45
Ned Carey, C.M. Chief Ned Carey, C.M. Chief - - November 4, 2019 5 th Annual Business Opportunities & Entrepreneurial Training Summit

Entrepreneurial Training Summit...Baltimore region. • 73 aircraft gates and 16 airlines • Southwest is the largest carrier • Over 90 domestic and international destinations •

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Ned Carey, C.M.Chief Ned Carey, C.M.

    Chief --

    November 4, 2019

    5th Annual Business Opportunities &Entrepreneurial Training Summit

  • Ned Carey, C.M.Division of Airport Technology

    November 4, 2019

    5th Annual Business Opportunities &Entrepreneurial Training Summit

  • Maryland Department of TransportationMaryland Aviation Administration

    • Vast majority (95%) of MDOT MAA IT procurements are from statewide IT contracts awarded by MD Dept of IT (DoIT)

    • These include computer hardware, software, and IT services including system design, coding, and database development

    • 100s of vendors on DoIT contracts presenting significant sub-contracting opportunities

    • Information on DoIT contracts:• http://doit.maryland.gov/contracts/Pages/AllMasterContracts.aspx

    http://doit.maryland.gov/contracts/Pages/Doing-Business.aspx

    http://doit.maryland.gov/contracts/Pages/AllMasterContracts.aspxhttp://doit.maryland.gov/contracts/Pages/Doing-Business.aspx

  • Maryland Department of TransportationMaryland Aviation Administration

    • Typical Types of MDOT MAA-Specific IT Procurements– Flight information Display System– Common Use Terminal Equipment System– Integrated Airport Security System– Parking and Revenue Control System– Comprehensive Airport IT Services– Noise Monitoring System– Airport Technology Master Planning

  • James G. Walsh, AAE, CFOBusiness Development & Management

    November 4, 2019

    5th Annual Business Opportunities &Entrepreneurial Training Summit

  • Baltimore/Washington International Thurgood Marshall Airport (BWI Marshall) is the 22nd busiest airport in the United States, and the busiest in the Washington-Baltimore region.

    • 73 aircraft gates and 16 airlines• Southwest is the largest carrier • Over 90 domestic and international destinations• 330 daily nonstop departures• 75,000 passengers every day.

    BWI Marshall Airport has a total economic impact of $9.3 billion. BWI Marshall and its visitors generate and support more than 106,000 jobs throughout the region.

    The Statistics

  • • What do we do?

    • Commercial Solicitations

    • Airport Developments – Current & Future

    Office of Commercial Management

  • Commercial Management’s responsibility is to achieve enhanced revenue generation through new and existing commercial contracts with tenants.

    Concessions

    Commercial Business Activities

    Airline Affairs

    Commercial Development

  • Commercial SolicitationsRequest For Proposals (RFPs) which have now CLOSED:• New Airport Convenience Store with Gas Station• Wi-Fi, DAS and Other Wireless Systems

    Current RFPs:• Advertising

    RFPs for future release:• Parking – dates pending• Concessions – dates pending

  • New Airport Convenience Store with Gasoline Station

    (Joint Solicitation with Existing Gas Station)

    SCHEDULE

    • Request for Proposals Issued: March 14, 2019

    • Contract Commencement Date: January 1, 2020

    5-acre parcel at corner of Aviation Blvd and Amtrak Way

    2-acre parcel on Aviation Blvd (existing gas station)

    CLOSED

  • Establish, Operate & Maintain a Next Generation Distributed Antenna System (DAS), Airport Wide Wi-Fi

    System & Other Wireless Technology Concessions Services

    SCHEDULE

    • Request for Proposals Issued: April 10, 2019

    • Contract Commencement Date: January 1, 2020

    CLOSED

  • Airport Commercial Advertising Program

    SCHEDULE

    • Request for Proposals Issued: September 4, 2019

    • Initial Proposals Due: October 30, 2019

    • Contract Commencement Date: February 1, 2020

  • Public Parking Facilities

    SCHEDULE (pending)

    • Request for Proposals Issue: Pending

    • Contract Commencement Date: July 1, 2020

  • Other Solicitations

  • Concessions

  • Current and upcoming

    opportunities can be found

    on our websitewww.marylandaviation.com

  • QUESTIONS?

  • Wayne Pennell, A.A.E.Chief, BWI Operations & Maintenance

  • The Maryland Aviation Administration has six (6)

    maintenance contracts that are being procured from

    November 2019 through December 2020

  • Contract MAA-MC-20-010Plumbing Repair Services at BWI and MTN

    Term: Five Years – March 1, 2020 to February 28, 2025, with one two-year renewal option

    Scope of Work: Perform repairs of plumbing facilities and systems, and other wet utilities on a time and material basis as required by the Maryland Aviation Administration

    MBE Goal: 15%; Designated Small Business PreferenceWith Direct Solicitation to MBE Firms

    SIDA Badge Required: Yes, Plus U.S. Customs Seal

  • Contract MAA-MC-20-013Interior/Exterior Painting Services

    at BWI and MTNTerm: Three Years – March 1, 2020 thru February 28, 2023, with one two year renewal option

    Scope of Work: Perform various types of interior and exterior maintenance painting tasks as directed by the Administration

    MBE Goal: SBR

    SIDA Badge Required: Yes, Plus U.S. Customs Seal

  • Contract MAA-MC-21-001Uninterrupted Power Supply (UPS) Systems

    Inspection, Repair and Maintenance at BWI and MTN

    Term: Five Years – August 1, 2020 thru July 31, 2025, with one two year renewal option

    Scope of Work: Provide a planned inspections, and preventative maintenance and repairs program for all UPS Units

    MBE Goal: 0% Specialized Work and Certification

    SIDA Badge Required: Yes, Plus U.S. Customs Seal

  • Contract MAA-MC-21-002Inspection, Repair and Maintenance of

    Emergency Generators at BWI and MTN

    Term: Five Years – October 1, 2020 thru September 30, 2025, with one two year renewal option

    Scope of Work: Perform inspections, preventative maintenance and repair services to emergency generators as requested by the Administration

    MBE Goal: TBD

    SIDA Badge Required: Yes, Plus U.S. Customs Seal

  • Contract MAA-MC-21-003Interior Plantscape Maintenance

    at BWI Marshall Airport

    Term: Five Years – December 1, 2020 thru November 30, 2025

    Scope of Work: Perform interior plantscape maintenance to the live and artificial plants located in the terminal building and outer buildings at BWI Marshall Airport

    MBE Goal: TBD; Advertise as Small Business ReserveWith Direct Solicitation to MBE Firms

    SIDA Badge Required: Yes

  • Contract MAA-MC-21-004Exterior/Interior Lighting Maintenance and Light Pole Inspection, Repair and Maintenance at BWITerm: Five Years – Five Years – December 1, 2020 thru November 30, 2025

    Scope of Work: Maintain and repair various exterior and interior lighting systems including re-lamping and light pole inspection, repair and maintenance, and maintenance of electrical systems

    MBE Goal: TBD

    SIDA Badge Required: Yes, Plus U.S. Customs Seal

  • Annette Fisher,Chief, Marketing & Air Service Development

  • Campaigns, Event Planning and Graphics

    Marketing

  • Air Service Development

    • More than 27 million Passengers

    Fourth Straight Annual Passenger Record

    Over 90 Domestic and International designations

    • Served by 15 Airlines

    • Busiest airport in the Baltimore/Washington region

  • • Manages the Airport’s Customer Experience programs including BWI Pathfinder Program, Lost & Found, Commercial filming program and Hospitality

    • Airport room rentals including Observation Gallery and D/E Art Gallery

    Customer Experience

  • Corporate & Community Relations

    • Educational outreach, engaging the art community, supporting military customers and promoting local nonprofits

    • Sustainable relationships with the business community, local chambers, tourism and civic organizations

    • BWI Marshall has a trusted reputation as a good corporate citizen

    A Wave of Color Artist, Janice Hendra

  • Corporate & Community Relations

    BWI Static Art Programs

    I am/ She is/ We are/Two Sides of the Same Moon,

    2017Artist, Erin Lehrman

    Concourse C Art GalleryNovember 14, 2019 "Colors of the World" Curated by the Arts Council of Anne Arundel County

    D/E International Art Gallery January 20, 2020 “Leonardo, When Arts Reach the Sky”Curated by the Maryland Italian Cultural Center

  • • Flight Status• Parking• Marc Train to DC• Contracting

    opportunities

    www.BWIairport.com

  • Communications

    Please Follow or Like Our Social Media Channels!

    @BWI_Airportwww.facebook.com/BWIAirport

    BWI Marshall Airport

  • OFP’s Free Small & Minority Owned Business Training Program

    Profitability & Stability to Win New Contracts: Be a Growth CFO – 11/26/19

    Make High Impact Presentations: Raise Money, Obtain Customers & Inspire Employees – 12/12/19

    Building Win More BWI Contracts: Build Capacity to Accelerate from Sub to Prime Manage a Rapidly -1/16/20, (Snow date 1/24/20)

    Synergy, A Business & Networking event – May 7, 2020 – BWI Marriott Hotel

    Email - [email protected]

    mailto:[email protected]

  • Questions?

  • Paul ShankChief of Planning & Engineering

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Construction Opportunities

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Three Level Expansion of the Terminal Multiple Packages in DesignBidding Opportunities Under CMAR

    Terminal A/B Connector and Baggage Handling System

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2020 -2023Construction Estimate - $400,000,000Potential DBE Subcontracts:• All Building Trades • Civil/Utilities/Paving

    Terminal A/B Connector and Baggage Handling System

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    • Major renovation and new construction of eight sets of Restrooms (incl: Men’s, Woman’s, Family, Adult Change & Lactation Rooms).

    • Expedited Design-Bid-Build Procurement

    Terminal Restroom Enhancement Program – Package 1

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2019 -2022Project Cost Classification - I ($30,000,000 - $50,000,000)Potential DBE Subcontracts:• All Building Trades • Civil/Utilities/Paving

    Terminal Restroom Enhancement Program – Package 1

    Meditation Rm

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2020 -2022Project Cost Classification – J($50,000,001 to $75,000,000)

    Airline Maintenance Complex

    • Two Projects; Site Work and Facility • Environmental Assessment

    Underway Potential DBE Subcontracts:• All Site Work Trades• All Building Trades

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2020 thru 2023$150,000,000 Estimated program value, multiple awardsPotential DBE Subcontracts:• All Site Work Trades

    Airfield Rehabilitation Program• Significant taxiway rehabilitations in both asphalt and concrete• Airfield Lighting Vault (ALV) relocation• New Taxiway F Phase II

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2020$2,000,000 Estimated program value, multiple awardsPotential DBE Subcontracts:• Traffic Control• Mechanical/Electrical

    Consolidated Rental Car Facility Improvements• Various improvements including

    – Equipment Replacement– Traffic Control Devices– Security Upgrades

  • 7201 Corporate Center Drive Hanover, MD 21076410.865.1000

    Maryland Department Of TransportationAviation Administration

    Anticipated Schedule:• 2020-2022$25,000,000 Estimated program value, multiple awardsPotential DBE Subcontracts:• All building trades• Site work

    Other upcoming construction Opportunities• D/E Connector Sterile Corridor Improvements• Concourse DX-DY HVAC Replacement• ATCT Elevator Replacement• RTR Relocation

    Ned Carey, C.M.� Chief Ned Carey, C.M.� Chief -�-Ned Carey, C.M.�Division of Airport Technology Maryland Department of Transportation�Maryland Aviation AdministrationMaryland Department of Transportation�Maryland Aviation AdministrationJames G. Walsh, AAE, CFO�Business Development & Management The StatisticsOffice of Commercial ManagementSlide Number 8Commercial SolicitationsSlide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16�Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Annette Fisher,�Chief, Marketing & Air Service DevelopmentCampaigns, Event Planning and Graphics Air Service Development Customer ExperienceCorporate & Community RelationsBWI Static Art Programs�Slide Number 32Communications��OFP’s Free Small & Minority Owned Business Training Program Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39Slide Number 40Slide Number 41Slide Number 42Slide Number 43Slide Number 44Slide Number 45