6
University of Wisconsin - Madison - College of Engineering Bachelor of Science - Civil Engineering - May 1998 Experienced in the administraon and development of BIM design environment from incepon to compleon. Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn Librarian Williams Architects (Feb 2007 - Dec 2011) Markeng, Construcon Admin., and 3D Digital Modeling/Draſting. University of Wisconsin - Milwaukee - School of Architecture and Urban Planning Masters of Architecture - December 2004 Harvard-Westlake Middle School (40,000 SF) – Los Angeles, California AutoCAD project supported by Sketchup design visualizaon. Revit- Used in 21 projects from markeng to construcon documents AutoCAD- Used primarily for construcon documents 3D Studio Max- Markeng tool and finished animaons Adobe Suite- Markeng tool and supporng graphics Sketchup- Basic pre-visualizaon tool Microsoſt Office - Standard of office and client communicaon Burr Ridge Police Department (19,200 SF) - Burr Ridge, Illinois Completed Revit project, requiring a minimal RFI, Addenda, and no change-orders. Dushan Milinovich 213-864-6293 [email protected] Project Draſtsman Kalban Architects (Feb 2013 – present) AutoCAD draſter: maintaining standards, following redlines, modifying details Project Engineer Williams Construcon Management (Feb 2006 - Feb 2007) Administraon of construcon sites, bridging communicator for architect, owner, and contractor. Carol Stream Recreaonal Center (90,000 SF)- Carol Stream, Illinois Revit project from markeng to construcon docs, with close consultant involve- ment. Independent Contractor Mulple Clients (Jan 2012 - Jan 2013) AutoCAD Specialist, Revit modeler, proficient in Adobe-Suite profile educaon soſtware highlights experience

Dushan milinovich resume

Embed Size (px)

DESCRIPTION

A short list of education, skills, projects, and experiences.

Citation preview

Page 1: Dushan milinovich resume

University of Wisconsin - Madison - College of Engineering Bachelor of Science - Civil Engineering - May 1998

Experienced in the administration anddevelopment of BIM design environment from inception to completion.

Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.

University of Wisconsin - Milwaukee - School of Architecture and Urban Planning Masters of Architecture - December 2004

Harvard-Westlake Middle School (40,000 SF) – Los Angeles, CaliforniaAutoCAD project supported by Sketchup design visualization.

Revit- Used in 21 projects from marketing to construction documentsAutoCAD- Used primarily for construction documents3D Studio Max- Marketing tool and finished animationsAdobe Suite- Marketing tool and supporting graphicsSketchup- Basic pre-visualization toolMicrosoft Office - Standard of office and client communication

Burr Ridge Police Department (19,200 SF) - Burr Ridge, IllinoisCompleted Revit project, requiring a minimal RFI, Addenda, and no change-orders.

Dushan Milinovich213-864-6293

[email protected]

Project DraftsmanKalban Architects (Feb 2013 – present)AutoCAD drafter: maintaining standards, following redlines, modifying details

Project EngineerWilliams Construction Management (Feb 2006 - Feb 2007)Administration of construction sites, bridging communicator for architect, owner, and contractor.

Carol Stream Recreational Center (90,000 SF)- Carol Stream, IllinoisRevit project from marketing to construction docs, with close consultant involve-ment.

Independent ContractorMultiple Clients (Jan 2012 - Jan 2013)AutoCAD Specialist, Revit modeler, proficient in Adobe-Suite

profile

education

software

highlights

experience

Page 2: Dushan milinovich resume

3D Modeling recreates long lost or never built buildings. Historic buildings are a particular challenge when judging the LOD (Level of Detail), balancing complete reproduction and memory load/file size.

Revit- combining available 2D information to create model3D Studio Max - Rendering

1893 House (4,000 SF) - USASkills development: Ornamentation, Roof conditions, family creation.

Page 3: Dushan milinovich resume

Project DraftsmanKalban Architects (Feb 2013 – present)AutoCAD drafter: maintaining standards, following redlines, modifying details

Revit- Analysis tool for relating existing building with remaining original drawingsAutoCAD- Construction Documents resulting from 3D analysis

Harvard-Westlake Wang Center (34,000 SF) - Los Angeles, CaliforniaRenovation existing structure to include code compliance and new program

K:\H

AR

VA

RD

WE

STL

AK

E R

EY

NO

LDS

HA

LL\0

4 C

ON

STR

UC

TIO

N D

OC

UM

EN

TS\S

HE

ET\

HW

W_A

221.

DW

G3/

27/2

014

1:51

PM

K:\H

AR

VA

RD

WE

STL

AK

E R

EY

NO

LDS

HA

LL\0

4 C

ON

STR

UC

TIO

N D

OC

UM

EN

TS\S

HE

ET\

HW

W_A

221.

DW

G3/

27/2

014

1:51

PM

FLOOR PLAN 11/8"=1'-0"

JEFFREY M. KALBAN & ASSOCIATES

10585 Santa Monica Boulevard, Suite 160Los Angeles, Ca. 90025

Tel: 310.441.9313 Fax: 310.441.9043e-mail: [email protected]

ARCHITECTURE, INC.

DRAWING ISSUESDescriptionNo. Date

File Name:Project No.: Scale:

c Jeffrey M. Kalban & Associates

08/08/13

121000

2013

KEY MAP

700 North Faring RoadLos Angeles, California 90077

08/27/1310/25/13

C-11124

01/20/14

FLOOR PLANLEVEL NO. 3

HWW_A221.DWG AS NOTED

A2.2.1A2.2.1REF. NORTH

Page 4: Dushan milinovich resume

Independent ContractorMultiple Clients (Jan 2012 - Jan 2013)AutoCAD Specialist, Revit modeler, proficient in Adobe-Suite

Texas A&M Equine Center (50,000 SF) - College Station, TexasRevit model requiring quick turn-over for A/V contractor of the project. Used to determine effective placement of sound systems under roof structure.

Revit- MEP CoordinationAutoCAD- Original construction document files available to A/V contractor

Page 5: Dushan milinovich resume

Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.

Revit- Marketing to Construction DocumentsAutoCAD- Construction Detailing SupportAdobe Photoshop- Marketing and supporting graphics

Carol Strem Recreational Facility (89,000 SF) - Carol Stream, IllinoisCompleted Revit project requiring coordination with consultant’s Revit Structure and MEP. Used effectively as client-public pre-visualization tool with seamless transfer to construction documents.

Page 6: Dushan milinovich resume

Project Coordinator, Revit/AutoCAD Specialist, Lunch-and-Learn LibrarianWilliams Architects (Feb 2007 - Dec 2011)Marketing, Construction Admin., and 3D Digital Modeling/Drafting.

Revit- Marketing to Construction DocumentsAutoCAD- Construction Detailing SupportAdobe Photoshop- Marketing and supporting graphics

Burr Ridge Police Department (19,200 SF) - Burr Ridge, IllinoisCompleted Revit project, requiring a minimal RFI, Addenda, and no change-orders.

FINISHED FLOOREL = 0' - 0"

T/ TOWEREL = 33' - 10 1/2"

123452

A5.1

15

A5.1

17

A5.1

25

A5.1

T/ROOFEL = 26' - 0"

24 24 24 24 24 24 24 2424

12

12

12

12

12

121212

MASONRY VENEER. STONE.

FLASHING. COPPER. 16 OZ.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

CEDAR. TRIM BOARD.

* * * * * * *

WINDOW. WOOD. ALUM. CLAD.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

SILL. CAST STONE. WITH DRIPEDGE.

POST. HEAVY TIMBER.

DOOR. OVERHEAD SECTIONAL.INSULATED.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.

GRADE.

SILL. CAST STONE. WITHDRIP EDGE.

SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.

SHINGLE VENT. CONTINUOUS.

ROOFING. SHAKE. CEDAR.

COPING. ALUM. PREFIN.

2

A4.1

CAMERA. CLOSED CIRCUITTELEVISION.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.

25 27 25 5

2

METER. GAS.

ROOF DRAIN OVERFLOW.ALL EXTERIOR EXPOSED

WOOD TO BE STAINED.

LIGHTNING PROTECTION.

*

DRYER VENT.

FINISHED FLOOREL = 0' - 0"

T/ TOWEREL = 33' - 10 1/2"ROOFING. SHAKE. CEDAR.

COPING. ALUM. PREFIN.

FACE BRICK. MODULAR.

MASONRY VENEER. STONE.

SILL. PRECAST CONC.

FOUNDATION WALL. CONC. WINDOW. WOOD. ALUM. CLAD.

WINDOW. WOOD. ALUM.CLAD.

SILL. CAST STONE.WITH DRIP EDGE.

BEAM. HEAVYTIMBER.

SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.

SHINGLE VENT.CONTINUOUS.

12

12

1 2 3 4 52

A5.1

15

A5.1

17

A5.1

25

A5.1

A4.24

A4.23

T/TOWEREL = 28' - 4 1/2"

GRADE

A4.210

A4.25

20 20 20 20 20 20 20 201616

2121212121

20

POST. HEAVY TIMBER.

ELEC.OUTLET.

EQEQ

* * * * * * * ** * * * * *

CEDAR. TRIM BOARD.

12

12

12

12

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

STOREFRONT WINDOW SYSTEM.ALUM. THERMALLY BROKEN.

CEDAR. TRIM BOARD.

POST. HEAVY TIMBER.

2

A4.1

COPING. ALUM. PREFIN.

11'-0

"

CAMERA. CLOSED CIRCUITTELEVISION.

MASONRY VENEER. STONE.

11'-0

"

CAMERA. CLOSED CIRCUITTELEVISION.

GUTTER. PREFIN. ALUM.

DOWNSPOUT. PREFIN. ALUM.

10 10

17 1414

6 4 9 4

13

1 1 1

ALL EXTERIOREXPOSED WOODTO BE STAINED.

DOWNSPOUT. PREFIN. ALUM.

LIGHTNING PROTECTION.

FINISHED FLOOREL = 0' - 0"

T/ TOWEREL = 33' - 10 1/2"

A B1

A5.1

5

A5.1

20

A5.1

T/ROOFEL = 26' - 0"

20

A5.4

24

AS0.1 5

A7.3

19 19

KNOX BOX. RECESSED.FURNISHED BY OWNER ANDINSTALLED BY CONTRACTOR.VERIFY FINAL LOCATION WITHLOCAL FIRE DEPARTMENT.

STROBE. PER FIREPROT. SYS.

METER. GAS.SIAMESE CONNECTION.

GRADE.

MASONRY VENEER. STONE.

SILL. CAST STONE. WITH DRIPEDGE.

POST. HEAVY TIMBER.

CEDAR. TRIM BOARD.

* *

SHINGLE VENT. CONTINUOUS.

12

12

12

12

12

12

12

12

ROOFING. SHAKE. CEDAR.

LIGHT FIXTURE. EXTERIOR.FOOTING. CONC.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

DOWNSPOUT. PREFIN. ALUM.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.

FACE BRICK.

CAMERA. CLOSED CIRCUITTELEVISION.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLE

FILLER & CAULK.

25 7 8 5

ROOF DRAINOVERFLOW.

ALL EXTERIOR EXPOSEDWOOD TO BE STAINED.

LIGHTNING PROTECTION.

MECHANICAL WALL CAP.

COPING. ALUM. PREFINISHED.

FINISHED FLOOREL = 0' - 0"

T/ TOWEREL = 33' - 10 1/2"

AB1

A5.1

5

A5.1

20

A5.1

T/ROOFEL = 26' - 0"

20

A5.4

A4.23

A4.210

18 18 22 2223 18 18

POST. HEAVY TIMBER.

SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.

WINDOW. WOOD. ALUM. CLAD.

EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.

CEDAR. TRIM BOARD. EXPANSION JOINT (EJ).PROVIDE COMPRESSIBLEFILLER & CAULK.

SHINGLE VENT. CONTINUOUS.ROOFING. SHAKE. CEDAR.

COPING. ALUM. PREFIN. SIDING. CEDAR. TONGUE &GROOVE. V. GROOVE.

GRADE.

MASONRY VENEER. STONE.

FACE BRICK.

SILL. CAST STONE. WITH DRIPEDGE.

DOWNSPOUT. PREFIN. ALUM.

GUTTER. PREFIN. ALUM.

EQ EQ

ELEC.OUTLET.

12

12

12

12

CAMERA. CLOSED CIRCUITTELEVISION.

5 8 7

11 312

15

2 2 2

25ALL EXTERIOR EXPOSED WOOD TO BE STAINED.

KNOX BOX. RECESSED.FURNISHED BY OWNER AND

INSTALLED BY CONTRACTOR.VERIFY FINAL LOCATION WITH

LOCAL FIRE DEPARTMENT.

DOWNSPOUT. PREFIN. ALUM.

LIGHTNING PROTECTION.

FOOTING. CONC.

MASONRY VENEER. STONE.

SILL. CAST STONE. WITH DRIPEDGE.

GATE

8'-0"

10'-0

"4"

PAVEMENTEL = 0' - 0"EL =SEE CIVIL

GATE. FIXED LOUVER.ALUMINUM. SEE GENERAL

SPECIFICATION NOTES.

FACE BRICK.

COPING. CAST STONE.DRIP EDGE BOTH SIDES.

GRADE.

MASONRY VENEER. STONE.

SILL. CAST STONE. WITH DRIPEDGE.

FLASHING. COPPER. 16 OZ.

MASONRY VENEER. STONE.

POST. HEAVY TIMBER.

WINDOW. WOOD. ALUM. CLAD.

2

COPYRIGHT © 2009williams/associates/architects, ltd.

date

draw

nch

ecke

d

wa

no.

revi

sed

3/23

/201

4 7:

55:1

4 PM

A4.1

EXTERIORELEVATIONS

VILL

AG

E O

F BU

RR R

IDG

EBU

RR R

IDG

E PO

LICE

FA

CILI

TYSE

LD

AM

29 JA

N 2

010

2006

-031

SEL

7700

Cou

nty

Line

Roa

d,Bu

rr R

idge

, IL.

605

27

SCALE: 1/8" = 1'-0" 3WEST ELEVATION

SCALE: 1/8" = 1'-0" 1EAST ELEVATION

SCALE: 1/8" = 1'-0" 8SOUTH ELEVATION

SCALE: 1/8" = 1'-0" 6NORTH ELEVATION

PARTIAL ELEV./ SCALE: 1/8" = 1'-0" 4GENERATOR

SCALE: 1/8" = 1'-0" 2PARTIAL SOUTH ELEVATION / NORTHTOWER

INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*

INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*

INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*

INDICATES WINDOWS TO RECEIVEBLINDS. REFER TO 122100.*

ENCLOSURE