1
CUTLINE CUTLINE CONTINUED ON SHEET 01 CUTLINE CUTLINE CONTINUED ON SHEET 03 EM2 Height 2.5m EM3 Height 2.5m EM4 Height 2.5m 56800 56900 57000 57100 57200 57300 57400 57500 57600 57700 57800 57900 58000 58100 58200 58300 58400 58500 58600 58700 58800 58900 59000 59100 59200 59300 59400 59500 59600 59700 59800 59900 60000 60100 60200 60300 60400 60500 60600 60700 60800 EM2 EM3 EM4 M4 JUNCTIONS 3 TO 12 SMART MOTORWAY ENHANCED NOISE MITIGATION DETAILS SHEET 2 OF 15 Drawing Title Job Title 0 250 500 125 Metres KEY PLAN SCALE 1:10,000 DRAWING 2 Drawing Number Alliance Document Reference 1:10,000 Rev Scale at A3 Appr'd Review Check Drawn Revision Details Revision Date Rev # This map is reproduced from Ordnance Survey material with permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright. Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Highways Agency 100030649 2014 All lanes will be provided with low noise surface along the complete length of the Scheme for opening. NOTES No dimensions are to be scaled from this drawing J12 J11 J8/9 J7 J6 J5 J4b J4 J3 J10 READING WOKINGHAM BRACKNELL MAIDENHEAD SLOUGH WINDSOR The Cube 199 Wharfside Street Birmingham B1 1RN SW AM AH BB First Draft 9/12/15 0D SW AM AH BB Issued for Review 22/12/15 1R SW AM AH BB Submitted 23/12/15 2F 3F Highways England 514451-MUH-00-ZZ-RP-EN-400158 SW AM AH BB Revision 15/2/2016 3F

EM2 - infrastructure.planninginspectorate.gov.uk... · EM2 EM3 EM4 M4 JUNCTIONS 3 TO 12 SMART MOTORWAY ENHANCED NOISE MITIGATION DETAILS SHEET 2 OF 15 Drawin g Title Job Title 0 125

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EM2 - infrastructure.planninginspectorate.gov.uk... · EM2 EM3 EM4 M4 JUNCTIONS 3 TO 12 SMART MOTORWAY ENHANCED NOISE MITIGATION DETAILS SHEET 2 OF 15 Drawin g Title Job Title 0 125

CUTL

INE

CUTL

INE

CONT

INUED

ON S

HEET

01

CUTLINE

CUTLINE

CONTINUED ON SHEET 03

EM2Height 2.5m

EM3Height 2.5m

EM4Height 2.5m

EM1Height 2.5m 5680

0

5690

0

5700

0

5710

0

5720

0

5730

0

5740

0

5750

0

5760

0

5770

0

5780

0

5790

0

5800

0

5810

0

5820

0

5830

0

5840

0

5850

0

5860

0

5870

0

5880

0

5890

0

5900

0

5910

0

5920

0

5930

0

5940

0

5950

0

5960

0

5970

0

5980

0

5990

0

6000

0

6010

06020

06030

06040

06050

06060

06070

06080

0

EM2

EM3

EM4

M4 JUNCTIONS 3 TO 12SMART MOTORWAY

ENHANCEDNOISE MITIGATION DETAILS

SHEET 2 OF 15

Drawing Title

Job Title

0 250 500125Metres

KEY PLAN

SCALE 1:10,000

DRAWING 2Drawing Number

Alliance Document Reference1:10,000

Rev Scale at A3

Appr'dReviewCheckDrawnRevision DetailsRevision DateRev #

This map is reproduced from Ordnance Survey material with permission ofOrdnance Survey on behalf of the Controller of Her Majesty's Stationery Office© Crown Copyright.Unauthorized reproduction infringes Crown Copyright and may lead toprosecution or civil proceedings. Highways Agency 100030649 2014

All lanes will be provided with low noise surface along the completelength of the Scheme for opening.

NOTESNo dimensions are to be scaled from this drawing

J12

J11

J8/9J7

J6J5 J4b J4 J3

J10

READING

WOKINGHAM

BRACKNELL

MAIDENHEAD SLOUGH

WINDSOR

The Cube199 Wharfside StreetBirminghamB1 1RN

SWAMAHBBFirst Draft9/12/150DSWAMAHBBIssued for Review22/12/151RSWAMAHBBSubmitted23/12/152F

3F

Highways England

514451-MUH-00-ZZ-RP-EN-400158

SWAMAHBBRevision15/2/20163F