Upload
herculie
View
225
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Citation preview
Phyo Si Thu [HT095879J]
Race informationLaps 61Circuit length 5.067 km (3.148 mi)Race length 309.087 km (192.066 mi)
http://en.wikipedia.org/wiki/Singapore_Grand_Prix
Singapore Grand Prix
Phyo Si Thu [HT095879J]
Race informationLaps 60Circuit length 3 km (1.86 mi)Race length 180 km (111.84 mi)
http://en.wikipedia.org/wiki/Singapore_Grand_Prix
E – Motor Sports Hub
PV Energy Production on Track
KWh/m2 250
Surface Area of Track (9m wide) 27,000 m2
Energy Produced (50% of Area) 6,750 MWh
Phyo Si Thu [HT095879J]
Changi – Circuit (U/C)
Phyo Si Thu [HT095879J]
Changi Motorsports HubF1 - Singapore
promoting and developing motorsports, as well as attract
and groom homegrown talents
Phyo Si Thu [HT095879J]
WHY Electric - Vehicles
http://www.hybridcars.com/electric-car
Phyo Si Thu [HT095879J]
Solar – powered Charging Station
Toyota Industries Corp.
Bosh eMobility
25 stations which will charge a vehicle fully within eight hours. There will also be a quick charging station which gives a full charge in 45 minutes.
design, develop, deploy, operate and maintain Singapore’s electric vehicle (EV) charging infrastructure
developing a new solar-powered charging station for plug-in vehicles
Phyo Si Thu [HT095879J]
Battery Swapping Station
S P E E DIt takes less time to swap the
battery with the newly-charged ones, than recharging over hours
New Battery in 1 Minute, 13 Seconds
Phyo Si Thu [HT095879J]
E – Motor Sports Hub
Race Track
Battery StationBattery Station
12 S
tore
y
8 S
tore
y
-Offices-R&D Labs-EV Rental-EV Sales & Showroom-Gallery-Restaurants-Parking & Charging Stations
-Race Teams-Recreations-Shops
Phyo Si Thu [HT095879J]
http://psipunk.com/tag/electric-vehicle/