76
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Grid Transformer Schedules Substation:…………………… Document Number: EDS 04-8000A Version : 2.0 Design doc No : Schedules - Index 1 SCHEDULE A - General Particulars of Definite Requirements.... 2 SCHEDULE B - Commencement Date and Date of Readiness for Inspection, Testing, Access to Site, Delivery and Completion. 3 SCHEDULE C - Manufacturers and Place of Manufacture, Testing and Inspection............................................... 4 SCHEDULE D - General Particulars and Guarantees.............. 5 SCHEDULE E - Drawings, Data, Assembly, Operating and Maintenance Instructions, Models and Samples................46 6 SCHEDULE F - Tests.......................................... 50 7 SCHEDULE G - Items of Equipment with Prices.................52 8 SCHEDULE H - Summary of Price and Quantities for Definite Work........................................................ 53 9 SCHEDULE J - Prices for Work at the Option of the Purchaser. 54 10 SCHEDULE K - Access and Site Facilities.....................55 11 SCHEDULE L - Proposed Exceptions or Additions to the Standard56 12 SCHEDULE M - List of Special Tools and Equipment to be Used. 57 Page 1 of 76

EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

Embed Size (px)

Citation preview

Page 1: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Schedules - Index

1 SCHEDULE A - General Particulars of Definite Requirements...............................................

2 SCHEDULE B - Commencement Date and Date of Readiness for Inspection, Testing, Access to Site, Delivery and Completion.............................................................................

3 SCHEDULE C - Manufacturers and Place of Manufacture, Testing and Inspection................

4 SCHEDULE D - General Particulars and Guarantees.............................................................

5 SCHEDULE E - Drawings, Data, Assembly, Operating and Maintenance Instructions, Models and Samples.........................................................................................................

6 SCHEDULE F - Tests...........................................................................................................

7 SCHEDULE G - Items of Equipment with Prices..................................................................

8 SCHEDULE H - Summary of Price and Quantities for Definite Work....................................

9 SCHEDULE J - Prices for Work at the Option of the Purchaser............................................

10 SCHEDULE K - Access and Site Facilities.............................................................................

11 SCHEDULE L - Proposed Exceptions or Additions to the Standard......................................

12 SCHEDULE M - List of Special Tools and Equipment to be Used.........................................

Page 1 of 59

Page 2: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

1 SCHEDULE A - General Particulars of Definite Requirements

Item Description UK Power Networks Requirements

1 Name of substation

2 Postal/delivery address See Schedule K

3 Designation of transformer(s)

SUMMARY OF DEFINITE REQUIREMENTS

4 Number of main transformers required …..………….

a) Method of cooling…………………………………...

b) Single or dual secondary windings………………..

c) Rated continuous output power (forced).....................MVA

d) Rated voltage ratio on principal tap ................................kV

e) Vector group symbols………………………………

f) Method of HV neutral earthing…………………….

g) Method of LV neutral earthing……………………..

5 Number of auxiliary/earthing transformers required…………..state which here.

a) Rated continuous output power (ONAN)……kVA

b) Rated voltage ratio on principal tap……………kV

c) Vector group symbols………………………………

6 Number of HV earthing resistors / reactors req.

State which here……

a) Rated impedance............................................................

b) Rated short-time current...............................................kA

c) Rated duration of short-time current...............................s

7 Number of LV earthing resistors / reactors req.

State which here……

a) Rated impedance............................................................

b) Rated short-time current...............................................kA

c) Rated duration of short-time current...............................s

8 Number of tap-change control marshalling boxes required......

Page 2 of 59

Page 3: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

9 Number of cooler control marshalling boxes required

10 Number of remote voltage control cubicles required

11 Number of sets of special tools and equipment (if any) required.....................................................................................

12 Installation and site pre-commissioning required......................

Note 1: For Item 4a), Supplier to determine appropriate method of cooling if not stated above.

Page 3 of 59

Page 4: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

2 SCHEDULE B - Commencement Date and Date of Readiness for Inspection, Testing, Access to Site, Delivery and Completion

(To be completed by the Tenderer)

COMMENCEMENT DATE……………………….

Item Times from Commencement Date Calendar Months

1 Within which outstanding Schedule D information will be provided........

2 Within which the material will be ready for inspection and testing:

a) Main transformers.............................................................................

b) Auxiliary transformers........................................................................

c) HV earthing resistors / reactors.........................................................

d) LV earthing resistors / reactors..........................................................

e) Tap-change control marshalling boxes...............................................

f) Cooler control marshalling boxes.......................................................

g) Standby voltage control cubicles........................................................

3 Within which the Contractor will require access to the site for erecting:

a) Main transformers and ancillary equipment......................................

b) Standby voltage control cubicles........................................................

4 Within which the material will be delivered to the site:

a) Main transformers.............................................................................

b) Auxiliary transformers........................................................................

c) HV earthing resistors / reactors.........................................................

d) LV earthing resistors / reactors..........................................................

e) Tap-change control marshalling boxes...............................................

f) Cooler control marshalling boxes.......................................................

g) Standby voltage control cubicles........................................................

5 Within which the work will be completed, tested and ready for continuous use..........................................................................................

Page 4 of 59

Page 5: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

PLANNING AND PROGRESS OF WORK

Planning of Work

The works shall be carried out and completed in accordance with the Contract completion date stated below. The Contractor shall submit a Plant Manufacture, Delivery and Erection Programme for the approval of the Engineer.

Three copies of the above mentioned Programme shall be provided by the Contractor.

If at any time during the execution of the Contract the Contractor finds it necessary to modify any approved Programme, the Contractor shall inform the Purchaser immediately and submit a modified Programme for his approval. The submission of a modified Programme shall not have effect as a claim by the Contractor for an extension of time for completion as provided by the Conditions of Contract, nor shall the approval of such modified Programme have effect as the grant of such extension of time fixed by the Contract for the completion of the Works.

Progress of Plant Manufacture in Contractor's Works

Progress of manufacture in relation to the detailed Plant Manufacture and Delivery Programme shall be reported on an approved form at such frequency as may be required.

Access to the Contractor's and Sub-contractor's works shall be granted to the Purchaser at any reasonable time for the purpose of ascertaining progress and checking quality.

Progress of Work on Site

Progress of Site Work in relation to the detailed Plant Erection Programme shall be indicated on an approved form and submitted monthly or at such other intervals as required by the Purchaser. These submissions shall include a schedule of Site Labour.

Delivery and Take-over Dates for Completed Work

Confirmation is required that the Tenderer can meet the following proposed Dates:

Factory Acceptance Dates

Take-over Dates

Damages for late delivery shall apply in accordance with Terms and Conditions.

Page 5 of 59

Page 6: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

3 SCHEDULE C - Manufacturers and Place of Manufacture, Testing and Inspection

(To be completed by the Tenderer)

Item Manufacturer’s Drawing Number and/or Type Designation

Manufacturer Place of Manufacture

Place of Testing and/or Inspection

Main transformers

Auxiliary transformers

Neutral earthing resistors

On-load tap-changers

HV bushings

LV Bushings

Neutral bushings

Insulating cylinders

Core plate

Copper

Aluminium

Steel tanks

Radiators

Pipework / expansion devices

Oil

Oil valves

Oil pumps

Oil pump motors

Oil flow indicators

Page 6 of 59

Page 7: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE C (CONTINUED)

Item Manufacturer’s Drawing Number and/or Type Designation

Manufacturer Place of Manufacture

Place of Testing and/or Inspection

Fans

Fan Motors

Gaskets for oil tight joints

Pressure relief devices

Conservators

Oil level indicators

Dehydrating breathers

Rubber bag

Gas and oil actuated relays

Tap-changer control marshalling cubicles

Cooler control marshalling cubicles

Winding temperature indicating devices

Current transformers

Page 7 of 59

Page 8: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE C (Continued)

Item Manufacturer’s Drawing Number and/or Type Designation

Manufacturer Place of Manufacture

Place of Testing and/or Inspection

Standby voltage control cubicles

Voltage control relays

Auxiliary relays

Voltmeters

Tap position indicators

Control and selector switches

Material for anti-vibration mountings

Dissolved gas in oil monitor

Oil dry out device

Oil/water heat exchanger

Page 8 of 59

Page 9: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

4 SCHEDULE D - General Particulars and Guarantees

PART I GENERAL PARTICULARS OF CONTROLS, INDICATIONS, ALARMS AND TRIPS

ItemControl, Indication, Alarm and Trip

If ReqType of Control, Indication, Alarm and Trip

If to be Supplied by Tenderer

Operating Supply Voltage

CONTROL

1 Local electrical control of on-load tap-change equipment

2 Standby electrical control of on-load tap-change equipment

3 Remote electrical control of on-load tap-change equipment

4 Remote voltage reduction (load shed) in addition to standby control

5 Local electrical control of cooling equipment

6 Electrical control of cooling equipment

INDICATIONS

7 Local tap position indication

8 Standby tap position indication

9 Remote tap position indication

10 Standby main transformer volts

11 Remote main transformer volts

12 Local main tx winding temperature

13 Remote main tx winding temperature

Page 9 of 59

Page 10: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D, PART I (CONTINUED)

Item Control, Indication, Alarm and Trip

If Req Type of Control, Indication, Alarm and Trip

If to be Supplied by the Tenderer

Operating Supply Voltage

ALARMS

14 Tap- changer faulty

15Main transformer winding temperature

16Tap-changer

Temperature

17Main gas and oil actuated relay

18Auxiliary transformer gas and oil actuated relay

19Neutral earthing reactor gas and oil actuated relay

20 Pump fail

21 Fan fail

22 Dehydrating breather fail

23 Conservator low oil level

24Gas-in-oil monitor Stage 1 and Stage 2

25On-line moisture management faulty

Page 10 of 59

Page 11: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D, PART I (CONTINUED)

Item Control, Indication, Alarm and Trip

If Req Type of Control, Indication, Alarm and Trip

If to be Supplied by the Tenderer

Operating Supply Voltage

TRIPS

26Main transformer winding temperature

27Main transformer oil temperature

28Tap-changer temperature

29Main gas and oil actuated relay

30Tap-changer oil actuated relay

31Auxiliary transformer gas and oil actuated relay

32Neutral earthing reactor gas and oil actuated relay

33 Pressure relief device

Page 11 of 59

Page 12: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART II (i) GENERAL PARTICULARS OF MAIN TRANSFORMERS

Item Description UK Power NetworksRequirements

OPERATING CONDITIONS

1 Location (Indoor or Outdoor)

2

Ambient air temperatures:

a) Minimum daily...........................................................……………………….….C

b) Maximum daily...............................................................………………….….C

c) Maximum monthly average.....................................................…………….C

d) Maximum daily annual average...............................................…………….C

3 Load power factor......................................................................................P.U.

RATING

4 No-load voltage ratio on principal tap ........................................................kV

5

Rated power (forced cooling):

a) Rated continuous output...................................................................MVA

b) Maximum ambient air temperature.......................................................C

c) Maximum hot spot temperature............................................................C

6

Rated power (ONAN):

a) Rated continuous output...................................................................MVA

b) Maximum ambient air temperature.......................................................C

c) Maximum hot spot temperature............................................................C

7

CER rated power:

a) Rated continuous output..................................................................MVA

b) Maximum ambient air temperature......................................................C

c) Maximum hot spot temperature...........................................................C

8

Rated power (normal cyclic loading):

a) Rated output....................................................................................MVA

b) Duration.................................................................................................h

c) Maximum ambient air temperature......................................................C

d) Maximum hot spot temperature...........................................................C

e) Load cycle...............................................................................................h

f) Rated output (remaining cycle)........................................................MVA

Page 12 of 59

Page 13: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

ALTERNATIVE RATING

9 Whether dual voltage ratio is required...........................................................

10 Alternative rated voltage ratio ...................................................................kV

11

Rated power (forced cooling):

a) Rated continuous output..................................................................MVA

b) Maximum ambient air temperature......................................................C

c) Maximum hot spot temperature...........................................................C

12

Rated power (ONAN):

a) Rated continuous output...................................................................MVA

b) Maximum ambient air temperature.......................................................C

c) Maximum hot spot temperature...........................................................C

13

CER rated power:

a) Rated continuous output...................................................................MVA

b) Maximum ambient air temperature.......................................................C

c) Maximum hot spot temperature............................................................C

14

Rated power (normal cyclic loading):

a) Rated output....................................................................................MVA

b) Duration.................................................................................................h

c) Maximum ambient air temperature......................................................C

d) Maximum hot spot temperature...........................................................C

e) Load cycle...............................................................................................h

f) Rated output (remainder of cycle)...................................................MVA

WINDING CONNECTIONS

15

Delta connected tertiary winding, when to be designed for external loading:

a) Rated voltage..........................................................................................kV

b) Rated continuous output (forced cooling)...........................................MVA

16

Winding connections:

a) HV windings...........................................................................Star / Delta

b) LV windings............................................................................Star / Delta

c) Tertiary windings......................................................................................

d) BS vector group symbols..........................................................................

e) Whether links are required for alternative vector group.........................

f) Whether links are required to change tapping range...............................

g) Alternative BS vector group symbols........................................................

Page 13 of 59

Page 14: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

17 Voltage limiting devices:

a) Whether required.......................................................................................

b) Whether internal or external to main tank.................................................

c) Type............................................................................................................

PERFORMANCE CHARACTERISTICS

18 Impedance voltage envelope at 75C See Annex C

19 Zero-sequence impedance:

a) as a % of positive-sequence component...............................................%

b) as value of ohms/phase.......................................................ohms/phase90-100

20 Short circuit capability:

a) Max. available at HV terminals (3 phase/1-phase).........................................................................................................MVA

b) Max. available at LV terminals (3-phase)........................................MVA

c) At external terminals of the delta connected tertiary winding with simultaneous HV and LV infeed shall not exceed....................................MVA

refer to table 4 of standards unless higher ratings required.

21 Rated Insulation Level:

a) 132kV Lightniimpulse...........................................................................kV

b) 66kV Lightning impulse........................................................................kV

c) 33kV Lightning impulse........................................................................kV

d) 22kV Lightning impulse........................................................................kV

e) 20kV Lightning impulse.......................................................................kV

f) 11kV Lightning impulse.......................................................................kV

g) 6.6kV Lightning impulse.......................................................................kV

550

325

170

125

125

75

60

22 Sound power levels:

a) Transformer only (ONAN)....................................................................dBA

b) Transformer plus coolers (forced cooling)...........................................dBA

VOLTAGE CONTROL

23 Method of variation of voltage ratio On-Load

24 Category of voltage variation VFVV / CFVV

25 Total range of variation of voltage ratio (expressed as a percentage of HV and LV constant):

a) Plus...........................................................................................................%

b) Minus........................................................................................................%

Page 14 of 59

Page 15: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

26 Size of step...................................................................................................%

27 Whether tap-change control by direct wire or selective system is required at remote control point.........................................................................................

28 Automatic voltage control:

a) Whether required.........................................................................................

b) Whether group parallel control is required...................................................

29 Space available for voltage compounding current transformer in LV switchgear:

a) inside diameter.......................................................................................mm

b) outside diameter.....................................................................................mm

c) Axial length including clamps..................................................................mm

30 Voltage ratio of voltage compounding VT......................................................V

31 Current ratio of voltage compounding CT......................................................A

32 Whether load shedding control by direct wire or selective system is required from a remote control point..............................................................................

33 Number of marshalling kiosk compartments.....................................................

34 Marshalling kiosk switched socket outlets:

a) No. required.............................................................................................

b) Type..........................................................................................................

c) Voltage...................................................................................................V

35 Marshalling kiosk telephone jacks:

a) Whether required.......................................................................................

b) Type.............................................................................................................

TERMINATIONS

36 Whether delta connected tertiary winding is to be brought out to separate terminations for external loading......................................................................

37 Terminals:

a) Bushing insulators or separable cable connectors (SCC) for live terminals:

i) HV windings...........................................................................................

ii) LV windings............................................................................................

iii) Delta connected tertiary windings.........................................................

iv) Auxiliary transformer.............................................................................

b) Bushing insulators or separable cable connectors (SCC) for neutral terminals:

Bushing

SCC

Not Applicable

SCC

Page 15 of 59

Page 16: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

i) HV..........................................................................................................

ii) LV...........................................................................................................

Bushing

SCC

38 Separable cable connector (SCC) details:

a) HV line termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cable cores per SCC bushing.............................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor...........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC..........................................................

b) LV line termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cable cores per SCC bushing.............................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor...........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC..........................................................

c) Tertiary line termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cable cores per SCC bushing.............................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor...........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC..........................................................

Not Applicable

Cu XLPE

Not Applicable

Page 16 of 59

Page 17: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

d) Auxiliary transformer line termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cable cores per SCC bushing.............................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor...........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC..........................................................

e) HV neutral termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cores per SCC bushing.......................................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor..........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC..........................................................

f) LV neutral termination:

i) Open or enclosed................................................................................

ii) Number of SCC bushings per phase....................................................

iii) Number of cable cores per SCC bushing.............................................

iv) Type of cable.......................................................................................

v) Cross sectional area of conductor..........................................mm

vi) Direction of cable entry......................................................................

vii) CENELEC type interface for SCC

viii) Number of neutral bushings...............................................................

Cu XLPE

Not Applicable

Cu XLPE

39

Whether CT accommodation is required on bushing insulators rated at 132 kV and below:

a) HV..................................................................................................................

b) LV..................................................................................................................

40

Whether neutral current transformers are to be provided:

a) HV..................................................................................................................

b) LV..................................................................................................................

Page 17 of 59

Page 18: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

41 Whether interposing CTs are required for main protection

COOLING

42 Cooling designation

43 Arrangement of coolers:

a) Tank attached..........................................................................................

b) Separate free-standing............................................................................

44 Number and rating of coolers per transformer:

a) Number and rating..................................................................................

b) Oil/air coolers..........................................................................................

c) Oil/water coolers.....................................................................................

45 The maximum allowable winding hot spot temperature................................

46 The maximum top oil temperature rise at any tapping position and supplying rated power at rated secondary voltage.........................................................

47 Whether valves for oil filtering require flexible hose adapters.......................

48 Size of flexible hose adapter........................................................................mm 50

OIL PRESERVATION

49 Oil preservation system:

a) Conservator fitted with refrigeration type breather.........................

b) Conservator fitted with moisture absorbing medium type breather (* Delete as appropriate)...............................................................

c) Conservator fitted with diaphragm..................................................

d) Conservator fitted with bag or bladder............................................

No

Regenerative /

Traditional*

Yes

50 UK Power Networks preference for refrigeration type breather:

a) Manufacturer...................................................................................

b) Model...............................................................................................

c) Type..................................................................................................

NA

51 On line moisture management system:

a) Whether required.............................................................................

b) Manufacturer...................................................................................

c) Model...............................................................................................

d) Type..................................................................................................

Yes

Bowden or Omnia

RT9

Page 18 of 59

Page 19: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

GENERAL

52 Losses:

a) The maximum permitted no-load loss of each main transformer on the principal tap..........................................................................kW

b) The maximum permitted load loss of each main transformer at a reference temperature of 75C over a variation of tapping ranges. Average of loss at tap 1, 7, 13, 19...............................................kW

53 Winding temperature indicators:

a) Total number required.....................................................................

b) Location...........................................................................................

i) HV windings...............................................................................

ii) LV winding.................................................................................

c) Type:

i) Mercury tilt-switch....................................................................

ii) Micro-switch..............................................................................

iii) Electronic...................................................................................

d) If electronic type, preferred:

i) Manufacturer............................................................................

ii) Type...........................................................................................

iii) Model........................................................................................

e) Settings:

i) Coolers switch-on...................................................................C

ii) Coolers switch-off...................................................................C

iii) Winding temperature alarm...................................................C

iv) Winding temperature trip......................................................C

90

130

54 Size of direct wire electrical winding temperature indicator Na

55 Whether anti-vibration pads are required.............................................. Yes

56 Whether a noise enclosure is required from the outset.........................

57 Number of copies of Operating and Maintenance Instructions required 3 hard copy

1 electronic copy

58 Whether core and frame earth connections are to be brought out to

Page 19 of 59

Page 20: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

bushings.................................................................................................

59 Whether provision is to be made for fitting a dissolved gas-in-oil monitor...................................................................................................

60 Whether a dissolved-gas-in-oil monitor is required from the outset..... Yes

61 UK Power Networks preference for dissolved-gas-in-oil monitor:

a) Manufacturer...................................................................................

b) Type..................................................................................................

c) Model...............................................................................................

GE

Hydran

M2

62 Whether multipair cables for SCADA are to ENATS 09-06 or DEF 61-12 Part 5 standards.....................................................................................

Page 20 of 59

Page 21: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D, PART II (i) (Continued)

HV LINE CURRENT TRANSFORMER CHARACTERISTICS

Mounted in 132kV or turrets

63 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose..............................................................................................

b) Quantity.............................................................................................

c) Rated primary/secondary current....................................................A

d) Minimum knee-point voltage (Vk)...................................................V

e) Maximum secondary winding resistance........................................

f) Maximum secondary excitation current at Vk/2...............................A

g) Rated output..................................................................................VA

h) Rated accuracy class/accuracy limit factor.........................................

i) Continuous Thermal Rating current @ 40°C.......................................

j) Type

k) Turns ratio..........................................................................................

a) Purpose..............................................................................................

b) Quantity.............................................................................................

c) Rated primary/secondary current....................................................A

d) Minimum knee-point voltage (Vk)...................................................V

e) Maximum secondary winding resistance........................................

f) Maximum secondary excitation current at Vk/2...............................A

g) Rated output..................................................................................VA

h) Rated accuracy class/accuracy limit factor.........................................

i) Continuous Thermal Rating current @ 40°C.......................................

j) Type

k) Turns ratio..........................................................................................

Page 21 of 59

Page 22: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

a) Purpose..............................................................................................

b) Quantity.............................................................................................

c) Rated primary/secondary current....................................................A

d) Minimum knee-point voltage (Vk)...................................................V

e) Maximum secondary winding resistance........................................

f) Maximum secondary excitation current at Vk/2...............................A

g) Rated output..................................................................................VA

h) Rated accuracy class/accuracy limit factor.........................................

i) Continuous Thermal Rating current @ 40°C.......................................

j) Type

k) Turns ratio..........................................................................................

HV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS

64 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose..............................................................................................

b) Quantity.............................................................................................

c) Rated primary/secondary current....................................................A

d) Minimum knee-point voltage (Vk)...................................................V

e) Maximum secondary winding resistance........................................

f) Maximum secondary excitation current at Vk/2...............................A

g) Rated output..................................................................................VA

h) Rated accuracy class/accuracy limit factor.........................................

i) Continuous Thermal Rating current @ 40°C.......................................

j) Type

k) Turns ratio..........................................................................................

Page 22 of 59

Page 23: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

HV LINE CURRENT TRANSFORMER CHARACTERISTICS Mounted in 66kV or turret

65 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose..............................................................................................

b) Quantity.............................................................................................

c) Rated primary/secondary current....................................................A

d) Minimum knee-point voltage (Vk)...................................................V

e) Maximum secondary winding resistance........................................

f) Maximum secondary excitation current at Vk/2...............................A

g) Rated output..................................................................................VA

h) Rated accuracy class/accuracy limit factor.........................................

i) Continuous Thermal Rating current @ 40°C.......................................

j) Type

k) Turns ratio..........................................................................................

HV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS

66 (Refer to item 20 for system fault levels for which the CT shall be compatible)

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

LV LINE CURRENT TRANSFORMER CHARACTERISTICS - Mounted in 33kV or turret

67 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

Page 23 of 59

Page 24: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

Page 24 of 59

Page 25: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio

LV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS

68 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

Page 25 of 59

Page 26: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

LV LINE CURRENT TRANSFORMER CHARACTERISTICS - Mounted in 11kV or turret

69 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

Page 26 of 59

Page 27: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio

LV NEUTRAL CURRENT TRANSFORMER CHARACTERISTICS70 (Refer to Item 20 for system fault levels for which the CT shall be compatible)

a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................A

d) Minimum knee-point voltage (Vk)..............................................................V

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................A

g) Rated output.............................................................................................VA

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

k) Turns ratio.....................................................................................................

Page 27 of 59

Page 28: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART II (ii) GENERAL PARTICULARS OF AUXILIARY TRANSFORMERS

Item Description UK Power NetworksRequirements

RATING

1

1a

Auxiliary or Earthing/Auxiliary transformer

Rated Continuous output (ONAN)............................................kVA

2 Rated voltage ratio...................................................................kV

3 Winding connections:

a) HV windings...........................................................................

b) LV windings............................................................................

c) BS Vector group symbols.......................................................

PERFORMANCE CHARACTERISTICS

4 Impedance voltage at 75°C on principal tap...........................................%

5 Short circuit capability:

a) Max available at HV terminals (3 phase)...........................................kA

b) Max available at LV terminals (3-phase)...........................................kA

VOLTAGE CONTROL

6 Method of variation of voltage control

7 Total range of variation of voltage ratio (expressed as a percentage of HV with LV constant):

a) Plus.................................................................................................%

b) Minus..............................................................................................%

8 Size of step..........................................................................................%

TERMINATIONS

9 Terminals:

a) Bushing insulators, cable boxes or separable cable connectors (SCC) for live terminals:

i) HV........................................................................................................

ii) LV........................................................................................................

b) Bushing insulators, cable boxes or separable cable connectors (SCC) for neutral terminals

i) HV........................................................................................................

ii) LV........................................................................................................

Page 28 of 59

Page 29: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

10 Cable box or separable cable connector details:

a) Higher voltage.................................................................................

b) Lower voltage..................................................................................

i) Number of switchfuses........................................................................

ii) Number of poles per box / SCCs per pole...........................................

iii) Number of cores per pole / SCC........................................................

iv) Type of cable.....................................................................................

v) Cross sectional area of conductor...............................................mm2

vi) Direction of cable entry.....................................................................

vii) Type of gland....................................................................................

viii) Filling medium for cable box............................................................

COOLING

11 Cooling designation

12 Arrangement of coolers:

a) Tank attached..................................................................................

b) Separate free-standing....................................................................

13 Whether valves for oil filtering require flexible hose adapters

14 Size of flexible hose adapter...............................................................mm

Page 29 of 59

Page 30: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART II (iii) GENERAL PARTICULARS OF NEUTRAL EARTHING RESISTORS

Item Description UK Power NetworksRequirements

GENERAL

1 Whether resistor of reactor is required*...................................................

2 Whether mounted on transformer tank or separate................................

RATING

3 Rated Continuous current (AN)...............................................................A

4 Rated Impedance..............................................................................ohms

5 Rated Loaded Time..................................................................................s

6 Line voltage of system to which resistance will be connected..............kV

7 Design voltage of external and internal high voltage bushings.............kV

8 Voltage that can be withstood for one minute dry by external and internal high voltage bushings...............................................................kV

9 Minimum wet flashover voltage for external high voltage bushing.......kV

10 Minimum wet flashover voltage for internal high voltage support bushings.................................................................................................kV

11 Routine Test Voltage – 1 minute dry .....................................................kV

12 Continous current rating

* If resistor is required then complete Schedule D Part II (iv)

Page 30 of 59

Page 31: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART II (iv) GENERAL PARTICULARS OF NEUTRAL EARTHING REACTORS

Item Description UK Power NetworksRequirements

PERFORMANCE CHARACTERISTICS

1 Rated Insulation Level (separate source withstand voltage):

a. Rated Lightning Impulse withstand voltage (peak) to earth.............kV

b. Rated one minute power frequency withstand voltage (rms) to earth kV

2 Rated continuous current...........................................................................A

3 Rated impedance.......................................................................................

4 Rated circuit capability:

a) Rated short time current.....................................................................A

b) Rated duration of short time current...................................................s

TERMINATIONS

5 Terminals:

Bushing insulator, cable boxes or separable cable connectors (SCC) for transformer side terminals:

a) Transformer side...................................................................................

b) Earthed side..........................................................................................

6 Whether current transformers are to be provided in reactor:

a) Transformer side.................................................................................

b) Earthed side.......................................................................................

c) Arrangement of current transformers...............................................

COOLING

7 Cooling designation

8 Arrangement of coolers:

a) Tank attached.....................................................................................

b) Separate free-standing.........................................................................

9 Whether valves for oil filtering require flexible hose adapters

10 Size of flexible hose adapter................................................................mm

Page 31 of 59

Page 32: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description UK Power NetworksRequirements

REACTOR/RESISTOR MOUNTED CURRENT TRANSFORMERS

11. a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................

d) Minimum knee-point voltage (Vk)..............................................................

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................

g) Rated output.............................................................................................

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

a)k) Turns ratio........................................................................................A

12 a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................

d) Minimum knee-point voltage (Vk)..............................................................

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................

g) Rated output.............................................................................................

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

a) k) Turns ratio....................................................................................A

13 a) Purpose.........................................................................................................

b) Quantity........................................................................................................

c) Rated primary/secondary current...............................................................

d) Minimum knee-point voltage (Vk)..............................................................

e) Maximum secondary winding resistance...................................................

f) Maximum secondary excitation current at Vk/2..........................................

g) Rated output.............................................................................................

h) Rated accuracy class/accuracy limit factor....................................................

i) Continuous Thermal Rating current @ 40°C..................................................

j) Type

a) k) Turns ratio....................................................................................A

Page 32 of 59

Page 33: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART II (v) GENERAL PARTICULARS OF REMOTE VOLTAGE CONTROL CUBICLES

Item Descriptions UK Power NetworksRequirements

PARTICULARS OF ACCESS AND INSTALLATION

1 Designated location...........................................................

2 Clear opening of plant hatch.......................................mm

3 Minimum headroom..................................................mm

4 Maximum permissible mass of heaviest transport unitkg

5 Whether cubicles are to be arranged for top or bottom cable entry.......................................................................

6 Whether cubicles are to be installed on a solid floor or on a computer floor with removable floor panels.............

7 Whether cubicle heating is required..................................

8 Whether separate analogue voltmeter and tap position indicator is required...........................................................

9 AVC relay:

a) Number required......................................................................................

b) Manufacturer...........................................................................................

c) Type..........................................................................................................

d) Model.......................................................................................................

VA Tech

Super Tapp

Version 5

Note : Minimum headroom below lifting hook, or in access route to final position, whichever is the lesser.

Note : A hoist suitable for the heaviest item of auxiliary plant will be supplied and installed by the Purchaser

Page 33 of 59

Page 34: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D (Continued)

PART III (i) GUARANTEES FOR MAIN TRANSFORMER

(To be completed by the Tenderer)

Item Description Value Unit

PERFORMANCE CHARACTERISTICS

1.0 Guaranteed rated continuous output power (ONAN) MVA

2.0 Guaranteed rated continuous output power (Forced cooling) MVA

3.0 No-load Loss (excl. cooling plant loss)

a. On principal tap kW

b. At max excitation (1.9 Tesla) kW

4.0 Cooling Plant Loss kW

5.0 Load Losses at rated continuous output power (forced cooling) at a reference temperature of 75°C:

a. On tapping positions:

5.1 (i) HV/LV loss on minimum tapping position kW

5.2 (ii) HV/LV loss on Tap number 7 kW

5.3 (iii) HV/LV loss on Tap number 13 kW

5.4 (iv) HV/LV loss on maximum tapping position kW

b. On tapping positions for maximum load loss:

5.5 (i)Tap number Tap No.

5.6 (ii) HV/LV loss kW

6.0 Impedance at Forced cooling rated continuous output at 75°C:

a. Impedance on principal tap: Tap No.

6.1 (i) HV/LV %

b. Minimum impedance on minimum tap: Tap No.

6.2 (i) HV/LV %

c. Maximum impedance on minimum tap: Tap No.

6.3 (i) HV/LV %

d. Minimum impedance on maximum tap: Tap No.

6.4 (i) HV %

e. Maximum impedance on maximum tap: Tap No.

6.5 (i) HV/LV %

6.6

6.7

Zero Sequence impedance

Maximum 3rd harmonic component of phase voltage

%

%

Page 34 of 59

Page 35: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SCHEDULE D, Part III (i) GUARANTEES FOR MAIN TRANSFORMER (Continued)

Item Description Value Unit

7.0 Maximum volts per step as seen by on-load tap changer at system highest volts:

7.1 a. At maximum rating end of range kV

7.2 b. At minimum rating end of range kV

8.0 Hottest spot winding temperature on most onerous tap position (See Schedule D part II (i) for average ambient air temperature)

8.1 a. Tap Number Tap No.

8.2 b. HV at Forced cooling rated continuous output °C

8.3 c. LV at Forced cooling rated continuous output °C

9.0 Oil and Winding temperature rises on most onerous tap position (See Schedule D part II (i) for average ambient air temperature)

a. At ONAN rated continuous output (Item 1) Tap No.

9.1 (i) Top Oil rise °C

9.2 (ii) Mean Oil rise °C

9.3 (iii) Average winding rise °C

b. During Cyclic loading

9.4 (i) Top Oil rise °C

9.5 (ii) Mean Oil rise °C

9.6 (iii) Average winding rise °C

Item Description Value Unit

10.0 Maximum observable oil temperature (See Schedule D part II (i) for average ambient air temperature)

a. At ONAN rated continuous output

10.1 (i) Top Oil °C

10.2 (ii) At inlet to cooler °C

10.3 (iii) At outlet to cooler °C

b. During normal cyclic loading

10.4 (i) Top Oil °C

10.5 (ii) At inlet to cooler °C

10.6 (iii) At outlet to cooler °C

11.0 Proportion of sum of iron and copper losses at forced cooling rated %

Page 35 of 59

Page 36: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

output which will be supplied during temperature rise test

12.0 Calculated winding capacitance

a. Approximate series capacitance of each phase winding

12.1 i) HV pF

12.2 ii) LV pF

b. Approximate shunt capacitance to earth of each phase winding with core and tank earthed

12.3 i) HV to earth with LV winding earthed pF

12.4 ii) LV to earth with HV winding earthed pF

12.5 c. Approximate capacitance HV to LV winding earthed pF

Item Description Value Unit

13.0 Guaranteed sound power level ('A' weighting):

13.1 a. Transformer tank dB

13.2 b. Cooler dB

13.3 c. Method of noise reduction

MAGNETIC CIRCUIT

14.0 Core Construction:

14.1 a. Taped/banded/bolted limbs

14.2 b. Taped/banded/bolted yokes

14.3 c. Taping/banding material

14.4 d. Number of limbs

14.5 e. Number of limbs wound

15.0 Insulation of:

15.1 a. Core bolts

15.2 b. Core bolt washers

15.3 c. Side plates

15.4 d. Core Laminations

16.0 Flux density in iron (Nominal value at normal voltage and frequency on principal tap):

16.1 a. Wound limbs Tesla

16.2 b. Yokes Telsa

16.3 c. Unwound limbs Telsa

16.4 d. Shields Telsa

17.0 Whether tank or other flux shields are incorporated

Page 36 of 59

Page 37: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

WINDINGS

18.0 Type and arrangement:

18.1 a. HV Windings

18.2 b. LV windings

18.3 c. Tapping windings

18.4 d. Tertiary windings

18.5 e. Winding arrangements (i.e.. Core/…./…./…./….)

19.0 Arrangement of tapping (e.g. linear, coarse/fine, reversing):

20.0 Conductor material for:

20.1 a. HV windings

20.2 b. LV windings

20.3 c. Tapping windings

20.4 d. Tertiary windings

21.0 Conductor insulation for:

21.1 a. HV windings

21.2 b. LV windings

21.3 c. Tapping windings

21.4 d. Tertiary windings

22.0 Oil circulation (e.g. natural, partially directed, directed)

a. To windings:

22.1 i) HV windings

22.2 ii) LV windings

22.3 iii) Tapping windings

22.4 iv) Tertiary windings

b. Through windings

22.5 i) HV windings

22.6 ii) LV windings

22.7 iii) Tapping windings

22.8 iv) Tertiary windings

23.0 Short circuit capability:

a. Potential axial thrust for worst fault condition of each winding:

23.1 i) HV windings t

23.2 ii) LV windings t

23.3 iii) Tapping windings t

Page 37 of 59

Page 38: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

23.4 iv) Tertiary windings t

b. Coil clamping short circuit withstand capacity:

23.5 i) HV windings t

23.6 ii) LV windings t

23.7 iii) Tapping windings t

23.8 iv) Tertiary windings t

23.9 c. Most onerous earth fault condition, HV or LV, for transformers with delta connected tertiary

NA t

24.0 Current density in windings at normal tap:

24.1 a. HV windings at forced cooling rated cont. output A/mm2

24.2 b. LV. windings at forced cooling rated cont. output A/mm2

24.3 c. Tapping windings at forced cooling rated cont. output A/mm2

24.4 d. Tertiary windings at forced cooling rated cont. output A/mm2

24.5 e. In HV or LV windings detailed in Item 23.9 above most onerous earth fault condition

A/mm2

24.6 f. Tertiary windings for condition as (e) above A/mm2

25.0 Weight of components:

25.1 Weight of copper t

25.2 Weight of core t

TANK AND COOLER

26.0 Tank material

27.0 Tank thickness

27.1 a. Sides mm

27.2 b. Base mm

27.3 c. Cover mm

28.0 Thickness of radiator plates and/or cooling tubes mm

29.0 Total volume of oil required (including cooling system) litres

30.0 Volume of oil to be removed (if applicable)

30.1 a. To effect in situ change of HV bushing litres

30.2 b To effect in situ change of LV bushing litres

31.0 Total volume of oil in conservator(s) litres

32.0 Volume of oil in (each) conservator between highest and lowest visible litres

Page 38 of 59

Page 39: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

levels

33.0 Height of oil at maximum level in the conservator (s) above pad level m

34.0 Total number of cooler oil pumps under service conditions

35.0 Output of each cooler oil pump under service conditions:

35.1 a. Volume of oil litres/s

35.2 b. Approximate head of oil m

36.0 Continuous rating of each cooler oil pump motor shaft kW

37.0 Starting current of each cooler pump motor A

38.0 Total number of cooler fans

39.0 Rated normal output of each cooler fan:

39.1 a. Volume of air m3/s

39.2 b. Approximate head of air mm water gauge

40.0 Nominal diameter of cooler fans mm

41.0 Speed of cooler fans rpm

42.0 Continuous rating of each cooler fan motor shaft kW

43.0 Starting current of each cooler fan motor A

GENERAL

44.0 Filling medium for transport

45.0 Total weight as installed in service, including cooling plant, all fittings and oil:

45.1 a. Quotation estimate t

45.2 b. Final design calculation t

46.0 Weight arranged for transport, excluding vehicle t

47.0 Weight of each bushing insulator (if applicable):

47.1 a. HV kg

47.2 b. HV neutral kg

47.3 c. LV kg

47.4 d. LV neutral kg

48.0 Overall Dimensions of main transformer:

48.1 a. Length mm

48.2 b. Width mm

48.3 c. Height mm

Page 39 of 59

Page 40: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

49.0 Overall Dimensions of cooler:

49.1 a. Length mm

49.2 b. Width mm

49.3 c. Height mm

50.0 Transport Dimensions:

50.1 a. Length mm

50.2 b. Width mm

50.3 c. Height mm

51.0 Type of safety device to restrict falling

52.0 Manufacturer

53.0 Type Designation

54.0 Ratings:

54.1 a. Rated through current A

54.2 b. Maximum rated through current A

54.3 c. Rated step capacity kVA

54.4 d. Rated step voltage V

54.5 e. Maximum rated step voltage V

54.6 f. Short circuit current (for 3 second duration) rms kA

54.7 g. Rated frequency Hz

h. Rated insulation level

54.8 (i) Power frequency withstand voltage (1 min) V

54.9 (ii) Phase to phase V

54.10 (iii) Phase to earth V

54.11 (iv) Busbar adjacent terminals V

54.12 (v) Across switch V

i. Impulse withstand voltage (1.2/50 microsecond)

54.13 (i) Phase to earth V

54.14 (ii) Phase to phase V

54.15 (iii) Between adjacent terminals V

54.16 (iv) Across switch V

55.0 Maximum number of tapping positions

56.0 Tested no load mechanical endurance (No of operations)

Page 40 of 59

Page 41: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

57.0 Number of on-load tap change operations before:

a. arcing contact

57.1 (i) maintenance

57.2 (ii) replacement

57.3 b. oil inspection

58.0 Design

58.1 a. Type of operation

58.2 b. Regulation

59.0 Oil:

59.1 a. Quantity of oil

59.2 b. Mechanical withstand of barrier board

59.3 c. Maximum working pressure when oil filled

59.4 d. Material of contacts

59.5 e. Drive Motor

59.6 f. No of phases

59.7 (I) rated voltage V

59.8 (ii) rated frequency Hz

59.9 (iii) starting current A

59.10 (iv) running current A

59.11 (v) type

60.0 Design of protection of enclosures IP

132kV LINE CURRENT TRANSFORMERS

61.0 Purpose:

61.1 a. Rated primary/secondary current A

61.2 b. Rated frequency Hz

61.3 c. Rated output VA

61.4 d. Rated knee point voltage (Vk) VA

61.5 e. Maximum secondary resistance ohms

61.6 f. Maximum secondary excitation current at Vk/2 A

61.7 g. Rated accuracy class/accuracy limit factor

61.8 h. Highest equipment voltage kV

61.9 i. Rated insulation level kV

61.10 j. Rated short time thermal current/duration kA/s

Page 41 of 59

Page 42: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

61.11 k. Rated dynamic current kA

61.12 l. Class of insulation

61.13 m. Rated continuous current at 40oC air ambient A

132kV LINE CURRENT TRANSFORMERS

62.0 Purpose

62.1 a. Rated primary/secondary current A

62.2 b. Rated frequency Hz

62.3 c. Rated output VA

62.4 d. Rated knee point voltage (Vk) VA

62.5 e. Maximum secondary resistance ohms

62.6 f. Maximum secondary excitation current at Vk/2 A

62.7 g. Rated accuracy class/accuracy limit factor

62.8 h. Highest equipment voltage kV

62.9 i. Rated insulation level kV

62.10 j. Rated short time thermal current/duration kA/s

62.11 k. Rated dynamic current kA

62.12 l. Class of insulation

62.13 m. Rated continuous current at 40oC air ambient A

132kV LINE CURRENT TRANSFORMERS

63.0 Purpose

63.1 a. Rated primary/secondary current A

63.2 b. Rated frequency Hz

63.3 c. Rated output VA

63.4 d. Rated knee point voltage (Vk) VA

63.5 e. Maximum secondary resistance ohms

63.6 f. Maximum secondary excitation current at Vk/2 A

63.7 g. Rated accuracy class/accuracy limit factor

63.8 h. Highest equipment voltage kV

63.9 i. Rated insulation level kV

63.10 j. Rated short time thermal current/duration kA/s

63.11 k. Rated dynamic current kA

63.12 l. Class of insulation

63.13 m. Rated continuous current at 40oC air ambient A

Page 42 of 59

Page 43: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

132kV NEUTRAL CURRENT TRANSFORMERS

64.0 Purpose

64.1 a. Rated primary/secondary current A

64.2 b. Rated frequency Hz

64.3 c. Rated output VA

64.4 d. Rated knee point voltage (Vk) VA

64.5 e. Maximum secondary resistance ohms

64.6 f. Maximum secondary excitation current at Vk/2 A

64.7 g. Rated accuracy class/accuracy limit factor

64.8 h. Highest equipment voltage kV

64.9 i. Rated insulation level kV

64.10 j. Rated short time thermal current/duration kA/s

64.11 k. Rated dynamic current kA

64.12 l. Class of insulation

64.13 m. Rated continuous current at 40oC air ambient A

SECONDARY WINDING LINE CURRENT TRANSFORMERS

65.0 Purpose

65.1 a. Rated primary/secondary current A

65.2 b. Rated frequency Hz

65.3 c. Rated output VA

65.4 d. Rated knee point voltage (Vk) VA

65.5 e. Maximum secondary resistance ohms

65.6 f. Maximum secondary excitation current at Vk/2 A

65.7 g. Rated accuracy class/accuracy limit factor

65.8 h. Highest equipment voltage kV

65.9 i. Rated insulation level kV

65.10 j. Rated short time thermal current/duration kA/s

65.11 k. Rated dynamic current kA

65.12 l. Class of insulation

65.13 m. Rated continuous current at 40oC air ambient A

Page 43 of 59

Page 44: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Page 44 of 59

Page 45: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

SECONDARY WINDING LINE CURRENT TRANSFORMERS

66.0 Purpose

66.1 a. Rated primary/secondary current A

66.2 b. Rated frequency Hz

66.3 c. Rated output VA

66.4 d. Rated knee point voltage (Vk) VA

66.5 e. Maximum secondary resistance ohms

66.6 f. Maximum secondary excitation current at Vk/2 A

66.7 g. Rated accuracy class/accuracy limit factor

66.8 h. Highest equipment voltage kV

66.9 i. Rated insulation level kV

66.10 j. Rated short time thermal current/duration kA/s

66.11 k. Rated dynamic current kA

66.12 l. Class of insulation

66.13 m. Rated continuous current at 40oC air ambient A

SECONDARY WINDING LINE CURRENT TRANSFORMERS

67.0 Purpose

67.1 a. Rated primary/secondary current A

67.2 b. Rated frequency Hz

67.3 c. Rated output VA

67.4 d. Rated knee point voltage (Vk) VA

67.5 e. Maximum secondary resistance ohms

67.6 f. Maximum secondary excitation current at Vk/2 A

67.7 g. Rated accuracy class/accuracy limit factor

67.8 h. Highest equipment voltage kV

67.9 i. Rated insulation level kV

67.10 j. Rated short time thermal current/duration kA/s

67.11 k. Rated dynamic current kA

67.12 l. Class of insulation

67.13 m. Rated continuous current at 40oC air ambient A

Page 45 of 59

Page 46: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Item Description Value Unit

SECONDARY WINDING NEUTRAL CURRENT TRANSFORMERS

68.0 Purpose

68.1 a. Rated primary/secondary current A

68.2 b. Rated frequency Hz

68.3 c. Rated output VA

68.4 d. Rated knee point voltage (Vk) VA

68.5 e. Maximum secondary resistance ohms

68.6 f. Maximum secondary excitation current at Vk/2 A

68.7 g. Rated accuracy class/accuracy limit factor

68.8 h. Highest equipment voltage kV

68.9 i. Rated insulation level kV

68.10 j. Rated short time thermal current/duration kA/s

68.11 k. Rated dynamic current kA

68.12 l. Class of insulation

68.13 m. Rated continuous current at 40oC air ambient A

69.0 MATERIAL:

70.0 (i) Castings for current carrying parts

71.0 (ii) Other purposes

72.0 Gaskets for oil-tight joints

73.0 Tubes for water cooled oil coolers

74.0 Tube plates for water cooled oil coolers

Page 46 of 59

Page 47: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

5 SCHEDULE E - Drawings, Data, Assembly, Operating and Maintenance Instructions, Models and Samples

Drawings

Scale

Drawings shall be to scale and fully detailed with dimensions in metric units.

General arrangement drawings shall be to a scale not less than 1:50

Detail drawings not less than 1:20

In exceptional circumstances, where the use of a scale of 1:20 is not practicable, a scale of 1:33 may be adopted

Drawing size A0 or A1 size

Some small detail drawings may be A4

Shall not exceed 1188 x 841mm (A0)

Type of drawing to be supplied for comment

The Contractor shall submit any drawing, in hard copy, in triplicate, for comment at all stages of revision, until the Contractor and the Purchaser agree that the drawing is in its final form. Drawings, other than those requiring comment, agreed between the Contractor and the Purchaser as being appropriate to the Contract, shall also be supplied in hard copy, in triplicate. The Tenderer/Contractor may, by agreement with the purchaser, provide preliminary and/or interim drawings on disk, in one of the formats specified below, in place of paper prints.

Size of drawing

All drawings shall be supplied in the format described above for pre-commissioning testing.

Final drawings shall also be supplied as A0 or A1 size.

Any other drawing size proposed shall be agreed at the tender stage

Identification of drawings

The Contractor shall provide on each drawing a box inscribed ‘UK Power Networks No.’ into which shall be entered an eight digit reference number which will be allocated by the Purchaser when final agreement is reached upon the drawing content.

Page 47 of 59

Page 48: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Design agreement

When applying for design type agreement, the Contractor or sub-Contractor shall submit for comment. Drawings shall show clearly in full detail the equipment for which agreement is sought. Any change made following agreement may invalidate the agreement previously given.

For final records the Contractor shall supply:

Contract Drawing list with the number, title and revision of each drawing

CD-ROM(s) containing each drawing as a file suitable for use with Bentley Microstation Version 8 CAD software. Preferably in Microstation drawing file (.dgn)

OR

Alternatively in drawing interchange file (.dxf) OR AutoCAD (.dwg) format.

The Contract Drawing list shall be submitted by the Contractor for approval by the Purchaser, who will indicate thereon the Company’s requirements for final records, one month before the commencement of the maintenance period, or such earlier date as may be required by the Purchaser.

Cable identification

1 Identification of cablescables and wires shall be identified at both ends with a clear identification system.

2 Numbering system shall be that shown on the UK Power Networks drawings.

a) The UK Power Networks numbering system shall be used throughout, unless otherwise agreed with the purchaser at the tender stage.

b) All wiring leading from the interface with UK Power Networks systems to manufacturers’ internal components must be ferruled in such a manner that all wiring is traceable.

c) Double ferruling is not desirable but may be accepted in certain circumstances – this shall be subject to agreement at the tender stage.

Page 48 of 59

Page 49: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

The following drawings are enclosed with the Standard and Schedules:

Item Drawing number Drawing title

A1 Impedance envelope for main transformer

A2 Schematic of tap-changer control

A3 General arrangement of standby voltage control panel

A4 Typical arrangement of WTI circuit

The following documents, which shall be sufficient to enable space and civil requirements for the transformer and associated equipment to be accurately determined, shall be submitted by the Tenderer with his Tender:

Item Drawing number Drawing Title

B1Preliminary outline giving side and end elevations and plan of the tanks including tap changer, auxiliary transformer, neutral earthing reactor, terminals, cable boxes and cooling equipment

B2 Preliminary foundation details

B3 Preliminary rating and diagram plates for the main transformers

B4 Relevant manufacturer’s safety data sheets

B5 Copy of the Tenderer’s environmental policy

The following drawings shall be submitted by the Contractor for approval by the date shown in Schedule B Item1 or at other times as may be agreed with the Purchaser.

Prior to the date shown in Schedule B Item 1:

Item Drawing number Drawing Title

C1Definite arrangement of the complete main transformer and coolers, auxiliary transformers and neutral earthing reactors

C2 Definite foundation plan

C3 Definite arrangement of cable boxes and disconnection chambers

C4Definite arrangement of the tap change control and cooler control marshalling boxes or kiosks and standby voltage control cubicles

Page 49 of 59

Page 50: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

Prior to the commencement of manufacture:

Drawing number Drawing Title

D1Name, rating and diagram plates and diagrams of connections for the main transformers, auxiliary transformers and neutral earthing reactors showing the relative position of leads taken out of the tank

D2 Valve function plate

D3Circuit diagrams of tap-change control, cooler control, indications, alarms trips, heaters and socket outlets

D4Wiring diagram of tap changer, current transformers and other fittings

D5Wiring diagrams of tap change control and cooler control marshalling kiosks and standby voltage control cubicles

D6Diagram and schedule of auxiliary multicore cables, including those to be installed by the Purchaser

D7Drawing showing any special features likely to need attention during testing or maintenance

EQUIPMENT DATA

An electronic file, in Microsoft Excel format, shall be provided showing all data relevant to the equipment supplied. This data is for direct input into the UK Power Networks MIMS database – a sample format will be supplied by UK Power Networks.

ASSEMBLY, OPERATING AND MAINTENANCE INSTRUCTIONS

Before the Completion Date specified in Schedule B, Item 5, the Contractor shall submit, in English, Assembly, Operating and Maintenance Instructions and Diagrams for approval by the Purchaser and after approval, but not later than one month before the commencement of the maintenance period, shall supply in a durable form the number of copies specified in Schedule D.

MODELS AND SAMPLES

The Contractor shall submit models and samples of materials as requested from time to time by the Purchaser.

Page 50 of 59

Page 51: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

6 SCHEDULE F - Tests

Factory tests

Tests shall be carried out in accordance with BS EN 60076. Special impulse tests are required on all transformers, including chopped wave at 110%. Tests shall be carried out in the order agreed in the test programme.

Routine tests to be conducted on all transformers.

The temperature rise tests on the transformer and cooling shall be undertaken in the physical configuration corresponding to the site layout.

Auxiliary components (tap changers, pressure relief devices, pumps, etc.) can be given general type approval.

Routine Test certificates for each auxiliary component shall be provided for each component which will include magnetisation test result sheets for the CTs.

Where auxiliary components have not been approved by UK Power Networks, evidence of satisfactory type testing and/or previous service experience shall be required and submitted with the tender.

The following tests shall be carried out in the factory and shall be regarded as a minimum requirement.

Item DescriptionUK Power Networks Requirement

1 Impulse Type test

2 Chopped wave impulse 110% Type test

3 Gas in oil analysis before and after tests All transformers

4 Temperature rise at rated power (forced cooling) Type Test

5 Temperature rise at CER rated power Type Test

6 Gas in oil analysis before and after tests Type Test

7 Particle count of oil at end of tests All transformers

8 Gas in oil analysis after tests All transformers

9 Physical properties of oil at end of all tests All transformers

10 Noise level test with frequency spectrum up to at least 1kHz Type Test

11 Harmonic current Type Test

12 Partial discharge All transformers

13 Zero phase impedance All transformers

14 Dielectric loss angle Type Test

15 Routine tests as defined in IEC 60076 All transformers

16 Auxiliary equipment tests including bushings and tap changers All units

Page 51 of 59

Page 52: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

17 Current transformers and connections. All CTs

Page 52 of 59

Page 53: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

SITE COMMISSIONING TESTS

All appropriate checks and tests shall be performed during commissioning at site. A full and comprehensive programme of testing shall be part of the Contract.

The proposed programme of testing shall be presented in tabular form for the approval of the Purchaser, and will subsequently form the basis of a commissioning schedule. The anticipated duration of the site testing shall also be stated.

Page 53 of 59

Page 54: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

7 SCHEDULE G - Items of Equipment with Prices

(To be completed by the Tenderer)

To complete each equipment detailed below there shall be provided the necessary oil, cabling, cable boxes, terminal boards, wiring, fuses, foundation bolts, labels and other sundries whether specified in detail or not.

Item Description Price of each Item supplied, delivered, erected and tested

(£ GBP)

1.0 Main Transformer complete with:

1.1 i) Tank mounted or separate oil/air coolers

1.2 ii) Tap-changer control marshalling box

1.3 iii) Cooler control marshalling box

1.4 iv) Standby voltage control cubicle

1.5 v) Routine tests in accordance with Schedule F

2.0 Loss Evaluation

2.1 i) No-load loss - No-load loss on principle tap x cost factor

2.2 ii) Load loss - Load loss (kWTap min + kWTap 7 + kWTap 13 + kWTap max

)/4 x cost factor

3.0 Anti-vibration pads for transformer main tank

4.0 Sum for transport of main indivisible load to site and installed onto prepared foundation

5.0 Special lifting device for tap-changer maintenance (if required)

6.0 Miscellaneous Equipment

7.0 Special Tools and Equipment (if any):

(To be listed and priced individually in Schedule M)

TOTAL

Page 54 of 59

Page 55: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

8 SCHEDULE H - Summary of Price and Quantities for Definite Work

(To be completed by the Tenderer)

Item No. in Sch. G

DescriptionNumber Required

Total Price

(£GBP)

1.0 Main transformer complete as Item 1 in Schedule G

3.0 Anti-vibration pads

4.0Sum for transport of main indivisible load and

installation onto prepared foundation

5.0 Special lifting device for tap-changer maintenance (if required)

6.0 Miscellaneous Equipment

7.0 Special tools and equipment

TOTAL

WARRANTY OFFERED (refer to Clause 26.1 of ES-04-8000)

a. Defects Liability period Years

b. Incidental costs per unit £ GBP Max

Page 55 of 59

Page 56: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

9 SCHEDULE J - Prices for Work at the Option of the Purchaser

(To be completed by the Tenderer)

Item Description Price of Each Item, Supplied, Delivered

and off-loaded

(£GBP)

1.0 Additional tests consisting of:

a) Temperature rise tests in accordance with Schedule F on a tap position and loading to be agreed with the Purchaser.

The test to also include DGA oil from top and bottom of main tank and from selector compartment per run

b) Type impulse tests in accordance with Schedule F, less cost of routine test already included in Item 1 of Schedule G.

c) Additional noise level test for complete transformer with all cooling plant in operation

d) Frequency response analysis tests for main transformer immediately prior to transportation and immediately after off-loading at site

2.0 Spare oil pump

3.0 Copy of a set of photographs taken:

a) of the core/winding assembly at cleat bar

inspection stage, both HV and LV sides

b) of the completed unit including assembled

transformer/cooler bank at type test stage, all

sides and top

4.0 Recommended spares:

To be listed and priced individually in Schedule M.

Page 56 of 59

Page 57: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

10 SCHEDULE K - Access and Site Facilities

The contractor shall ensure that all construction traffic and employees vehicles for which he is responsible, including his Sub-Contractors, use the following site access facilities. These facilities will be in constant use by all Contractors working on site.

Road Entry

Road Exit

Rail Access

Off-Loading

Where equipment is to be erected by the Contractor, the Works shall include the off-loading of the equipment from the Contractor's vehicle and installation into its final position by the Contractor. The point of off-loading and methods of handling within the substation shall be agreed between the Purchaser and the Contractor.

Any equipment that is not to be erected by the Contractor shall be off-loaded from the Contractor's vehicle onto a firm surface as close as practicable to the point of installation. The Contractor's vehicle shall incorporate suitable lifting apparatus, or separate means of off-loading shall be provided by the Contractor. The point of off-loading shall be agreed between the Purchaser and the Contractor.

Contractor's Area (Contracts with Erection)

The Contractor will, if he so request and if it is practicable, be allocated an area of land or space within an existing building for the purpose of temporary buildings, materials storage and the like.

Materials, temporary structures or plant shall not be placed elsewhere unless, in the opinion of the Purchaser, these are required for the immediate construction of the Works.

Accommodation for Employees (Contracts with Erection)

The Contractor shall prohibit the committing of nuisance by his employees within the site or upon the land of the Company or others. Any employee found violating this provision shall be immediately discharged and not employed again on this contract.

Page 57 of 59

Page 58: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

11 SCHEDULE L - Proposed Exceptions or Additions to the Standard

(To be completed by the Tenderer)

The Tenderer shall state below the detail and extent to which his offer(s) departs from the specified requirements for every clause / sub-clause.

The Tenderers offer will be deemed to fully conform to the requirements of the Standard (EDS 04-8000) and Schedules (EDS 04-8000A) except, where the Tenderer specifically states below.

Clause / Sub-

Clause

Conformance Description(Partial Conformance, Non-Conformance)

Supplier Remarks

Page 58 of 59

Page 59: EDS 00-0000 Insert title - Document Library - Homelibrary.ukpowernetworks.co.uk/library/asset/5bb1df46-ca... · Web viewSubstation:…………………… Document Number:EDS 04-8000A

THIS

IS A

N U

NCO

NTR

OLL

ED D

OCU

MEN

T, T

HE R

EADE

R M

UST

CO

NFI

RM IT

S VA

LIDI

TY B

EFO

RE U

SE

Grid Transformer Schedules

Substation:……………………

Document Number:EDS 04-8000AVersion : 2.0Design doc No :

12 SCHEDULE M - List of Special Tools and Equipment to be Used

(To be completed by the Tenderer)

Item Description Quantity

1.0 LIST OF SPECIAL TOOLS AND EQUIPMENT TO BE USED:

2.0 LIST OF RECOMMENDED SPARES

3.0 LIST OF REQUIRED TRAINING

Page 59 of 59