400 kV DC OHL New RUWAIS G/S - New MIRFA G/S

Contract No. N 12305/ A

Schedule for Conductor and OPGW stringing in Section 157-159

for 400 kV OHL New Ruwais G/S – New Mirfa G/S

crossing

220 kV OHL Ruwais-Elixir 1&2 ; 220 kV OHL Mirfa-Medinat Zayed

and 220 kV OHL Mirfa –Baab2

CC Forum No 38

17th December 2015

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingRoles and responsibilities

ETS specializes in Scaffolding for Overhead Transmission Lines and

Scaffolding material used by ETS is the heavy duty tubular scaffold

popularly known in the market as the Cup Lock System.

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - Scaffolding

- Design drawings

- Site Survey

- Plans of Services (existing OHL)

- All relevant authorities and utility

services (TRANSCO, Gasco) were

informed and approvals (NOCs,

LAP/PtW) were obtained before

every work stage started.

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingPlanning and Assessment

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingPlanning and Assessment

CC Forum No 38

17th December 2015

Planning and Assessment

AD EHSMS RF – CoP 26.0 - Scaffolding

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Scaffolding material properly unloaded

Scaffolding material

properly stocked

Scaffolding material

properly prepared for assembly

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Even ground and wood platforms for

each base of the scaffolding towers

All scaffolding towers were

provided with grounding rods

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Ensure that all bracings and ties properly installed

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Anchorage of the scaffolding – concrete block and steel wire ropes

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Ladders, resting platforms and top-working platforms

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Guardrails and working at height PPE

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingScaffolding general requirements

Scafftags and regular inspection of the scaffolding towers

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingSafety documents

Application for work Limit Access Permits

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingSite trainings

Toolbox Talk Safety Induction

Working at Height Traning

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingSite facilities

CC Forum No 38

17th December 2015

AD EHSMS RF – CoP 26.0 - ScaffoldingSite inspections

Conductor Stringing

Coordinator

Site Manager

Transco and Lahmeyer

MONTHLY COMPLIANCE

TOPICS DECEMBER 2015

Thank you very much for your

time and attention

CC Forum No 38

17th December 2015