23
ELECTRICITATE DIN “DESEU” APA CALDA 80 C Locatie: SC Sortilemn SA, Gherla (Jud. Cluj), Romania Dragostin Catalin Director, SC Energy-Serv SRL Presedinte, ESCOROM Romanian Energy Efficiency Forum 2016 October 13, 2016, HOTEL INTERCONTINENTAL, BUCHAREST EFICIENTA ENERGETICA 1

EFICIENTA ENERGETICA - ARPEEarpee.org.ro/wp-content/uploads/2016/09/Energy-Serv.pdf · 2016-10-17 · Primaria Locala, fiecare cu “agenda proprie”; CONCLUZIE RELEVANTA PENTRU

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

ELECTRICITATE DIN “DESEU”

APA CALDA 80 C

Locatie: SC Sortilemn SA, Gherla (Jud. Cluj), Romania

Dragostin Catalin

Director, SC Energy-Serv SRL

Presedinte, ESCOROM

Romanian Energy Efficiency Forum 2016

October 13, 2016, HOTEL INTERCONTINENTAL, BUCHAREST

EFICIENTA ENERGETICA

1

ORC joasa T

Utilizarea “bottom cycle” in ciclu ORC, T medie

Utilizarea capacitatii termice excedentare a unei CHP

(sau orice alta sursa !)

2

PRIMUL PROIECT DE ACEST TIP DIN ROMANIA (Heat Recovery for Power Generation)

3

“SISTEMUL COGEN” AL SORTILEMN (cogen inalta eficienta pe biomasa - energie verde)

4

PRODUCTIA DE CALDURA (APA CALDA 80 C)

PRODUCTIA DE ELECTRICITATE (urmareste caldura)

5

COGEN ACOPERA CONSUMUL DE CALDURA SI EXCESUL ESTE ELIMINAT IN ATMOSFERA

6

Excesul de CALDURA eliminat in atm = pierdere !

PRODUCTIA DE ELECTRICITATE (constant la maxim)

Energie termica disipata in atmosfera prin racitoare

Energie termica necesara procesului tehnologic Sortilemn

7

CURBA DE SARCINA TERMICA

8

COGEN ACOPERA CONSUMUL DE CALDURA SI EXCESUL ESTE “CONSUMAT” PT. PRODUCTIE SUPLIMENTARA DE ELECTRICITATE in ORC DE JOASA TEMP.

9

PRODUCTIA DE ELECTRICITATE SUPLIMEMENTARA

PRODUCTIA DE ELECTRICITATE initiala (constant la maxim)

Energie termica disponibila “transformata” in electricitate

Energie termica necesara procesului tehnologic Sortilemn

10

FOTO INVESTITIE

11

PROIECTUL 3-D AL INVESTITIEI

12

PROCESUL TEHNOLOGIC ORC

13

PARAMETRII PRINCIPALI (INPUT/OUPUT)

14

Productia de energie si economii realizate

15

VARIATIA ZILNICA A PRODUCTIEI REALIZATE

16

VARIATIA SAPTAMINALA A PRODUCTIEI REALIZATE

17

18

CONTRACT ESCO / EnPC: ENERGY-SERV / SORTILEMN

•Tehnologie

•Fezabilitate

•Proiect General

•Contract EnPC

Pregatirea Proiectului

•Energy-Serv 35%

•FREE 65%

•Avize/Autorizatii

Finantare •Spec. Echip.

•Contr. & Achizitii

•Constr.& PIF

•Performance G.

Implementare

•Joint O&M

•Op.optimisation

Exploatare ESCO

2 luni

3 luni

7 luni

10 ani

Managementul a 10 Subcontractori (!), pentru parte electrica,

conexiuni, automatica, mecanica, structuri, civile, echipamente auxiliare;

Managementul aprobarilor si avizelor (inca 7 entitati !) de la: Sortilemn, FREE, ANRE, Min.Mediului, Inspectoratul Constructii, Electrica, Primaria Locala, fiecare cu “agenda proprie”;

CONCLUZIE RELEVANTA PENTRU PROIECTE DE EFICIENTA ENERGETICA: Efort si costuri disproportionate de management pentru 200 Kwe eficienta energetica (care nu este CNE Cernavoda !) si a carui implementare dureaza 12 luni !

MANAGEMENTUL PROIECTULUI

19

Cresterea puterii instalate cu 16,2%;

Cresterea randamentului electric al ciclului ORC al CHP cu ~3%;

Cresterea cu ~25% estimat, a productiei anuale de “energie electrica verde” (dar se va determina dupa 1 an de zile de functionare) ;

Reducerea emisiilor GES cu ~1.000 t CO2/an

PERFORMANTE OBTINUTE

20

Energie termica reziduala care oricum se pierde: • Gaze din motoare, CHP (gaz, biodiesel, bioas, etc.),

racirea motoarelor; • Abur rezidual (deseu) de joasa presiune

Procese industriale: • Industria metalurgica, sticla, alimentara, etc; • Procese de incinerare (biocombustibili, deseuri, etc.); • Petrochimie (racire distilat); • Termocentrale;

Aplicatii geotermale, retele de termoficare; Incalziri, raciri de gaze

“COMBUSTIBILI” PENTRU ORC DE JOASA TEMPERATURA

(REPLICABILITATE MARE)

21

Reducere Emisii GES

Recuperare Energie Verde

Finantare ESCO

Tehnologie noua

22

CARACTERISTICI “POLITICE” ALE PROIECTULUI