1
0 2 4 6 8 10 12 14 0 50 100 150 200 250 300 350 400 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Accum. Man-Hours spent on the List No of Line Items Number of Line Items vs Accumulated Hours Spent on Listings No of Line Items Median Line Actual Time Spent Est Time Spend if use Manual Method (Trending) PURCHASING PROCESS 0.2 0.2 2.7 0.2 3.2 0.2 0.2 0.8 0.2 1.3 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Sorting Consolidating Checking & Entry Filing Man-Hours 100 Line Items (Manual) 100 Line Items (Automated) Estimated Average Time Spent to Prepare a 100-Line Items List for Submission Diana V. Naden, Mohktar B. Sopari, Alan N.H. Chui, Oh Ching Ching, Kim Ming Hwa and Teo Kian Kian. Effective Use of Information Technology for Efficient and Timely Submission of Accrual Financial Reports from Pharmacy Store To use existing data in Pharmacy Maxcare System, to present Goods Received Note (GRN) List in a complete, accurate and timeliness manner; so that prompt payment can be made to the vendors. In vision for sound inventory management in Pharmacy, this automated list has brought performance and satisfaction to the team. This list will be further explored for planning, organising, better manpower resource allocation and control for both goods & documents handling. Discovering workplace needs and taking advantage of technologies, users can leverage on existing data, translating them into useful information to improve efficiency and for better decision-making. Stocks ordering Purchase Order (PO) creation Delivery of Goods Vendor’s Invoice or Delivery Order (DO) Methodology Pharmacy Purchasing Office Vendor Pharmacy Store PO GRN Invoice Every month-end before Finance close account, to mitigate the tight lead time, staff have to MANUALLY TRANSCRIBE documents’ details into a List for accrual purposes This List contains details such as Suppliers’ Name, GRN, PO/DO, Invoice Number and Amount. The List can have 80 - 150 line-items and may spent up to 5.0 man-hours to complete the list. Purchasing and Inventory information are stored in Maxcare System’s Database As data and information are readily available in Maxcare, by allowing the system to generate a daily AUTOMATED spreadsheet- list, Pharmacy is able to submit a similar List to Finance NEW PREVIOUS To compare and evaluate the efficacy of Pharmacy Store’s new listing process over a 8-months period (4-months period for each Pre and Post): Record Process Time for List preparation end of month Amount of time saved with Automated versus Manual methods. The completeness and validity of the new List. Upon receiving of goods from vendor, Pharmacy will check Open PO in Maxcare Retrieve PO Check Goods Endorse Acceptance Goods stored in Storage Area Enter the goods’ PO details into Maxcare, for Goods-Received Notes (GRN) creation Consolidate the PO/DO, Invoices and GRN Mail to Finance for accounting purposes. This entire cycle usually take 2 - 4 work-days. INVOICE . ........ ... . ........ ... Finance Account Payable Accrual created with List Received documents and List 3-Way Match of PO/DO, GRN and Invoices Accrual removed Finance release payment to vendor "Numbers have an important story to tell. They rely on you to give them a voice.” – Stephen Few Few. Statistical Narrative -Telling Compelling Stories with Numbers, Perceptual Edge - Visual Business Intelligence Newsletter, July/August 2009 New: As data are in the system, manual entry has been eliminated, hence spend most time checking of documents The new List helps to save 1.5-2 hours for 100 Line Item List AUTOMATED MANUAL From Feb16, New daily Lists are received from Maxcare Mid-Jan16 User Acceptance Test (UAT) was conducted and tested. Some time savings were already observed Maxcare Maxcare Overall Reduction 6.8 hrs savings 7.6 hrs savings 8.0 hrs savings 11.3 hrs savings During testing, Staff have identified that the List can be explored for other purposes, e.g. Checklist, Cover-page Report, Inventory performance measurement and Forecasting movements. Achievements 82% Man-hours Savings per month! Minimize Duplication Allow hands off Reduce Process Time Almost… Better productivity Effective method of doing work Efficiency The new List came in just in time during the seasonal festivals period, as more stocks (buffer) were ordered, resulting in longer list. Conclusion Aim Result 72% 60% Spent up to 5.0 man- hours to complete the List. In May16, 373 line-items completed in 2.5 man-hours; Estimate would take 14 man- hours if by Manual method

Effective Use of Information Technology for Efficient and ...... · Mid-Jan16 User Acceptance Test (UAT) was conducted and tested. Some time savings were already observed Maxcare

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Effective Use of Information Technology for Efficient and ...... · Mid-Jan16 User Acceptance Test (UAT) was conducted and tested. Some time savings were already observed Maxcare

0

2

4

6

8

10

12

14

16

0

50

100

150

200

250

300

350

400

Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Acc

um

. Man

-Ho

urs

sp

en

t o

n t

he

Lis

t

No

of

Lin

e It

em

s Number of Line Items vs Accumulated Hours Spent on Listings

No of Line Items Median Line Actual Time Spent Est Time Spend if use Manual Method (Trending)

PURCHASING PROCESS

0.2 0.2

2.7

0.2

3.2

0.2 0.2

0.8

0.2

1.3

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Sorting Consolidating Checking& Entry

Filing

Man

-Ho

urs

100 Line Items(Manual)

100 Line Items(Automated)

Estimated Average Time Spent to Prepare a 100-Line Items List for Submission

Diana V. Naden, Mohktar B. Sopari, Alan N.H. Chui, Oh Ching Ching, Kim Ming Hwa and Teo Kian Kian.

Effective Use of Information Technology for Efficient and Timely Submission of Accrual Financial Reports from Pharmacy Store

To use existing data in Pharmacy Maxcare System, to present Goods Received Note (GRN) List in a complete, accurate and timeliness manner; so that prompt payment can be made to the vendors.

In vision for sound inventory management in Pharmacy, this automated list has brought performance and satisfaction to the team. This list will be further explored for planning, organising, better manpower resource allocation and control for both goods & documents handling.

Discovering workplace needs and taking advantage of technologies,

users can leverage on existing data, translating them into useful information to improve efficiency and for better decision-making.

•Stocks ordering •Purchase Order (PO) creation

•Delivery of Goods •Vendor’s Invoice or Delivery Order (DO)

Methodology

Pharmacy Purchasing

Office

Vendor

Pharmacy Store

PO

GRN Invoice

Every month-end before Finance close account, to mitigate the tight lead time, staff have to MANUALLY TRANSCRIBE documents’ details into a List for accrual purposes

This List contains details such as Suppliers’ Name, GRN, PO/DO, Invoice Number and Amount.

The List can have 80 - 150 line-items and may spent up to 5.0 man-hours to complete the list.

Purchasing and Inventory

information are stored in Maxcare System’s Database

As data and information

are readily available in

Maxcare, by allowing the

system to generate a daily

AUTOMATED spreadsheet-

list, Pharmacy is able to

submit a similar List to

Finance

NEW PREVIOUS

To compare and evaluate the efficacy of Pharmacy Store’s new listing process over a 8-months period (4-months period for each Pre and Post): • Record Process Time for List preparation end of month • Amount of time saved with Automated versus Manual methods. • The completeness and validity of the new List.

Upon receiving of goods from vendor,

• Pharmacy will check Open PO in Maxcare

• Retrieve PO

• Check Goods

• Endorse Acceptance

• Goods stored in Storage Area

• Enter the goods’ PO details into Maxcare, for Goods-Received Notes (GRN) creation

• Consolidate the PO/DO, Invoices and GRN

• Mail to Finance for accounting purposes.

• This entire cycle usually take 2 - 4 work-days.

INVOICE . ........ ... . ........ ...

Finance Account Payable

• Accrual created with List • Received documents and List • 3-Way Match of PO/DO, GRN

and Invoices • Accrual removed • Finance release payment to

vendor

"Numbers have an important story to tell. They rely on you to give them a voice.” – Stephen Few

Few. Statistical Narrative -Telling Compelling Stories with Numbers, Perceptual Edge - Visual Business Intelligence Newsletter, July/August 2009

New: As data are in the system, manual entry has been eliminated, hence spend most time checking of documents

The new List helps to save 1.5-2 hours for 100 Line Item List

AUTOMATED MANUAL

From Feb16, New daily Lists

are received from Maxcare

Mid-Jan16 User Acceptance

Test (UAT) was conducted and

tested. Some time savings were

already observed

Maxcare Maxcare

Overall Reduction

6.8

hrs

sav

ings

7.6

hrs

sav

ings

8.0

hrs

sav

ings

11

.3 h

rs s

avin

gs

• During testing, Staff have identified that the List can be explored for other purposes, e.g. Checklist, Cover-page Report, Inventory performance measurement and Forecasting movements.

Achievements

82% Man-hours Savings per month!

Minimize Duplication

Allow hands off

Reduce Process Time

Almost…

Better productivity Effective method

of doing work Efficiency

The new List came in just in time during the seasonal festivals period, as more stocks (buffer) were ordered, resulting in longer list.

Conclusion

Aim Result

72%

60%

Spent up to 5.0 man-

hours to complete the List.

In May16, 373 line-items completed in 2.5 man-hours; Estimate would take 14 man-hours if by Manual method