Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Exemplifying achievement in the following areas:
23%Energy Savings
45%Water Savings
Less EmbodiedEnergy in Materials
40%
109.29 tCO₂/year
32.03 tCO₂/year
Operational CO₂ Emissions
Operational CO₂ Savings
THIS CERTIFIES THAT MPS workshop maintenance building
HAS ACHIEVED AN EDGE CERTIFICATE
CERTIFICATE NUMBER LP7-GHA-19022810059421
DEVELOPED BY MPS
CERTIFIED BY thinkstep-SGS
Thomas Saunders, EDGE Program Director DATE OF ISSUE: 28-JUN-2019
ENERGY MEASURESReduced Window to Wall RatioReflective Paint/Tiles for RoofEnergy Saving Light Bulbs- Sales AreaEnergy Saving Light Bulbs- Corridors and Common AreasEnergy Saving Light Bulbs- External AreasSkylight(s) to Provide Daylight to 50% of Top Floor Area
WATER MEASURESDual Flush for Water Closets in BathroomsWater-Efficient Urinals in all BathroomsAerators for Faucets/ Auto Shut-Off Faucet
MATERIALSFloor Slabs - In-Situ Reinforced Concrete SlabRoof Construction - Steel (Zinc or Galvanised Iron) Sheets on Steel RaftersExternal Walls - Steel Profile CladdingExternal Walls - Solid Dense Concrete BlocksInternal Walls - Solid Dense Concrete BlocksFlooring - Finished Concrete Floor
THIS CERTIFIES THATMPS workshop maintenance buildingTema Port Project P.O. Box TT240Tema,
28-JUN-2019DATE OF ISSUE
thinkstep-SGSCERTIFIED BY
EDGE Software Version: v2.1.5Paul OcranWAS AUDITED BY
LP7-GHA-19022810059421CERTIFICATE NUMBER
EDGE CERTIFICATEHAS ACHIEVED AN
MPSDEVELOPED BY
Ghana
Thomas Saunders, EDGE Program Director
www.edgebuildings.comEDGE is a registered trademark of IFC. ©IFC 2019The EDGE standard requires 20% efficiencies in energy, water and materials compared to a local benchmark. Predicted efficiencies are not a guarantee of future operational performance. Energy savings may be associated with virtual energy for comfort depending on the presence of heating and cooling systems. Virtual energy does not contribute savings to utility bills.
This certificate is issued by the Certifier based on information provided by the client and the audit by the Auditor, and is subject to the terms and conditions of the Certifier. Contact [email protected] if the above measures are not consistent with your observation on the project.