7
FEC FEC UP DN DN PSPSPS M M N N 8 8 10 10 12 12 13 13 14 14 16 16 17 17 20 20 H H J J K K L L 9 9 11 11 15 15 18 18 19 19 13.5 13.5 A A C C D D E E F F G G B B 1 1 2 2 3 3 4 4 5 5 6 6 7 7 MATCHLINE (N./S.) MATCHLINE (E./W.) MATCHLINE (N./S.) MATCHLINE (E./W.) PLUMBING GENERAL PLAN NOTES: 1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILING NEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LAB WING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLAN NOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATE ISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVES DOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THE PLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLE RECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THE AUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OF CONTROL VALVES & PANELS. 2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALL INSULATION. 3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THE WALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE A PLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWO SEPARATE 1/2" RUNOUTS WITH VALVES. 4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGER PIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS. 5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED & INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACID WASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD. 6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TO THE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00. BRIAN J. DETERMAN 20912 H A O O L K M A O F E S S I O N A L R P D E R E T S I G E R E N I G N E E R DETERMAN SCHEIRMAN, INC. CONSULTING ENGINEERS CERTIFICATE OF #38,06/30/2018 EXPIRES AUTHORIZATION 5749 NW 72ND STREET OKLAHOMA CITY, OK 73132 PHONE:405.603.4820 FAX:405.603.4810 Sheet: Job No. Date Issued: ates Arch E ott + Assoc l i i l tects i Oklahoma 35 405 232 Harrison 9554 Avenue City, 04 1 73 OK Revisions: 10-21-16 + 11798 North Lakeridge Pkwy. Ashland, VA 23005 Tel. 804.228.7473 www.mwlarchitects.com McClaren, Wilson & Lawrie, Inc. C:\Revit Local Files\15013 UCO STEM-MEPcentral_v15_David.rvt ADD. #2 11/28/16 1 UNIVERSITY OF CENTRAL OKLAHOMA GARLAND GODFEY DRIVE EDMOND, OK 73034 UCO STEM TEACHING AND RESEARCH CENTER 1543 P2.20 SECOND FLOOR PLUMBING REFERENCE PLAN 0 8' 16' 24' 32' NORTH 1/8" = 1'-0" A SECOND FLOOR PLUMBING REFERENCE PLAN NORTH KEY PLAN (2ND FLR.) AREA "1" AREA "2" AREA "3" AREA "4"

UCO STEM TEACHING AND RESEARCH CENTER …sites.uco.edu/administration/pur-pay-trav/files/files-pur-forms... · key plan(2nd flr.) area "1" area "2" ... bio. lab 248 student area 242

  • Upload
    ngobao

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

DN

UP DN

FEC

FEC

UP DN

DN

PSPSPS

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

PLUMBING GENERAL PLAN NOTES:

1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.

2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.

3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.

4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.

5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.

6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

P2.20

SECOND FLOORPLUMBING REFERENCEPLAN

0 8' 16' 24' 32'NORTH

1/8" = 1'-0"

ASECOND FLOOR PLUMBING REFERENCE PLAN

NORTH

KEY PLAN (2ND FLR.)

AREA "1"

AREA "2"

AREA "3"

AREA "4"

PLUMBING GENERAL PLAN NOTES:

1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.

2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.

3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.

4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.

5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.

6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

8

8

10

10

BIOMEDICALENGINEERING

RESEARCHLAB249

CELLCULTURE

COREFACILITY

241

RESEARCHCELL/MOLECULAR

BIO. LAB248

STUDENTAREA

242

DARKROOM

247

BIOMEDICALEQUIPMENT

COREFACILITY

246

CORECORRIDOR

245

RESEARCHMICROBIOLOGY

LAB243

STERILIZATIONAREA

244

VEND 2209

2ND FLOORCORRIDOR

200

OFFICE219

OFFICE218

JAN.216

OFFICE217

OFFICE214

OFFICE210

OFFICE212

S. STUDYSPACE

201

(OPEN TOBELOW)

(OPEN TOBELOW)

9

9

11

11

P-5

P-6

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

SCW

HW

TSW

SCW

HW

(HT)

TSW

SCW

HW

(HT)

TSW

TSW

HW

SCW

HW(HT)SCW

TSW

HW

(HT)

SCW

HW(HT)SCW

HW

(HT)

SCW NG

TSW

HW

TSW

SCW

NG

NG

NG

PW PW

PWPW

PW

PW

PWPW

PWPW

PW

PW

PW

PW

PW

PW

PWPW

PWR

PW

1 1/2"1 1/2"1 1/2"

1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/

2"1

1/2"

1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"1 1/2"1 1/2"

1 1/2"1 1/2"

N

NN

N

N

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

CO2

CO

2

CO

2

CO

2

CO2

CO2

CO

2

CO2

CO2

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

LA

LA

LA

LA

LA

LA

LA LA

LA

LA

LA

3/4"

1/2"3/4"1/2" 1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

LV

LV

LV

LVLV

LV

LV

LV

LV

LV

LV

LV

2"

2"

1"

2"

2"

3/4"

3/4" 1"

2"

2"

1 1/2"

1 1/2"

3/4"

1"

1 1/4"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1"

3/4"

3/4"

3/4"

3/4"

1 1/2"

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

AW

AW

4"3"

3"

3"

2"

HT-

246

(25'

- 0"

)

N15

HT-

243

(80'

- 0"

)

N15

HT-241 (24' - 0")

N15

HT-245 (141' - 0")N15

HT-249 (80' - 0")

N15

AW

2"

2"

MECH.SHAFT

BBB

AV

AV

AV

AV

AV

AV AV

AV

AV

AV

AV

AV

AV

AV

1 1/2"

2"

2"1 1/2"

1 1/2"

2"

1 1/2"

3"3"

1 1/2"

1 1/2"

1 1/2"

1 1/

2"1

1/2"

3"

2"

1 1/2"1 1/2"

1 1/2"1 1/2"

1 1/

2"1 1/2"

1 1/2"

1 1/2"

1 1/2"

3"

3"

W. OFFICECORR.

203

N58

N58

N58

N59

N59

N59

N59

N59

N60

N60

N60

N60N60

3" FS-A

N54N54

SV

SV

2"

2"

N31

2" S.S. VENT DOWN

2" S.S.VENT UP

2" S.S. VENT DOWN

3" ACIDVENT UPSV

SV SV

SV

SV2"

2"

2"

2"2"

2"

AV

1 1/2"3"

1 1/2"N5

N47

SCW

SCW

SCW

TSW

SCW

TSW

TSW

SCW

SCW

SCW

TSW

TSW

HW

SCW

PW LA

NG

CO

2 N

1 1/2"

2"2"

1 1/2"

1"1/2"

1/2"1/2"

3/4"1"

1 1/4"

1 1/2"

1/2"

3/4"3/4"3/4"

N16

N17N16

N46

N16

N9N9

1/2"1/2"

1 1/4"

1/2"1/2" SCW

1/2"

1 1/2"

1 1/2"N16

N161 1/4"

1"1"2"

1 1/2"

1 1/4"

1 1/4"1 1/2"2"

1 1/2"1 1/2"

1/2"1/2"

3/4"

N16 N16

N16

1/2"1/2"

1/2"

1 1/4"1 1/4"

1 1/

2"1 1/2" N9

N9

1 1/2"

1 1/2"

N48

1/2"1/2"

3/4" 1 1/2"

1"3/4" 1"1/2"

1 1/2"

1/2"1/2"

1 1/2"

3/4"

N5TS

W

1 1/2"

1 1/

2"1

1/2"

1 1/4"

1"

3/4"

1"

1/2"1/2"

1 1/2"1 1/4"

1 1/2"

1/2"1/2"

1/2"3/4"

3/4"3/4"3/4"

1/2"

3/4"

N16

N16

SCW

1/2"1/2"

1/2"

2"

3"

3"

3/4"

1 1/2"

1 1/2"

1/2"1/2" 3/4"

1/2"1/2" N16

3"3"

3/4"

1 1/2"1 1/2"

3/4"

N9

3/4"3/4"

1 1/2"1 1/2"

1/2"1/2"

3"

N16

3"

3"

3"

4"

2"

3"

2"

3"

N163/4"

3/4"

N16

3/4"

1"

3/4"

2"1 1/2"1 1/2"

2"2"

1 1/2"1 1/2"

1 1/2"1 1/2"

1"

LV

LV

HW

TSW

SCW

1/2"1/2"

2"2"2"2"

2"

1 1/2"1 1/4"1 1/4"

HW

3"

3"

1/2"

1 1/2"1 1/2"

AV

2"

2"

PW

2"

N62 N63

N63

N62 N63

N63

N63

N64

1/2"

LA

1/2"NG

TSW

3/4"

NG, LV, & LA PIPING INCHASE OF LAB TABLE

NG, LV, & LA PIPING INCHASE OF LAB TABLE

NG, LV, & LA PIPING INCHASE OF LAB TABLE

LV1 1/4"

1/2"

N62

N63

NG

HW(HT)

TSW

LAN

HW(HT)

1 1/2"

AX02

BX02

1 1/2"

1"

3/4"

3/4"

1 1/2"

SCW

1/2"1/2"

1/2"

1/2"

PW LA

N, LA, SCW, & AW/AVDOWN FOR LAB HOOD

PW

PWHW(HT)

LV

CO2

LV

LV

LV

3/4"

3/4"3/4"

1"

1"

1"

AV

1/2" 3/4"

1-1/2" PW DOWN TO TYPE 3 OUTLET AT LAB SINK& 1-1/2" PW BACK UP; 1/2" HW, 1/2" SCW & 1-1/2"AV/AW DOWN TO SERVE LAB SINK; & 3/4" TSWDOWN TO EYEWASH AT LAB SINK.

1 1/

2"

N161 1/

2" A

V

N45

N16

N46

N19

N44

NG N

TSW

SCWLV

LV

HW(HT)

TSW

3/4" TSW

3/4"

HW

(HT)

MOLECULARBIO.

STUDENTAREA248B

LV

CO2

PW1 1/2"

PW

TSW

SCW

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

P2.21

ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 1

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1

PLUMBING SHEET PLAN NOTESN46 ACID VENT UP FROM FIRST FLOOR.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN

THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N48 P.W. DOWN TO SERVE GLASS WASHER & TYPE 3 OUTLET AT LAB SINK.N54 S.C.W., & H.W. DOWN TO SERVE BOTH AUTOCLAVES WITH 1/2" RUNOUTS WITH ISOLATION VALVES. INSTALL

DRAIN LINES FROM BOTH AUTOCLAVES TO FLOOR SINK. PROVIDE UNISTRUT BRACING TO SUPPORT VERTICALPIPING.

N58 ACID WASTE OR SANITARY SEWER UP TO FLOOR CLEANOUT ABOVE.N59 ACID WASTE UP TO FLOOR SINK ABOVE.N60 SANITARY SEWER UP TO FLOOR DRAIN ABOVE.N62 L.A., N.G., & L.V. PIPING DOWN WITHIN LAB BENCH UMBILICAL SERVICE CHASE FROM ABOVE-CEILING TO

BELOW-COUNTER & ROUTE PIPING TO LAB GAS NEEDLE VALVES (BY OTHERS) WITHIN THE CHASE OF THE LABTABLE.

N63 1/2” L.A., 3/4" N.G., & 1” L.V. PIPING ROUGH-INS STUBBED UP FROM PIPING MAINS WITHIN THE CHASE OF THELAB TABLE FOR FINAL CONNECTION TO LAB GAS NEEDLE VALVES (BY OTHERS) AT COUNTER-TOP LEVEL.

N64 1/2" L.A., 1” N.G., & 1” L.V. PIPING WITHIN THE CHASE OF THE LAB TABLE.

PLUMBING SHEET PLAN NOTESN5 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN LAB. REFER TO

DETAIL “D” ON SHEET M4.05.N9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE

SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.

N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.

N17 P.W. DOWN TO SERVE WATER POLISHER “WP” & TYPE 3 OUTLET AT LAB SINK.N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK IN

CABINET SPACE.N31 SANITARY VENT UP THRU ROOF.N44 WATER POLISHER, REFER TO LAB DRAWINGS, EXTEND DRAIN FROM POLISHER TO DRAIN INTO THE ADJACENT

LAB SINK.N45 ACID VENT UP THRU ROOF.

NORTH

KEY PLAN

AREA "1"

(2ND FLR.)

DNDN

PLUMBING GENERAL PLAN NOTES:

1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.

2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.

3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.

4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.

5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.

6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

M M

N N

8

8

10

10

MATH/BIOL.255

PROJECTSCHOLAR

254

TEACHINGLAB CELL

GEN/HIST/EXPERIMENTALBIOCHEMISTRY

250

TEACHINGLAB

CELL/VIROLOGY/DEVELOPMENTBIO253

VEST.251B

TEACHINGLAB PREP

252

REFRIG.ROOM

251

SOUTHSTAIR105-2

VEND 2209

2ND FLOORCORRIDOR

200

OFFICE233

OFFICE231

OFFICE229

S. STUDYSPACE

201

(OPEN TOBELOW)

(OPEN TOBELOW)

H H

J J

K K

L L

9

9

11

11

RD

SRD

RD

SRD SRD

RDSLOPE

SLOPE

G G

1

1

2

2

3

3

4

4

5

5

6

6

7

7

TSW H

W

SCW

TSWHW(HT)

SCW

TSWHW

SCW

HW

(HT)

SCW

TSW

SCW

NG

NG

PWPW

PWPW

PWPW

PW

1 1/2"1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"1 1/2"

N

N

NN

1/2"1/2"

1/2"

CO2

CO

2

CO

2

1/2"

1/2"

1/2"

4"RD @ .5"/FT6"SRD @ .25"/FT

4"RD @ .5"/FT6"SRD @ .5"/FT

4"RD @ .5"/FT6"SRD @ .5"/FT

LA

LA

LA

LA

LA

1/2"

1/2"

1/2"

1/2"

1/2"

LV

LV

LV

LV

LV

1 1/2"

1 1/2"

3/4"

3/4"

3/4"

1 1/2"

3/4"3/4"1"

1 1/4"

3/4"

3/4"3/4"

3/4"

E. OFFICECORR.

204

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

HT-250 (127' - 0")N15

HT-253 (26' - 0")N15

HT-252 (40' - 0")N15

AV

AV

AV

AV

AV

AV

AV

1 1/2"

1 1/2"

1 1/2"1 1/2"

2"

1 1/2"

1 1/2"1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/

2"

1 1/2"

OFFICE276

HW(HT)

SCWPW

PW

LV

N9

1/2"1/2"

1 1/2"

TSW

TSW

AV2"

ISLAND SINK VENTUP FROM BELOW

ISLAND SINK VENTUP FROM BELOW

N45

2"

N46

1 1/2"

1 1/2"

1 1/4"

1 1/2"

2"

3/4"N16

1 1/2"

1/2"

1"

1 1/4"

N33

N36

1/2"1/2"

N36

N19

1 1/4"1"1"

3/4"3/4"

1" 1/2" N42

LV

NG

NG

N33

N9

1/2"

1/2"

NG PIPING IN CHASEOF LAB TABLE

3/4"

1 1/4"

1 1/4"

SCW

2"

NG

3/4"3/4" 1 1/4"

3/4"N40

N16

N32

1/2"1/2"

N16N16

N48

N37

1/2"

1/2"

1 1/4"

NG NG

LVLV

NG PIPING IN CHASEOF LAB TABLE

1"

1"

1"

1 1/4"1 1/4"

1 1/2"1 1/2"

N33 N33

1/2"

1/2"

2 1/2"

1 1/2"

3"

LV

N16

N32 N9 N41

N47

3/4"

1 1/4"

2"1/2"

1/2"1/2"

NG

N

1/2"

LV

PW LA

NG

CO

2 N

3/4"

N16

N16

N45

NG

CO2N

LVLA

1/2"1/2" 3"

1 1/2" 1/2"

1/2"

N.G. UP FROMBELOW

CO

2

N.G. UP FROMBELOW

1/2"

LASCW

1 1/4"

1"

1 1/2"

LALV

SCW

1/2"

3/4"

1 1/2"1 1/2"

1 1/2"1 1/2"

HW

(HT)

PW

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

P2.22

ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 2

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2

PLUMBING SHEET PLAN NOTESN36 S.C.W. & H.W. UP FROM FIRST FLOOR TO ISLAND LAB TABLE SINK & CONNECT TO SINK FAUCETS WITH

ISOLATION VALVE.N37 THE UTILITIES IN THIS DROP SERVE TWO (2) FUME HOODS.N40 3/4” S.C.W. & 3/4” H.W. DOWN TO SERVE ISLAND BENCH SINKS FROM UNDERFLOOR.N41 1-1/2" P.W. DOWN TO FIRST FLOOR.N42 1-1/2" H.W. DOWN TO FIRST FLOOR.N45 ACID VENT UP THRU ROOF.N46 ACID VENT UP FROM FIRST FLOOR.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN

THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N48 P.W. DOWN TO SERVE GLASS WASHER & TYPE 3 OUTLET AT LAB SINK.

PLUMBING SHEET PLAN NOTESN9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE

SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.

N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.

N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK INCABINET SPACE.

N32 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN ROOM 250 OR253, REFER TO DETAIL “D” ON SHEET M4.05. THE NATURAL GAS (NG) PIPING TO THE ISLAND LAB TABLES ISLOCATED IN THE FIRST FLOOR CEILING SPACE BELOW.

N33 NATURAL GAS UP FROM FIRST FLOOR. ROUTE PIPING IN LAB TABLE CHASE & CONNECT TO THE QUADOUTLETS.

NORTH

KEY PLAN

AREA "2"

(2ND FLR.)

UP DN

FEC

FEC

UP DN

PLUMBING GENERAL PLAN NOTES:

1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.

2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.

3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.

4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.

5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.

6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

12

12

13

13

14

14

16

16

17

17

20

20

CONFERENCE261

NORTHSTAIR104-2

FACULTYKITCHEN

208

STOR.257

TEACHINGLAB &PREP.

BIOMED.ENGINEERING

256

RESEARCHNANO

FABRCTN.260

WOMEN'S206 MEN'S

207

GOWN259

RESEARCHNANO BIO

LAB258

OFFICE219

OFFICE217

OFFICE215

OFFICE211

OFFICE213

OFFICE227

OFFICE224

OFFICE225

OFFICE221

OFFICE220

OFFICE222

OFFICE223

WORKROOM

228 ELEV.

(OPEN TOBELOW)

(OPEN TOBELOW)

P-4

P-4

P-2

P-2

P-3

P-2

P-2

P-1 P-1 P-1

P-3P-7

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

HW

R

HW SC

W

CW

NG

SCWHW(HT)TSW

TSW

SCW

HW

(HT)

HW

R

HW

SCW

SCW

SCW

HW

TSW

TSW

HWR

SCW

HW

TSW

HW

SCW

HW(HT)SCW

TSW

SCW

HW

(HT)

CW

CW

SCW

HW(HT)

PWR

PW

PWR

PW

PW

PW

PWPWR

PWR PW

PWPW

1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"1 1/2"

N

NN

N N

N5

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

CO

2

CO2

CO

2

1/2"

1/2"

1/2"1/2"

1/2"

1/2"1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

LA

LA

LA

LA

REFER TO SHEET P3.01 FOR WATERAND WASTE & VENT PIPING ISOMETRICSFOR THE MEN'S AND WOMEN'S TOILETS.

1"

(OPEN TOBELOW)

2ND FLOORCORRIDOR

200

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

JAN. STOR.274

RD

RD

3" UP TO GUTTEROUTLET ABOVE,RE: ROOF PLAN

AW

4"

3"

4"

HT-256 (50' - 0")

N15

HT-258 (70' - 0")N15

HT-260 (50' - 0")N15

HT-207 (70' - 0") N15

N50N50N50

CF4 O2

2" FD-A

MECH.CHASE

AAA

ELEC./I.T.CHASE

226

W. OFFICECORR.

203

N58

N58

N58

N58

N59

N60

N60 N60

N60

N60N60 P-5

2" FD-A

SV

SVSV

SV

SVSV

2"

2"

2"

3"2"

2"CW

P-1 P-1 P-1

N43

1 1/2"1 1/2"

LV

2"2"2"2" 2"

2"

2"

1/2"

2"2"

2 1/2"

2"

3/4"

1 1/2" 2"1 1/4"1 1/4"

HW

SCW

TSW

HW

R

LA

TSW

TSW

TSW

TSW

SCW

HW

HW

RC

O2N CW NG

FP

CW

HW

SCW

SCWHW

FP

CW

NG

NLA

SCW

NG

NG

LA

LA

N

LASCW

AV

N

4"

4"

4"

3"

4"

3"

4"

3"

3"4"

4"4"4"

3"3"

2"

2" 2"

3"

3"

4" AW & 4" SSDOWN AND 3"AV & 3" SV UP.

1 1/4"

1 1/4"1 1/2"

1/2"

3/4"1 1/4"2"2"

1 1/2"

2"2"

1 1/4"

3/4"

1 1/2"

1/2"

3/4"

1/2"1/2"

1"

1 1/2"

1 1/4"

3/4"

1/2"1/2"

1 1/2"

1 1/4"

1/2"1/2"1 1/2"1 1/2"

N9

N16

N16 N45

2"2"

1 1/2"1/2"1/2"1/2"

3/4"

1 1/2"

1 1/2"

1 1/2"

3/4"

1 1/4"

1/2"

N16

N5

N47

3/4"

3/4"

4"

3"

1"1"1"1"

1 1/4"

1 1/2"

1"

1/2"

3/4"

1/2"

1 1/2" AV

1/2" SCW

N16

N16 N17

1 1/2" AV1/2"1/2"

3/4"

3/4"

N16

1"

1"1"

2"

2"

2"2"

1"

1/2"1/2"

3/4" 1"1"

2 1/2"2 1/2"

N38 N16

N39

N16

N16

3/4"

2"

3/4"3/4"3/4"

3/4"

1/2"

1/2"

1 1/2"1 1/2"

1 1/2"1 1/4"

1"

1"

1"

1" 1 1/4"

C

N16

N57

1/2"1/2" 3/4"1 1/2"1 1/2"

1/2" LA

3/4"

1/2"

3/4"

1/2"1/2"

N47N16

N9

N1 1/2"

1"

1 1/2"

1 1/2"1 1/4"

1/2"

1 1/2"

1 1/2"

HUM-1

2" FD-B

SCW

1 1/2"

1 1/2"1 1/2"

1/2"

1 1/2"

1 1/

4"

2"

1 1/2"

TSW

LA

LA

NG N

CO2

LALA

HW

(HT)

SCWHW(HT)TSW

AV

AV

AVAVAVAV

AV

AV

1 1/2"

3"4"

4" 4"

NG

4"4"

3"

FCU

-104

-2

FP

FP

FP

3/4"

3/4"

1/2"

B02

N16

N19

N16

N52

N52

N52

N16

N16

N53

N53N53N53

N53

CO2

CO2

N49

N49

N44

3/4"

OFFSET SINK AV/AW RISERTO AVOID BEAM BELOW

1/2"1/2"1/2"1/2"

1/2"1/2"

3/4" COND. DOWN IN WALL TO1ST FLR. CEILING SPACE

3/4" COND. DRAIN FROM UNIT

2"

LGR

V

N66

N30

LGR

V

2"

HW(HT)SCW

2" SV

3/4"

1/2"

HW(HT)

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

P2.23

ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 3

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3

PLUMBING SHEET PLAN NOTESN44 WATER POLISHER, REFER TO LAB DRAWINGS, EXTEND DRAIN FROM POLISHER TO DRAIN INTO THE ADJACENT

LAB SINK.N45 ACID VENT UP THRU ROOF.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN

THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N49 CARBON DIOXIDE (CO2) SENSOR, TO BE MONITORED & ALARMED.N50 MANIFOLDS FOR O2, CF4, & N5 – REFER TO SHEET M4.01 FOR MANIFOLD SCHEDULE.N52 PIPING UP TO PENTHOUSE. REFER TO SHEETS M2.30 & M2.31 (ENLARGED).N53 CAPPED FOR EXTENSION TO FUTURE NF5. PRIOR TO INSTALLING THE ROUGH-IN FOR THIS FUTURE UNIT,

OBTAIN A SUBMITTAL DRAWING OF THE UNIT FROM THE OWNER & ROUGH-IN ACCORDINGLY.N57 WALL MOUNTED HUMIDIFIER #1 MOUNTED WITH THE TOP 24” DOWN FROM THE CEILING. PIPE S.C.W. TO UNIT

WITH ISOLATION VALVE & STRAINER CLOSE TO UNIT. PIPE THE TWO (2) DRAINS (1/2” & 3/4") TO THE FLOORDRAIN. UNIT TO BE CONTROLLED FROM HUMIDITY SENSOR IN SOUTHEAST CORNER OF THE SPACE.

N58 ACID WASTE OR SANITARY SEWER UP TO FLOOR CLEANOUT ABOVE.N59 ACID WASTE UP TO FLOOR SINK ABOVE.N60 SANITARY SEWER UP TO FLOOR DRAIN ABOVE.N66 CONNECT RELIEF VALVE DISCHARGE FROM O2, CF4, & N5 CYLINDER MANIFOLDS TO RELIEF VENT PIPE &

ROUTE UP THRU THE ROOF.

PLUMBING SHEET PLAN NOTESN5 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN LAB. REFER TO

DETAIL “D” ON SHEET M4.05.N9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE

SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.

N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.

N17 P.W. DOWN TO SERVE WATER POLISHER “WP” & TYPE 3 OUTLET AT LAB SINK.N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK IN

CABINET SPACE.N30 2” LAB GAS RELIEF VENT UP THRU ROOF & TURNED DOWN WITH INSECT COVER. CONNECT THE DISCHARGE

OF THE CYLINDER MANIFOLD RELIEF VALVES TO THIS VENT THRU ROOF.N38 2-1/2" C.W. DOWN TO FIRST FLOOR WATER CLOSETS & URINALS.N39 1-1/4" H.W. & 1” S.C.W. DOWN TO SERVE FIRST FLOOR LAVATORIES.N43 3” SANITARY VENT UP FROM FIRST FLOOR & 3” SANITARY VENT UP THRU ROOF.

NORTH

KEY PLAN

AREA "3"

(2ND FLR.)

PS PS PS

PLUMBING GENERAL PLAN NOTES:

1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.

2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.

3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.

4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.

5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.

6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

M M

N N

12

12

13

13

14

14

16

16

17

17

20

20

DEBRIEFINGROOM

262

ADULT 1272

CNTRL. 2271

ADULT 2270

ISO.273

MATERNITY267

PEDIATRIC269CNTRL. 1

268

ELEC.263

WARD LAB265

STOR.264

NURSINGCORRIDOR

266

OFFICE234

OFFICE232

OFFICE230

OFFICE240

OFFICE239

OFFICE237

OFFICE238

OFFICE235

NURSINGSUITE

MANAGER236

STUDENTINTERACTIVE

SPACE205

N. STUDYSPACE

202

(OPEN TOBELOW)

(OPEN TOBELOW)

H H

J J

K K

L L

15

15

18

18

19

19

RD

SRD

RD

SRD

RD

SRD

13.5

13.5

P-9

G G

HWRHW

SCW

HWRHW

SCW

CW NG

FP

NGNG

N

1/2"

1/2"CO2

3/4"

1/2"1/2"

1/2"

4"RD @ .25"/FT6"SRD @ .25"/FT

4"RD @ .5"/FT6"SRD @ .5"/FT

5"[email protected]"/FT

4"[email protected]"/FT

A

A

A

A

A

A

1/2"

1/2"

1/2"

1/2"

V

V

V

V

V V

AA

V

V

1 1/4"1 1/4"

1 1/4"

1"

1/2"

3/4"

1"

3/4"3/4"

1/2" 1/2"

1 1/4" 1" 3/4"1/2"

1 1/4"

1" 1" 3/4"

(OPEN TOBELOW)

2ND FLOORCORRIDOR

200

E. OFFICECORR.

204

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

OFFICE275

N30

N31N56

4"SV UP FROM BELOW

4"4"

SV

SCW

HW

HW

RC

O2N CW NG

RD

SRD

RDSRD

ROOF DRAIN & SECONDARYDOWN IN FURRING SPACE,AVOID BEAM BELOW

1/2"1/2"

3/4" 1"1"

1/2"1/2" 3"

1 1/2" 1/2"

O

O

N34

1 1/2" N55

OO

O

O

O

1/2"

1/2"

1/2"1/2"

O

SCW

HWSC

W

N35

1"

1/2"

3/4"

1"

1/2"1/2"

3/4"

1/2"

1/2"

3"

4"1 1/2"

1/2"1/2"

1 1/2" SV

4" 4"

N

LVLA

CO

2

3"3"

NG

CO2N

LVLA O

A

V

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"1/2"

6"

4"

5" 8"

1/2"1/2"

1/2"

3/4"1/2"1/2"

3/4" 1/2"1/2"

3/4" 1/2"1/2"

V

O

OA

1/2"

1 1/2"

1" 1"

3/4"

1/2"1/2"

SV

SS 1 1/2"

2"

4"

SCW

HW

HW

RC

O2N

3/4"

1"1"

1/2"1/2"

V

A O

1/2"1/2"

1 1/2"

SV

1"

3/4"

1 1/2"

BM4.05

6"[email protected]"/FT

8"[email protected]"/FT

5"RD & 8"SRD DOWNINTO SHELTER CEILINGSPACE BELOW

4"RD & 6"SRC DOWN TO1ST FLR. CEILING SPACE

N51

PANEL, RE: ELEC.

N65N65N65

N65

N65N65

N65 N65 N65 N65

N65 N65 N65N65

1"

VA

1"

NCO2

CW NG

NG

1/2"3/4"N

CO2

4"NG UP FROM BELOW

4"CW UP FROM BELOW

FP MAIN UP FROM BELOW

1/2"N UP FROM BELOW3/4"CO2 UP FROM BELOW

2"SS DOWNINTO SOFFITSPACE BELOW

HW

N56

MGAAP-1

3/4"

NORMALLY CLOSED BYPASSVALVE BETWEEN HW & HWR

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

P2.24

ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 4

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4

PLUMBING SHEET PLAN NOTESN30 2” LAB GAS RELIEF VENT UP THRU ROOF & TURNED DOWN WITH INSECT COVER. CONNECT THE DISCHARGE

OF THE CYLINDER MANIFOLD RELIEF VALVES TO THIS VENT THRU ROOF.N31 SANITARY VENT UP THRU ROOF.N34 MEDICAL GAS VALVE BOX.N35 MEDICAL GAS AREA ALARM PANEL.N51 MEDICAL GAS PRESSURE SENSOR IN EACH OF THE THREE SERVICE LINES (V, O, & A). PROVIDE LOW-VOLTAGE

CONTROL WIRING FROM SENSORS BACK TO THE MEDICAL GAS AREA ALARM PANEL AS PER SPECIFICATIONSECTION 22 62 13.

N55 LAB AIR PRESSURE REDUCING VALVE (6 C.F.H. – 100 PSI TO 55 PSI). PROVIDE AN ISOLATION VALVE UPSTREAMOF P.R.V. & A RELIEF VALVE DOWNSTREAM.

N56 OFFSET SINK WASTE LINE ABOVE FLOOR TO CLEAR COLUMN & TURN DOWN TO CLEAR LECTUREHALL/SHELTER BELOW.

N65 1/2" O., 1/2" A., & 3/4" V. DOWN AT MEDICAL HEADWALL (BY OTHERS).

NORTH

KEY PLAN

AREA "4"

(2ND FLR.)

Sheet:

Job No.

Date Issued:

Revisions:

11-28-16

1543

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Ave

nue

City

,041

73O

K+

1179

8 N

orth

Lak

erid

ge P

kwy.

Ash

land

, VA

230

05Te

l. 80

4.22

8.74

73w

ww

.mw

larc

hite

cts.

com

McCl

aren

, Wils

on &

Lawr

ie, In

c.

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

100 N

ORT

H U

NIV

ERSI

TY D

RIV

E E

DM

ON

D, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

P3.01

PLUMBING ISOMETRICS

1 ADD. #2 11-28-16

Sheet:

Job No.

Date Issued:

Revisions:

11-28-16

1543

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Ave

nue

City

,041

73O

K+

1179

8 N

orth

Lak

erid

ge P

kwy.

Ash

land

, VA

230

05Te

l. 80

4.22

8.74

73w

ww

.mw

larc

hite

cts.

com

McCl

aren

, Wils

on &

Lawr

ie, In

c.

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

100 N

ORT

H U

NIV

ERSI

TY D

RIV

E E

DM

ON

D, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

P3.02

PLUMBING SCHEMATICS& DETAILS

1 ADD. #2 11-28-16