ELECTRICAL SAFETY INSPECTION REPORT.
Factory List:
1. Kento Asia Limited.
Inspected on May 15, 2014
KENTO ASIA LIMITED
Plot # B-32,BSCIC I/E,Tongi,Gazipur
SUMMARY
Kento Asia Ltd. factory is established in a rented premises consisted of Six (6)sheds built for industrial purpose in 2008, but the officials we met were not sure of the year when the sheds were built. Factory rented the premises and started operation in 2008, and the factory, at the time of survey, reported to have about 664 workers working on regular basis.
The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd.
(WEC). The purpose of the survey was to identify significant electrical safety issues and to provide
recommendations for remediation based on applicable standards specified by the Accord. The
scope of this initial electrical safety inspection was limited to the review and identification of major
electrical safety issues. The inspection did not include identification of minor deficiencies, which will
be further addressed as part of follow-up inspections.
Table below summarizes the major electrical safety issues identified during the inspection.
Recommendations have been provided to address each issue.
An implementation schedule shall be developed by the factory to remediate each of the
findings. The specific timing of improvements, including any requested extensions due to
design / installation constraints, shall be submitted to the Accord for approval.
Page 2 of 9KENTO ASIA LIMITED
FINDINGS AND RECOMMENDATIONS
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
1E-
6 Months
Panel installed near transformer and narrow space between the tranformer
and guard.
TRANSFORMER ROOM
In adequate space around the transformer.
Panels installed near transformer may be rearranged and guards around the transformer may be expanded. Barrier wall between the transformer and panels may be constructed.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
2E-
Within 1 Month
Transformer breather (at far end). Silica gel color turned white.
TRANSFORMER ROOM
Silica gel in transformer breather, discoloured.
Replace silica gel in the transformer breather and refill the oil cup to trap dusts entering transformer through breather.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
3E-
3 Months
HT cables near termination are
sharp bent.
SERVICE LINE
Sharp bent in HT cable near termination, at the HT
breaker panel.
Cable must be supported at the panel base plate
and terminated without stressing at the termination
point.
Page 3 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
4E-
Within 1 Month
HT Cables laid directly on concrete floor near HT panel.
SERVICE LINE
HT Cables laid directly on concrete floor.
11kV HT cable must be supported in cable trays or
laid in trenches. The cable must be protected
against physical injury.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
5E-
3 Months
HT service cable droping from pole
.
SERVICE LINE
HT service cable dropping from pole is not protected
near the base of the pole, above ground level.
HT cable dropping from 11kV pole must be
protected in steel pipe of required size at least 2m
from the ground level to protect from physical
injury by moving objects.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
6E-
3 Months
Cables entring panel.
SWITCH BOARD & PANELS
Panel base plates removed to allow cable entry.
Panel base plates must be installed, at all time,
and cable(s) entering panel must be firmly fixed
with cable gland.
Page 4 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
7E-
Within 1 Month
Thermal imager measuring hotspots inside panel.
SWITCH BOARD & PANELS
Hot spots at terminations inside panel.
Loose connection or overloading are the causes of over heating. Regularly check terminations for loose connections and tighten it. Overloading may be the cause.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
8E-
3 Months
Cables and wires terminating at MCCBs inside panel
SWITCH BOARD & PANELS
Cables and wires inside panel are not securely fixed.
Cables and wires inside panel must be arranged and securely fixed to the panel safely. Layout of MCCBs inside panel may be rearranged.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
9E-
3 Months
Cable termination at MCCB are
extended using additional copper bars .
SWITCH BOARD & PANELS
Cables terminating at MCCB (ACB) not protected and extention plates not securely placed in safe position.
Cables terminating at MCCB terminals with extenders must be securely fixed in safe possitions and phase barriers between terminals must be installed. Cables may be fixed securely to connect to the MCCBs.
Page 5 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
10E-
3 Months
Multiple cables are terminating at
single MCCB inside panel (typical).
SWITCH BOARD & PANELS
Multiple wires terminating to MCCB terminals.
Multiple cable connecting at a MCCB terminal
must be disconnected. Existing multiple circuits
may be distributed through bus bars.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
11E-
3 Months
Multiple cable terminating at bus bars inside panel
SWITCH BOARD & PANELS
Multiple cables connected at a terminal of the
busbar.
Cables and wires terminating to bus bars must be independently connected installing thimble/lugs.
Page 6 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
12E-
6 Months
Wooden material is used as
cable duct for wiring.
CABLE & CABLE SUPPORTS
Wooden wiring ducts used for wiring support.
Existing wooden ducts supporting wiring may be
replaced with non-combustible ducts supported
at regular intervals.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
13E-
Within 1 Month
Generator frame is not connected
to earth.
GENERATOR ROOM
Generator frame not connected to earth.
Generator frame must be connected to earth with
proper size earth conductor. Solid copper
conductor connecting to earth must be connected
securely with loops.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
14E-
3 Months
Wiring for ceiling fan and lightssupported at roof trusses.
WIRINGS
Wirings in flexible PVC conduit partially supported to roof trusses.
Wirings under ceiling or roof must be protected from external heat and supported in cable tray/
ducts.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
15E-
3 Months
Steam line (damaged glass wool insulation) crossing wirings above SDB
panel.
CABLE & CABLE SUPPORTS
Steam line crossing electrical wirings.
Steam line (pipes) crossing wiring (protected or not protected) must be separated and installed at safe distances.
Page 7 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
16E-
Within 1 Month
Compressor machine installed with wheels.
EQUIPMENT & MACHINE
Compressor machine mounted on wheel.
Compressor machine mounted on wheel must be
anchored or the wheels must be locked to prevent
from trolling.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
17E-
Within 1 Month
Foot mounted motor without proper
foundation and laying on bricks.
BOILER & COMPRESSOR ROOM
Motor in the boiler room, not firmly fixed on the
foundation/frame.
Motor in boiler must be firmly grouted on the
concrete floor or fixed on the foundation
structures.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
18E-
Within 1 Month
Wirings and cables installed in the
boiler room are not properly
protected from the heat.
BOILER & COMPRESSOR ROOM
Wiring and cables installed in boiler room are not
protected.
All electrical installations, including wiring and
cable works must be protected against heat from
the boiler by supporting and separating at safe
distance.
Page 8 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
19E-
Within 1 Month
MCBs and contactors inside the
boiler control panel.
BOILER & COMPRESSOR ROOM
MCBs and contactors are not fixed firmly on the
panel board, inside boiler control panel.
MCB, contactor and other devises used in panel
must be firmly fixed and protected from touching
unintentionally to other live parts.
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
20E-
Within 1 Month
Water spillage inside generator room .
GENERATOR ROOM
Wet floors in generator room.
Floors in generator room must be free from water
and oil spillage.
Page 9 of 9KENTO ASIA LIMITED
Remediation Timeframe:
Recommendation:
Finding:
Finding #:
Category:
21E-
3 Months
PVC hose conduit used is not
proper and open gaps are still
found(typical).
WIRINGS
Cables terminating to distribution panels
(switchboards) are not protected.
Flexible PVC conduit used for cable protection, but
slit open from side may be removed and
supported on rigid cable supports. Cable tray, riser
or conduits may be used.