18
EEF GENERAL ASSEMBLY 2013 EEF BROTHERHOOD PROGRAMME TM 1

EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF GENERAL ASSEMBLY 2013

EEF

BROTHERHOOD PROGRAMME TM

1

Page 2: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

- A need for a development program, long existing within EEF.

- September 2011, EEF approves the initiation of ‘Brotherhood Program’

- Sept 2011- Dec 2012. Preperation phase

- March 2013. Official Launch in Essen (GER)

HISTORY

2

Page 3: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

- A program where a developed NF provides technical/theoretical/administrative

assistance to a requesting NF.

- Under the administration of EEF.

- A program where a donor NF can also be a receiver NF in another field.

DEFINITION

3

Page 4: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

DEFINITION

E.E.F.

Donor NF Receiver NF

Administration

4

Service

Page 5: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

DEVELOPMENTS

- Applications received during the period March-April

- Receiver Applications:

- Bulgaria

- Hungary

- Estonia

- Malta

5

Page 6: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

DEVELOPMENTS

- Applications received during the period March-April

- Donor Applications:

- Netherlands

- Ireland

- Spain

- Germany

- Hungary

6

Page 7: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

PROJECT 1: Endurance trainer/consultant for infrastructure development and nat. teams

7

BULGARIA SPAIN

Page 8: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Applicant: BUL NF

Project Responsible at Receiver: Theodor Sheytanov (Sec. General)

Donor: ESP NF

Project Responsible at Donor : Venancio Garcia (Sec. General)

Technical Expert: Ignasi Casas

8

PROJECT 1:

Page 9: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Status of the Project: - Preliminary assesment of the endurance level in Bulgaria conducted (June) - Indicative planning and road map initiated - First technical visit by the technical expert: 18-20 October.

9

PROJECT 1:

Page 10: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

PROJECT 2: Talent Identification Programme (Jumping)

10

HUNGARY NETHERLANDS

Page 11: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Applicant: HUN NF

Project Responsible at Receiver: Dorottya Strobl (Sec. General)

Donor: NED NF

Project Resp. at Donor : Maarten van der Heijden

Technical Expert: same as above

11

PROJECT 2:

Page 12: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Status of the Project:

- First technical visit conducted 14-16 August

- Draft plan circulated to Chef’d equipe of the Junior and Senior teams

- Level III trainers also involved in the programme

- First selection in Spring 2014.

- First assesment by the technical expert: Spring 2015

12

PROJECT 2:

Page 13: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

PROJECT 3: Eventing Track . ( 1- Construction of a new site 2- Renovation of Shumen course)

13

BULGARIA IRELAND

Page 14: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Applicant: BUL NF

Project Responsible at Receiver: Theodor Sheytanov (Sec. General)

Donor: IRL NF

Project Responsible at Donor : Damian Mc Donald (Sec. General)

Technical Expert: Andrew Fell

14

PROJECT 3:

Page 15: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

Status of the Project: - Digital drawings of the new venue obtained (July) - First visit by the technical expert: 28-31 October.

15

PROJECT 3:

Page 16: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

16

Second Phase in the Programme

- Follow up of current projects

- Evaluation of other applications :

• Estonia Talent Identification Programme

• Bulgaria- Dressage trainer

• Malta-Infrastructure

Page 17: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

17

Future Aspects - Involvement of other developed nations

- Sustainability of the current projects

- Calendar match of the two parties

Page 18: EEF GENERAL ASSEMBLY 2013 · - A need for a development program, long existing within EEF. - September 2011, EEF approves the initiation of ‘Brotherhood Program’ - Sept 2011-

EEF BROTHERHOOD PROGRAMME TM

18

EEF

WOULD LIKE TO THANK

ALL RECEIVER AND DONOR NFs IN THE PROJECT