2
OSH MANAGEMENT THROUGH CONSTRUCTION INDUSTRY MANAGEMENT (CIM) AND BUILDING INFORMATION MODELLING (BIM) INTRODUCTION 11-12 JULY 2017 | RUMAH ALUMNI, UTM JB According to statistics by the Department of Occupational Safety and Health (DOSH) Malaysia, in 2016, about 41% of occupational fatalities are from the construction sector involving 99 fatalities. Due to high concern for this figure, the DOSH Malaysia has issued a new guideline called Guidelines of Occupational Safety and Health in Construction Industry (Management) 2017. In this conference, the essence of the guideline will be explored where the requirements for designers, contractors, employers, and employees are to be discussed. Under Section 4 of the guideline, the requirements for designer to eliminate, reduce, or control foreseeable risk through design has been declared by using the higher Hierarchy of Control, including the Building Information Modelling (BIM). This conference is very useful for safety practitioners such as HSE manager safety and Health Officer (SHO) and Site Safety Supervisor (SSS) to enhance their roles and responsibilities as stipulated in the guideline and how BIM can be used as a hazard avoidance at early stage of building design throughout project management life cycle. To outline the legal requirement for designers, contractors, owners, employers, and employees as apitulate in CIM Guidelines 2017 Understand the key elements and the right measures for employer and management to improve safety performance in construction sector To explain what is BIM and its benefits for safety practitioners To ulize the guideline of BIM and CDM for connuous improvement of safety and health OBJECTIVES ORGANISED BY Universiti Teknologi Malaysia (UTM) Social Security Organisation (SOCSO) Department of Occupational Safety and Health (DOSH) Construction Industry Development Board (CIDB) SUPPORTED BY DOSH CEP POINT: 15 ; CIDB CCD POINT: 20 CONFERENCE ON To explain the need of the CIM Guideline 2017 to participants The overall objective of the conference is to ensure that participants are familiar with the new guideline of Guidelines of Occupational Safety and Health in Construction Industry (Management) 2017 as well as BIM requirements. Hence, the following sub-objectives need to be fulfilled in order to accomplish the overall objectives: DYNAMIC Unbox Resources Sdn Bhd *Awaiting for approval http://www.utm.my/mprc/2017/05/07/ conference-dynamic-osh-management/ HRDF CLAIMABLE Institute for Oil & Gas (IFOG)

DYNAMIC OSH MANAGEMENT - utm.my · conference-dynamic-osh-management/ HRDF. ... Introduction to Act 520 CIDB Speaker: ... Manager Construction Industry Development Board (CIDB…

Embed Size (px)

Citation preview

Page 1: DYNAMIC OSH MANAGEMENT - utm.my · conference-dynamic-osh-management/ HRDF. ... Introduction to Act 520 CIDB Speaker: ... Manager Construction Industry Development Board (CIDB…

OSH MANAGEMENT THROUGH CONSTRUCTION

INDUSTRY MANAGEMENT (CIM) AND BUILDING INFORMATION MODELLING

(BIM)

INTRODUCTION 11-12 JULY 2017 | RUMAH ALUMNI, UTM JB

According to statistics by the Department of Occupational Safety and Health

(DOSH) Malaysia, in 2016, about 41% of occupational fatalities are from the

construction sector involving 99 fatalities. Due to high concern for this figure,

the DOSH Malaysia has issued a new guideline called Guidelines of Occupational

Safety and Health in Construction Industry (Management) 2017. In this

conference, the essence of the guideline will be explored where the

requirements for designers, contractors, employers, and employees are to be

discussed. Under Section 4 of the guideline, the requirements for designer to

eliminate, reduce, or control foreseeable risk through design has been declared

by using the higher Hierarchy of Control, including the Building Information

Modelling (BIM). This conference is very useful for safety practitioners such as

HSE manager safety and Health Officer (SHO) and Site Safety Supervisor (SSS) to

enhance their roles and responsibilities as stipulated in the guideline and how

BIM can be used as a hazard avoidance at early stage of building design

throughout project management life cycle.

To outline the legal requirement for designers, contractors,

owners, employers, and employees as apitulate in CIM Guidelines 2017

Understand the key elements and the right measures for employer and

management to improve safety performance in construction sector

To explain what is BIM and its benefits for safety practitioners

To utilize the guideline of BIM and CDM for continuous improvement of

safety and health

OBJECTIVES

ORGANISED BY

Universiti Teknologi Malaysia

(UTM)

Social Security Organisation(SOCSO)

Department of Occupational

Safety and Health

(DOSH)

Construction Industry Development Board

(CIDB)

SUPPORTED BY

DOSH CEP POINT: 15 ; CIDB CCD POINT: 20

CONFERENCE ON

To explain the need of the CIM Guideline 2017 to participants

The overall objective of the conference is to ensure that participants are

familiar with the new guideline of Guidelines of Occupational Safety and Health

in Construction Industry (Management) 2017 as well as BIM requirements.

Hence, the following sub-objectives need to be fulfilled in order to accomplish

the overall objectives:

DYNAMIC

Unbox Resources Sdn Bhd

*Awaiting for approval

http://www.utm.my/mprc/2017/05/07/conference-dynamic-osh-management/

HRDFCLAIMABLE

Institute for Oil & Gas(IFOG)

Page 2: DYNAMIC OSH MANAGEMENT - utm.my · conference-dynamic-osh-management/ HRDF. ... Introduction to Act 520 CIDB Speaker: ... Manager Construction Industry Development Board (CIDB…

Authorised Signatory (*This registration is invalid without

signature from an authorised officer)

DAY 1 DAY 2 TENTATIVES

Name 1

Job Title …………………

I/C No. …………………

Email …………………………..No. Phone …………………………..

Name 2 …………………………………………………...

Job Title ………………… Email …………………………..

I/C No. ………………… No. Phone …………………………..

COMPANY INFORMATION

Company …………………………………………………...

Address …………………………………………………...

Town …………………………………………………...

State …………………………………………………...

Tel …………………. Fax ………………………..

Email …………………………………………………...

Name …………………………………………………………....

Job Title …………………………………………………………...

Tel ………………………… Fax ..……………………...

…………………………………………

Signature & Company StampCONTACT

*kindly complete and return the reply form 2 weeks before the commencementdate by fax, email or online registration as details below.

: +6017-3970979 (Dr. Kamarizan), Fax:+607-5545667

: [email protected] : +6012-7751911 (Mohammad Aqram)

: [email protected]

11 - 12 JULY 2017 | RUMAH ALUMNI, UTM JB

YES! I would like to register the following participants

08:1509:00

09:15

10:30

11:00

15:00

17:00

Registration and coffee Welcoming SpeechSafety Briefing Session 1 - Guideline of OSH in Construction Industry Management 2017 Speaker: Hj. Zulkifly Sulaiman, Section Head of Building Construction, DOSH JOHORCoffee BreakOpening Ceremony Opening remarks by Director of DOSH JOHOR Session 2 - Keynote by Director of DOSH JOHOR, Ir. Hj. Kormain bin Hj. Mohd Noor, Director, DOSH JOHOR "Outlining the current status of Construction Safety in Malaysia and way forward"Session 3 - Managing Construction Industry through MyKKP Speaker: DOSH OfficerRaya FeastSession 4 - Best practice on Hazard Evaluation in Oil & Gas Construction Project Speaker: Hj Mahmood Embong, Unbox Resource Sdn Bhd Session 5 - Effect of Construction Industry Management (CIM) Guideline 2017 to Construction CompaniesSpeaker: Hj Mohd. Zaharuddin Bin Ruskam, AME Group Session 6 - Construction Safety in Pengerang (Rapid) Speaker: Mr. Sharif Bin Idros, Pengarah Jabatan Keselamatan Industri & Kesejahteraan RakyatAfternoon coffee & End of Day 1

08:30 09:00

11:00

13:00

REGISTRATION FEES & PAYMENT*RM 699 (Normal Price) RM 599 (Early Bird, SRG & JOSHE Members)

12:15

14:00

16:00

11:30

12:45

RegistrationSession 7 - Introduction to Act 520 CIDBSpeaker: Mr Raffizee Ibrahim, Manager Construction Industry Development Board (CIDB) JOHOR

10:00 Session 8 - CIDB Role and Enforcement Policy for Construction Safety in JohorSpeaker: Mr. Aerrey Safi'i, Manager Construction Industry Development Board (CIDB) JOHOR Tea BreakSession 9 - HSE BIM Literature Review & BIM Execution Plan Speaker: Hj. Othman bin Ismail, CEO, Unbox Resources Sdn. Bhd. Universiti Teknologi MalaysiaNetworking LunchSession 10 - BIM Case study Speaker: Mr Muhamad Razif B. Abdullah, Head of Construction IT Department, CIDB MalaysiaSession 11 - CIM 2017 and BIM ForumForum Moderator: Mrs. Noraita Tahir, Section Head, Promotion of JKKP Johor Panels: Hj. Zulkifly Sulaiman, DOSH JohorMr. Muhammad Razif B. Abdullah, CIDB MalaysiaHj. Othman bin Ismail, Unbox Resources Sdn BhdHj. Zaharuddin, AME ConstructionClosing ceremony End of course and afternoon coffee

16:4517:00

CLAIMABLE

Beneficiary Name UNBOX Resources Sdn Bhd Bank Name MAYBANK

Method Transfer Electronic Fund Transfer (EFT)*Kindly send proof of payment [email protected]

Account no. 551623213023

PAYM

ENT

15:30