38
ENERGIZING A SUSTAINABLE FUTURE. Company presentation 2015 - An introduction to mp-tec.

ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

  • Upload
    lytram

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

ENERGIZING

A SUSTAINABLE FUTURE.

Company presentation 2015 - An introduction to mp-tec.

Page 2: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Headquarter: Eberswalde, Germany CEO: Michael Preißel Founded: 2002

Business divisions

Products: solar modules, inverters, mounting system QUICK.LINE, ground mounting systems SINGLE.SYST, DOUBLE.SYST und TRACK.SYST, solar pump system, solar carports, off-grid systems

Solutions: solar irrigation complete System SOLAR.SEED, commercial and industrial energy solutions

Services: EPCM Services, project management, optimized engineering and site management for large-scale photovoltaic projects

COMPANY OVERVIEW

Page 3: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

• mp-tec is an international and successful system integrator for sustainable energy with the

focus on solar energy.

• mp-tec delivers worldwide articles in the fields of photovoltaics, mounting systems and LED-

Technology.

• As a system integrator mp-tec offers integrated photovoltaic packages, from engineering to

installation for commercial, industrial and public sector.

• One of our core competence is the mp-tec own modular mounting system QUICK.LINE, which

is suitable for almost all applications for installation of solar modules.

• mp-tec is the professional partner for photovoltaic installers, architects, builders, developers,

investors and EPCs.

• mp-tec assumes also project management services responsibility of photovoltaic projects as

EPCM with a specially developed concept.

EXECUTIVE SUMMARY

Page 4: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Rainer Sperling

Chief Finance Officer

Michael Preißel

Founder and

Chief Executive Officer

Martin Müller

Chief Sales Officer

Dr. Peer Piske

Chief Legal Officer

In 2002, Michael Preißel had a vision – 100 percent

renewable energy. This vision has been inspiring

and driving us for more than 12 years and enables

our customers to make positive progress and

change on a journey full of possibilities, with one

major goal: where consumption is the same as

renewal.

EXECUTIVE MANAGEMENT

Page 5: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

• Wide range of fully-developed services

• Individual consulting by experienced employees with professional know-how

• Ideal coordinated components in order to gain maximum yields

• Authorised specialist retailer of various premium brands

STRONG BRANDS

Page 6: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

QUICK.LINE - The ingenious modular system for all types of assembly and every conceivable application

• Useable for pitched-roof, flat-roof, facade or ground-mounting

• Perfectly coordinated modular system

• Universally useable components

• Permanently weather-resistant; made of the ideal materials of aluminium and stainless steel

The required statics of the quick.line profiles can be undertaken by mp-tec or external companies.

Base profiles

Accessories

Substructure

Ground mounting

systems

Module fixings

Flat roof systems

SOLID BASE BY SYSTEM – MODULAR SYSTEM QUICK.LINE

Page 7: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

The SINGLE.SYST one-pile system was developed

by the mp-tec engineers and is characterized by

flexibility and enabling extremely efficient assembly.

MOUNTING SYSTEM SINGLE.SYST …

Page 8: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

The DOUBLE.SYST two-pile system enables

maximum performance in a small space. Even with

two support posts, DOUBLE.SYST is mounted quickly.

Lateral or diagonal struts can be omitted by

integrating the posts into the ground. The high support

widths are what distinguishes DOUBLE.SYST. The

angle is defined by the different positions of the posts,

but can be changed by using different pile depths.

… AND DOUBLE.SYST

Page 9: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

• Extremely fast installation due to a high level of

pre-assembly and reduced use of tools

• Excellent adaptability through freely adjustable

table lengths

• Flexible base on piling or concrete foundations

• Long service life of the system

• System based on steel/aluminum or steel/steel

• Galvanic separation with aluminum profiles

• Adjustable module tilt angle of 10° to 30° according to customer requirements

• Complete module compatibility through the use

of framed or frameless modules

• Maximum reliability through project-based

statics

BENEFITS OF SINGLE.SYST AND DOUBLE.SYST AT A GLANCE

Page 10: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Our TRACK.SYST single-axis tracking system

enables the optimal utilization of all incident

radiation energy and is suitable for all commonly

used solar modules. It can achieve yield increases

of up to 30 percent. East/west oriented uni-axial

tracking systems are a great way to maximize

profitability and efficiency as a result of the system’s ability to use more of its own energy in open areas.

Benefits at a glance

• Uni-axial horizontal tracker

• Tilt angle (dynamic): +/- 45° • Excellent adaptability through specific module

table lengths

• Material: galvanized steel and aluminum

• Adaptation to virtually any type of terrain

• Cost-effective and quick to install through pile

foundations

• Backtracking to avoid shadowing

• Scalable, flexible system design

• Enormous yield advantages of up to 30 percent

• Maximum reliability through project-based statics

TRACKING SYSTEM TRACK.SYST

Page 11: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

• More roofs suitable for photovoltaic installation

• No leaks in the roof caused by the installation

• No chips on the roof

• Variety of mounting options with modular design

• Freely selectable shading distance between rows

• Structural analysis of the assembly on the customer’s roof included as standard

Fast mounting

Prefabrication and few parts

save time and costs

Audited Safety

Audited by VDE

Aerodynamically optimized

Wind channel tested

Kind to the roof

Without penetration of the roof

UNIVERSAL FLAT-ROOF SYSTEM SNOW.FLAKE

Page 12: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

mp-tec SOLAR.KITS – The complete solution for more self-consumption

With the mp-tec SOLAR.KITS you will get all ready

assembled components of a sloping roof system:

mp-tec S.LINE quality modules "Made in

Germany", QUICK.LINE mounting system, cables

and accessories, as well as an inverter from the

world leader SMA or Fronius, with optional energy

solution.

INDIVIDUAL, CUSTOMISED SOLAR.KITS

Page 13: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

An intelligent solar pump inverter features class-

leading characteristics: the high performance

frequency inverter optimizes the photovoltaic

installation`s energy production and guarantees

efficient control of the water pump. It controls the

pump according to the amount of sunlight

available. Existing irrigation systems which use

diesel generators can be easily improved with

solar.seed to reduce operating costs.

SOLAR IRRIGATION COMPLETE SYSTEM SOLAR.SEED

Page 14: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Client Application: Agriculture investment company

Location: Wadi El Natrun, Egypt

Power: 150 KW

Application: Irrigation (submersible water pump 150 Hp)

MILESTONE PROJECT IN EGYPT

Page 15: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

mp-tec plans for all possibilities of ground-

mounted, roof-top and facade systems with

innovative technology on the basis of optimized

calculations and create the entire technical design

for alle system components.

mp-tec supports its customers at all stages from

technical design to construction of the system.

Expertise combined with know-how and flexibility

ensure that efficient and optically appealing

solutions are possible even under difficult

conditions.

An extensive concept from one source

• Competence and responsibility at all stages

of the supply chain

• Optimized interface management for smooth

transition for every step

• Guarantee of the single assembly sections and

products

SOLAR POWER PROJECTS

Page 16: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

We provide services within the following areas:

EPCM – We provide EPCM services for power plant

owners, investors and EPC suppliers. A full-scope

EPCM project includes multi-discipline services

ranging from feasibility studies, total project

management to commissioning on site. In short, as

the EPCM contractor, we manage the project as the

main representative.

Engineering – We offer tailored Engineering

Management Services for all or specific parts of the

engineering disciplines.

Project & Site Management – We are able to

manage the full project responsibility of Project and

Site Management Services according to the

customer’s requirements. We can also execute specific tasks and offer technical services. We offer

experienced personnel with international

experience. Our staff has diverse technical and

management skills. We can provide Site Engineers

and Site Agents, Project Managers and

Coordinators and Quality Control Managers.

OUR PROJECT SERVICES

Page 17: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

mp-tec takes responsibility for:

Engineering and Engineering Management

within all disciplines required in the project

including:

• Engineering and Design

• Expert consultation and the procurement of the

services

• Engineering scheduling and progress follow-up

Procurement, and Procurement Management of

services and equipment according to the agreed

procurement strategy. Our services also include:

• Advise in optimizing the procurement

• Procurement scheduling and progress follow-up

• Services throughout the project

Construction Management and acts as the

Owners representative on the Construction site

performing:

• Site supervision, Safety and Management of the

activities

• Coordination between Engineering and

Construction

• Construction scheduling and progress follow-up

• Commissioning support

EPCM contracts are commonly used when the customer is constructing large-scale solar power plants.

EPCM services include total project management of the project: Engineering Management, Procurement

Management and Construction Management.

EPCM SERVICE - ENCO.SYST

Page 18: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

ENCO.SYST – EPCM SERCIVES FOR PHOTOVOLTAIC PROJECTS

ENCO.SYST is an intelligent management service that

effectively combines our know how in the analysis, planning

and implementation of solar power plants and our expertise

in the field of mounting systems.

In the illustration we present an overview of EPCM

management and the different phases from the owner`s

point of view.

Page 19: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

ENCO.SYST ist the easier, faster and more profitable way to project success.

Our primary goal is to find the most economical solution for our clients.

If required, we also integrate professional EPC partner of leading international service

providers.

Your project. Our know how.

• Risk minimization through early detailed cost planning, taking into account all

relevant factors using optimization and planning software

• Faster construction time using the proven mp-tec mounting system

• Faster project completion and profit

BENEFITS OF ENCO.SYST EPCM SERVICES

Page 20: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Worldwide mp-tec designs and builds solar power plants on industrial roofs

and agricultural buildings as roof or facade system.

200 KWp, Backnang, DE, 2007

750 KWp, Carport, Veilsdorf, DE, 2011

787 kWp, snowflake, Großwallstadt, DE, 2011

1.4 MWp, indoor ski slope Bottrop, DE, 2011

2.9 MWp, indoor ski slope Wittenburg, DE, 2012

6.4 MWp, roof top system quick.line and flat-roof system snow.flake, DE, 2014

REFERENCES – ROOF TOP SYSTEMS (EXCERPT)

Page 21: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

9 MWp, Vockerode, Germany, 2011

5 MWp, Grange Farm, England, 2011/2012

5 MWp, Eberswalde, Germany, 2011

4 MWp, Lüptitz II, Germany, 2010

1 MWp, Macedonia, 2012

8.64 kWp, Warsaw, Poland, 2012 (ground mounting und tracking system)

Our project business comprises the planning and

implementation of solar parks and extensive

management services. Optionally we support

you across all project phases, in fact from

engineering to implementation of the plant,

or even in certain aspects.

REFERENCES – GROUND MOUNTED SYSTEMS (EXCERPT)

Page 22: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

© ib vogt GmbH © ib vogt GmbH © ib vogt GmbH

Other Projects

2013

• 1.9 MWp, DE

• 4.6 MWp, DE

• 6.2 MWp, UK

• 9.8 MWp, UK

• 6.7 MWp, UK

• 8.0 MWp, UK 6.17 MWp, Lagunnett, UK, 2014

6.72 MWp, Pyworthy, UK, 2014

195 KWp, Self-consumption system, Altfriedland, DE, 2014

7.54 MWp, West Farm, UK, 2014

1.0 MWp, Antofagasta, CL, 2014

Other Projects

2014

• 37.0 MWp, UK

• 11.3 MWp, UK

• 17.0 MWp, UK

• 3.0 MWp, DE

• 18.7 MWp, UK

• 11.4 MWp, UK

• 11.8 MWp, UK

• 9.5 MWp, UK

• 5.1 MWp, DK

• 441 kWp, DK

990 kWp, Rzeczyca Księża, PL, 2015

REFERENCES – GROUND MOUNTED SYSTEMS (EXCERPT)

Page 23: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

49.8 KWp, Eberswalde, Germany, 2006 6.24 kWp, Horuphav, Denmark, 2011

7.28 KWp, Herning, Denmark, 2012

7.8 kWp, Oranienburg, Germany, 2010

In the field of small installations, we have access on many years of experience.

REFERENCES – SMALL-SCALE SYSTEMS (EXCERPT)

Page 24: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

• Despite an increasingly

international focus, as an owner-

operated company we feel

ourselves strongly rooted in the

Berlin-Brandenburg region

• Dealing responsibly with the

market, the environment, our

employees, and society is one of

our major objectives.

• Since 2004, mp-tec has been

committed to children and young

people with the “mp-tec for kids” project, introducing them to solar

energy as a technology of the

future.

• Since the start of 2015, mp-tec is

partner of “Stiftung Waltwelten

e.V.”

COPORATE RESPONSIBILITY

Page 25: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

A selection of institutions and projects

mp-tec supported in the last 3 years:

• mp-tec organized several public and admission-free film screenings for the documentary film “Leben mit der Energiewende” about the energy revolution in Germany

• Patronage for a class within the scope of the nationwide competition “Energiesparmeister” in order to show pupils how to save energy

• Sponsorship of the regional football youth team FV Preussen

• Sponsorship of the major regional event series „Guten Morgen Eberswalde“

• Supporting the development and implementation of the “Solar Explorer project” – a solar driven research vessel for kids and young researchers

• Annual employees cycle team for the benefit of the local zoo since 2008

• Cooperation and supporting the local sheltered workshop “Lebenshilfe Eberswalde”

COPORATE RESPONSIBILITY

Page 26: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

2007

Brandenburg´s former

economic minister Ulrich

Junghanns visited mp-

tec

2008

Germany´s former federal

minister of finance Peer

Steinbrück visited mp-tec

2009

CEO Michael Preißel with

the so called solar pope

Hermann Scheer (died in

2010)

2010

Ralf Christoffers,

Brandenburg´s former

economic minister at mp-tec

MP-TEC IN THE PUBLIC

Page 27: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

2012

mp-tec celebrates its 10

years anniversary during

the event „long night of

the economy“

2011

Brandenburg´s former

environmental minister Anita

Tack awarded mp-tec

2011

South African

ambassador Dr.

Makhenkesi Arnold

Stofile (right) visited mp-

tec

2011

Jambalsuren Gankhuyag

(mayor of the Khan-Uul-

District of Ulan Bator)

(right) visits mp-tec

MP-TEC IN THE PUBLIC

Page 28: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

2014

mp-tec and German Energy

Agency (dena) during the

opening of the solar

educational path at the

Accra Polytechnic

2013

US Counselor John

Rodgers visits mp-tec

2012

Attache Armand Mahinay

(left) of the Philippine

embassy visits mp-tec

MP-TEC IN THE PUBLIC

Page 29: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Contact Details

General enquiriers:

+49 3334 59 44 0

[email protected]

Sales:

+49 3334 5944 50 00

[email protected]

Careers:

+49 3334 59 44 23

[email protected]

Adress:

mp-tec GmbH & Co. KG

Wilhelm-Conrad-Röntgen-Str. 10-12

16225 Eberswalde, Germany

www.mp-tec.com

Page 30: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

solar.seedsolar irrigation complete system

off-grid solar power solution

Page 31: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

We make sure water gets to where it’s needed.

The growing trend towards “desert agriculture”,

required by an increased poor quality of water

and the ongoing development of fertile land,

demands stable and sustainable water supply

systems. Renewable energy sources and inno-

vative energy converters face an increasing

demand in these ields; of-grid photovoltaic

installations can be used to establish a water

supply system, afordable, autonomous, free

of batteries and without miles of power lines.

The intelligent irrigation system with more

than 10 kW power input ofered by mp-tec,

KSB and HARTMANN as cooperation partners

thus helps to stabilize a reliable water supply.

As constructing a solar irrigation system,

tailored to speciic needs demands a high

level of technical expertise, experience and

interdisciplinary skills, mp-tec works closely

with prestigious partners. Such as KSB AG as a

leading international manufacturer of pumps

and valves and HARTMANN Elektrotechnik, a

well-known supplier of electrical engineering

services and electrical equipments. They are of

central importance and particularly responsible

for the construction of the switch cabinets and

project coordination.

The intelligent solar pump inverter features

class-leading characteristics: the high perfor-

mance frequency inverter optimizes the pho-

tovoltaic installation`s energy production and

guarantees eicient control of the water pump.

It controls the pump according to the available

amount of sunlight. Existing irrigation systems

which use diesel generators can be improved

with solar.seed to reduce operating costs.

3

Page 32: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

SOLAR IRRIGATION SYSTEM

4 solar.seed

We make sure water gets to where it’s needed.

5

solar modules

e.g. mp-tec s-line and the mp-tec quick-line

assembly system, incl. installation

pump management and

solar pump inverter

from hartmann

elektrotechnik

water pump

from ksb

direct irrigation

or water tank

SYST

EMEN

GIN

EER

ING

fr

om h

artm

ann

ele

ktro

tech

nik

Page 33: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

NOTES GET IN TOUCH

We ofer expert advice from the expertise for

the right system of your power requirements.

Detailed information on the innovative

beneits ofered:

for photovoltaics

www.mp-tec.de

for pumps and valves

www.ksb.com

for electrical solutions

www.hartmannhamburg.de

6 notes

Page 34: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Publisher:

mp-tec GmbH & Co. KG

Copyright by mp-tec © 2015

1st edition 05/2015

HARTMANN Elektrotechnik GmbH

König-Georg-Stieg 8-10

21107 Hamburg, Germany

Tel: +49 (0) 40 752 466 - 0

Fax: +49 (0) 40 752 18 - 81

[email protected]

www.solar-seed.com

Page 35: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Product Overview

Solar subsurface pump systemsolarpump

Solar subsurface pump systemsolarpump 400, 800, 1200 and 1600

Solar Energy

Solar Heat

Mounting System

english

Page 36: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Hotline +49 (0) 33 34.59 44 40 Subject to change without notice. Images and descriptions do not claim to be exhaustive.

PV MODULE – monocrystalline (example)

Rated power Pmax 195 Wp

Rated voltage Umpp 36,4 V

Rated current Impp 5,36 A

Open-circuit voltage Uoc 45,2 V

Short-circuit current Isc 5,71 A

PUMP – Grundfos SQF series

Power consumption max. 1400 W

Power I max. 8,4 A

Voltage U min. – U max. 30 – 300 V / DC

SOLAR SUBSURFACE PUMP SYSTEM

The solar subsurface pump system is used to deliver ground water independently and off-grid. With its modular construction,

the individual components can be adapted to meet all requirements and application areas.

Properties

• Module surface area: 2,5 – 10,5 m²

• High stability (calculated according to DIN 1055/ EC 1)

• Selectable tilt angle

• Weight optimisation and prevention of rust formation through use of aluminium

• Flexible module mount installation on roof / water storage / foundation

• Easy installation and maintenance of pump

• Installation on concrete foundations

• Optional: water storage system

Structure

The system comprises the following components:

a

b

c

d

Module mount with modules: adjustable construction for

different number of modules and angle

Pump

polyethylene pipe DN 25, 32, 40

submarine cable, stainless steel support cable (cut to length),

sleeve set

Disconnector unit (mp-tec) incl. fuse

Optional: at extra charge, delivery with Grundfos CU200

e

a

b

c

d e

Page 37: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Product OverviewSubject to change without notice. Images and descriptions do not claim to be exhaustive.

The system comprises four performance classes. * PV module under 800 W/m²

Example 1

least 3,000 litres per hour and a total head of 15

metres.

>>

for the value “15

3,000 litres

800, and

in this case, with 4,700 litres per hour, exceeded.

The two search values of 3,000 litres per hour

and a total head of 15 metres are met by the

5 7.

How it works:

the tables, round it up to the next

higher available value.

the table by interpolation or

extrapolation is not permitted.

the same pump, this does not

planned.

Example 2You desire a pump system with a pumping capacity of at least

2,000 litres per hour and a total head of 70 metres.

>> The total head “70 m” is not listed in any of the tables. There

fore always round up to the next higher available total head, in

this case “75

the value “75

solarpump 400 equates to 600 litres per hour, solarpump 800

1,300 litres per hour.

The two search values of 2,000 litres per hour and a total head

of 70 1200 2.5 2

(2,300 liter/h)

1 400

• MPP output: 390 Wp

• 2 modules

• 1 string

2 800

• MPP output: 780 Wp

• 4 modules

• 1 string

3 1200

• MPP output: 1,170 Wp

• 6 modules

• 1 string

4 1600

• MPP output: 1,560 Wp

• 8 modules

• 1 string

Total head Flow rate* Pump type

15 m 2,100 litres/h 2.5 2

30 m 1,500 litres/h 2.5 2

50 m 900 litres/h 1.2 2

75 m 600 litres/h 1.2 3

Total head Flow rate* Pump type

15 m 4,700 litres/h 5 7

30 m 2,800 litres/h 2.5 2

50 m 2,200 litres/h 2.5 2

75 m 1,300 litres/h 1.2 2

100 m 1.200 litres/h 1.2 3

Total head Flow rate* Pump type

15 m 8,000 litres/h 8 5

30 m 2,800 litres/h 2.5 2

50 m 2,700 litres/h 2.5 2

75 m 2,300 litres/h 2.5 2

100 m 1,300 litres/h 1.2 3

Total head Flow rate* Pump type

15 m 9,900 litres/h 8 5

30 m 5,200 litres/h 5 7

50 m 2,800 litres/h 2.5 2

75 m 2,700 litres/h 2.5 2

100 m 1,300 litres/h 1.2 3

Page 38: ENERGIZING - chile.ahk.de · 200 KWp, Backnang, DE, 2007 750 KWp, Carport, Veilsdorf, DE, 2011 787 kWp, snowflake, Großwallstadt, DE, 2011 ... sheltered workshop “Lebenshilfe

Hotline +49 (0) 33 34.59 44 40 Subject to change without notice. Images and descriptions do not claim to be exhaustive.

product guarantee

15yearsup to

*easy handleto maintenance-freevirtually

* Guarantee: up to a 15-years on the mounting system

and 3-years on the pump

Dimensions

400

1.700

2.000

2.000

2.000

2.000

5.010 3.360

3.360

800

1200 1600