22
FORM – 1 (Submitted to SEIAA, Telangana) By EIPL VENTURES (Expansion of Residential Gated Community) Sy. No. 414 (P), 415(P), 416(P), 417(P), 419(P) & 420(P), Manchirevula Village, Gandipet Mandal (earlier Rajendra Nagar Mandal), Ranga Reddy District, Telangana 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | |Hyderabad- 500082|Phone: + 91-40-23314270 / 71| E mail: [email protected] |www.pioneerenvirolabs.com | PEOPLE | SAVE ENVIRONMENT | Prepared by

EIPL VENTURES desh. - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/14102017... · FORM – 1 (Submitted to SEIAA, Telangana) By desh. EIPL VENTURES

Embed Size (px)

Citation preview

FORM – 1

(Submitted to SEIAA, Telangana)

By

desh.

EIPL VENTURES

(Expansion of Residential Gated Community) Sy. No. 414 (P), 415(P), 416(P), 417(P), 419(P) & 420(P),

Manchirevula Village,

Gandipet Mandal (earlier Rajendra Nagar Mandal),

Ranga Reddy District,

Telangana

6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | |Hyderabad- 500082|Phone: + 91-40-23314270 / 71| E mail: [email protected]

|www.pioneerenvirolabs.com | PEOPLE | SAVE ENVIRONMENT |

Prepared by

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

1

APPENDIX I (See paragraph – 6)

FORM - 1

S. No

(I) Basic Information

1 Name of the project EIPL VENTURES

(Expansion of Residential Gated

Community)

2 S. No. in the schedule 8(a)

3 Proposed capacity / area / length /

tonnage to be handled / command area

/ lease area/number of wells to be

drilled

Additional 20 Villas (G + 2) with Built-up area

of 12,327.98 Sq.m

After expansion Total built-up area will be

40,853.38

4 New / Expansion / Modernization Expansion

5 Existing capacity/Area etc. Residential Gated Community with Built up

area of 28,525.4 Sq. m consisting of 55 villas

(G + 2 floors), LIG & EWS (G + 2 floors) and

Amenities (Basement + G + 1 floor).

6 Category of project i.e. ‘A’ or ‘B’. B

7 Does it attract the general condition? If

yes, please specify.

No

8 Does it attract the specific condition? If

yes, please specify.

No

9 Location

Plot/Survey / Khasra No. 414 (P), 415(P), 416(P), 417(P), 419(P) &

420(P)

Village Manchirevula Village

Tehsil / Mandal Gandipet Mandal

District Ranga Reddy District

State Telangana

10 Nearest railway station/airport along

with distance in kms.

Nearest Railway station: Hitech city – 10.5

Kms.

Nearest Airport – Rajiv Gandhi International

Airport – 17.8 Kms

11 Nearest Town, city, District

Headquarters along with distance in

kms

Hyderabad – adjacent to the site

12 Village Panchayats,Zilla Parishad,

Municipal corporation, Local

body(complete postal addresses with

telephone no.s to be given)

The project site falls under HMDA

13 Name of the applicant EIPL VENTURES

14 Registered Address EIPL OFFICE, Sy. No. 476, ORR Gandipet Circle,

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

2

S. No

Manchirevula (V), Gandipet (M), Hyderabad - 500089

15. Address for correspondence:

Name P.R. SEKHAR REDDY

Designation(owner/partner/CEO) MANAGING DIRECTOR

Address EIPL OFFICE, Sy. No. 476, ORR Gandipet Circle, Manchirevula (V), Gandipet (M), Hyderabad - 500089

Pin code 500089

E-Mail [email protected]

Telephone No. 9000333419

Fax No. ---

16.

Details of Alternative sites examined, if

any. Location of these sites should be

shown on a topo sheet

No alternate sites are considered

17. Interlinked Projects No

18. Whether separate application of

interlinked project has been submitted?

No

19. If yes, date of submission Not applicable

20. If no, reason Not applicable

21. Whether the proposal involves

approval/clearance under; if yes,

details of the same and their status to

be given.

(a) The Forest

(conservation)Act,1980

(b) The

Wildlife(protection)Act,1972

(c) The C.R.Z Notification,1991?

No

22.

Whether there is any a government

order/policy relevant/relating to the

site?

No

23. Forest land involved(hectares) No

24. Whether there is any litigation pending

against the project and/or land in which

the project is propose to be set up?

(a)Name of the court

(b)Case No.

(c) Orders/directions of the court, if any

and its relevance with the proposed

project.

No

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

3

(II) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions,

which will cause physical changes in the locality (topography, land use, changes in

water bodies, etc.)

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

1.1 Permanent or temporary change in

land use, land cover or topography

including increase in intensity of

land use (with respect to local

land use plan)

No The proposed 20 additional villas will

be constructed in the area acquired

adjacent to the existing site.

The additional area acquired falls

under Multi-purpose zone as per

Metropolitan Development Master

Plan for Moinabad and Rajendranagar

Mandal (G.O M.S No. 33 MA & UD (11)

dated 24-01-2013. Hence there will not

be any change in land use. The

topography of the site is more or less

flat without many undulations.

Greenbelt / greenery will be developed

with in the premises as per the norms.

Hence there will not be any adverse

impact due to the change in land use

pattern due to the proposed

expansion of Residential gated

community

1.2 Clearance of existing land,

vegetation and buildings?

No No clearance of buildings or

vegetation is envisaged in the

additional area acquired for proposed

expansion.

1.3 Creation of new land uses? No No other land use other than

residential will be created in the

additional area acquired for the

proposed expansion.

1.4 Pre-construction investigations e.g.

bore houses, soil testing?

No Investigations have been carried out

for soil and water at the site.

1.5 Construction works?

No No construction work will be taken-up

pertaining to expansion without

obtaining the Prior Environmental

clearance from SEIAA and Consent

For Establishment from SPCB.

1.6 Demolition works?

No Not applicable as no demolition works

are envisaged for the proposed

expansion

1.7 Temporary sites used for Yes Construction workers will be from

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

4

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

construction works or housing of

construction workers?

local area only. Temporary housing is

proposed for construction workers.

1.8 Above ground buildings, structures

or earthworks including linear

structures, cut and fill or

excavations

Yes Most of the structures will be above

the ground. However excavations will

be involved for foundations. Excess

cut will be used for Flooring & internal

road laying

1.9 Underground works including mining

or tunneling?

No No mining and tunneling will be

involved in the proposed expansion

activity.

1.10 Reclamation works?

No No reclamation works are envisaged

in proposed expansion project.

1.11 Dredging?

No No dredging activity will be involved.

1.12 Offshore structures? No No offshore structures are envisaged

in the proposed expansion project.

1.13 Production and manufacturing

processes?

No Not applicable as proposed expansion

project involves construction of

Residential gated community.

1.14 Facilities for storage of goods or

materials?

Yes Raw materials will be stored as per

norms. The raw materials like Cement,

Sand, Bricks, Steel, Wood, Paint &

aggregates will be stored at site only.

Cement & Paint will be stored at

indoors & remaining will be at

outdoors.

1.15 Facilities for treatment or disposal of

solid waste or liquid effluents?

Yes Wastewater generated during the

operation of the Residential gated

community will be treated in sewage

treatment plant. Treated wastewater

will be utilized for non-potable

purposes like Toilet flushing &

Greenbelt development.

Treatment and disposal of wastewater

& solid waste will be in accordance

with the CPCB/SPCB norms.

1.16 Facilities for long term housing of

operational workers?

No No permanent housing will be

provided for the construction

workers.

1.17 New road, rail or sea traffic during

construction or operation?

Yes There will be a slight increase in

traffic volume during construction

and operation of the proposed

Residential gated community.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

5

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

The proposed Residential gated

community site is well connected by

Narsing – Appa service road

Hence there will not be any adverse

impact on road traffic / rail traffic / sea

traffic due to the proposed Residential

gated community.

1.18 New road, rail, air waterborne or

other transport infrastructure

including new or altered routes and

stations, ports, airports etc?

No No new road / rail / air transport

infrastructure is proposed.

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No No closure or diversion of existing

transport routes is envisaged.

1.20 New or diverted transmission lines

or pipelines?

No Water required for the proposed

expansion of Residential gated

community will be sourced from

ground water

1.21 Impoundment, damming, culverting,

realignment or other changes to the

hydrology of watercourses or

aquifers?

No No culverting, realignment are

envisaged. There will not be any

changes to the hydrology of

watercourses or aquifers.

1.22 Stream crossings? No No stream crossing is involved

1.23 Abstraction or transfers of water

form ground or surface waters?

Yes Water required for the proposed

expansion project will be sourced

from ground water

1.24 Changes in water bodies or the land

surface affecting drainage or run-

off?

No No changes in water bodies, drainage

and land surface are anticipated as

the site is more or less flat without

many undulations. Separate storm

water drains will be provided.

1.25 Transport of personnel or materials

for construction, operation or

decommissioning?

Yes There will be a slight increase in

traffic volume during construction

and operation of the proposed

Residential gated community.

The proposed Residential gated

community site is well connected by

Narsingi - Appa service road. The

existing road can handle this

additional increase in vehicular traffic.

Hence there will not be any adverse

impact on road traffic / rail traffic / sea

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

6

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

traffic due to the proposed Residential

gated community.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No No such works are envisaged

1.27 Ongoing activity during

decommissioning which could have

an impact on the environment?

No No such works are envisaged

1.28 Influx of people to the area either

temporarily or permanently?

No Temporary labour required for the

construction activity will be met from

the local places.

1.29 Introduction of alien species? No No such activity is envisaged

1.30 Loss of native species or genetic

diversity?

No As a part of greenbelt/greenery

development plan native species that

are suitable to that soil condition will

be developed.

1.31 Any other actions? No Nil

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

7

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply)

S.No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes The proposed 20 additional villas will

be constructed in the area acquired

adjacent to the existing site.

Additional acquired for the proposed

expansion project falls under Multi-

purpose zone as per Metropolitan

Development Master Plan for

Moinabad and Rajendranagar

Mandal (G.O M.S No. 33 MA & UD

(11) dated 24-01-2013). Hence there

will not be any change in land use.

The topography of the site is more or

less flat without many undulations.

Total land acquired for the proposed

expansion of Residential gated

community is 6.3 Acres. Total land

after proposed expansion project

will be 14.33 acres.

2.2

Water (expected source &

competing users) unit: KLD

Yes Water required for the proposed

project will be sourced through

Ground water resources during

operation & construction of the

Project. Total water demand is about

1 KLD during Construction of

additional 20 villas & 78 KLD during

operation of the gated community

after expansion. Net water

requirement after recycling of

treated waste water will be 42 KLD

2.3 Minerals (MT) Yes Sand - 25000 Cum

2.4 Construction material – stone,

aggregates, sand / soil (expected

source – MT)

Yes All construction materials such as

Ready mix Concrete, Cement, Sand,

Aggregate, Aerated Auto clave,

Concrete Brick (nos.),

Reinforcement Steel, Wood material,

Painting material, Flooring Material,

Sanitary Material, Electrical Material,

Plumbing material are available

locally.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

8

S.No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.5 Forests and timber (source – MT) No Wood material required for Windows

& Doors of Imported Quality will be

procured locally.

2.6 Energy including electricity and fuels

(source, competing users) Unit: fuel

(MT), energy (MW)

Yes The total energy requirement for the

proposed expansion project will be

200 KvA (Maximum peak demand). It

will be taken from TSSPDCL.

DG set will be provided for

emergency Backup Power Supply.

2.7 Any other natural resources (use

appropriate standard units)

No Not applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

9

3. Use, storage, transport, handling or production of substances or materials, which

could be harmful to human health or the environment or raise concerns about

actual or perceived risks to human health

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna, and

water supplies)

Yes The hazardous wastes like empty

containers of paints, petroleum

products, thinners, adhesives will be

given to authorized recyclers. All the

hazardous materials will be stored

as per HWM rules.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g.

insect or water borne diseases)

No Not Applicable

3.3 Affect the welfare of people e.g. by

changing living conditions?

No Not Applicable as the proposed

expansion of Residential gated

community will create direct /

indirect employment opportunities

in the area and thereby contributing

in the improvement of socio-

economic status of people in the

area. Land prices will increase

substantially.

3.4 Vulnerable groups of people who

could be affected by the project e.g.

hospital patients, children, the

elderly etc.,

No Approach roads to the gated

community is already paved

Speed of the vehicle will be

reduced

Greenbelt will be developed

By following the above the dust

generation will be minimized.

The Solid waste in the form of

garbage will be segregated at each

section distinguishing Recyclable &

Non- recyclable garbage and will be

taken away by Municipal

Corporation.

Wastewater generated from the

gated community will be treated in

sewage treatment plant and treated

waste water will be utilized for non-

potable purposes like flushing and

Green belt development plan

Hence there will not be any adverse

impact on vulnerable groups.

3.5 Any other causes No Not Applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

10

4. Production of solid wastes during construction or operation or decommissioning

(MT/month)

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

4.1 Spoil, overburden or mine wastes Yes The dug soil during excavation will

be used for filling of low lying areas.

4.2 Municipal waste (domestic and or

Residential wastes)

Yes Municipal solid waste generated

during construction phase of the

project will be given to the Municipal

Corporation.

The Solid waste generated during

operation phase will be mainly in the

form of garbage, paper waste,

plastic waste and e-waste from the

individual homes.

The garbage will be segregated at

each section distinguishing

Recyclable & Non- recyclable

garbage and will be taken away by

Municipal Corporation.

4.3 Hazardous wastes (as per

Hazardous Waste

Management Rules)

Yes Used batteries & Waste oil will be

given to SPCB approved vendors

4.4 Other industrial process wastes No Not Applicable as there will not be

any industrial operations in the

Gated community

4.5 Surplus product Yes Surplus raw materials after

construction will be given to the

suppliers.

4.6 Sewage sludge or other sludge

from effluent treatment

Yes Sewage sludge generated will be

stored in HDPE bags and will be

used as manure.

4.7 Construction or demolition wastes Yes At the time of construction of the

proposed expansion project, there

will be some recyclable material like

Steel, metal, Plastic material, Wood

etc., will be sent to reuse / recycle

and other wastes like Bricks,

cement waste will be used for

leveling. The disturbed slopes shall

be well stabilized before the onset of

the monsoon.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

11

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

The site for proposed expansion of

project is sparsely vegetated

without any buildings, hence there

will not be any demolition waste

from the proposed expansion of

Residential gated community

project

4.8 Redundant machinery or equipment No No redundant machinery will be kept

in the premises after construction of

the Residential gated community

4.9 Contaminated soils or other

materials

No During the construction phase of

the expansion Project, all

precautionary measures will be

taken to prevent the spillage of oil,

paints on to the ground to prevent

the contamination of soil.

4.10 Agricultural wastes No Not applicable

4.11 Other solid wastes Yes E-waste generated will be given

Authorized recyclers approved by

SPCB.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

12

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes During the operation phase of the

Residential gated community,

emissions will be mainly PM, NMHC,

NOx & CO due to vehicular traffic

and from D.G. sets provided for

Backup power supply.

All the internal roads will be

paved. Hence the dust emissions

due to the vehicles will be very

low

Good greenbelt will be

developed in the gated

community premises which will

further help in mitigating the

emission levels.

Stack of adequate height will be

provided to the DG set for

effective dispersion of gases into

the atmosphere.

Hence there will not be any much

impact on surrounding environment

due to the proposed Residential

gated community.

5.2 Emissions from production

processes

No Not applicable.

5.3 Emissions from materials handling

including storage or transport

No Not applicable as there will not be

any storage or transportation of raw

materials

5.4 Emissions from construction

activities including plant and

equipment

Yes During construction phase, there

will be dust emissions during raw

material handling and transportation

of raw materials. To mitigate the

dust emissions

Raw materials will be brought to

the site through covered trucks /

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

13

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

Trolleys.

Minimum water spraying will be

done to mitigate the dust

emanation

All the materials will be properly

covered to prevent the dust

emissions during high winds

Hence there will not be any

significant dust emissions due to

raw material storage &

transportation during construction

phase of the project.

5.5 Dust or odours from handling of

materials including construction

materials, sewage and waste

Yes Adequate precautionary measures

will be taken up to control the Odour

from the Construction materials like

Paint material & Sewage.

5.6 Emissions from incineration of

waste

No Not applicable

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris)

No All such wastes will be disposed

along with Municipal Solid Waste.

5.8 Emissions from any other sources No Nil

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

14

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data with

source of information data

6.1 From operation of equipment e.g.

engines, ventilation plant,

crushers

Yes Main source of Noise generation will

be DG sets and Motor pumps for

supply of water.

The D.G. Sets & Motor pumps

manufactured in accordance with the

noise level standards stipulated by

MOEF vide notification dated 14-02-

2000, only will be used in the Gated

community.

Hence there will not be much increase

in Noise levels in the surrounding

areas.

6.2 From industrial or similar

processes

Yes The sources of noise generation in the

proposed expansion project will be

DG set. DG sets manufactured as per

OSHA / MOEF guidelines will be

procured. Ambient noise levels will be

in accordance with MOEF notification

dated 14-02-2000 i.e. noise levels will

be <55 dBA during daytime and < 45

dBA during night time.

6.3 From construction or demolition Yes Construction equipment will cause

some noise. Ear plugs will be

provided to construction workers who

work near the noise generating

equipment.

6.4 From blasting or piling No No such operations are involved.

6.5 From construction or operational

traffic

Yes There will be slight increase in traffic

noise during construction and

operation of the proposed Residential

gated community.

Speed of the vehicles will be

reduced

Greenbelt will be developed

By following above control measures

noise levels will be minimized.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

15

7. Risks of contamination of land or water from releases of pollutants into the

ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

7.1 From handling, storage, use or

spillage of hazardous materials

Yes Good housekeeping practices will

be followed to prevent any spillage

of hazardous materials.

7.2 From discharge of sewage or other

effluents to water or the land

(expected mode and place of

discharge)

No Wastewater generated during the

operation of the Residential gated

community will be treated in

sewage treatment plant and treated

wastewater will be utilized for non-

potable purposes like Toilet

flushing & Gardening

7.3 By deposition of pollutants emitted

to air into the land or into water

No During construction phase, there

will be dust emissions during raw

material handling and

transportation of raw materials. To

mitigate the dust emissions

Raw materials will be brought to

the site through covered trucks /

Trolleys.

Minimum water spraying will be

done to mitigate the dust

emanation

All the materials will be properly

covered to prevent the dust

emissions during high winds

Dust curtains will be provided

around the project site

Hence there will not be any

significant dust emissions due to

raw material storage &

transportation during construction

phase of the project.

During the operation phase of the

Residential gated community,

emissions will be mainly PM, CO

and NOx due to vehicular traffic

and from D.G. sets provided for

Backup power supply.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

16

All internal roads will be paved.

Hence the dust emissions due

to the vehicles will be very low

Good greenbelt will be

developed in the gated

community premises which will

further help in mitigating the

emission levels.

Stack of adequate height will be

provided to the DG set for

effective dispersion of gases

into the atmosphere.

Hence there will not be any much

impact on surrounding

environment due to the proposed

Residential gated community.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term build up

of pollutants in the environment

from these sources?

No Not applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

17

8. Risk of accidents during construction or operation of the Project, which could

affect human health or the environment

S.No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

8.1 From explosions, spillages, fires etc

from storage, handling, use or

production of hazardous

substances

Yes Good housekeeping practices will

be followed during Construction

and Operation phase of the

Residential gated community.

All precautionary measures will be

taken to prevent the spillage of oil,

paint etc.

D.G sets will be operated only

during power failure. Hence

storage of Diesel will be very low.

Hence the occurrence of explosion

due to the storage of Diesel will be

low.

All the rules and regulations as per

the Fire & Safety Department,

Andhra Pradesh will be followed

strictly to prevent the Fire

accidents in the gated community

8.2 From any other causes Yes Earthquakes & Natural disasters

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc)?

No Not applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

18

9. Factors which should be considered (such as consequential development) which

could lead to environmental effects or the potential for cumulative impacts with

other existing or planned activities in the locality

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

9.1 Lead to development of supporting

utilities, ancillary development or

development stimulated by the

project which could have impact

on the environment e.g.:

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

• housing development

• extractive industries

• supply industries

• other

No

No such activities are envisaged

9.2 Lead to after-use of the site, which

could have an impact on the

environment

No Not applicable

9.3 Set a precedent for later

developments

Yes With the improvement in the socio-

economic status of the people in

the area, later developments are

expected.

9.4 Have cumulative effects due to

proximity to other existing or

planned projects with similar

effects

No Not applicable

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

19

(III) Environmental Sensitivity

S.No.

Areas

Name/

Identity

Aerial distance

(within 15 km.)

proposed project

location boundary

1 Areas protected under international

conventions, national or local legislation

for their ecological, landscape, cultural

or other related value

Birla Mandir

Quli Qutub Shah

Tombs

13.4 Kms

5.7 Kms

2 Areas which are important or sensitive for

ecological reasons - Wetlands,

watercourses or other water bodies,

coastal zone, biospheres, mountains,

forests

KVR Botanical

garden

7.9 Kms

KBR National

park

8.5 Kms

Mrugavani

National park

2.0 Kms

Musi river 0.3 Kms

Osman sagar 3.0 Kms

Himayat sagar 4.2 Kms

Hussain sagar 13.4 Kms

Kokapet lake 2.9 Kms

Manikonda

cheruvu

4.6 Kms

Khajaguda lake 4 Kms

& many other

ponds

Within 15 Km radius

3 Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

Nehru Zoological

park

10.9

4 Inland, coastal, marine or underground

waters

Underground

water

Available at the site

5 State, National boundaries

---- No inter-state

boundary, No

international

boundary.

6 Routes or facilities used by the public for

access to recreation or other tourist,

pilgrim areas

No Not applicable

7 Defense installations Yes 5.5

8 Densely populated or built-up area Yes Project is proposed

comes under

Hyderabad

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

20

S.No.

Areas

Name/

Identity

Aerial distance

(within 15 km.)

proposed project

location boundary

jurisdiction

9 Areas occupied by sensitive man-made

land uses (hospitals, schools, places of

worship, community facilities

Many schools &

Hospitals exits

Within 15 Km radius

10 Areas containing important, high quality or

scarce resources

(ground water resources, surface

resources, forestry, agriculture, fisheries,

tourism, minerals)

Osman sagar 3.0 Kms

Himayat sagar 4.2 Kms

& many other

water bodies

Within 15 Km radius

11 Areas already subjected to pollution or

environmental damage. (those where

existing legal environmental standards

are exceeded)

--- Not applicable

12 Areas susceptible to natural hazard which

could cause the project to present

environmental problems

(earthquakes, subsidence, landslides,

erosion, flooding or extreme or adverse

climatic conditions)

--- Based on the

historical data, the

site is not likely to

prone to

earthquakes, floods,

etc.

EIPL VENTURES

Expansion of Residential Gated Community FORM – 1

21

(IV). PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

As the proposed project is a construction project with built up area is below 1,50,000 Sq.m., no

terms of reference for EIA studies is proposed. However we are here with enclosing Conceptual

Management Plan for your kind reference. The Conceptual Management Plan consists the

following

Air emission management

Effluent treatment & disposal

Solid waste generation, storage & disposal

Greenbelt development plan

Rain water harvesting

“I hereby given undertaking that the data and information given in the application and enclosures

are true to the best of my knowledge and belief and I am aware that if any part of the data and

information submitted is found to be false or misleading at any stage, the project may be rejected

and clearance given, if any to the project will be revoked at our risk and cost.

Date: 13-10-2017

Place: Hyderabad