Integration Test Plan Module - Customer Service Test Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/ Reference 9/ SSD/350/ECC6.0 No BUSINESS PROCESS STEPS TRANS. CODE INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots) Scenario Testing for Customer Service – Without AMC 1 Create Maintenance Plan: Initial IP42 Maint. plan cat.- Maintenance Order Strategy – Month Data Accepted Ok 2 Create Maintenance Plan: Strategy Plan IP42 Maintenance plan AMC plan test for CS free service. Item Level Tab Equipment 5 Order Type SM02 Main WorkCtr ME- GEN / 1000 Business area 1000 Press Enter Click on at Task List Deselect Funct.Loc task list and Gen. task list And Execute Data Accepted A Task List was selected Ok Comments : Tested By Test Date Approved By Approved Date K.Gunasekar 18/10/200 7 19/10/200 7

ECC6-0 Testing With AMc Wo Billing to Customer- STP

Embed Size (px)

Citation preview

Page 1: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

Scenario Testing for Customer Service – Without AMC1 Create Maintenance Plan: Initial

IP42Maint. plan cat.- Maintenance OrderStrategy – Month

Data AcceptedOk

2 Create Maintenance Plan: Strategy Plan

IP42

Maintenance plan AMC plan test for CS free service.Item Level TabEquipment 5Order Type SM02 Main WorkCtr ME-GEN / 1000 Business area 1000Press Enter

Click on at Task List Deselect Funct.Loc task list and Gen. task list

And Execute Maintenance Plan Scheduling Parameters (TAB Page).Call horizon 100 %Scheduling period 365 DAYSaveSelect No and Enter

Data Accepted

Specify a cycle start for the maintenance plan? Yes / No

A Task List was se-lected

Maintenance Plan 153 Created

Ok

3 Scheduling Maintenance Plan: Initial IP10 MaintenancePlan 153 Data Accepted Ok

4 Scheduling Maintenance Plan: Strategy Plan 000000000153

IP10Click on button Start of Cycle 06.10.2007 (30days back date)

Displays the list of schedules

Maintenance Plan 153

Ok

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007

Page 2: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

Save Scheduled. 5 Scheduling Overview List Form: Selection

Criteria IP24

Maintenance Plan 153

Execute

Data Accepted Takes to the new screen: Scheduling Overview list form : Maintenance Scheduling over list

Ok

6 Scheduling Overview list form : Maintenance Scheduling over list

IP24Copy the Order number

Ok

7 Change Order: Initial IW32 Order 50000833 Data Accepted Ok8 Change Service Order (with Revenues)

50000833: Central Header IW32Go to Components Tab Page Data Accepted

Ok

9 Change Service Order (with Revenues) 50000833: Components Overview

IW32

Components: 900000003Required Qty: 2Batch: sp_repPress EnterOperation: 0010 (Give Appropriate Operation Number from the operation Tab Page for which the Material is required).

Click on (Release)Sales Org: 1000Distr. Channel: 10Division: 10Press Enter Twice.

Save the Order click on button

Enter Operation Number and Sequence

Determined Costs: See Costs OverviewSales Organizational DataStatic Credit Limit Check: Credit Limit Exceeded 57,900.00 INROrder 50000833 will be released after update

Order Saved With Number 50000833.

10Create PM Order Confirmation: Initial Screen IW41

Order: 50000833Press Enter

Data AcceptedOk

11 Create PM Order Confirmation: Operation Overview

IW41 Select Two Line Items Data Accepted Ok

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007

Page 3: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

Click on Actual Data button

12 Create PM Order Confirmation: Actual Data

IW41

Work Starts on 06.11.2007 06:00:00Work Ends on 06.11.2007 11:00:00Actual Duration 5 h

Click on Next Operation ButtonWork Starts on 06.11.2007 11:00:00 Work Ends on 06.11.2007 13:00:00Actual Duration 2 H

Save

Number of Operation saved for Order 5000833: 2.

Ok

13 Goods Issue Order: Plant Maintenance

MIGO

Goods Issue Order – 50000833Press Enter

Data Accepted

Takes to new screenGoods Issue Order: 50000833 – Plant Maintenace

14 Deadline Monitoring for Maintenance Plans ( Batch input IP10)

IP30

Maintenance Plan 153Interval for Call Objects 365 DAY

Execute

And Press back button twice

Data Accepted

Maintenance Plan 153 Scheduled

Takes to new screen Ok

151617

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007

Page 4: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

1819 Goods Issue Order: 50000833 – Plant

Maintenace

MIGO

(General Tab Page)Document Date 30.09.2007Posting Date 30.09.2007 (as the current opening period is 6)(Quantity Tab Page)No. Containers 1 (Where Tab Page)Storage Location 1050

Select Item Ok

Click on button

Click on button

Document is O. K. Material Document 4900001175 Posted

Ok

20 Change Order: Initial IW32 Order 50000833 Data Accepted Ok21 Change Service Order (with revenues)

50000833: Central HeaderIW32

Click on Complete (Technical completion of the Order)Press Enter

Reference Date 06.11.2007Reference time 11:55:00

Order Saved With Number 50000833.

Ok

22 Actual Settlement: Order

KO88

Order 50000833 Settlement period 6 Fiscal Year 2007Select Test Run

Execute

Takes to a new screen Actual Settlement: Order Basic List

Ok

23 Actual Settlement: Order KO88 Order 50000833 Settlement period 6 Fiscal Year 2007

Select

Takes to a new screen Actual Settlement: Order Basic List

OK

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007

Page 5: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

Execute 24 Change Order: Initial IW32 Order 50000833 Data Accepted Ok25 Change Service Order (with Revenues):

Central HeaderIW2

Click on

Button

click on Log

26 Scheduling Overview list form: Selection Criteria IP24

Maintenance Plan 153 Scheduling Overview list form : Maintenance Scheduling over list

27 Scheduling Overview list form: Maintenance Scheduling over list

IP24

It is a report where we can find the order completed date and all other orders created for the next scheduled calls.

Ok

282930

3132333435 36373839404142

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007

Page 6: ECC6-0 Testing With AMc Wo Billing to Customer- STP

Integration Test Plan Module - Customer ServiceTest Scenario CS with AMContract, maintenance plan and wo billing the customer Patch/

Reference9/SSD/350/ECC6.0

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

4344454647484950 OK51 OK52 OK53 OK54 OK55 OK56 OK57 OK58 OK59   OK60 OK6162 OK63 OK64 OK65 Ok66 OK67 OK68 OK69 OK

Comments :

Tested By Test Date Approved By Approved Date

K.Gunasekar18/10/200719/10/2007