAR. TRIM BOARD.
* * * * * * *
WINDOW. WOOD. ALUM. CLAD.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
SILL. CAST STONE. WITH DRIPEDGE.
POST. HEAVY TIMBER.
DOOR. OVERHEAD SECTIONAL.INSULATED.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.
GRADE.
SILL. CAST STONE. WITHDRIP EDGE.
SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.
SHINGLE VENT. CONTINUOUS.
ROOFING. SHAKE. CEDAR.
COPING. ALUM. PREFIN.
2
A4.1
CAMERA. CLOSED CIRCUITTELEVISION.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.
25 27 25 5
2
METER. GAS.
ROOF DRAIN OVERFLOW.ALL EXTERIOR EXPOSED
WOOD TO BE STAINED.
LIGHTNING PROTECTION.
*
DRYER VENT.
FINISHED FLOOREL = 0' - 0"
T/ TOWEREL = 33' - 10 1/2"ROOFING. SHAKE. CEDAR.
COPING. ALUM. PREFIN.
FACE BRICK. MODULAR.
MASONRY VENEER. STONE.
SILL. PRECAST CONC.
FOUNDATION WALL. CONC. WINDOW. WOOD. ALUM. CLAD.
WINDOW. WOOD. ALUM.CLAD.
SILL. CAST STONE.WITH DRIP EDGE.
BEAM. HEAVYTIMBER.
SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.
SHINGLE VENT.CONTINUOUS.
12
12
1 2 3 4 52
A5.1
15
A5.1
17
A5.1
25
A5.1
A4.24
A4.23
T/TOWEREL = 28' - 4 1/2"
GRADE
A4.210
A4.25
20 20 20 20 20 20 20 201616
2121212121
20
POST. HEAVY TIMBER.
ELEC.OUTLET.
EQEQ
* * * * * * * ** * * * * *
CEDAR. TRIM BOARD.
12
12
12
12
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
STOREFRONT WINDOW SYSTEM.ALUM. THERMALLY BROKEN.
CEDAR. TRIM BOARD.
POST. HEAVY TIMBER.
2
A4.1
COPING. ALUM. PREFIN.
11'-0
"
CAMERA. CLOSED CIRCUITTELEVISION.
MASONRY VENEER. STONE.
11'-0
"
CAMERA. CLOSED CIRCUITTELEVISION.
GUTTER. PREFIN. ALUM.
DOWNSPOUT. PREFIN. ALUM.
10 10
17 1414
6 4 9 4
13
1 1 1
ALL EXTERIOREXPOSED WOODTO BE STAINED.
DOWNSPOUT. PREFIN. ALUM.
LIGHTNING PROTECTION.
FINISHED FLOOREL = 0' - 0"
T/ TOWEREL = 33' - 10 1/2"
A B1
A5.1
5
A5.1
20
A5.1
T/ROOFEL = 26' - 0"
20
A5.4
24
AS0.1 5
A7.3
19 19
KNOX BOX. RECESSED.FURNISHED BY OWNER ANDINSTALLED BY CONTRACTOR.VERIFY FINAL LOCATION WITHLOCAL FIRE DEPARTMENT.
STROBE. PER FIREPROT. SYS.
METER. GAS.SIAMESE CONNECTION.
GRADE.
MASONRY VENEER. STONE.
SILL. CAST STONE. WITH DRIPEDGE.
POST. HEAVY TIMBER.
CEDAR. TRIM BOARD.
* *
SHINGLE VENT. CONTINUOUS.
12
12
12
12
12
12
12
12
ROOFING. SHAKE. CEDAR.
LIGHT FIXTURE. EXTERIOR.FOOTING. CONC.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
DOWNSPOUT. PREFIN. ALUM.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.
FACE BRICK.
CAMERA. CLOSED CIRCUITTELEVISION.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE
FILLER & CAULK.
25 7 8 5
ROOF DRAINOVERFLOW.
ALL EXTERIOR EXPOSEDWOOD TO BE STAINED.
LIGHTNING PROTECTION.
MECHANICAL WALL CAP.
COPING. ALUM. PREFINISHED.
FINISHED FLOOREL = 0' - 0"
T/ TOWEREL = 33' - 10 1/2"
AB1
A5.1
5
A5.1
20
A5.1
T/ROOFEL = 26' - 0"
20
A5.4
A4.23
A4.210
18 18 22 2223 18 18
POST. HEAVY TIMBER.
SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.
WINDOW. WOOD. ALUM. CLAD.
EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.
CEDAR. TRIM BOARD. EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.
SHINGLE VENT. CONTINUOUS.ROOFING. SHAKE. CEDAR.
COPING. ALUM. PREFIN. SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.
GRADE.
MASONRY VENEER. STONE.
FACE BRICK.
SILL. CAST STONE. WITH DRIPEDGE.
DOWNSPOUT. PREFIN. ALUM.
GUTTER. PREFIN. ALUM.
EQ EQ
ELEC.OUTLET.
12
12
12
12
CAMERA. CLOSED CIRCUITTELEVISION.
5 8 7
11 312
15
2 2 2
25ALL EXTERIOR EXPOSED WOOD TO BE STAINED.
KNOX BOX. RECESSED.FURNISHED BY OWNER AND
INSTALLED BY CONTRACTOR.VERIFY FINAL LOCATION WITH
LOCAL FIRE DEPARTMENT.
DOWNSPOUT. PREFIN. ALUM.
LIGHTNING PROTECTION.
FOOTING. CONC.
MASONRY VENEER. STONE.
SILL. CAST STONE. WITH DRIPEDGE.
GATE
8'-0"
10'-0
"4"
PAVEMENTEL = 0' - 0"EL =SEE CIVIL
GATE. FIXED LOUVER.ALUMINUM. SEE GENERAL
SPECIFICATION NOTES.
FACE BRICK.
COPING. CAST STONE.DRIP EDGE BOTH SIDES.
GRADE.
MASONRY VENEER. STONE.
SILL. CAST STONE. WITH DRIPEDGE.
FLASHING. COPPER. 16 OZ.
MASONRY VENEER. STONE.
POST. HEAVY TIMBER.
WINDOW. WOOD. ALUM. CLAD.
2
COPYRIGHT © 2009williams/associates/architects, ltd.
date
draw
nch
ecke
d
wa
no.
revi
sed
3/23
/201
4 7:
55:1
4 PM
A4.1
EXTERIORELEVATIONS
VILL
AG
E O
F BU
RR R
IDG
EBU
RR R
IDG
E PO
LICE
FA
CILI
TYSE
LD
AM
29 JA
N 2
010
2006
-031
SEL
7700
Cou
nty
Line
Roa
d,Bu
rr R
idge
, IL.
605
27
SCALE: 1/8" = 1'-0" 3WEST ELEVATION
SCALE: 1/8" = 1'-0" 1EAST ELEVATION
SCALE: 1/8" = 1'-0" 8SOUTH ELEVATION
SCALE: 1/8" = 1'-0" 6NORTH ELEVATION
PARTIAL ELEV./ SCALE: 1/8" = 1'-0" 4GENERATOR
SCALE: 1/8" = 1'-0" 2PARTIAL SOUTH ELEVATION / NORTHTOWER
INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*
INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*
INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*
INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*
ENCLOSURE