19th National Award for Excellence in

Energy Management-2018

Fortis Hospital Vasant Kunj

Page 2: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

FHVK- BRIEF INTRODUCTION Fortis Hospital FHVK was established

in 2006, and has built up recognition as foremost super specialty Hospital

FHVK is a 150 bedded, NABH, NABL,GREEN OT certified Super specialty tertiary care hospital,

Fortis is accredited with NABH, has platinum grade Green OT certification and awarded best nursing excellence award

Services Location

• OPD Block (Basement)/ Ground floor

• IPD Block (1st & 2nd Floor

• OT & ICU (3rd Floor)

• Pathology (4th & 5th Floor)

Page 3: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Energy Management Structure

National Head EnergyMr. Ravi Adlakha

Head Engg. Unit Vasant Kunj

Mr. Subhash Jha

Head Engg.Unit Mohali

Mr. Neeraj Tandon

Head Engg. Other Units

Various Units Teams

Page 4: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

2014-15 2015-16 2016-17 2017-18

4348178 4068661 3777413.5 3640770.8

Power consumption trend 2014-18

Page 5: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Energy Usage

EquipmentAve.

Consumption

HVAC (heating, ventilation, & air conditioning)

55-65%

Lighting 7-10%

Medical Equipment 10-15%

Boilers 2-3%

Water Systems 3-5%

Medical Gases 01- 02%

STP (sewage treatment plant) 2-3%

Page 6: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

ENERGY ANALYSIS

Parameter 2014-15 2015-16 2016-17 2017-18

Specific Energy Consumption in

kWh/M2/annum 252 236 219 211

Total kWh/Bed 28987 27124 25182 24271

No. Of Beds 150 150 150 150

Area of building 17232 17232 17232 17232

Page 7: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Chiller TR KW/TR

Trane 250 0.65

Clivet 175 1.1

Replacement of clivet chiller by VFD Trane chiller

Page 8: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Trane chiller

Adaptive Frequency

Drive

The largest energy user in most buildings

is the chilled water system. The RTHD Adaptive

Frequency Drive, from Trane Care Energy Services,

can make significant savings in the energy

consumed.

Page 9: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Trane Chiller VFD

Adaptive Frequency Drive Overview

A powerful upgrade that

delivers

1.Precision control

2.Energy efficiency

3.Lower utility costs

4.Noise reduction

5.Longer equipment life

Page 10: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Performance

Up to 35% better energy efficiency at all load points

Trane AFD reduces electricity bills by improving chiller

efficiency at reduced load, while at same time meeting

the building’s cooling requirements. The combination

of Trane chiller capacity control and Adaptive

Frequency Drive will improve chiller efficiency up to

35%.

Page 11: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Benefits

Benefits

• Low load capability

• Unloading capabilityRTHD : 20%

RTHD AFD: 12%

Reduces start-stop cycles by enabling the chiller to

operate at lower capacities.

For chiller operating at low loads (comfort application)

stop/start will be reduced by ~45%

Page 12: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Benefits

Benefits

• Lower inrush current

• Starting current reduced by 5

Helpful for application experiencing

disruption when starting many electric

devices at same time.

Starter type Inrush current (% Imax)

Direct in line 600 - 800%

Wye Delta 200 – 275%

Solid State 300 - 500%

AFD <100%

Page 13: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Maintenance in existing Air- conditioning system for better Efficiency

Air Handling Unit:• Cooling Coil efficiency – by cleaning with proper cleaning

agent at regular interval. Use of UV light to reduce bacteria growth in the coil.

• Fan efficiency

Cooling Tower (for water-cooled system)• Proper spray of water

• Clean of fills

• Proper adjustment of fan blades.

• Use of water bleed off for circulation water

• Only soft water to be used for make up to reduce fouling in the condenser .

Page 14: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

National Bench mark 17762 KWh/Bed per annum (reference Bureau of Energy Efficiency, Govt. of India ECO-III project)

14

0

5000

10000

15000

20000

25000

30000

2014-15 2015-16 2016-17 2017-18 Bench Mark

28987

27124 25182

24271

17762

KWH/Bed

2014-15

2015-16

2016-17

2017-18

Bench Mark

National Bench mark 17762 kwh / Bed per annum Reference ECO III serve

Page 15: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

KWH / SQM

2014-15 2015-16 2016-172017-

18

252 236 219 211

Specific power consumption

Page 16: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

LIST OF ENCON PROJECTS IMPLEMENTED IN 2015-16

Sr. No. PROJECT

Annual Savings Achieved

INVESTMENT (in Lac)

ROI (Months)

KWHINR

(lacs)

2015-16

250 TR Trane chiller installed. 223613 22.80 38.00 20

Conventional CFL replaced with LED 55903 5.7 6.48 11.44

Total 279516 Units , Rs. 2851063

Page 17: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Energy saving activity 2016-17

Sr. No. PROJECT

Annual Savings Achieved

INVESTMENT (in Lac)

ROI (Months)

KWHINR

(lacs)

2016-17

Replacement of 4 Nos. split Ac with FCU. 37324 3.80 1.0 3.15

Conventional light replaced with LED 171247.5 17.46 17.28 11.87

Total 208571.5 Units , Rs. 2126724.5

Page 18: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

LIST OF ENCON PROJECTS IMPLEMENTED IN 2017-18

Sr. No. PROJECT

Annual Savings Achieved

INVESTMENT (in Lac)

ROI (Months)

KWHINR

(lacs)

2017-18

Descaling of chiller plant to maintain the approach below 4 Deg. Fahrenheit

74000 7.54 0.22 0.34

Conventional CFL replaced with LED 62595.7 6.38 6.48 12.12

Total 13659.7Units , Rs. 1393276.14

Page 19: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Energy Consumption Trend

Remarks– New MRI machine installed increased 750 kw / month of load, our

energy conservation effectively neutralizes the upward consumption trend.

Page 20: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

ENERGY MEASUREMENT,MONITORING & REPORTING

•Dedicated energy Meters for all the panels

•Separate energy meters for lighting, HVAC

•Record of daily energy meter recording

•Annual calibration of all energy meters.

•Monthly review of energy balancing by energy

Management Cell

Page 21: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Waste Reduction

• Mixture Tap nozzle fixed in OPD area washroom to reduce the waterconsumption approx 500 KL monthly

• Hand Dryier fixed in OPD wash room to reduce the paper consumption upto 15 %

• Paper saving by Using both sides of paper while printing also reuse old papers for inter office work.

• X-Ray films eliminated using PACS systems through IT.

• On line soft wares are used for office work like oracle, my Fortis,out look, Patient Portal ,QMS etc. Resulting saving of papers

Page 22: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Implementation on Energy, Water & Environment

BY maintaining of Power factor above 0.99Regular de-dusting of lighting fixture.Cleaning of filters in air conditioning system.Maintaining the optimum voltage of lighting systemSwitching off lights/monitors/AC when not in use.Use of high –efficiency fixtures (water closet & urinal) to reduce the potable water demand.Raw and treated sewage quality monitoring on daily basis and Quaterly report to be submit to DPCC. water meter to be measured on daily basis for the water consumption control. Conducting Daily inspection walkthroughs for identification of any water losses.Use of separate storm , sewage and oil water separators drainages to avoid ground water contamination.Celebration of Environmental day, Engineers day etc.

Page 23: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

corrective/preventive action for better efficiency

• Routine preventive maintenance and Calibrations and testing of equipment,

on yearly basis

• Realignment of lighting with respect to the lumen , corridors, staircases & IPD OPD rooms

• Running only one Transformer during non peak season when the load goes down .

• Installation of VFDs

• Monthly CFM measurement to check the Hepa filter efficiency and replacement when the efficiency comes down

Page 25: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Utilization of Waste Materials

• STP Water is reused in gardening, Irrigation and in cooling towers, .

• Newspaper & waste papers are sent to authorized person , for recycling.

• Plastic, Polythene is sent for recycling.

• Kitchen waste is being given for making fuel .

• Used Engine oil & lubricant materials are sent to Authorized

recyclers.

Page 26: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Operation and maintenance practices Categories Remark

Authorized O& M vendor for all equipment Available

Daily monitoring of energy consumption as compared to the last year same day

Available

Training to motivate the staff for energy saving Available

Half yearly performance check of all equipment's Like DGs, chillers , UPS etc

Available

Preventive maintenance of all the equipment for maintaining the efficiency

Available

Reduction of diesel consumption by the reduction of DG testing time on daily basis

Available

Monthly energy saving meeting with the dept. Available

Use of renewable energy for day to day operations In progress

Page 27: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

WHERE WE ARE TODAY

Benchmarks :- 200 KWh/m2

(By Bureau of Energy Efficiency,

Govt of India ECO-III project)

Page 28: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

EMPLOYEE INVOLVEMENT /TEAM WORK • Suggestion from all levels of employees on

energy conservation

• Training/Awareness for contract labour/office staff on energy conservation.

• Sharing best practices among the industries

• Objective are set for employees on reduction in energy and water .

• To adopt safe and hygienic hospital

procedures and practices

• Environmental safety and fire fighting training sessions

• Hand Hygiene campaign launched and Emphasis on 5S initiative

• Trainings imparted and monitoring done on Energy Conservation measures.

• Energy savings Efficiencies of Boiler, DG sets and HVAC are regularly monitored for timely maintenance and energy savings.

Page 29: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

GREEN INITIATIVE

• We have solar water heating system to used the non-conventional energy resources for hot water of the hospital.

• Under discussion to have solar electricity system for the electricity power supply of the hospital.

Page 30: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Reduction of CO2 in MT

Page 32: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

• Reduction of water consumption of 2016-17 to 2017-18 by 7499.5 KL yearly due to fixing of nozzle into taps of mixture in general wash room & nursing station area along with sensor operated taps.

• Total annual saving Rs. - 7 Lacs

water consumption trend

Page 33: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

• Diesel consumption reduced by optimum utilization of solar water heater.

Diesel consumption of Hot Water Generators 2016-2018

Page 34: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

FUTURE PLAN

20

17

-18

Total Existing CFL(KWH)

Total Existing LED(KWH)

Savings (kWh)

Savings (INR in Lacs)

Investment (In Lacs)

ROI (Years)

189864 92739 97125 9.90 14.38 1.74

LED light replacement with conventional CFL

Page 35: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

FUTURE PLAN

Sr. No.Hot water generator conversion into PNG

Proposed consumption

Saving /YearINVESTMENT

(in Lac) ROILiters/

YearAmount

20

17

-18

HSD consumption/ Year

26455 1666667

3684921000000

32.56PNG consumption/ Year 27045 1298174

Conversion of hot water generator into PNG

Page 36: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Future Plan

• Replacement of old chiller plant with energy efficient chiller

• Replacement of conventional pump with energy efficient pump

• Re-insulation of chilled water line After testing the insulation by thermography equipment to reduce the losses

• Fixing of sun film towards the sun facing area of the hospital

• Installation of heat pump for the energy saving after completion of energy audit

• Replacement of Old kone lift with energy efficient lift

• Complete water and air balancing for the air conditioning system to reduce the losses.

• To start the solar energy.

Page 37: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Cost benefit analysis hot water generatorS no. HOT WATER GENERATOR Unit HSD PNG

1 Capacity in Kcal/hr Kcal/hr 200,000 200,000

2 Actual load Kcal/hr 200,000 200,000

3 Efficiency NCV % 90% 87%

4 Cal val. Of Fuel kcal/kg or NM3/hr 10500 8500

5 Fuel cost Rs/lit or Rs/kg 63.00 48.00

6 Fuel Consumption Kg/hr 21.16 27.05

7 Density of Fuel kg/lit 0.8 1

8 Fuel Consumption lit or kg/hr 26.46 27.05

9 Fuel Cost per Hour Rs/hr 1666.67 1298.17

10 No. of hrs operation in an year hrs 1000 1000

11 Total Fuel Cost Rs/year 1666667 1298174

12 Net saving/year 368492

Page 38: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

Existing CFL Tube light fixtureConversion of CFL(conventional Light) with LED

S. NoType of fixture

QuantityTotal watts

Rate/unitR/Hours(

AVG)KW

Total unit/day in KWH

Amount/day

Amount/month

Annual

1 1x18WCFL 215 3870 10.2 15 3.87 58.05 592.11 17763.3 213159.6

2 2x18W CFL 174 6960 10.2 15 6.96 104.4 1064.88 31946.4 383356.8

3 2x36W CFL 67 5360 10.2 15 5.36 80.4 820.08 24602.4 295228.8

4 3x36WCFL 25 3000 10.2 15 3 45 459 13770 165240

536WTube

light325 13000 10.2 15 13 195 1989 59670 716040

618 W Tube

light135 2970 10.2 15 2.97 44.55 454.41 13632.3 163587.6

Total 527.4 5379.48 161384.4 1936613

Total Unit/year

189864

Page 39: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661

LED light replacement planLed light details

S.no

Type of fixtureQuantity

Total watts

Rate/unit

R/Hours(AVG)

KWTotal unit/day

in KWHAmount/

dayAmount/

monthAnnual

118 W CFL replaced with

12 W215 2580 10.2 15 2.58 38.7 394.74 11842.2 142106.4

218x2W CFL replaced with

12x2 W LED174 4176 10.2 15 4.176 62.64 638.928 19167.84 230014.1

32x36 WCFL replaced with

40 W LED67 2680 10.2 15 2.68 40.2 410.04 12301.2 147614.4

43x36WCFL replaced with

3x18W LED25 1350 10.2 15 1.35 20.25 206.55 6196.5 74358

536W tube light replaced

with 18 W LED325 5850 10.2 15 5.85 87.75 895.05 26851.5 322218

618W Tube light replaced

with 10W LED135 1350 10.2 15 1.35 20.25 206.55 6196.5 74358

Total Unit

269.79 2751.85 82555.74 990668.9

Total Unit/yea

r97124.4

Net Saving

Amount

1936613 -990668=945943.9

Page 40: Energy Management-2018 … · Mr. Subhash Jha Head Engg. Unit Mohali Mr. Neeraj Tandon Head Engg. Other Units Various Units Teams. 2014-15 2015-16 2016-17 2017-18 4348178 4068661