17
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic Studies

Dynamic Model Validation Project

  • Upload
    karli

  • View
    68

  • Download
    1

Embed Size (px)

DESCRIPTION

Dynamic Model Validation Project. Sidharth Rajagopalan Engineer, Dynamic Studies. Jonathan Rose Engineer, Resource Integration. Need for Model Validation…. - PowerPoint PPT Presentation

Citation preview

Page 1: Dynamic Model Validation Project

November 16, 2012Synchrophasor Meeting

Dynamic Model Validation Project

Jonathan RoseEngineer, Resource Integration

Sidharth RajagopalanEngineer, Dynamic Studies

Page 2: Dynamic Model Validation Project

2

Need for Model Validation…

Synchrophasor MeetingNovember 16, 2012

Source: https://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/06212011/Lists/Presentations/1/2011-06%20Power%20Plant%20Model%20Validation%20Using%20Disturbance%20Data.pdf

Page 3: Dynamic Model Validation Project

3

Validation Methodology

• Compare computer simulations to actual generator behavior, measured during a disturbance.

Synchrophasor MeetingNovember 16, 2012

Channel Plot

100*A : Test7pgfedcb 10 - MW : Test7pgfedcb

Time (seconds)1009080706050403020100

70

69.5

69

68.5

68

67.5

67

66.5

66

65.5

65

Compare Results

Field Measurements PMUs, DFRs...

Pass / Fail

Page 4: Dynamic Model Validation Project

4

Overview

• Near Term Goals– Validate a few generator dynamic models based on available

measured response during system events.

• Long Term Goals– Develop plan to systematically validate generator models in ERCOT.

– New responsibilities? (NERC MOD Standard)

• Resource Entities, ERCOT, TSP

– Install measurement devices

• PMU at every power plant

Synchrophasor MeetingNovember 16, 2012

Page 5: Dynamic Model Validation Project

5

Challenge #1: Gathering Measurements

• Existing PMUs available to ERCOT– Installed for specific purpose of transmission observability.– none measure generator output

• Some gen companies have continuous fault recorders– Difficult to access data. “Leap-frog” communication.– Need coordination on setting up recorders.

• This issue is unresolved.– Only attempted to validate Governor models.

Synchrophasor MeetingNovember 16, 2012

POIGenerator

•High-speed measurements of V, , P, Q, Hz.•>= 30 samples / second.•Measure unit output , not plant.

Page 6: Dynamic Model Validation Project

6

Possible Solution #1: Gathering Measurements

• Install PMU or proper set Continuous DFR at each generator– Does not need to stream live data. (Communication $$).– PMU preferred over DFRs.– Installation and Maintenance

• Provide easy access to data

Synchrophasor MeetingNovember 16, 2012

POIGenerator

Need method to easily get data to ERCOT.

Page 7: Dynamic Model Validation Project

7

Challenge #2: Identifying Disturbances

Available Difficult

Frequency disturbances Voltage disturbance (e.g. faults)

Angle disturbance due to unit trip Angle disturbance due to line open

Synchrophasor MeetingNovember 16, 2012

Problem: Some stochastic disturbances difficult to monitor and identify.

Possible Solution:

• Move a nearby switched shunt.• Change generator voltage set point.

Page 8: Dynamic Model Validation Project

8

Brainstorming A Synchrophasor Plan…

• PMUs for Operational Needs– Stream live data.– Penetration: capture system condition

• PMUs for Generator Model Validation– Archive data for 30 days. Data downloaded as needed.– Measure terminal behavior of each plant.

• Overlap?– Some generator PMUs stream data for Operations.

Synchrophasor MeetingNovember 16, 2012

Page 9: Dynamic Model Validation Project

Questions?

Thank You

November 16, 2012 Synchrophasor Meeting

Page 10: Dynamic Model Validation Project

10 Synchrophasor MeetingNovember 16, 2012

ADDITIONAL MATERIAL

Page 11: Dynamic Model Validation Project

11

Overview of Validation Process

1. Capture electrical measurements during a disturbance using PMU.• Need plant-level or unit-level measurements.

2. Introduce disturbance and measurements into simulation.

3. Check that the simulated response matches plant actual response.

4. If not, discuss the results with the resource entity.

Synchrophasor MeetingNovember 16, 2012

Field Measurem

ents

POI

Present independent

variables (V, , Hz) to Generator

Test Generator

Channel Plot

100*A : Test7pgfedcb 10 - MW : Test7pgfedcb

Time (seconds)1009080706050403020100

70

69.5

69

68.5

68

67.5

67

66.5

66

65.5

65

ComparisonMeasure vs. Simulation Pass /Fail.

Page 12: Dynamic Model Validation Project

12

Example – Simple Model Validation Exercise

SPWG MeetingNovember 16, 2012 Synchrophasor Meeting

Page 13: Dynamic Model Validation Project

13

Types of Measurement Devices

• Phasor Measurement Units– Stand-alone measurement device. High-fidelity.

• Synchrophasors– Relay with PMU-like features. High-fidelity.– E.g. Schweitzer 421.

• Digital Fault Recorders (Continuous)– Predecessor to synchrophasors.– Similar to PMUs except no GPS-clock and cannot

measure angle.– May or may not be able to stream live measurements.

• Digital Fault Recorders (Triggered)– Oscilloscope-type measurements that are triggered. Used

for relay performance reviews, event forensics, etc.

• SCADA

Synchrophasor MeetingNovember 16, 2012

Page 14: Dynamic Model Validation Project

14

Measurement Device Comparison

High Speed

Real Time

GPS Clock

Angle Meas

Penetra-tion

Model Validation

PMU & Synchroph. ~50 DFR

100’s Difficult

SCADA 1000’sGovernor

Only

November 16, 2012 Synchrophasor Meeting

Page 15: Dynamic Model Validation Project

15

Response Disturbances

GEN Fast Fault, sudden angle shift due to nearby unit trip / line open.

AVR Fast Fault, switched shunt adjust, V-schedule adjust.

GOV Slow Large unit trip anywhere.

PSS Fast Nearby unit trip or line open.

Gathering Measurements – Need a Good Disturbance!

AVR

GOV

PSS

Vmeas

Hz

d/dt

Qgen

Pgen

Pgen

• The nature of the disturbance determines which system is affected.– Multiple disturbances needed to validate all

parts of model.

d/dtV Pgen,

Qgen

Machine

Synchrophasor MeetingNovember 16, 2012

Page 16: Dynamic Model Validation Project

16

Disturbances

• Voltage Disturbances are difficult to find!– Wait for a fault? How know when it happened?

• WECC creates their own disturbances– 1400 MW Chief Joseph braking resistor.

• Could ERCOT do similar?– Disturb generator by adjusting nearby tap, switched shunt or

change Voltage set point.

Chief Joseph:

November 16, 2012 Synchrophasor Meeting

Page 17: Dynamic Model Validation Project

17 Synchrophasor MeetingNovember 16, 2012