ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2 35 Harrison Avenue Oklahoma City, Oklahoma 73104 405.232.9554 University of Central Oklahoma UCO STEM Teaching and Research Center Edmond, Oklahoma November 28, 2016 ADDENDUM 2 _____________________________________________________________________________________ This addendum is hereby made part of the Contract Documents to the same extent as though it were originally included therein. Refer to “Bid Form” for acknowledgment of Addenda. All Contractors, Subcontractors and suppliers are reminded that they shall review and be familiar with all Addenda items (as well as all parts of the Construction Documents) so, as to understand the extent of their work and its interrelation with other trades. To all bidders for furnishing all labor and materials necessary for the following contract: UCO STEM Teaching and Research Center University of Central Oklahoma, Edmond, Oklahoma Prepared and Issued by: Elliott + Associates Architects This addendum includes: (7) 8.5 x 11 pages (Including this sheet) (35) 24 x 36 Drawing Sheets
MECHANICAL ITEM AD2-M01 Refer to page 23 82 19 - 3, and add the following sub-paragraph:
"3.2.D - Suspend the fan-coil units from spring isolators. Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01. Refer to page 23 82 19 - 3 and add the following sub-paragraph: "3.3.E - Install flexible duct connectors at the unit in the supply and return air duct connections.
ITEM AD2-M02 Refer to page 23 36 00 - 4, sub-paragraph 3.1.C and add the
following sentence: "Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01." Refer to page 23 36 00-5 and add the following sub-paragraph: "3.1.E - Install flexible duct connectors at the FPT unit.
ITEM AD2-M03 Refer to page 22 62 13 - 5, and add the following sub-paragraph:
"2.7.C.3 Wiring - 120/1/60 power to the alarm panel will be provided under Division 26. The low voltage wiring between the pressure sensors and the control panel shall be furnished and installed in accordance with manufacturer's instructions, as work under Section 22 62 13."
ITEM AD2-M04 The following mechanical sheets have been revised: M1.00 MECHANICAL SITE PLAN, SYMBOLS, & GENERAL
NOTES M2.10 FIRST FLOOR HVAC REFERENCE PLAN M2.11 ENLARGED FIRST FLOOR HVAC PLAN - AREA 1 M2.12 ENLARGED FIRST FLOOR HVAC PLAN - AREA 2 M2.13 ENLARGED FIRST FLOOR HVAC PLAN - AREA 3 M2.14 ENLARGED FIRST FLOOR HVAC PLAN - AREA 4 M2.20 SECOND FLOOR HVAC REFERENCE PLAN M2.21 ENLARGED SECOND FLOOR HVAC PLAN - AREA 1 M2.22 ENLARGED SECOND FLOOR HVAC PLAN - AREA 2 M2.23 ENLARGED SECOND FLOOR HVAC PLAN - AREA 3 M2.24 ENLARGED SECOND FLOOR HVAC PLAN - AREA 4 M2.30 MECHANICAL PENTHOUSE PLAN M2.31 ENLARGED MECHANICAL PENTHOUSE PLAN M2.40 MECHANICAL ROOF PLAN M3.01 FIRST FLOOR HVAC PIPING PLAN M3.02 SECOND FLOOR HVAC PIPING PLAN M4.01 MECHANICAL SCHEDULES M4.02 MECHANICAL SCHEDULES M4.03 MECHANICAL SCHEDULES M4.04 MECHANICAL SCHEMATICS M4.05 MECHANICAL ENLARGED PLANS, ELEVATIONS, & DETAILS M4.09 TEMPERATURE CONTROLS - AUTO ISOLATION VALVES P1.00 UNDERFLOOR PLUMBING PLAN P2.10 FIRST FLOOR PLUMBING REFERENCE PLAN P2.11 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 1 P2.12 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 2 P2.13 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 3 P2.14 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 4 P2.20 SECOND FLOOR PLUMBING REFERENCE PLAN P2.21 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1 P2.22 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2 P2.23 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3 P2.24 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4 P3.01 PLUMBING ISOMETRICS P3.02 PLUMBING SCHEMATICS & DETAILS
ITEM AD2-M05 Refer to Section 21 13 13 "Wet-Pipe Sprinkler System" - A second
flow test was conducted in a portion of the water distribution system more relevant to the STEM building. A report of this second flow test and a partial site plan locating fire hydrants are attached at the end of this addendum. The elevation of the fire-line tap is approximately 9' below the flow test hydrant elevations, so the available pressure should be adjusted accordingly. If possible to eliminate a requirement for a fire pump, upsize the fire protection piping to reduce the pipe friction head.
SCALE B
SCALE ASCALE BSCALE C
DATE: 11-04-2016 CONDUCTED BY: E. Baze TIME: 12:42 PM JOB #:CONTRACT NAME: UCO STEM
BID INFORMATION:
WATER DISTRICT: EdmondFIRE DISTRICT: Edmond
WATER FLOW TEST SUMMARYHYDRANT #
DESIGN BASE: X
#1
TOTAL FLOW
STATIC PSI RESIDUAL PSI PITOT PSI FLOW GPMOUTLET I.D.INCHES
OUTLETCOEFFICIENT
ADJUSTEDGPM
AREAMAP
NOTES:Test #1Hydrant #1 produced a static of 48 psi and a residual of 38 psi with hydrant #2producing a pitot of 48 psi.
PRES
SUR
E PS
I
48 2.5"38 ~
ADDRESS:UCO Campus, Edmond, Oklahoma BAZEDRAFTING DESIGN
#2 2.5" 0.901291.68 1162.5148~
SEE ATTACHED
~
SGDI
TG=1192.78
FL(W)=1187.18
FL(E)=1187.23
SGDI
TG=1192.80
FL(W)=1188.00
FL(E)=1188.10
SGDI
TG=1188.49
FL=1185.99
1312"RCP
24"RCP
Storm Inlet
TG=1184.86
FL(N)=1176.66
FL(W)=1176.56
SGDI
TG=1187.92
FL=1179.12
Storm Inlet
TG=1185.38
FL(N)=1178.98
FL(E)=1178.88
FL(W)=1179.28
SGDI
TG=1188.17
FL=1178.97
Storm Inlet
TG=1185.15
FL=1180.50
(No Outlet Found
For Inlets in This Area)
8"V
CP
8"V
CP
SSMH
TR=1189.11
FL(N)=1172.96
FL(S)=1172.91
24724"RCP
SGDI
TG=1188.02
FL(E)=1181.22
FL(W)=1181.17
253
SGDI
TG=1187.96
FL(E)=1181.01
FL(W)=1180.96
SDMH
TR=1194.11
FL(N)=1188.66
FL(W)=1188.56
LP
FH
(SEALED)
TR=1189.86
SDMH
FL=1184.43
TG=1189.53
DGDI
3'x3'Box
FL(W)=1184.35
FL(E)=1184.40
TG=1189.65
DGDI
3'x3'Box
8"V
CP
8"V
CP
vault
comm
E 2125612.98
N 238580.74
DO
DO
DO DO
DOSS
SS
GM
XFMR
GE
NE
RA
TO
R
EM
DRAWING DATED 5/17/2016
PER EDMOUND ELECTRIC
ELECTRICAL CONDUIT
OF END OF EXISTING
CONFIRM LOCATION
FF 1197.00
FF 1200.00
trees
plastic
plastic
pine
LP
Do Not Enter
pine
Stop
pine
GPGP
DSBUSH
rcp
treestrees
(x3)
GP
DS
1x1.5
ICVGP
SGDI
d
SG
DI
GP
SGDI
LP
Visitor Parking
LPLPLP
14"
LP
Motorcycle ParkingMotorcycle ParkingMotorcycle Parking
GP
W WM
trees
pine
8"
auto spkr
WV
ICV
10"
1x1.5
No Parking
12"
Map
12"
10"
BUSH
SignSignSign
LP
BUSH
GV
1x1.5
LP
HC HC
ICV
HC
GP
HC
GP
BUSH
LPLPLP
Reserved
Tree
8"PVC88"PVC
No ParkingNo ParkingNo Parking
Reserved
ICV
1x1.5
GP
BUSH
GP
WV
W WM
auto spkr
2"2"2"
1.5x11.5x1
1.5x1
ICV
10"
ICV
1 x 11 x 11 x 1
LPLPLP
LP
10"
GP
GP
com mh
GPGP
Do Not Enter
E 2125919.79
N 238374.84
14
24"R
CP
24"R
CP
24"RCP24"RCP
4"
4"
1x1.5
LP
Stop
GP
No Parking
GP
1x1.5
GP
GP
Visitor
Com Parking
WVWWM
12"
vault
1x1 box
4"
GP
1x1.5 boxGP GP
GP
com mh
WV
1x1.5 box
LP
1x1.5 box
GP
GP
No Parking
LP
4" LP
GP
DO
DD
DD
GP
DO
10"
WV
Pedestrian X
WV
WV
FH
LP
12"
8"P
VC
WV
FH
No Parking
LP
10"
moto parking only
FLOW TESTING
HYDRANTS FOR
PROPOSED FIRE
E 2125362.66
N 238665.71
E 2125636.85
N 238914.02
ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2
35 Harrison Avenue Oklahoma City, Oklahoma 73104 405.232.9554 University of Central Oklahoma UCO STEM Teaching and Research Center Edmond, Oklahoma November 28, 2016
ELECTRICAL
ITEM AD2-E01 Refer to Spec Section 270528, Pathways for Communication Systems. In Section 3.2.I.5, revise statement to read “Change from RNC, Type EPC-40-PVC to GRC before rising above the floor.
ITEM AD2-E02 Refer to Drawing E1.10, Electrical Site Plan, Plan Note *11 and E5.01,
First Floor Communications and Data Plan, Keynote E51. Delete the requirement to provide Maxcell innerduct inside the 4” I.T. conduits. Provide just the conduit and pull strings without the innerduct.
ITEM AD2-E03 Refer to Drawing E2.01, First Floor Lighting Plan. The following placement of devices should be noted to provide the correct coordination with the drawing’s revised floorplan background:
1. In Lecture Hall 134, the Type “K” step lights in the center of the
room need to be shifted into the middle of the open walkway and not under the east tables.
2. In Beresford Endowed Chair 127, the dimming light switch is to be on the wall east of the door opening into the room.
3. In I.T. 131, the dimming light switch is to be inside the room just to the east of the door opening.
4. In Computer Simulation 137, the dimming light switch is to be just to the west of the revised door opening and not behind the door.
ITEM AD2-E04 Refer to Drawing E2.01, First Floor Lighting Plan. The “unnamed” circuit for the Type “G” fixture in the Elevator 000 pit is “LSBD”-8.
ITEM AD2-E05 Refer to Drawing E2.01, First Floor Lighting Plan. The “unnamed”
circuit for the LV1 panel in Electrical Room 142 is “1HSB”-30. ITEM AD2-E06 Refer to Drawing E2.01, First Floor Lighting Plan. In Lecture Hall 147,
homerun indicated as “1HN”-1,7 should just be “1HN”-7.
ITEM AD2-E07 Refer to Drawing E2.02, Second Floor Lighting Plan. In Work Room
228, delete the row of undercabinet fixtures on the north wall above the copy machine.
ITEM AD2-E08 Refer to Drawing E2.02, Second Floor Lighting Plan. In E. Office Corr.
204, note the missing circuit connection shown below between the two Type “T” fixtures.
ITEM AD2-E09 Refer to Drawing E2.02, Second Floor Lighting Plan. In E. Office Corr.
204, note the missing circuit connection shown below between the two Type “T” fixtures.
ITEM AD2-E10 Refer to Drawing E2.03, Penthouse Lighting Plan. In Penthouse 301,
the low-voltage relay panel on the north wall should be labeled “LVP” and not “LV3”.
ITEM AD2-E11 Refer to Drawing E4.02, Second Floor Motors and Equipment Plan, E7.06, Motor Equipment Schedule-1, and E8.05, Panelboard Schedules. In Ward Lab 265, Division 22 has added a Medical Gas Alarm Panel that needs 120V power. Provide circuit “2LLN6”-32 and update panelboard schedule accordingly.
ITEM AD2-E12 Refer to Drawing E7.01, Electrical Riser Diagram and panelboard
schedules for “MSBD”, “1HSB”, “1LND”, “1HSB”, “2LND”, “PHN”, and Generator. Provide 100% rated breakers for the L-frame circuit breakers indicated on the drawings and in the panelboard schedules.
END OF ADDENDUM 2
FEC
FEC
FEC
FEC
FEC
S P
DUMPSTER
INTAKE
EXISTING SIDEWALK
NEW
SIDEWALK
GAS
1500KVAUTIL TRFM
NG 400KW GEN
285LX96.02WX112.5HG
CW
CS
GF
CSCR
HSH
R
G
8"5"
4"
3" - BASE BID
4" - ALTERNATE #6
6"
IW
IW
IW CW F
6"4"2"
2"
6" 4" 2"
M
M
N
N
88
1010
1212
1313
1414
1616
1717
2020
H
H
J
J
K
K
L
L
99
1111
1515
1818
1919
NEW UCO STEM BUILDING
13.513.5
A
A
C
C
D
D
E
E
F
F
G
G
B
B
11223344
5566
77
6" SS
4" AW
4" SS
NEUTRALIZINGTANK
SAMPLINGMANHOLE
REFER TO CIVIL DRWGS.
REFER TO CIVIL DRWGS.FOR CONTINUATION
REFER TO CIVIL DRWGS.FOR CONTINUATION
REFER TO CIVIL DRWGS.FOR CONTINUATION
REFER TO CIVIL DRWGS.FOR CONTINUATION
6" SD6" SD
6" SD
6" SD
6" SD
6" SD
6" SD
P-8
P-8
P-8
P-8
P-8
P-8
P-8
P-8
4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION
4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION
4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION
4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION
REFER TO CIVIL DRWGS.FOR CONTINUATION
4" SD
*1
*1
*1
*1
*1
*1
FIRE DEPT.CONNECTION
GAS SERVICE LINE,REFER TO CIVIL DWGS.
GAS METER AS REQUIRED BYOKLAHOMA NATURAL GAS CO.,BLDG. DEMAND - 2180 CFHGENERATOR DEMAND - 2115 CFH (BASE BID)GENERATOR DEMAND - 4230 CFH (ALT #6)
COLD WATER MAXDEMAND = 230 GPM
REFER TO PLAN "A" ON SHEET M4.05FOR LARGE SCALE PLAN OFMECHANICAL ROOM & UTILITY YARD
ALL IN-GROUND UTILITIESSHALL HAVE A TRACER WIRE.
CONTRACTOR SHALLCOORDINATE THEELEVATIONS OF THEUTILITIES AT THECROSSING POINTS.
C.O.
AV
NOTE: ALL SYMBOLS DO NOTNECESSARILY APPEAR ON PLANS.
ACID VENT ATV ATMOSPHERIC VENT (STEAM)CR CHILLED WATER RETURNCS CHILLED WATER SUPPLY
CHR CHILLED-HEATING WATER RETURNCHS CHILLED-HEATING WATER SUPPLYCDR CONDENSING WATER RETURNCDS CONDENSING WATER SUPPLY
HR HEATING WATER RETURN
HS HEATING WATER SUPPLY
RHG REFRIGERANT HOT GASRL REFRIGERANT LIQUID
RS REFRIGERANT SUCTIONSMR SNOW MELTING HEATING WATER RETURNSMS SNOW MELTING HEATING WATER SUPPLYHSR STEAM RETURN - HIGH PRESSURESR STEAM RETURN - LOW PRESSURE
MSR STEAM RETURN - MEDIUM PRESSUREHSP STEAM - HIGH PRESSURE
S STEAM - LOW PRESSUREMS STEAM - MEDIUM PRESSURE
AW ACID WASTE
FIRE PROTECTION, PRE-ACTION SYSTEM
DWR CHILLED DRINKING WATER RETURNDWS CHILLED DRINKING WATER SUPPLY
A [COMPRESSED] AIR
CW DOMESTIC COLD WATERHW DOMESTIC HOT WATER
HW 140 DOMESTIC HOT WATER - 140°FHWR DOMESTIC HOT WATER RETURN
HWR 140 DOMESTIC HOT WATER RETURN - 140°FFCW FILTERED COLD WATERFP FIRE PROTECTION
NG NATURAL GAS - LOW PRESSURENG-M NATURAL GAS - MEDIUM PRESSURE
D INDIRECT DRAIN
O [COMPRESSED AIR] "OXYGEN" GAS
PDL PERFORATED DRAIN LINE
PW PURE WATERPWR PURE WATER RETURNRWS RAIN WATER SUPPLY
RD ROOF DRAIN
SRD SECONDARY ROOF DRAIN
SV SANITARY VENTSS SANITARY SEWER (WASTE)
SD STORM DRAIN
TW TEMPERED WATERTWR TEMPERED WATER RETURN
V VACUUM PIPING
BALL VALVE
GATE VALVEGLOBE VALVECHECK VALVE
MOTOR OPERATED VALVEBUTTERFLY VALVE
GEAR OPERATED BUTTERFLY VALVE
MOTOR OPERATED BUTTERFLY VALVEUNIONPLUG COCKBALANCING COCK
CALIBRATED BALANCING COCK
GAS PRESSURE REGULATORPRESSURE REDUCING VALVE
FLOW SWITCHSTRAINER - WYE TYPE
STRAINER - BASKET TYPECONCENTRIC REDUCERPIPE ANCHOREXPANSION JOINT
BACK FLOW PREVENTER
PIPE SLEEVE
X
FLEXIBLE CONNECTORTHERMOMETER
THERMOMETER WELL
PRESSURE RELIEF VALVEPRESSURE GAUGE WITH SHUT-OFF COCK
YARD HYDRANTWALL HYDRANTAIR ELIMINATOR - AUTOMATICWATER HAMMER ARRESTORS
CLEANOUTFLOAT AND THERMOSTATIC TRAP
PRESSURE AND TEMPERATURECONNECTOR PLUG
Y.H.W.H.
THERMOSTATIC TRAPD.A. DRIP ASSEMBLY (REFER TO DETAIL)T.A. TRAP ASSEMBLY (REFER TO DETAIL)
PITCH DOWN IN DIRECTION OF ARROWFLOW IN DIRECTION OF ARROWFLOOR DRAIN TYPE "A" INDICATEDAREA DRAIN TYPE "A" INDICATED
THERMOSTAT
F.D."A"A.D."A"
HUMIDISTATCONNECT TO EXISTING
F.D.C. FIRE DEPARTMENT CONNECTIONF.F. FINISHED FLOORG.C. GENERAL CONTRACTORM.C. MECHANICAL CONTRACTORP.C. PLUMBING CONTRACTOR
T
H
V.T.R. VENT THROUGH ROOFV.C.T. VITRIFIED CLAY TILES.A. SOUND ABSORBER
ICW INDUSTRIAL COLD WATER
FPPRR REFRIGERANT RELIEF
HR 180 HEATING WATER RETURN - 180°F SYSTEMHR(SB) HTG. WTR. RETURN - SUMMER SETBACK SYS.
HS 180 HEATING WATER SUPPLY - 180°F SYSTEMHS(SB) HTG. WTR. SUPPLY - SUMMER SETBACK SYS.
FUTURE PIPING, ACCESSORIES & EQUIP-MENT (FINE DASHED)
PRIMARY ROOF DRAINSECONDARY ROOF DRAINPRIMARY SYPHONIC ROOF DRAINSECONDARY SYPHONIC ROOF DRAINS
S
IW IRRIGATION WATER
NON-SLAM CHECK VALVE
PIPE GUIDE
T.W.
TEMPERATURE SENSORT
AUTOMATIC GAS SHUTOFF VALVE
E.C. ELECTRICAL CONTRACTOR
C.I. CAST IRONB.G. BELOW GRADE
A.F.G. ABOVE FINISHED GRADE
MECHANICAL SYMBOLS
D.N. DOWNSPOUT NOZZLE (ROOF DRAIN ORSECONDARY ROOF DRAIN DISCHARGE)
ERR ENERGY RECOVERY RETURN (GLYCOL)ERS ENERGY RECOVERY SUPPLY (GLYCOL)
CO2 CARBON DIOXIDE LAB GASCF4 CARBON TETRAFLUORIDE LAB GAS
LA COMPRESSED LAB AIR
O2 [PURE] OXYGEN LAB GAS
LGRV LAB GAS RELIEF VENT
LV LAB VACUUM PIPING
N NITROGEN GASN5 [PURE] NITROGEN LAB GAS
RO REVERSE OSMOSIS WATER
SCW SOFTENED COLD WATER
TSW TEMPERED SAFETY WATER
FIRE PROTECTION, CLEAN-AGENT SYSTEMFPC
HW(HT) DOMESTIC HOT WATER, HEAT TRACED
BALL VALVE (IN VERTICAL PIPE)
PD PUMPED (PRESSURIZED) DRAIN
SSD SUB-SOIL DRAIN
C CONDENSATE DRAIN
PRESSURE SENSORPS
GENERAL NOTES (APPLIES TO ALL HVAC PLANS)
CONDENSATE DRAINS TO BE INSTALLED WITH 1/8" PER FOOT SLOPEMINIMUM.
1.
COORDINATE WITH ALL TRADES TO PROVIDE MAINTENANCE ANDOPERATIONAL CLEARANCES OF ALL MECHANICAL EQUIPMENT.
2.
GENERAL NOTES (APPLIES TO ALL PLUMBING PLANS)
ALL PIPE SIZES ARE IN INCHES UNLESS OTHERWISE NOTED.1.
REFER TO ARCHITECTURAL FLOOR PLANS FOR FINAL LOCATION OFPLUMBING FIXTURES.
2.
DO NOT ROUTE PIPING OVER THE ELECTRICAL ROOMS OR ELECTRICALPANELS.
3.
4. PROVIDE ACCESS PANELS IN GYP. BOARD CEILINGS FOR ACCESS TOISOLATION VALVES.
THE FINAL LOCATION OF ALL "V.T.R." SHALL BE LOCATED A MINIMUM OF10 FT. FROM THE NEAREST PORTION OF THE OUTSIDE AIR INTAKESUNLESS OTHERWISE NOTED.
5.
INSTALL ACCESSIBLE WATER HAMMER ARRESTORS IN DOMESTIC C.W.AND H.W. LINES AT EACH BATTERY OF PLUMBING FIXTURES.
6.
INSTALL CHECK VALVES IN THE C.W. AND H.W. BRANCH LINES SERVINGEACH MOP BASIN.
7.
GENERAL DELINEATION POINT: MECHANICAL/PLUMBING CONTRACTORSHALL INSTALL PIPING TO A POINT 5 FT. BEYOND THE BUILDING OR ASOTHERWISE INDICATED. EXTENSION OF SITE PIPING SHALL BEFURNISHED UNDER ANOTHER DIVISION.
8.
SHEET PLAN NOTES SYMBOL = *
SECONDARY ROOF DRAIN TERMINATION WITH OVERFLOW DOWNSPOUTNOZZLE AT 1'-6" ABOVE FINISHED GRADE & SPLASH BLOCK
*1
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M1.00
MECHANICAL SITEPLAN, SYMBOLS, &GENERAL NOTES0 60'20' 80'40'
NORTH
1" = 20'-0"
AMECHANICAL SITE PLAN
MECHANICAL DRAWING INDEXSHEET
NUMBER DESCRIPTIONM1.00 MECHANICAL SITE PLAN, SYMBOLS, & GENERAL NOTESM2.10 FIRST FLOOR HVAC REFERENCE PLANM2.11 ENLARGED FIRST FLOOR HVAC PLAN - AREA 1M2.12 ENLARGED FIRST FLOOR HVAC PLAN - AREA 2M2.13 ENLARGED FIRST FLOOR HVAC PLAN - AREA 3M2.14 ENLARGED FIRST FLOOR HVAC PLAN - AREA 4M2.20 SECOND FLOOR HVAC REFERENCE PLANM2.21 ENLARGED SECOND FLOOR HVAC PLAN - AREA 1M2.22 ENLARGED SECOND FLOOR HVAC PLAN - AREA 2M2.23 ENLARGED SECOND FLOOR HVAC PLAN - AREA 3M2.24 ENLARGED SECOND FLOOR HVAC PLAN - AREA 4M2.30 MECHANICAL PENTHOUSE PLANM2.31 ENLARGED MECHANICAL PENTHOUSE PLANM2.40 MECHANICAL ROOF PLANM3.01 FIRST FLOOR HVAC PIPING PLANM3.02 SECOND FLOOR HVAC PIPING PLANM4.01 MECHANICAL SCHEDULESM4.02 MECHANICAL SCHEDULESM4.03 MECHANICAL SCHEDULESM4.04 MECHANICAL SCHEMATICSM4.05 MECHANICAL ENLARGED PLANS, ELEVATIONS, & DETAILSM4.06 TEMPERATURE CONTROLSM4.07 TEMPERATURE CONTROLSM4.08 TEMPERATURE CONTROLSM4.09 TEMPERATURE CONTROLS - AUTO ISOLATION VALVES
P1.00 UNDERFLOOR PLUMBING PLANP2.10 FIRST FLOOR PLUMBING REFERENCE PLANP2.11 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 1P2.12 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 2P2.13 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 3P2.14 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 4P2.20 SECOND FLOOR PLUMBING REFERENCE PLANP2.21 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1P2.22 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2P2.23 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3P2.24 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4P3.01 PLUMBING ISOMETRICSP3.02 PLUMBING SCHEMATICS & DETAILS
UP
UP
FEC
FEC
FEC
UP
UP ATS
SB
SB
F/S
F/S
F/S
F/S
F/S
FF
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.10
FIRST FLOOR HVACREFERENCE PLAN
0 8' 16' 24' 32'NORTH
1/8" = 1'-0"
AFIRST FLOOR HVAC REFERENCE PLAN
NORTH
KEY PLAN (1ST FLR.)
AREA "1"
AREA "2"
AREA "3"
AREA "4"
FEC
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
8
8
10
10
FSICORRIDOR
117
FSI STOR.119
FSI ALSEXAMROOM
118
AMP116
PRE PCR115
EXTRACT.PREP.
114FSI PREP.ROOM
113
FSI/MOLECULAREVOLUTIONARY
BIOLOGYTEACHING
LAB112
FSIIMPRESSION
EVIDENCELAB121
OFFICE130
BERESFORDENDOWED
CHAIR127
WHEELCHAIRSTOR.
128
WHEELCHAIRSIMULATION
PROJECT129
TL STYLECLASSROOM
120
JAN.148
9
9
11
11
MAV-113
MAV-115
MAV-116
MAV-118
MAV
-121
HEV
-112
AH
EV-1
12B
HEV-112C
HEV
-112
D
GEV
-112
GEV
-113
GEV
-115
GEV
-116
GEV-118
HEV-121
GEV
-121
A
GEV-121B
VAV-120
VAV-
114
VAV-106
FPT-101
VAV-129/128
VEND 1149
VAV-130
VAV-
107
GEV-148CP-10
CP-14(TSI)
CP-15(TSI)
CP-16(TSI)
CP-17(TSI)
HWC-113
HWC-112A
HWC-121
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
10"ø
8"ø 8"
ø15"x8"
15"x
8"
8"ø 10
"ø
14"ø 12"ø
15"x15" 12"ø
12"ø
14"ø
14"ø 22"x14"Θ
14"ø
8"ø
8"ø
8"ø
14"x
10"
12"ø
10"ø
12"ø
11"ø
10"ø
8"ø
29"x16"Θ27"x14"Θ
12"ø
8"ø 6"
ø
14"ø
29"x18"Θ
29"x18"Θ 31"x20"Θ 34"x22"Θ
14"ø10
"ø
10"ø
14"ø
30"ø
6"ø
40"x20"Θ 44"x24"Θ
6"ø
6"ø
6"ø
8"ø
18"ø
40"x2
4"Θ
28"x
28"
36"x36" 36"x36"
36"x36" 36"x36"
28"x28"
10"ø
18"ø
10"ø
14"ø
14"ø
10"ø
10"ø
10"ø10"ø
10"ø
10"ø
12"ø
14"x
13"
10"ø
10"ø
8"ø
8"ø12
"ø
31"x20"Θ 36"x20"Θ 40"x20"Θ
40"x20"Θ
33"x
18"
10"ø
10"ø
24"x12"
52"x
18"
23"x20"Θ
23"x20"Θ
12"ø
11"ø
10"ø8"ø
14"ø
8"ø
14"x
10"
8"ø8"ø8"ø
8"ø
8"ø
10"ø
24"x12" 16"ø
16"ø
14"x
13"
10"ø
14"ø
25"ø16"ø
8"ø 8"ø 8"ø
8"ø
14"ø
14"ø
8"ø
12"ø
318A10" x 24SQ
0A10" x 24SQ
706A12" x 24SQ
353A10" x 24SQ
353A10" x 24SQ
261A8" x 24SQ
0A10" x 24SQ 417A
10" x 24SQ0A
12" x 24SQ417A
10" x 24SQ0A
12" x 24SQ
199J8" x 24SQ
379J8" x 24SQ 354J
8" x 24SQ199J8" x 24SQ
379J8" x 24SQ 354J
8" x 24SQ
100A6" x 24SQ
326K12" x 48/24
50A6" x 24SQ
180A8" x 24SQ
HWC-118
180A8" x 24SQ
377J8" x 24SQ
367J8" x 24SQ
377J8" x 24SQ
377J8" x 24SQ
377J8" x 24SQ
377J8" x 24SQ
367J8" x 24SQ
177A8" x 24SQ
177A8" x 24SQ
122A6" x 24SQ
122A6" x 24SQ
122A6" x 24SQ
171A8" x 24SQ
171A8" x 24SQ
367J8" x 24SQ
367J8" x 24SQ
377J8" x 24SQ
340J8" x 24SQ
340J8" x 24SQ
377J8" x 24SQ
367J8" x 24SQ
377J8" x 24SQ
367J8" x 24SQ
180A8" x 24SQ
180A8" x 24SQ
180A8" x 24SQ
542A12" x 24SQ
542A12" x 24SQ
180A8" x 24SQ
379J8" x 24SQ
199J8" x 24SQ
199J8" x 24SQ
199J8" x 24SQ
379J8" x 24SQ
199J8" x 24SQ
223A8" x 24SQ
199J8" x 24SQ
379J8" x 24SQ
337E1S x 24"
8"
337E1S x 24"
8"
736F1S x 36"
736F1S x 36"
336E1S x 24"
10"
1,395F1S x 60" 1,395F
1S x 60"
336E1S x 24"
10"
336E1S x 24"
10"
171A8" x 24SQ
171A8" x 24SQ
10" x 10"158C
VAV-
127
VAV-119
MAV-112A
2"ø
18" x 10"450L
12"x
8"
10"ø
14"ø
H1 H1H1H1
H2
18"ø
8"ø
36"x7"36"x7"
12"x
12"
12"x
12"
HWC-112B
MAV-112B
14"x
13"
12"x
8"
12"x8" 8"ø
12"x
10"
60"x7" 60"x7"
38"x22"Θ
199J8" x 24SQ
10"ø
30"øH3
H3
H3
H1
16"x16" 16"x16"
10"ø
8"ø
6"ø
14"ø
10"ø
11"ø
10"ø
10"ø
10"ø
H10H10
H10
8"x8"
8"ø
30"x30"
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.11
ENLARGED FIRSTFLOOR HVAC PLAN -AREA 1
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H2 EXHAUST GRILLE WITH BOTTOM 12” ABOVE THE FLOOR EXHAUSTING INTO A 24”x4” DUCT IN THICKENED WALL.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER
TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED FIRST FLOOR HVAC PLAN - AREA 1
NORTH
KEY PLAN
AREA "1"
(1ST FLR.)
UP
FEC
FEC
UP
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
M M
8
8
10
10
OPERATIONSRESEARCH
CONSULTINGGROUP
126
DIGITALEVIDENCE
LAB123
DIGITALEVIDENCETEACHING
LAB124
FSI/MOLECULAR&
EVOLUTIONARYBIOLOGY
RESEARCHLAB122
VEST.101
SOUTHSTAIR
105
TL STYLECLASSROOM
125
S.CORRIDOR
106
H H
J J
K K
L L
9
9
11
11
MAV
-122
GEV
-122
HEV-122A
HEV
-122
B
HEV
-122
C
VAV-
124
VAV-
123
VAV-126
FPT-147A
VAV-109
FPT-100
FPT-147B
VAV-
125
CP-9
CP-13(TSI)
HW
C-1
22
G G
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
8"ø
8"ø
22"x14"Θ27"x14"Θ
8"ø
8"ø
22"x
14"Θ
8"ø
8"ø
8"ø 8"ø 10"ø
8"ø
8"ø
12"ø
8"ø
8"ø
8"ø
8"ø
8"ø
8"ø 16
"ø20
"x18
"
8"ø
8"ø
29"x18"Θ
40"x
24"Θ
10"ø
10"ø
10"ø
16"x15"
14"ø
14"ø
8"ø
29"x
18"Θ
8"ø
8"ø
18"ø
8"ø8"ø
8"ø
8"ø
18"ø
10"ø
8"ø
10"ø
8"ø
8"ø
18"ø
8"ø
8"ø
14"ø
8"ø
8"ø
10"ø
10"ø
18"ø
10"ø
10"ø
10"ø
16"ø14"ø
8"ø
8"ø8"ø
8"ø
8"ø
8"ø
36"x
18"
11"ø
14"ø
337E1S x 24"
8"
337E1S x 24"
8"
736F1S x 36"
736F1S x 36"
336E1S x 24"
10"
1,395F1S x 60" 1,395F
1S x 60"
336E1S x 24"
10"
305E1S x 24"
8"
305E1S x 24"
8"
336E1S x 24"
10"
52"x
18"Θ
40"x
24"Θ
559A12" x 24SQ
279A10" x 24SQ
279A10" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
677A12" x 24SQ
677A12" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
135A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
825A14" x 24SQ
183A8" x 24SQ
183A8" x 24SQ
563A12" x 24SQ
160A8" x 24SQ
825A14" x 24SQ
160A8" x 24SQ
563A12" x 24SQ
160A8" x 24SQ
160A8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
160A8" x 24SQ
160A8" x 24SQ
160A8" x 24SQ
194J8" x 24SQ 194J
8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
194J8" x 24SQ
245J8" x 24SQ
245J8" x 24SQ
245J8" x 24SQ
2"ø
H1 H1H1H1
18"ø
36"x7"36"x7"
14"x
13"
60"x7" 60"x7"
14"x
13"
16"ø
14"ø
8"ø
25"x18"
25"x18"
10"ø
10"ø10"ø
12"x10"
10"ø
H3
H1
16"x16" 16"x16"
8"ø
H10H10
H10H10
H10
H10
H10
H10
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.12
ENLARGED FIRSTFLOOR HVAC PLAN -AREA 2
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED FIRST FLOOR HVAC PLAN - AREA 2
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER
TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "2"
(1ST FLR.)
UPUP
FF
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
12
12
13
13
14
14
16
16
17
17
20
20
WHEELCHAIRSTOR.
128
VEST.102
CREICCOLLABORATIVE
LAB134
OFFICE135
OFFICE136
DATAWORKROOM
133
CREICDATA
CENTER132
IT131
COMPUTERSIMULATIONS
137
COMPUTATIONALCLASSROOM
138
NORTHSTAIR
104
STOR.140
MEN'S111
WOMEN'S110
ELEV.
STOR.139
15
15
18
18
19
19
GEV
-110
/111
13.5
13.5
VAV-129/128
FPT-102
VAV-
131
VAV-
134
VAV-137
VAV-
108
FPT-103
VAV-133
VAV-
107
CRACU-1CRACU-2
CP-
7
CP-
12(T
SI)
CP-
8
A A
C CD D
E E
F F
G G
B B
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
38"x22"Θ
54"x16"Θ
38"x
22"Θ
6"ø
20"x18"
20"x18"
10"ø
8"ø
9"ø
8"ø
9"ø
8"ø
14"ø 14"ø 14"ø
14"ø
8"ø
8"ø
8"ø8"ø
8"ø
8"ø
8"ø
20"x18"
20"x18"
54"x16"Θ 46"x16"Θ 38"x16"Θ
14"ø
20"x
18"
8"ø 8"ø
8"ø
9"ø
8"ø
16"x15"
29"x
16"Θ
24"x
16"Θ
18"ø
12"ø
12"ø
12"ø
12"ø
12"ø
10"ø
8"ø12
"ø
8"ø
10"ø
10"ø
8"ø
8"ø
8"ø
9"ø9"
ø
122A6" x 24SQ
342A10" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
271A8" x 24SQ
271A8" x 24SQ
271A8" x 24SQ
271A8" x 24SQ
158A8" x 24SQ
158A8" x 24SQ
158A8" x 24SQ
237A8" x 24SQ
237A8" x 24SQ
237A8" x 24SQ
158A8" x 24SQ
158A8" x 24SQ
158A8" x 24SQ 158A
8" x 24SQ158A
8" x 24SQ158A
8" x 24SQ
237A8" x 24SQ
237A8" x 24SQ
237A8" x 24SQ
217A8" x 24SQ
217A8" x 24SQ
217A8" x 24SQ
217A8" x 24SQ
406E1S x 24"
8"
609F1S x 36"
406E1S x 24"
8"
406E1S x 24"
8"
10"Ø270H
10"Ø270H
12" x 6"26G
6" x 6"26G
30" x 10"1,002G
152A8" x 24SQ
152A8" x 24SQ
152A8" x 24SQ
520B12" x 24SQ
235B8" x 24SQ
235B8" x 24SQ
152A8" x 24SQ
518B12" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
500A15" x 24SQ
30" x 10"1,002C
368A10" x 24SQ
270E1S x 24"
8"
270E1S x 24"
8"
541E1S x 24"
10"
244A8" x 24SQ
244A8" x 24SQ
CAV
-132
VAV-135/136
609F1S x 36" FCU-104-1
VAV-
110/
111/
141
VAV-138
VAV-
127
14"x
13"
14"x
13"
12"x8"
8"x8
"
21"x13"
24"x
10"
24" x 10"800G
8"ø
541F1S x 24"
H8H8
H8H8
H8
H8
H8
H8H8
H8
44"x24"
14"ø
18"x18"
30"x
22"
18"ø
CONTROLDAMPER
10"ø
14"x
13"
12"x
8"
8"ø
10"Ø372H
10"Ø372H
10"ø
10"ø
30"ø
12"x10"
80"x24" R.A. DUCT FROMTOP OF CRACU UP TOCEILING R.A. PLENUM
NOTE: SEAL AIR TIGHT AROUND ALLDUCT PENETRATION OF THE DATACENTER WALLS AND FLOOR ABOVE.RHE DATA CENTER WILL HAVE A CLEANAGENT FIRE EXTINGISHING SYSTEM.
H9
H1
H1 H1
36"x7"
12"x10"
9"ø
12"ø
H1
36"x7"
H1
12"x
10"
9"x13"
16"x
8"
24"x7"
18" x 18"800C
18"x
18"
16"x8"
H1
H1
12"x10"
8"x8"
10"ø10"ø
19"x5"Θ TIGHT UNDER BEAM
8"ø
8"ø
6"ø
8"ø
8"ø
8"ø
14"ø
8"ø
8"ø
11"ø
10" x 10"385G
H8
H10H10
H10
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.13
ENLARGED FIRSTFLOOR HVAC PLAN -AREA 3
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED FIRST FLOOR HVAC PLAN - AREA 3
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H8 SEAL AROUND ALL DUCT PENETRATIONS THRU THE DATA CENTER WALLS FOR CLEAN-AGENT FIRE
PROTECTION SYSTEM CONTAINMENT.H9 NORMALLY OPEN TWO-POSITION AUTOMATIC CONTROL DAMPER – TO CLOSE WHEN CLEAN-AGENT FIRE
PROTECTION SYSTEM IS ACTIVATED.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "3"
(1ST FLR.)
FEC
ATS
SB
SB
F/S
F/S
F/S
F/S
F/S
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
M M
N N
12
12
13
13
14
14
16
16
17
17
20
20
OPERATIONSRESEARCH
CONSULTINGGROUP
126
VEST.100
STUDENTLOUNGE/LOBBY
109
VEST.103
LECTUREHALL/
SHELTER147
LOADING146
MECHANICAL145
ELEC.142
CYL.144
BIO WASTE143
N.CORRIDOR
108
H H
J J
K K
L L
15
15
18
18
19
19
GEV-143/144
13.5
13.5
FPT-147A
FPT-147B
VAV-
145/
146
E/WCORRIDOR
107
G G
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
10"ø
10"ø
16"x15"
10"ø
10"ø
16"ø
16"ø
16"ø
8"ø
8"ø
9"ø
9"ø
9"ø
18"ø
14"ø 16"x15"
8"ø
12"x8"
16"ø
16"ø
16"ø
16"ø
16"ø
16"ø
10"ø
10"ø
10"ø
270E1S x 24"
8"
270E1S x 24"
8"
541E1S x 24"
10"
244A8" x 24SQ
244A8" x 24SQ
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 57"
8"
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 60"
8"
250D1S x 57"
8"
250D1S x 60"
8"
250D1S x 60"
8"
10" x 8"194C
10" x 8"212C
12" x 8"156G
12" x 8"156G
10"Ø336H
10"Ø336H
10"Ø336H
10"Ø336H
279A10" x 24SQ
VAV-110/111/142
541F1S x 24"
20" x 10"806G
20" x 10"806G
10"x26"
FPPAir
Compr.-1
SP-1
HB
RET
UR
N A
IR D
UC
TU
P IN
CH
ASE
ABO
VE, D
O N
OT
POSI
TIO
N A
BOVE
ELEC
. EQ
UIP
.
F.D.C.
14"x
13"
25"x18"
25"x18"
10"ø
10"ø10"ø
12"x10"
10"ø
H1
H1 H1
BM4.0510"Ø
326H
24"x7"
H1
H1
H1
12"x10"
RETURN AIR DUCT FOR FPT-147A & B
RETURN AIR DUCT FOR FPT-147A & B
H10
H10H10
H10
H10H10
H10
H10
H10
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.14
ENLARGED FIRSTFLOOR HVAC PLAN -AREA 4
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED FIRST FLOOR HVAC PLAN - AREA 4
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "4"
(1ST FLR.)
DN
UP DN
FEC
FEC
UP DN
DN
F
F
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.20
SECOND FLOOR HVACREFERENCE PLAN0 8' 16' 24' 32'
NORTH
1/8" = 1'-0"
ASECOND FLOOR HVAC REFERENCE PLAN
NORTH
KEY PLAN (2ND FLR.)
AREA "1"
AREA "2"
AREA "3"
AREA "4"
8
8
10
10
BIOMEDICALENGINEERING
RESEARCHLAB249
CELLCULTURE
COREFACILITY
241
RESEARCHCELL/MOLECULAR
BIO. LAB248
STUDENTAREA
242
DARKROOM
247
BIOMEDICALEQUIPMENT
COREFACILITY
246
CORECORRIDOR
245
RESEARCHMICROBIOLOGY
LAB243
STERILIZATIONAREA
244
VEND 2209
OFFICE219
OFFICE218
JAN.216
OFFICE214 OFFICE
215
OFFICE210
OFFICE212
OFFICE213
S. STUDYSPACE
201
(OPEN TOBELOW)
(OPEN TOBELOW)
9
9
11
11
2ND FLOORCORRIDOR
200
GEV-246
GEV-244
GEV-243
HEV-243A
HEV
-243
B
HEV-248AHEV-248B
HEV
-248
D
HEV-248C
GEV-248
GEV-249
HEV
-249
GEV-247
VAV-201/209
MAV-244
MAV-243
MAV
-248
A
MAV-248B
MAV
-249
MAV-246
MAV-247
VAV-200A
VAV-203A
MOLECULARBIO.
STUDENTAREA248B
MAV-241
GEV-241
MECH.SHAFT
BBB
GEV-209
CP-1(TSI)
26"x20"Θ21"x18"Θ
18"ø
CP-2(TSI)
CP-3(TSI)CP-1
CP-4(TSI)
CP-5(TSI)
VAV-242
HW
C-2
49
HWC-248A
HWC-248B
HWC-243
HWC-241
HWC-244
HWC-246
HWC-247
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
24"x
12"
74"x36"
14"ø
10"ø 10"ø 8"
ø
14"ø
28"x24"
74"x36"74"x36"
9"ø
12"ø
10"ø
8"ø
12"ø
8"ø
11"ø
12"ø
30"x32"
21"x
18"Θ
10"ø10
"ø
10"ø
10"ø
18"ø
30"x16"
10"ø
10"ø
16"ø
14"ø
14"ø
14"ø
14"ø
10"ø
10"ø
23"x12"
10"ø
10"ø
10"ø
14"ø
10"ø
10"ø
20"ø
10"ø
24"x16"Θ 30"x24"Θ 36"x24"Θ 40"x24"Θ
16"ø
14"ø
10"ø
16"ø
10"ø
10"ø
27"x18"
12"x10"
8"ø
18"x15"
10"ø
12"ø
12"ø
10"ø
10"ø
28"x24"
28"x
24"Θ
10"ø
12"x10"
8"ø
8"ø
10"ø
10"ø
12"ø
18"ø
18"ø
24"x
16"Θ
8"ø
24"x
16"Θ
8"ø8"ø
10"ø
10"ø
8"ø
8"ø
6"ø
6"ø
6"ø
6"ø 6"
ø 6"ø
14"ø
8"ø
14"ø
8"ø
8"ø
8"ø
8"ø
18"x
18"
8"ø
36"x
24"Θ
10"ø
20"x18"
10"ø
6"ø
6"ø
6"ø
6"ø
16"x15"
50"x24"
10"ø
10"ø
10"ø
40"x24"Θ
10"ø
14"ø
10"ø
10"ø
1D
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
233J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
233J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
233J8" x 24SQ
233J8" x 24SQ
228J8" x 24SQ
228J8" x 24SQ
309A10" x 24SQ
309A10" x 24SQ
180A8" x 24SQ
180A8" x 24SQ
319J8" x 24SQ
319J8" x 24SQ
319J8" x 24SQ
291J8" x 24SQ
208A8" x 24SQ
233A8" x 24SQ
208A8" x 24SQ
325J8" x 24SQ
233A8" x 24SQ
233A8" x 24SQ
208A8" x 24SQ
233A8" x 24SQ
208A8" x 24SQ
440A10" x 24SQ
240A8" x 24SQ
298E1S x 24"
8"
298E1S x 24"
8"
30" x 14"819C
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
385J8" x 24SQ
385J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
291J8" x 24SQ
385J8" x 24SQ
385J8" x 24SQ
282J8" x 24SQ
282J8" x 24SQ
207J8" x 24SQ
207J8" x 24SQ
282J8" x 24SQ
282J8" x 24SQ
207J8" x 24SQ
207J8" x 24SQ
282J8" x 24SQ
0A8" x 24SQ
207J8" x 24SQ 120A
6" x 24SQ
282J8" x 24SQ
207J8" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
504E1S x 24"
10"
504E1S x 24"
10"
H3
H3
H1 H1
H1
H1
36"x
36"
68"x
24"Θ
28"x28" 28"x28"
H1
120A6" x 24SQ
120A6" x 24SQ
12"x12"
60" x 7"1,037F
H1
10"ø
27"x
18"
30"x24"Θ30"x22"Θ
45"x21"
15"x12"
24" x 14"650C
113A6" x 24SQ
12"ø 15"x15"
12"ø
12"ø170A
8" x 24SQ
24" x 14"733C
336E1S x 24"
10"
336E1S x 24"
10"
24" x 14"650C
VAV-
248B
6"ø
6"ø
H10
H10
10"ø10"ø
H10
H10
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.21
ENLARGED SECONDFLOOR HVAC PLAN -AREA 1
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR HVAC PLAN - AREA 1
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER
TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "1"
(2ND FLR.)
DNDN
M M
N N
8
8
10
10
MATH/BIOL.255
PROJECTSCHOLAR
254
TEACHINGLAB CELL
GEN/HIST/EXPERIMENTALBIOCHEMISTRY
250TEACHING
LABCELL/VIROLOGY/DEVELOPMENT
BIO253
VEST.251B
TEACHINGLAB PREP
252
REFRIG.ROOM
251SOUTHSTAIR105-2
VEND 2209
OFFICE233
OFFICE231
OFFICE229
S. STUDYSPACE
201
(OPEN TOBELOW)
(OPEN TOBELOW)
H H
J J
K K
L L
9
9
11
112ND FLOORCORRIDOR
200
GEV-250
HEV-250A
HEV-250B
HEV-253A HEV-253B
HEV-253C
HEV-253E
HEV-253F
GEV-251
VAV-
229-
234
VAV-
254
VAV-
255
MAV
-252
MAV-253
MAV-251
MAV-250
GEV
-252
HEV-253G
HEV-253D
CP-6(TSI) CP-7(TSI) CP-8(TSI)
HWC-250
HWC-253
HWC-251
HWC-252
G G
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
24"x16"Θ 29"x18"Θ
16"ø
14"ø
10"ø
14"ø
10"ø
10"ø
26"x20"Θ 36"x20"Θ
10"ø
10"ø
28"x24"
28"x
24"Θ
36"x24"Θ
10"ø
10"ø
10"ø
8"ø8"ø
20"ø
16"ø
26"x20"Θ 12"x
6"Θ
298E1S x 24"
8"
298E1S x 24"
8"
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
262A8" x 24SQ
262A8" x 24SQ
262A8" x 24SQ
262A8" x 24SQ
173A8" x 24SQ
173A8" x 24SQ
173A8" x 24SQ
173A8" x 24SQ
H3
H1 H1
H3
H1
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
20"ø
14"ø
36"x18"
36"x18"
10"ø
10"ø
10"ø
31"x20"Θ
344J8" x 24SQ
344J8" x 24SQ
29"x16"Θ
15"ø
15"ø
27"x18"
15"ø 16"ø
10"ø
14"ø
10"ø
10"ø 10
"ø 10"ø 10
"ø
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
12"x
10"
9"ø
9"ø
8"ø
12"x
8"
8"ø
36"x24"Θ
14"ø
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
355J8" x 24SQ
355J8" x 24SQ
355J8" x 24SQ
355J8" x 24SQ
355J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
251J8" x 24SQ
676A14" x 24SQ
576A12" x 24SQ
853A15" x 24SQ
853A15" x 24SQ
953A15" x 24SQ
953A15" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
344J8" x 24SQ
10"ø
10"ø
10"ø
10"ø
10"ø
10"ø
120A6" x 24SQ
120A6" x 24SQ
557E1S x 24"
12"
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ120A
6" x 24SQ120A
6" x 24SQ
422E1S x 24"
10"
6"ø
12"ø
6"ø
12"ø
6"ø
12"ø
16"ø
6"ø
6"ø
6"ø
6"ø
26"x10"
6"ø
6"ø
6"ø
10"ø 10"ø
6"ø
20"x18"
H1
336E1S x 24"
10"
336E1S x 24"
10"
20"x
18"
H1 68"x
24"Θ
H10H10
H10
H10
H10
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.22
ENLARGED SECONDFLOOR HVAC PLAN -AREA 2
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR HVAC PLAN - AREA 2
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER
TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "2"
(2ND FLR.)
UP DN
FEC
FEC
UP DN
F
F
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
12
12
13
13
14
14
16
16
17
17
20
20
CONFERENCE261
NORTHSTAIR104-2
FACULTYKITCHEN
208
STOR.257
TEACHINGLAB &PREP.
BIOMED.ENGINEERING
256
RESEARCHNANO
FABRCTN.260
WOMEN'S206
MEN'S207
GOWN259
RESEARCHNANO BIO
LAB258
OFFICE219
OFFICE217
OFFICE215
OFFICE211
OFFICE213
OFFICE227
OFFICE224
OFFICE225
OFFICE221OFFICE
220
OFFICE222
OFFICE223
WORKROOM
228
ELEV.
W. OFFICECORR.
203
15
15
18
18
19
19
HEV
-260
A
GEV
-206
/207
GEV-260
GEV-256
HEV-256
13.5
13.5
VAV-203A
VAV-210-219
VAV-220-228
VAV-203BMAV-256/257
MAV-258
MAV-260
VAV-206/207
VAV-208
VAV-261
HEV-260B
GEV-259
GEV-258
VAV-202
MAV-259
31"x20"Θ
HU
M-1
CP-
4
CP-9(TSI)
CP-5
CP-
10(T
SI)
CP-
11(T
SI)
HWC-256/257
HWC-258
HWC-259
HWC-260
A A
C CD D
E E
F F
G G
B B
ELEC./I.T.CHASE
226
2ND FLOORCORRIDOR
200
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
12"ø
12"ø
12"ø
5"ø
22"x14"Θ
12"ø
10"ø
14"ø
20"x
12"Θ22
"x14
"Θ
36"x24"
36"x
24"
24"x
12"
49"x24"Θ
16"ø
36"x
24"Θ
30"x24"
30"x
24"
30"x32"
6"ø
6"ø
6"ø 6"
ø
20"x18"
10"ø
14"ø
6"ø
6"ø6"ø
14"ø
20"x18"
10"ø 10"ø
6"ø
6"ø
12"ø16"x15"
16"x
15"
6"ø
6"ø
6"ø
44"x24"
44"x2
4"Θ
50"x24"
8"ø
12"ø
8"ø
10"ø
15"x15"
8"ø
12"ø
12"ø
24"x
10"
14"x
12"
28"x24"Θ
12"ø
8"ø
8"ø
18"ø
28"x24"Θ
16"ø
22"x14"Θ
10"ø
10"ø
10"ø
10"ø
10"ø
8"ø
14"ø
14"ø
10"ø
16"ø
20"x18"
10"ø6"ø
8"ø
8"ø
10"ø
10"ø
12"x
12"
18"ø
10"ø
10"ø 10"ø
8"ø
8"ø
8"ø
8"ø8"ø
8"ø8"ø
27"x
14"
33"x18"
10"ø
14"ø
120A6" x 24SQ
120A6" x 24SQ
285A8" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
10" x 6"100G
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
504E1S x 24"
10"
501E1S x 24"
10"
501E1S x 24"
10"120A
6" x 24SQ120A
6" x 24SQ
154A6" x 24SQ
120A6" x 24SQ
501E1S x 24"
10"
120A6" x 24SQ120A
6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
285A8" x 24SQ
169B8" x 24SQ
475B12" x 24SQ
166B8" x 24SQ
206J8" x 24SQ
206J8" x 24SQ
313J8" x 24SQ
313J8" x 24SQ
313J8" x 24SQ
206J8" x 24SQ
206J8" x 24SQ
206J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
387J8" x 24SQ
387J8" x 24SQ
387J8" x 24SQ
387J8" x 24SQ
387J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
231J8" x 24SQ
79A6" x 24SQ
253J8" x 24SQ
343J8" x 24SQ
374E1S x 24"
10"
374E1S x 24"
10"
374E1S x 24"
10"
374E1S x 24"
10"
374E1S x 24"
10"
343J8" x 24SQ
343J8" x 24SQ
343J8" x 24SQ
343J8" x 24SQ
343J8" x 24SQ
289J8" x 24SQ
89J8" x 24SQ
322A10" x 24SQ
322A10" x 24SQ
18" x 18"800C
24" x 10"800G
863E1S x 48"
12"
H1
H3
H7
H6
H4H4
H3
H1
FCU
-104
-2
8"ø
H1H1
36"x
36"
68"x
24"Θ
28"x28" 28"x28"
239B8" x 24SQ
239B8" x 24SQ
H10
H10
H10H10
14"ø
10"ø
H10
H10
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.23
ENLARGED SECONDFLOOR HVAC PLAN -AREA 3
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR HVAC PLAN - AREA 3
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER
TO LAB DRAWING L5.00, DETAIL “2”.H4 3” EXHAUST DUCT DOWN TO & THRU THE BACK OF THE VACUUM PUMP CABINET. A FLEXIBLE HOSE FROM THE
VACUUM PUMP DISCHARGE WILL BE INSERTED INTO THIS 3” EXHAUST DUCT. THE EXHAUST DUCT WILL THUSEXHAUST BOTH THE VACUUM PUMP DISCHARGE & THE VACUUM PUMP CABINET. REFER TO LAB DRAWINGS.
H6 CAPPED FOR EXTENSION TO FUTURE NF5.H7 WALL MOUNTED ELECTRIC HUMIDIFIER MOUNTED ON THE WALL WITH THE TOP DOWN 24” FROM THE CEILING,
PIPE DRAIN TO F.D.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "3"
(2ND FLR.)
M M
N N
12
12
13
13
14
14
16
16
17
17
20
20
DEBRIEFINGROOM
262
ADULT 1272
CNTRL. 2271
ADULT 2270
ISO.273
MATERNITY267
PEDIATRIC269
CNTRL. 1268
ELEC.263
WARD LAB265
STOR.264
NURSINGCORRIDOR
266
OFFICE234
OFFICE232
OFFICE229 OFFICE
230
OFFICE240
OFFICE239
OFFICE237
OFFICE238
OFFICE235
NURSINGSUITE
MANAGER236
STUDENTINTERACTIVE
SPACE205
N. STUDYSPACE
202
(OPEN TOBELOW)
(OPEN TOBELOW)
H H
J J
K K
L L
15
15
18
18
19
19
(OPEN TOBELOW)
13.5
13.5
VAV-
272/
273
VAV-
271
VAV-
265
VAV-
262/
264/
266
VAV-
269/
270
VAV-
268
VAV-
200B
VAV-
263
VAV-204A
E. OFFICECORR.
204
CP-2
CP-3
VAV-235-240
VAV-204B
G G
2ND FLOORCORRIDOR
200
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
36"x
24"Θ
12"ø
6"ø
10"ø
10"ø
14"ø
10"ø
7"ø
11"ø7"ø
BM4.05
H1
H1
H1 H1
557E1S x 24"
12"
557E1S x 24"
12"
120A6" x 24SQ
120A6" x 24SQ
557E1S x 24"
12"
6" x 6"100G
12" x 6"100C
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
422E1S x 24"
10"
422E1S x 24"
10"
422E1S x 24"
10"
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ
120A6" x 24SQ120A
6" x 24SQ120A
6" x 24SQ120A
6" x 24SQ120A
6" x 24SQ
330E1S x 24"
10"60" x 7"
1,037F60" x 7"
1,037F 330E1S x 24"
10" 60" x 7"1,037F
60" x 7"1,037F
230A8" x 24SQ
230A8" x 24SQ
461A12" x 24SQ
130A6" x 24SQ
130A6" x 24SQ
81A6" x 24SQ
81A6" x 24SQ
130A6" x 24SQ
130A6" x 24SQ195A
8" x 24SQ195A
8" x 24SQ
130A6" x 24SQ
130A6" x 24SQ
195A8" x 24SQ
195A8" x 24SQ 130A
6" x 24SQ
195A8" x 24SQ130A
6" x 24SQ195A8" x 24SQ
260A8" x 24SQ
260A8" x 24SQ
219A8" x 24SQ
219A8" x 24SQ
248A8" x 24SQ
248A8" x 24SQ
248A8" x 24SQ
248A8" x 24SQ
219A8" x 24SQ
219A8" x 24SQ
97A6" x 24SQ
427A10" x 24SQ
427A10" x 24SQ
113A6" x 24SQ
12"ø
12"ø
30"x24"Θ 28"x24"Θ
16"ø
6"ø
12"ø 12"ø
6"ø
6"ø
6"ø
16"ø
12"ø
6"ø
10"ø
6"ø
20"x18" 20"x18"
10"ø 10"ø
6"ø
6"ø
12"ø
28"x16"Θ
20"x18"
6"ø6"ø
12"ø
12"ø
28"x1
6"Θ
6"ø
6"ø
8"ø
6"ø
8"ø
12"x
10"
28"x16"Θ 24"x16"Θ
10"ø
6"ø
10"ø
12"x
12"
12"x12" 12"x12"
6"ø
6"ø
6"ø6"ø
16"x
15"
6"ø
16"ø 12"ø
6"ø
6"ø
6"ø
10"ø12"x
8"
14"x
13"
12"x
8"
12"x
10"8"ø
8"ø8"ø
8"ø
6"ø12"x12" 12"x12"
10"ø
6"ø
6"ø
6"ø6"ø
68"x
24"Θ
26"x10"
12"x
10"
H10H10
H1
36"x
24"
H10
H10
HVAC GENERAL NOTES:
1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.
2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO
GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Jere
my.
rvt
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.24
ENLARGED SECONDFLOOR HVAC PLAN -AREA 4
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR HVAC PLAN - AREA 4
HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H10 DUAL WALL DUCT.
NORTH
KEY PLAN
AREA "4"
(2ND FLR.)
DNDN
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
PENTHOUSE301
FANENCLOSURE
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
ELEV.
ATTIC
NORTHSTAIR104-3
2ND FLOORFLAT ROOF
N. STAIR TOPENTHOUSECORRIDOR
302
13.5
13.5
COND-2
ELEV.CONTROLLER
CLOSET
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
36"x
24"
24"x
12"
24"x
12"
24"x
12"
14"x12"
28"x24"
INSTALL RETURN AIR DUCT TOTRAVERSE STAIR/CORRIDORSPACE IN ATTIC, UP AS HIGHAS POSSIBLE TO UNDERSIDEOF STRUCTURE
M2.31A
NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREAFOR VENTS THRU ROOF & ROOF
DRAIN INFORMATION FOR FLATROOF AREAS, REFER TO MECHANICALROOF PLAN, SHEET M2.40
FOR VENTS THRU ROOF & ROOFDRAIN INFORMATION FOR FLATROOF AREAS, REFER TO MECHANICALROOF PLAN, SHEET M2.40
PENTHOUSE EXIT
PENTHOUSE EXIT
COND-1
AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE
AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE
AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE
ATTIC
AV
2"ACID VENT UPFROM BELOW
RELIEF AIR LOUVER
INTAKE AIR LOUVER
M7
M7
M7M7
M7
M32M32 M33M33
M38
M38 M38 M38 M38 M38
M38
M7
8"x8"
MECHANICAL PENTHOUSE GENERAL NOTES
1. ALL PIPING THAT PENETRATES THE FLOOR OF THE PENTHOUSE SHALL BE INSLEEVES CAST IN THE FLOOR AND EXTENDED 4" ABOVE THE FLOOR TO PREVENTWATER FROM LEAKING TO THE 2ND FLOOR.
2. IN MECHANICAL ROOMS NO PIPING SHALL BE INSTALLED ACROSS THE FLOOR & NOPIPING OR DUCTWORK SHALL BE INSTALLED BELOW 7'-6".
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.30
MECHANICALPENTHOUSE PLAN0 8' 16' 24' 32'
NORTH
1/8" = 1'-0"
AMECHANICAL PENTHOUSE PLAN
MECHANICAL SHEET PLAN NOTESM7 RETURN AIR DUCT UP FROM SECOND FLOOR WHICH RETURNS THE AIR INTO THE ATTIC SPACE TO
TEMPER/CONDITION THE ATTIC SPACE. THE INSIDE-CLEAR SIZE OF THE RETURN AIR DUCT IS INDICATED ONTHE PLANS.
M32 REFRIGERANT LINES BETWEEN CRACU #1 & CONDENSER #1 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. REFER TO DRAWING M3.02 FOR CONTINUATION &REFER TO SHEET M3.01 FOR PLAN NOTE “M1” FOR R.H.G. & R.L. LINE SIZING. THE REFRIGERANT LINES SHALLPENETRATE THE ROOF THRU A PIPING PORTAL.
M33 REFRIGERANT LINES BETWEEN CRACU #2 & CONDENSER #2 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. REFER TO DRAWING M3.02 FOR CONTINUATION &REFER TO SHEET M3.01 FOR PLAN NOTE “M2” FOR R.H.G. & R.L. LINE SIZING. THE REFRIGERANT LINES SHALLPENETRATE THE ROOF THRU A PIPING PORTAL.
M38 3” ROOF DRAIN FROM GUTTER BOTTOM OUTLET. REFER TO SECOND FLOOR PLUMBING PLANS FORCONTINUATION.
8
8
10
10
12
12
13
13
H H
J J9
9
11
11
13.5
13.5
C CD D
E E
F F
G G
PENTHOUSE301
LEF-1
FANENCLOSURE
AIRHANDLING
UNIT#1
ELEV.
ATTIC
CWP-1 CWP-2
HWP-1
HWP-2
ERGP-1
40"x
24"Θ
31"x
20"Θ
44"x24"
30"x24"
ERU-1
150"x44"
28"x20"
36"x24"
40"x24"Θ
31"x20"Θ
CP-6
ELEV.CONTROLLER
CLOSET
28"x
24"
HR
HS
HR
HS
HR
CSCR
CSCS
CR
CR
CS
CRFP
CR
NG
NG
NG
TSW
TSW
HWR
HW
SCW
CW
CW
CW
CW
HW
R
ERR
ERS
ERS
ERS
ERR
ERR
ERS
ERS ER
S
ERR
ERS
ERR
RORO
3/4"
3/4"LA
LA
LV
LV
2"
2"2"
RD RD
4"RD ABOVE4"RD ABOVE
SLOPE
ROUTE R.D. PIPE DOWN TIGHT TOCORNER OF INTAKE PLENUM &SEAL THE PENETRATIONS
REFER TO ROOF PLAN ON SHEET M2.40 FORDOWNSPOUT NOZZLE DISCHARGE NOTES
REFER TO ROOF PLAN ON SHEET M2.40 FORDOWNSPOUT NOZZLE DISCHARGE NOTES
0.25"/FT SLOPE
0.25"/FT SLOPE
1"1"3/4"3/4" 1"1" 3/4"3/4"
3" FD-B
3" C.O.
4" C.O.2" FD-B
3" F
S-A
3" FS-B
3" FS-A
4" F
D-B 2" FD-B2" FD-B
3" FD-B
2" FS-B 2" FD-B
2" FS-B2" FD-B
3" FD-B
2" FD-B
4" FD-B
NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREA
4" C.O.
3" C.O.
4" C.O.
4" C.O.
4" C.O.
M34
M34
M34M34
M34
M34
M37M37
M37
M37
PENTHOUSE EXIT
PENTHOUSE EXIT
3" AV2" SV
M35
M36VENTS UPFROM BELOW
RO
48"x48"
2 1/2"2 1/2"
3"3" 3"3"
HR HR
HSHS
HR H
S
3"3"
3"
3"
CS
HS
CR
CS
HRC
S
CR
3"3" 5"5"
4"4"
3/4"3/4"
1"1"
RELIEF AIRLOUVER #2
15' - 0" x 10' - 0"
O.A. INTAKELOUVER #1
15' - 0" x 10' - 0"
ENERGY RECOVERY COIL
ENER
GY
REC
OVE
RY
CO
ILS
HO
T W
ATER
HEA
TIN
G C
OIL
S
CH
ILLE
D W
ATER
CO
OLI
NG
CO
ILS
M7
M17 M18
M19M19
M18
M8
M35
2"
AV
FP
5" HR5" HS
8" CR
8" CS
4" NG
3" CW
PIPING UP FROM 2NDFLR. BELOW, ALLSERVICES FROM 1STFLR. MECH. ROOM #145
PIPING DOWN TO 2ND FLOOR
M26M26
M27M27M27 M27M27M27M25M25
4' - 0"
EXIT WALK-WAY CLEAR
8"3"
4"
8"
5" HS
5" HS
3"
3"
4"4"1 1/4"1 1/4"
4" HS
40"x24"Θ
1/2" RO4" HR
2 1/2"
2" NG
1 1/
4"
2 1/2"
2 1/2" SCW
8"
3/4"
5" HS
5" HR
1 1/4"
3"
P-8EXHAUST PLENUM FOR LABEXHAUST FAN ASSEMBLY
M24
ELEC. PANELS & EQUIP., RE: ELEC.
2 1/2"2 1/2"
CS
CRHR H
S
8"8"8"8"
CS
CW
2" NG
2 1/2"
NG4"
NG
5" HS
FCU-301A
FCU-301B
M31
M31
PWH-2
PWH-1
LV
HRHS
CSCR
HRHS
M20
M20
AIRCOMPRESSOR
PACKAGE#1
VACUUMPUMP
PACKAGE#1
M9 M10
60"x
102"
78"x
102"
REL
IEF
AIR
DU
CT
O.A
.IN
TAKE
DU
CT
C
1"
1" C
VFD PANEL,RE: ELEC. VFD PANEL,
RE: ELEC.VFD PANEL,RE: ELEC.
SUPPLY FAN WALLVFD PANELS, RE: ELEC.
RETURN FAN WALLVFD PANELS, RE: ELEC.
HB 3/4"3/4"3/4"
CW
HB
WATERSOFTENERPACKAGE
#1M12
WATERPURIFICATION
SYSTEM#1
M13
GASFIRED
HUMIDIFIERPACKAGE
#1M11
2 1/2"
2"2 1/2"
2 1/2"
2 1/2"
2 1/2"
2"
2 1/2"
2"
SCW
CW3"
2 1/2"
PWR
PW
HW
RH
W
SCW
TSW NG
NG
NG
HW
CW
3/4"
CS C
R
3"1 1/2"
1 1/2"1 1/4" 2 1/2"
2 1/
2"
2"
HW 140HWR
SCW
ERS
ERR
AX02
BX02
MU
LTI-S
TEAM
DIS
PER
SIO
N H
UM
IDIF
ICAT
ION
SYS
TEM
M14
M15
M42
M28
M40
M41
M16
M21
M22
M23
FRO
M A
.H.U
.TO
PLE
NU
M
FRO
M A
.H.U
.TO
PLE
NU
M
4"
3"
5"5"
UP FROMBELOW
UP FROMBELOW
SUPPLY AIR DOWNTO 2ND FLR. CEILING
SUPPLY AIR DOWNTO 2ND FLR. CEILING
RETURNAIR DUCTUP FROMBELOW
M39 M39M39
M39M39M39
MECHANICAL PENTHOUSE GENERAL NOTES
1. ALL PIPING THAT PENETRATES THE FLOOR OF THE PENTHOUSE SHALL BE INSLEEVES CAST IN THE FLOOR AND EXTENDED 4" ABOVE THE FLOOR TO PREVENTWATER FROM LEAKING TO THE 2ND FLOOR.
2. IN MECHANICAL ROOMS NO PIPING SHALL BE INSTALLED ACROSS THE FLOOR & NOPIPING OR DUCTWORK SHALL BE INSTALLED BELOW 7'-6".
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.31
ENLARGEDMECHANICALPENTHOUSE PLAN
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED MECHANICAL PENTHOUSE PLAN
MECHANICAL SHEET PLAN NOTESM26 RELIEF AIR SHEET METAL PLENUM TO BE CONSTRUCTED PER SMACNA STANDARDS & EXTENDING FROM THE
FLOOR UP TO 6" ABOVE THE RELIEF LOUVER.M27 SLOPE FLOOR TO FLOOR DRAIN (F.D.) AS INDICATED & PROVIDE A 4" WIDE BY 2" HIGH OPENING IN PLENUM TO
PERMIT DRAINAGE TO F.D.M28 2-1/2" EXHAUST VENT PIPE UP THRU ROOF FROM VACUUM PUMP. PROVIDE A 180-DEGREE TURN ABOVE ROOF
WITH INSECT SCREEN.M31 FAN COIL UNIT SUSPENDED OVERHEAD ON VIBRATION ISOLATORS. UNIT NUMBER INDICATED ON PLANS.
INSTALL A 1" CONDENSATE DRAIN WITH TRAP & ROUTE TO NEAREST FLOOR DRAIN.M34 FLOOR SINK, FLOOR DRAIN, OR CLEANOUT CONNECTED TO ACID WASTE DRAINAGE SYSTEM BELOW. REFER
TO SECOND FLOOR PLUMBING PLAN FOR CONTINUATION BELOW.M35 ACID VENT UP THRU ROOF.M36 SANITARY VENT UP THRU ROOF.M37 COIL CLEARANCE SPACE REQUIRED.M39 REFER TO DETAIL “A”, “B”, & “I” ON SHEET M4.04 FOR AIR HANDLING UNIT #1 COIL PIPING SCHEMATICS &
REQUIRED VALVING.M40 48” DIAMETER PURIFIED WATER STORAGE TANK MOUNTED ON A CONCRETE HOUSEKEEPING PAD - THE
HEIGHT OF THE CONCRETE PAD SHALL BE ESTABLISHED TO LINE UP THE TANK OUTLET & THE PURIFIEDWATER BOOSTER PUMP SUCTION. REFER TO SPECIFICATION SECTION 22 67 13.
M41 PURIFIED WATER DISTRIBUTION BOOSTER PUMP MOUNTED ON AN INERTIA PAD. REFER TO SPECIFICATIONSECTIONS 22 67 13 & 23 05 48. PROVIDE THE FOLLOWING TRIM FOR THE PUMP: ISOLATION BALL VALVES,FLEXIBLE CONNECTORS, & INLET STRAINER.
M42 1-1/2” AIR INTAKE PIPE UP THRU ROOF FROM AIR COMPRESSOR PACKAGE. PROVIDE A 180-DEGREE TURNABOVE ROOF WITH INSECT SCREEN.
MECHANICAL SHEET PLAN NOTESM17 ENERGY RECOVERY GLYCOL PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23
& 23 05 48. REFER TO DETAIL “I” ON SHEET M4.04 FOR PIPING SCHEMATIC.M18 HEATING WATER PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23 & 23 05 48.
PUMP NUMBER INDICATED ON PLANS. REFER TO DETAIL “D” ON SHEET M4.04 FOR PIPING SCHEMATIC. PUMP#2 IS STANDBY/BACKUP.
M19 CHILLED WATER PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23 & 23 05 48.PUMP NUMBER INDICATED ON PLANS. REFER TO DETAIL “C” ON SHEET M4.04 FOR PIPING SCHEMATIC. PUMP#2 IS STANDBY/BACKUP.
M20 GAS FIRED WATER HEATER MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO SPEC SECTION22 34 00. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC. PROVIDE 4" PVC FLUE ANDCOMBUSTION AIR PIPE UP THRU ROOF COMPLETE WITH ROOF THIMBLE, FLASHING, & A WEATHER CAP.PROVIDE EXPANSION TANK FOR H.W. SYSTEM. PROVIDE CIRCULATOR PUMP (CP-1) AS INDICATED INSCHEMATIC.
M21 POTABLE HOT WATER MIXING VALVE - MOUNT ON UNISTRUT FRAMING. REFER TO DETAIL “D” ON SHEET P3.02FOR PIPING SCHEMATIC.
M22 TEMPERED SAFETY WATER (SERVING EMERGENCY SHOWERS & EYEWASHES) WATER MIXING VALVE - MOUNTON UNISTRUT FRAMING. REFER TO DETAIL “D” ON SHEET P3.02 FOR PIPING SCHEMATIC.
M23 ENERGY RECOVERY SYSTEM EXPANSION TANK. REFER TO SHEET M4.01 FOR SCHEDULE. REFER TO DETAIL “I”ON SHEET M4.04 FOR PIPING DETAIL.
M24 LAB EXHAUST FAN PACKAGE MOUNTED ON AN INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 34 15 &23 05 48. REFER TO DETAIL “C” ON SHEET M4.05 FOR DETAILS.
M25 OUTSIDE AIR (O.A.) INTAKE SHEET METAL PLENUM TO BE CONSTRUCTED PER SMACNA STANDARDS &EXTENDING FROM THE FLOOR UP TO 6" ABOVE THE INTAKE LOUVER.
MECHANICAL SHEET PLAN NOTESM7 RETURN AIR DUCT UP FROM SECOND FLOOR WHICH RETURNS THE AIR INTO THE ATTIC SPACE TO
TEMPER/CONDITION THE ATTIC SPACE. THE INSIDE-CLEAR SIZE OF THE RETURN AIR DUCT IS INDICATED ONTHE PLANS.
M8 LAB EXHAUST DUCT UP FROM THE 2ND FLOOR.M9 VACUUM PUMP PACKAGE MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 22 62 19 & 22 05 48.
REFER TO DETAIL “F” ON SHEET M4.04 FOR PIPING SCHEMATIC.M10 LAB AIR COMPRESSOR PACKAGE MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 22 61 19 &
22 05 48. REFER TO DETAIL “E” ON SHEET M4.05 FOR PIPING SCHEMATIC.M11 GAS FIRED STEAM HUMIDIFIER PACKAGE MOUNTED ON A 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO
SPECIFICATION SECTION 23 84 13. REFER TO DETAIL “F” ON SHEET M4.05 FOR PIPING SCHEMATIC.M12 WATER SOFTENER PACKAGE MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO
SPECIFICATION SECTION 22 67 13. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC.M13 WATER PURIFICATION SYSTEM PACKAGE MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO
SPECIFICATION SECTION 22 67 13. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC.M14 6" FLUE DUCT UP THRU ROOF FROM GAS FIRED HUMIDIFIER. FLUE SHALL BE COMPLETE WITH ROOF THIMBLE,
FLASHING, & A WEATHER CAP. TYPE OF FLUE SHALL BE AS RECOMMENDED BY THE HUMIDIFIERMANUFACTURER.
M15 8" COMBUSTION AIR INTAKE DUCT UP THRU ROOF FROM GAS FIRED HUMIDIFIER. COMBUSTION AIR DUCTSHALL BE COMPLETE WITH ROOF THIMBLE, FLASHING, & A WEATHER CAP. TYPE OF COMBUSTION AIR DUCTSHALL BE AS RECOMMENDED BY THE HUMIDIFIER MANUFACTURER. TERMINATE WITH A WEATHER CAP.
M16 ENERGY RECOVERY GLYCOL SYSTEM MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TOSPECIFICATION SECTION 23 25 13. REFER TO DETAIL “I” ON SHEET M4.04 FOR PIPING SCHEMATIC.
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
4" RD(4" HORIZ. @ 0.5"/FT BELOW)
5" SRD(6" HORIZ. @ 0.25"/FT BELOW)
4" RD(4" HORIZ. @ 0.5"/FT BELOW)
5" SRD(6" HORIZ. @ 0.5"/FT BELOW)
4" RD(4" HORIZ. @ 0.5"/FT BELOW)
6" SRD(6" HORIZ. @ 0.5"/FT BELOW)
4" RD(4" HORIZ. @ 0.5"/FT BELOW)
6" SRD(6" HORIZ. @ 0.25"/FT BELOW)
5" RD(5" HORIZ. @ 0.5"/FT BELOW)
6" SRD(8" HORIZ. @ 0.25"/FT BELOW)
4" RD(4" HORIZ. @ 0.25"/FT BELOW)
5" SRD(6" HORIZ. @ 0.25"/FT BELOW)
4" RD(4" HORIZ. @ 0.5"/FT BELOW)
5" SRD(6" HORIZ. @ 0.5"/FT BELOW)
4" RD(4" HORIZ. @ 0.25"/FT BELOW)
4" RD(4" HORIZ. @ 0.25"/FT BELOW)
REFER TO ARCHITECTURAL ROOF PLANFOR FINAL TAPERED ROOF INSULATIONBOUNDARIES TYPICAL. ROOF DRAIN (&SECONDARY) SIZING IS PER BOUNDARIESSHOWN ON THIS PLAN, NOTIFY ENGINEERFOR REVISED PIPE CALCULATIONS IFROOF TAPER OR DRAINS ARE INSTALLEDIN DIFFERENT LOCATIONS.
6" / 12"
1/4"
/ 12
"
1/4"
/ 12
"
1/4"
/ 12
"
1/4"
/ 12
"
1/4"
/ 12
"
1/4"
/ 12
"
6" / 12"
6" /
12"
6" /
12"
6" /
12"
6" /
12"
6" /
12"
PRIMARY ROOF DRAIN FROM PENTHOUSEHIGH ROOF TO DISCHARGE ONTO 2ND FLOORROOF HERE THRU DOWNSPOUT NOZZLE (18"ABOVE LOW ROOF) ONTO A SPLASH BLOCK
4" D.N. 4" D.N.
REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED
REFER TO ARCH. ROOF PLAN FOR STORMWATER DRAINAGE DETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED & DIAGONAL PATTERNED
REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED
REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED
3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER
3"RD INLETFROM GUTTER
3"RD INLETFROM GUTTER
MIN. 10" WIDE BY 4" TALL SECONDARYROOF DRAINAGE SCUPPER OPENING,RE: ARCH. FOR FINAL LOCATION
MIN. 10" WIDE BY 4" TALL SECONDARYROOF DRAINAGE SCUPPER OPENING,RE: ARCH. FOR FINAL LOCATION
PRIMARY ROOF DRAIN FROM PENTHOUSEHIGH ROOF TO DISCHARGE ONTO 2ND FLOORROOF HERE THRU DOWNSPOUT NOZZLE (18"ABOVE LOW ROOF) ONTO A SPLASH BLOCK
THIS SET OF ROOF DRAINSALSO RECEIVES THE STORMWATER FROM THE SOUTH HALFOF THE PENTHOUSE HIGH ROOF,AS DISCHARGED THRU DOWN-SPOUT NOZZLE AT PENTHOUSEWALL ALONG COLUMN LINE "G"
THIS SET OF ROOF DRAINSALSO RECEIVES THE STORMWATER FROM THE NORTH HALFOF THE PENTHOUSE HIGH ROOF,AS DISCHARGED THRU DOWN-SPOUT NOZZLE AT PENTHOUSEWALL ALONG COLUMN LINE "G"
2" S.S. V.T.R.
2" S.S. V.T.R.
3" ACID V.T.R.
EXHAUST DUCT PLENUM
NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREA
RELIEF AIR LOUVER
INTAKE AIR LOUVER
PENTHOUSE EXIT
PENTHOUSE EXIT
2" S.S. V.T.R.
4" S.S. V.T.R.
2" LAB GAS RELIEF VENT UP FROMBELOW, TURN DOWNWARD & COVERWITH INSECT SCREEN
2" ACID V.T.R.
2" ACID V.T.R.
PIPING PORTALS FOR REFRIGERANTPIPING PENETRATIONS, REFER TOSHEET M2.30 FOR ADDITIONAL NOTES
TRIPLE LAB EXHAUSTFAN SYSTEM
DATA CENTER CRACU CONDENSERSP-8
2" LAB GAS RELIEF VENT UP FROMBELOW, TURN DOWNWARD & COVERWITH INSECT SCREEN
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M2.40
MECHANICAL ROOFPLAN0 8' 16' 24' 32'
NORTH
1/8" = 1'-0"
AMECHANICAL ROOF PLAN
UP
UP
FEC
FEC
FEC
UP
UP ATS
SB
SB
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
MAI
N 1
ST F
LR.
(SLA
B @
119
7.0'
)
UPP
ER 1
ST F
LR.
(SLA
B @
120
0.0'
)
FSICORRIDOR
117
FSI STOR.119
FSI ALSEXAMROOM
118
AMP116
PRE PCR115
EXTRACT.PREP.
114FSI PREP.
ROOM113
FSI/MOLECULAREVOLUTIONARY
BIOLOGYTEACHING
LAB112
FSIIMPRESSION
EVIDENCELAB121
OPERATIONSRESEARCH
CONSULTINGGROUP
126DIGITAL
EVIDENCELAB123
DIGITALEVIDENCETEACHING
LAB124
FSI/MOLECULAR&
EVOLUTIONARYBIOLOGY
RESEARCHLAB122
OFFICE130
BERESFORDENDOWED
CHAIR127
WHEELCHAIRSTOR.
128
WHEELCHAIRSIMULATION
PROJECT129
VEST.101
SOUTHSTAIR
105
VEST.100
TL STYLECLASSROOM
125
VEST.102
STUDENTLOUNGE/LOBBY
109
S.CORRIDOR
106
TL STYLECLASSROOM
120
CREICCOLLABORATIVE
LAB134
OFFICE135
OFFICE136
DATAWORKROOM
133
CREICDATA
CENTER132
IT131
COMPUTERSIMULATIONS
137
COMPUTATIONALCLASSROOM
138
NORTHSTAIR
104
VEST.103
LECTUREHALL/
SHELTER147
LOADING146
MECHANICAL145
ELEC.142
CYL.144
BIO WASTE143
STOR.140
MEN'S111
WOMEN'S110
N.CORRIDOR
108
ELEV.
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
HRHRHRHS
HR
HS
HR
HS
HR
HRHS HS
HR
HS
HR
HRHS
HR H
S
HSHR
HSHSHR
MAV-113HWC-113 VAV-114 HWC-115
MAV-115
MAV-116HWC-116
MAV-118HWC-118
VAV-119
HWC-121
MAV-121
VAV-129/128
VAV-107
VAV-120
VAV-106
FPT-101
MAV-112AHWC-112A
MAV-122HWC-122
VAV-123
VAV-124
VAV-125
VAV-126
FPT-100
FPT-147B
VAV-109
FPT-147A
VAV-145/146
FPT-103
VAV-134
VAV-137
VAV-131
CRACU-2 CRACU-1
FPT-102VAV-133
VAV-130
2 1/2"
2 1/2"1 1/4"1 1/4"
2"
2"
3/4"3/4"
3/4"3/4"
3/4"3/4"2"2"
1"
1"
1"1" 3/4"3/4"
1"1"
1"1"
3/4"3/4"
1 1/2"1 1/2"
3/4"3/4"
1 1/2"1 1/2"
1 1/4"1 1/4"
1 1/4"1 1/4"
3/4"3/4"
1"1"
3/4"3/4"
3/4"3/4"
3/4"3/4"
3/4"3/4"
1"1"
3/4"3/4"
3/4"3/4" 3/4" 3/4"
1 1/2"1 1/2"
1 1/2"1 1/2"
3/4"3/4" 3/4"3/4"
3/4"3/4"
3/4"
1 1/4"1 1/4"
1 1/4"1 1/4"
1"1"
3/4"3/4"
1 1/4"1 1/4"
3/4"3/4"
3/4"3/4"2"2"
3/4"3/4"
CP-17(TSI)
CP-16(TSI)
CP-15(TSI)
CP-10
CP-14(TSI)
CP-8CP-7 CP-12(TSI)
CP-9
CP-13(TSI)
5"5"
5"5"
1 1/4"1 1/4"
3/4"3/4"
1 1/2"1 1/2"
VAV-135/136
VAV-138
VAV-110/111/141VAV-108
VAV-127
STOR.139
3/4"
CAV-1323/4"3/4"
MAV-112B
HWC-112B
VAV-110/111/142
M3M3
REFRIGERANT PIPES UPIN CHASE ABOVE, SEALAROUND FLOOR SLABPENETRATION FORCLEAN-AGENT FIRE PROT.SYS. CONTAINMENT
M3
M1M1 M2M2
FCU-104-1
HR
HEATING WATER MAINSUP TO 2ND FLOOR
2 1/2"2 1/2"
REFER TO PLAN "A" ON SHEET M4.05FOR ENLARGED COMBINEDMECHANICAL-PLUMBING OF THIS AREA
3/4"
3/4"
3/4"3/4"
8"8"
HRHS
CR
CS
PIPES UP TO 2ND FLR.IN CHASE ABOVE,REFER TO "A"-M3.02
1"1"
M45M45
M45M45
M45M45
M3
M45M45
HS HS
3/4"3/4"
3/4"3/4"
8"8"
HS
MAIN 1ST FLR.(SLAB @ 1197.0')
UPPER 1ST FLR.(SLAB @ 1200.0')
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
M3.01
FIRST FLOOR HVACPIPING PLAN
0 8' 16' 24' 32'NORTH
1/8" = 1'-0"
AFIRST FLOOR HVAC PIPING PLAN
MECHANICAL SHEET PLAN NOTESM1 REFRIGERANT LINES BETWEEN CRACU #1 & CONDENSER #1 ON ROOF. THERE ARE TWO SETS OF LINES FOR
DUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. THE SIZE OF THE REFRIGERANT HOT GAS (R.H.G.)LINES ARE 1-1/8” FOR HORIZONTAL PIPING & 7/8” FOR VERTICAL PIPING. THE SIZE OF THE REFRIGERANTLIQUID (R.L.) LINES ARE 7/8” FOR BOTH HORIZONTAL & VERTICAL PIPING. REFER TO DRAWING M3.02 FORCONTINUATION.
M2 REFRIGERANT LINES BETWEEN CRACU #2 & CONDENSER #2 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. THE SIZE OF THE R.H.G. LINES ARE 1-1/8” FORHORIZONTAL & 7/8” FOR VERTICAL PIPING. THE SIZE OF THE R.L. LINES ARE 7/8” FOR BOTH HORIZONTAL &VERTICAL PIPING. REFER TO DRAWING M3.02 FOR CONTINUATION.
M3 PIPING CROSSING OVER THE DATA CENTER SHALL BE WITHOUT FITTINGS. IF FITTINGS ARE REQUIRED, SUCHAS A COUPLING, IT SHALL BE BRAZED.
M45 SEAL AROUND ALL PIPING PENETRATIONS THRU THE DATA CENTER WALLS FOR CLEAN-AGENT FIREPROTECTION SYSTEM CONTAINMENT.