98
REPUBLIC OF YEMEN MINISTRY OF PUBLIC WORKS AND HIGHWAYS RURAL ACCESS PROGRAM CENTRAL MANAGEMENT OFFICE Attahriah / Al-Ka’’ka’ / Je’wal RURAL ROAD (11.89 Km) Al-Sowadiah District, Al Baidah Governorate, YEMEN Prepared by: Arabtech-Jardaneh - Engineers and Architects Reviewed and updated by: RAPCMO Environmental and Social Unit Staff December, 2014 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT (ESIA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

REPUBLIC OF YEMEN MINISTRY OF PUBLIC WORKS AND HIGHWAYS

RURAL ACCESS PROGRAM CENTRAL MANAGEMENT OFFICE

Attahriah / Al-Ka’’ka’ / Je’wal RURAL ROAD (11.89 Km)

Al-Sowadiah District, Al Baidah Governorate, YEMEN

Prepared by: Arabtech-Jardaneh - Engineers and Architects

Reviewed and updated by: RAPCMO Environmental and Social Unit Staff

December, 2014

ENVIRONMENTAL AND SOCIAL

IMPACT ASSESSMENT REPORT (ESIA)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb371432
Typewritten Text
E1067 V17
Page 2: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

THIS PAGE INTENTIONALLY LEFT BLANK

Page 3: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Revision History

Version Revision

Date

Description or Reason for

Change Discipline Review

Director Review

Approval

00 01-04-2014 Initial Release

01 01-07-2014 First revision Comments addressed

02 20-08-2014 Second revision Comments addressed

03 19-09-2014 Third revision Comments

addressed

04 15-11-2014 Forth revision Comments addressed

Quality Review by: Dariusz Kobus Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team Name Specialty 1 Ahmad Abu Hijleh Environment Specialist- Team Leader

2 Eng. Hayel Msharbash Senior Roads Engineer

3 Eng. Ashraf Al- Jafari Traffic Engineer 4 Ahmad Kuqash Environment Specialist

5 Eng. Ali Sa’ad Hydrology Specialist 6 Abdul Nasser Almwudda Socio-Economic Specialist

7 Mrs. Souhad Noamman

8 8 Mrs. Yassmin Al zubaidi

Women Consultation Specialist

Women Consultation specialist

Page 4: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

THIS PAGE INTENTIONALLY LEFT BLANK

Page 5: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

TABLE OF CONTENTS

LIST OF ABBREVIATIONS ................................................................................................................................................. 9

LIST OF NOMENCLATURE ............................................................................................................................................. 10

EXECUTIVE SUMMARY.................................................................................................................................................. 11

1 PROJECT DESCRIPTION ................................................................................................................................ 22 1.1 Introduction to the Project ................................................................................................................ 22 1.2 Description of the Project .................................................................................................................. 23 1.3 Objectives of the ESIA ........................................................................................................................ 25 1.4 Environmental Screening ................................................................................................................... 25 15 Existing Alignment .............................................................................................................................. 25 1.6 Proposed Works ................................................................................................................................. 29 1.7 Land Acquisition and Compensation ................................................................................................. 30 1.8 Land Donation .................................................................................................................................... 31

2 LEGAL AND ADMINISTRATIVE FRAMEWORK ....................................................................................... 32 2.1 National Legal Framework .................................................................................................................. 32 2.2 Environmental Institutions .................................................................................................................. 33 2.3 Environmental Applications to the Road Sector ................................................................................. 34 2.4 Involved Authorities ............................................................................................................................ 34 2.5 World Bank environmental and social safeguards and policies .......................................................... 35

3 BASELINE DATA ............................................................................................................................................... 37 3.1 Land Resources (Physical Region, Geology and Land use) ................................................................... 37 3.2 Climate and Rainfall ............................................................................................................................. 37 3.3 Absorption and Runoff Zones .............................................................................................................. 39 3.4 Catchment Characteristics ................................................................................................................... 39 3.5 Groundwater Resources ...................................................................................................................... 41 3.9 Population and Community Structure ................................................................................................. 43 3.9.3 Waste Disposal ............................................................................................................................................................................................ 44 3.9.4 Economic Activities and Poverty Status ............................................................................................................................................ 44 3.9.5 Agriculture ......................................................................................................................................... 46 3.9.6 Additional Income Sources ................................................................................................................ 46 3.9.7 Type and Volume of Exports and Dependency on Import ................................................................. 46 3.9.8 Services and Facilities ........................................................................................................................ 46

4 POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS ...................................................................... 52 4.1 Scoping of Impacts ................................................................................................................................ 52 4.2 Potential Impacts .................................................................................................................................. 52 4.3 Environmental and Social Impacts during Construction Phase ............................................................ 60 A-1.5. Disposal of Cut Materials and Surplus Fill ......................................................................................................................................... 61 A-1.6 Borrow Pits and Quarry Area ................................................................................................................................................................. 61 4.3.2 Hydrology and Water Resources. ........................................................................................................................................................ 61 A-2.1 Source of Construction Water ............................................................................................................................................................... 61 A-2.2 Pollution from Wastewater, Diesel or Asphalt Spills from Site Compound and Machinery ......................................... 62 A-2.5 Cross drainage and Scour Effects on New Fills ................................................................................................................................ 62 4.3.3 Air quality and Noise Nuisance ............................................................................................................................................................. 62 A-3.1 Dust and Potential Pollution from Construction Machinery, Stored materials and Spoil Heaps ................................ 62 A-3.2 Smoke from Burning of Waste materials .......................................................................................................................................... 63 A-3.3 Noise Nuisance ............................................................................................................................................................................................ 63 4.3.4 Biological Resources .................................................................................................................................................................................. 63 4.3.5 Socio-Economic and Cultural Impacts ................................................................................................................................................. 64 A-5.4 Safety and Health Measures at Construction Site ......................................................................................................................... 64 A-5.9 Gender considerations ............................................................................................................................................................................. 64 A-5.11 Employment Opportunities .................................................................................................................................................................... 64 4.4 Environmental and Social Impacts during Maintenance and Operation Phase .................................. 65 4.4.1 Land Resources: The impacts in these cases will be very limited ............................................................................................ 65

Page 6: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

4.4.2 Hydrology and Water Resources ........................................................................................................................................................... 65 B-2.1 Affecting Water Harvesting Structures .............................................................................................................................................. 65 B-2.2 Blockage of Cross Drainage / Culverts from Uncontrolled Discharged ................................................................................. 65 B-2.3 Erosion of Road Platform from Drainage Discharge ..................................................................................................................... 65 B-2.4 Pollution from Vehicle Leakage ............................................................................................................................................................. 65 B-3.2 Noise Nusinance .......................................................................................................................................................................................... 65 4.4.3 Socio-Economic Resources ...................................................................................................................................................................... 65

5 ANALYSIS OF ALTERNATIVES ..................................................................................................................... 66 5.1 No Action Alternative............................................................................................................................ 66 5.2 Improving the Existing Road ................................................................................................................. 66 5.3 Assessment of Alternatives ................................................................................................................... 66

6 ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) ........................................................ 68 6.3 Mitigation of Impacts during Construction Phase ................................................................................ 70 6.3.4 Socio-Economic and Cultural ................................................................................................................................................................... 74 (A-5.1) Public Health and Safety at construction site ................................................................................................................................. 74 (A-5.2) Chance Finds of cultural resources or other socio-economic resources.............................................................................. 74 (A-5.3) Gender Considerations ............................................................................................................................................................................ 74 (A-5.4) Employment ................................................................................................................................................................................................. 74 6.4 Mitigation of Impacts during Maintenance Phase ............................................................................................................................ 75 6.4.1 Land Resources ............................................................................................................................................................................................ 75 B-1.1 Maintenance of contractor site compounds, materials and equipment storage .............................................................. 75 6.4.2 Hydrology and Water Resources ........................................................................................................................................................... 75 6.4.3 Air Quality and Noise ................................................................................................................................................................................. 75 6.4.4 Socio-Economic Resources ...................................................................................................................................................................... 75 B-4.3 Chance finds of Cultural Resources or Other Socio-Economic Resources ........................................... 76 6.5 Monitoring Plan .................................................................................................................................. 76

7 SOCIAL CONSULTATIONS ............................................................................................................................. 82 7.1 Objectives of the Consultations ............................................................................................................ 82 7.2 Consultation Process ............................................................................................................................. 82 7.3 Findings of the Consultations................................................................................................................ 82 7.3.1 Men Consultations ...................................................................................................................................................................................... 82 7.3.2 Women Consultations ............................................................................................................................................................................... 83 Annex 1: Update of the Social Framework Agreement (SFA) in Arabic……………………………………………………..86 Annex 2: List of Beneficiary Committee ....................................................................................................... 87 Annex 3: List of Consulted People. Attendance Sheet………………………………………………………………………………..88 Annex 4: Findings of Social Consultations (Second Round)……………………………………………………………………….94

Page 7: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

LIST OF TABLES PLEASE UPDATE LIST OF TABLES

Table No P.N

Table (1.1): Road Alignment Characteristics

7

Table (1.2): Bill of Quantities for Attahiriahl / Al Ka’Ka’ road

12

Table (2.1): List of Major Laws/Decrees/Orders relevant to roads Projects

15

Table (2.2): List of Conventions and International Agreements that were ratified by Yemen

16

Table (2.3): World Bank Safeguard Policies Triggered in Attahriah – Al Ka’ka’ Rural Road

19

Table (3.1): Climate in Al-Baydha Governorate

21

Table (3.2): Catchment Characteristics of Road area

24

Table (3.3): Cultivated Land by Type of Irrigation in Al-Baida Governorate

25

Table (3.4): Population Dynamics within the Project Area.

27

Table (3.5): Major Land Use Patterns Along and Close to the Project Route

28

Table (3.6): Governorate and District Poverty Level in the Project Area

29

Table (3.7): Educational Services within the Road Project area

32

Table (4.1): Checklist of Potential Impacts Associated with Road Project

38

Table (5.1): Alternatives Analysis for the Project Major Impacts

54

Table (5.2): Comparative Evaluation of the project's alternatives

54

Table (6.1): Clauses relevant to mitigation measures in the Standard Construction Contracts

58

Table (6.2): Summary Environmental Management Plan (ESMP) during construction phase

66

Table (6.3): Summary of Environmental Management Plan during Maintenance

70

Table (7.1): Location and number of consulted Men

73

Table (7.2): Location and number of consulted Women

74

Page 8: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment (ESIA)

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

LIST OF FIGURES

Names of Figures P.N

Figure (1.1): General location of AlBaidah Governorate in the R.Y

2

Figure (1.2): Photo shows typical view from Section one.

3

Figure (1.3): Attahriah, Alk’aka / Je’wal road project start point 8

Figure (1.4): Attahriah, Al Ka’Ka /Je’wal road project end point

Figure (1.5): Photo shows typical view from Section two.

9

Figure (1.6): Attahriah, Al Ka Ka / Je’wal road project Location Map

10

Figure (1.7): Topographic map of Road Alignment.

11

Figure (3.1): Climatic Zones in the project area

22

Figure (3.2): Average temperature graph for Al-Baidah

22

Figure (3.3): Average annual rainfall in the Project Area

23

Figure (3.4): Sub- Catchments of the Road Project

24

Figure (3.5): Shows natural vegetation cover in the road project area

27

Figure (3.6): Under/ Upper Poverty Map

29

Figure (3.7): Food Poverty Map

29

Figure (3.8): Photo shows electric pole location.

31

Figure (3.9): Distribution of Educational Institutions within the Project Area

32

Figure (3.10): Distribution of the Health Services within the Project Area

33

Figure (3.11): Photos of Flora taken along the road

34

Figure (3.12): Photos of Fauna taken during site visit

34

Figure (4.1): Photo shows alignment road passing through Je’wal village. 47

Figure (4.2): At km 8.8, photo shows the alignment road 47

Page 9: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

LIST OF ABBREVIATIONS

AASHTO American Association of State Highway and Transportation Officials

BOQ Bill of Quantity

BP Bank procedures

CO Carbon Monoxide

CSO Central Statistical Organization

EHS Environment, Health and Safety

EIA Environmental Impact Assessment

EMP Environmental Management Plan

EPA Environmental Protection Authority

EPC Environment Protection Council

FAO Food and Agriculture Organization

GALSUP General Authority for Land Survey and Urban Planning

GARWSP General Authority for Rural Water Supply

GOY Government of Yemen

GP Good Practices

HC Hydro Carbon

IFC International Finance Corporation

MoAI Ministry of Agriculture and Irrigation

MoF Ministry of Finance

MoWE Ministry of Water and Environment

MPWH Ministry of Public Works and Highways

MSL Mean Sea Level

NEAP National Environmental Action Plan

NGO Non-Governmental Organization

NO Nitrogen Oxides

NWRA National Water Resources Authority

OP Operational Procedure

RAP Rural Access Project

RAPCMO Rural Access Project Central Management Office

RMF Road Maintenance Fund

ROW Right Of Way

SEA Sectoral Environmental Assessment

SO2 Sulphur Oxide

TSP Total Suspended Particulates

WB World Bank

Page 10: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

LIST OF NOMENCLATURE

% Percentage

C Degree Celsius

mm Millimeter

cm Centimeter

m Meter

Km Kilometer

US $ m2

United States Dollar

Square meter

m3 Cubic meter

KW Kilo Watt

No. Number

Page 11: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Executive Summary

Introduction

The Environmental and Social Impact Assessment (ESIA) was prepared for the Project "

Attahriah – Al Ka’ka’ – Je’wal” Rural Road" for the Rural Access Program (RAP) as a variation

order under a contract signed between the Ministry of Public Works and Highways, Rural

Access Program Central Management Office (RAPCMO) and Arabtech-Jardanah - Engineers

and Architects.

This Environmental and Social Impact Assessment (ESIA) study was prepared in

conformance with category B requirements of the World Bank’s Environmental Assessment

Policy OP 4.01. In addition, this ESIA complies with the Environment Protection Law No 26

of 1995 (EPL), and according to the guidelines set forth in the Sectoral Environmental

Assessment (SEA) document prepared during phase 2 of the Rural Access Program (RAP 2)

which was approved by the WB in November 2009, depending on the nature of road

impacts.

The ESIA study was reviewed and updated by the Environmental and Social Unit Staff at

RAPCMO in December 2014 addressing all comments raised by the World Bank Safeguard

Team.

Description of the Project

This road is located in the North West part of Al Baidah Governorate within the As-

Sowadiah District; for a total length of 11.89 Km, which starts at about 17.5 km from the

As-Sowadiah town. The proposed road serves 10 villages directly and indirectly, among

them “Boukhor village at km 1.7, Al Ka’ka’ village at km 4.5, Je’wal village at Km 8.6, and

Dhahebah village at Km 9.65

The overall objective of this road project is to connect the populated communities and

areas located along “Attahriah – Al Ka’ka’ – Je’wal” road with the other parts of Al Baida

Governorate, and the national roads network. In general, the design will follow the existing

track and the work will comprise earthworks, mostly excavation, drainage works,

protection works, and the provision of road pavement layers, including base course and

bituminous surfacing. This road is classified as category (B) because the expected adverse

environmental and social impacts will be limited and temporary in most cases, while it is

reversible for the most part. Meetings were conducted with the local community’s

representatives and the women sector within the project area.

It is estimated that the road will serve about 46,404 persons directly and indirectly.

The main works that will be necessary for the construction of the road are: earthworks as a

result of the re-profiling of the horizontal and vertical profiles of the road, filling, grading,

and leveling of sub-grade, base course layer, asphalt layer, and the construction of several

culverts for stream water crossings.

Page 12: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Legal and administrative framework

EIA in Yemen is enabled by the Environment Protection Law No 26 of 1995 (EPL), and

implemented through Executive Regulations (By-Law 148-2000), issued by a decree of the

Council of Ministers. Other major laws and By-Laws related to the road sector include:

Construction Law No. 19/2002;

Road safety Law No. 119/1976;

Weights and Dimension of Transport Vehicles Law No. 23/1994 with its Executive Regulations no. 282/2002;

The Road Maintenance Law (No.22/1995) with its two amendments n. 7 of 1997 and 27 of 2000.

Yemen ratified also a number of International Environmental Agreements and Conventions.

The central organization responsible for the coordination of decisions and actions related

to the road project is the Ministry of Public Works and Highways (MoPWH) that administers

among others, the Rural Access Program. Several organizations are also directly involved in

road related projects such as, the Ministry of Water and Environment (MoWE), the Ministry

of Agriculture and Irrigation (MAI), the Ministry of Finance (MoF), the General Authority for

Land Survey and Urban Planning (GALSUP), the Local Councils and many existing Non

Governmental Agencies (NGOs)

As the Project was classified under Category B (following the World Bank OP 4.01), affected

groups and local NGOs were consulted about the project's environmental aspects and their

views were taken into account.

In addition, temporary land use will be required for contractors camp’s and storage of

equipment. However, during field consultations, the beneficiary committee voluntary

donated a community land for this purpose free of charge. Accordingly, the World Bank OP

4.12 is not triggered in this situation.

Environmental Applications to the Road Sector

The current Government Policy in the road sector is mainly related to road maintenance

and development is reflected in the following projects and programs:

The Rural Access Program (RAP) with the aim to improve livelihood for the rural population and reduce rural isolation.

The creation of the Road Maintenance Fund (1995) with the aim to improve the maintenance of roads and to enhance cost recovery in the road sector.

The Transport Rehabilitation Project -1995- (financed by the World Bank) to undertake urgent rehabilitation needs in the roads and civil aviation sectors;

The Rural Access Program has established an Environmental & Social Management Unit within its Central Management Office (CMO). Through this Unit, the Program has put in place a standard environmental and social management process.

Page 13: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Environmental and Social Baseline Conditions

Physical Environment

Topography, Geology and Land Use

The project is located within the central/southern highlands of Yemen, which is dominated

by intrusive and metamorphic rocks of the Precambrian basement complex. The main rock

types within the direct vicinity of the project route were gneissic granite, intruded by many

mafic dikes, and some marble outcrops were also observed near Al Ka’ka’ village. The

project area is dominated by agricultural and residential land use pattern.

Climate and Rainfall

The general climatic pattern of the project area is sub-tropical and dry where the rainfalls

are rather low to medium over the region, but at the mountains, by the aerographical

effects, the rainfall amounts are getting little bit higher, especially in the western and

northern parts of the catchments.

The mean annual precipitation depends on the orientation of the topography towards the

wind direction. The rainfall of the region varies from 150 mm in the lower catchment areas

to about 250 mm in the higher hills. Monsoon rains come in rainy seasons, between Mar –

May and from July to Aug.

Air Quality

Unfortunately, no data exists on air quality in the project area. The lack of point pollution

sources renders the air quality high. However, from the site visit one can note the high level

of dust covering all the vegetation along the road (caused by traffic).

Noise

Typical existing noise levels near the project site are generally limited because the project

site is located in a relatively underdeveloped area. Cars encountered were relatively old

and slowly driven at low gear due to the rough terrain. Noise comes from the engines,

transmission, exhaust and suspension of the vehicles and from frictional contact between

the tires and the hard road. There are 2 schools at about 100m and 10m distance from the

road and therefore are considered as potentially sensitive spots.

Waste Disposal

The common waste management practice is to discard the solid waste in pits near the

houses and to burn it when it accumulates. Wind causes littering and smoke dispersion in

the surrounding environment.

Biological Resources

Within the project area, major part has only very sparse natural vegetation. Scattered crops

exist mostly near the wadi courses or at terraces. Fauna wise, the dominant types within

Page 14: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

the project area are the reptiles and the domestic mammals. Furthermore, the project area

doesn’t include any biologically sensitive or protected areas or species.

Socio-Economic and Cultural Aspects

Population and Economic Activity

The population served by the road belongs to As-Sowadiah district and is estimated at

some 46,404 persons with a density of 62 person/km2. Part of the population of the region

work in farming and grazing of their domestic animals. However, the limited rainfall in the

region led to the migration of many members of the population, specifically the adult males

in order to work in other regions of the Yemen or even outside the Country. In general, the

population along the road has very low level of income.

Health and Education Facilities

According to the socio-economic survey, there are no health facilities in the Project area.

Most of the residents have to go to As-Sowadiah Hospital or to the town of Al-Baidah or

even Sana`a for medical consultation. In the health district As-Sowadiah, there is 1 hospital,

1 health centre and 6 health units. There are 6 schools in the villages along the road. There

is no telephone network (land line) in the area of the project; residents rely on mobile

phones as 3 telecommunication companies cover the area.

Employment

Agriculture is the main source of income for the population served by the road, with the

main agricultural crop being corn. Soils are fertile but agriculture is mainly rain fed and

consequently, yields are very limited and almost nil in a dry year. The main water sources in

the project area are wells and small springs. Runoff water is also collected mainly for

irrigation. Residents rely sometimes on cisterns transporting water at a price ranging from 5

to 7 $ per m3 of water.

Archaeology and cultural heritage

There are no sites of archaeological or cultural significance identified within the Project.

Potential Environmental and Social Impacts

Scoping matrix (adopted from the SEA-RAP2) was used to identify impacts that should be

given attention. Input from the public consultation was considered and incorporated in the

list of potential impacts. The key predicted impacts of the project during the construction

phase include:

Potential contamination of soil, ground and surface water by solid and liquid waste

disposal, and handling of fuel and oil.

Social impacts and littering caused by the constrution camp.

Noise and erosion caused by borrow pits and local quarries.

Dust emissions by earthworks and movement of vehicles.

Page 15: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Noise emissions by project machines and vehicles.

Potential water shortage caused by constuction of water by the project.

Damage to water harvesting and irrigation system.

Disruption to amphibia and other small animals by blockage of culverts.

None of the impacts identified were evaluated as major irreversible. Most impacts are

considered minor or negligible. The impacts can be mitigated. Impacts of more significance

are short-term and reversible. Impacts are listed below in order of importance starting

from permanent reversible to temporary reversible.

The baseline conditions do not indicate any possibility of significant cumulative impacts. Similarly, no other infrastructure projects, that could give rise to cumulative impacts, are expected during the road project implementation.

Environmental and Social Management Plan (ESMP)

An Environmental and Social Management Plan (ESMP) was prepared for the project. It

aims at addressing the environmental and social impacts required during the project

implementation. The ESMP is essentially a guidance document to be continually referred to

during the construction and operation of the project.

Mitigation Plan

The majority of the proposed mitigation measures is part of the works contract and listed in

the BOQ. In addition, the General Specifications and Regulations (attached as annex of the

contract documents) contain specific environmental, health and safety requirements for

proper management of construction waste, waste fuel, oil and lubricants, noise and dust,

temporary storage of construction materials, and maintenance of equipment. The list of

mitigation measures are presented in Table 1. The cost of mitigation measures (other then

those already included in the BoQ) is expected to reach 20,793 USD.

Environmental and Social Monitoring Plan

The monitoring program will comprise site inspections and photographic documentation on

weekly basis designed to determine contractor compliance or otherwise with the ESMP and

other applicable regulations. It is also anticipated that additional inspections would be

required in response to complaints by local communities.

The costs of the monitoring program during the construction works include the costs of 1

part time environmental specialist and 1 part time social specialist with vehicle and camera.

They are expected to reach 12,000 USD. The ESMP for the Project is summarized in the

following tables 1 and 2 below.

Social Consultations

The aim of this consultation was to solicit the views and concerns of men and women on

the construction of the road and incorporate them into this ESIA and the contract

Page 16: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

documents of the project. The consultation with men was conducted by the Environmental

and Social Unit Staff at RAPCMO on 22-23 Feb, 2014 during review and update of this ESIA

where 130 men were consulted in four villages.

Findings of the Consultations with men

During the consultation process the following information and opinions were gathered:

1. The road works do not require any land acquisition or destruction of any house.

2. All residents are convinced of the positive economic, social and health impacts of the road paving on their lives.

3. Transport is expensive especially for the sick.

4. Some resident showed lack of confidence in the implementation of the project as they were promised implementation several times long time ago.

5. Most residents showed their willingness to help during the implementation process.

Most of the population did not express displeasure with the problems that accompany

the implementation process such as the noise and dust.

Findings of the Consultations with women

Gender expert undertook the consultations on 27-29 March, 2014 in four villages along the

road and 117 interviewed women from different levels and discussed with them the

expected impact and the appropriate mitigation measures with regard to daily activities.

Women expressed their concern about the safety of the road especially in the area of

Bakhor village, Alerk village, Jewal village, Dhahebah village and Attahriah villages Hammaz

village & Alka'kavillag where they use the road to bring water and in the area of Attahriah

villages where they use the road to get the firewood and they proposed to install bumps

and signs in these 2 areas. In the village of Dhahebah and Attahriah villages, women

expressed their concerns about the vicinity of the school, and their safety as they usually

cross the road with their cattle and sheep when they take them grazing and they proposed

to install bumps and signs to alert drivers to lower their speed.

Page 17: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Summary Environmental Management Plan (ESMP) during construction phase

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A.1 Land Resources

A-1.1 Temporary Land Use

-Voluntary land donation through beneficiary committee -Location of site offices and plants away from residential areas -Re-instatement of the used lot to its initial condition -Collection, temporary storage and disposal of all solid and liquid wastes

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist, car and camera USD 10,000 A-1.2Management

of Construction site Compound

-Location of camp away from residential area -Proper management of the construction site compound to keep the site clean

Contractor Environment and Social Specialist of the Supervision Engineer

Part of contractor’s responsibility

Cost included in salary of 1 part time social & environmental specialist

A-1.3 Borrow Pits and Quarry Areas

-Get the base course from existing quarries and from nearby borrow area to prevent disruption of visual amenities - In case new borrow pits or local quarry needs to be opened, the contractor has to obtain permits from the governorate authorities, address land ownership issue and comply with environmental regulations of the Law 26/1995. -

Contractor Environment and Social Specialist of the Supervision Engineer

7,619 USD Cost included in salary of 1 part time social & environmental specialist

A-2 Hydrology and Water Resources

A-2.1 Sources of construction water

-Contractor to negotiate access to water with the local Communities

Contractor, Consultant and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

Page 18: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-2.2 Pollution from wastewater, diesel or asphalt spills from site compounds and machinery

- Store fuel and oils in sealed containers

- Refueling and small repairs to be conducted in sealed sites with sump

-Do not use contaminated water for dust suppression

-Do not keep the soil exposed in the rainy season

- Locate stockpiles away from storm water

-Limit the height & slope of stockpiles

-Divert the overflow around work areas

-Inspect regularly the erosion/sedimentation incidents

-Develop contingency plans in the event of a spill

Contractor

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

A-2.3 Flood protection in Wadi

-Install culverts as per the design Contractor Environment and Social Specialist of the Supervision Engineer

3,000 USD Cost included in salary of 1 part time social & environmental specialist

A-2.4 Alteration of water harvesting patterns

-Install irrigation steel pipes for encasing water pipes

- Prevent damage by earth works to water harvesting and irrigation system

-Avoid irreversible destruction of water patterns

Contractor, Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

7,000 USD Cost included in salary of 1 part time social & environmental specialist

A-2.5 Cross drainage and scour effects

-Install culverts at designated locations and sizes as per the hydrological study

Contractor Environment and Social Specialist of the Supervision Engineer

Added under A.2-3 Cost included in salary of 1 part time social & environmental specialist

A-2.6 Discharge to Adjacent Lands: - Plain Terraces

-Install irrigation steel pipes to accommodate channel flow Contractor, and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Added under A.2-4 Cost included in salary of 1 part time social & environmental specialist

Page 19: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-3 Air Quality and Noise Nuisance

A-3.1 Dust & Potential air pollutants from construction, Machinery, stored material and spoil heaps

-Minimize the land disturbance by staging the work

-Cover dusty vehicles

-Restrict works to day time hours in and near residential areas

-Regular spraying of water

-Cover material stockpiles

-Minimize excavation and transfer during windy days

-Control drop height of excavated materials

-Minimize the height & slope of stockpiles

-Visually inspect dust generation

-Efficient use of machinery

-Regular maintenance and inspection of vehicles

-Minimize the number of fuel & chemical storage places

-Ensure sealed storage of volatile fuels

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

A-3.2 Smoke from burning of waste materials

-Do not burn waste material

-Locate storage areas away from sensitive recipients

-Regularly transfer project waste to designated dumpsites

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

A-3.3 Noise Nuisance from Construction Works

-Regular maintenance of construction equipment

-Work in day time near settlements

-Work outside of school hours near schools

-Make sure all personnel have and use hearing protection

-Prepare contingency plans to deal with noise complaints

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

Page 20: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-4 Biological Resources

A-4.1 Conversion of Degradation of a critical or non-critical Natural habitat.

-The Contractor is not allowed to cut trees other than those necessary to conduct the works

-Plant new bushes and provide necessary irrigation if bushes are destroyed during works

- Unblocking of culverts to allow passage of small animals

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

A-5 Expected Impacts on Socio-Economic Resources

A-5.1Public health and safety at construction site Health and Safety for construction workers -Interaction between the workers and the Public

-Removable Barriers erected in high risk areas

-Installation of warning signs

- Locate workers’ camps away from settlements

Contractor in coordination with the Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

3,174 USD Cost included in salary of 1 part time social & environmental specialist

A-5.2 Gender considerations

Installation of traffic signs and bumps for road safety near schools

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social specialist

A-5.3 Employment -Employ local residents when feasible

-Contract local companies when feasible

Contractor and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Indirect cost included in the BOQ

Cost included in the salary of the part time social specialist

TOTAL 20,793 USD 12,000 USD

Page 21: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Summary of Environmental Management Plan during maintenance phase

Potential Impact Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

B-1 Land Resources

B-1.1 Maintenance of contractor site compounds, materials and equipment storage

Follow Safety, Health and Environmental Regulations in particular:

- Fire protection and prevention

- Protection of the Environment

- Air and water pollution

- Solid Waste

-Noise control

Contractor Environment and Social Specialist of RMF

No additional cost No additional cost

B.2 Hydrology and Water Resources

B-2.1 Water Harvesting -Regular maintenance of water harvesting structures

Contractor and the Beneficiary Committee

Environment and Social Specialist of RMF

Cost will be included in

the maintenance BoQ

No additional cost

B-2.2 Blockage of cross drains/culverts

-Regular maintenance of the drainage structures

Contractor Environment and Social Specialist of RMF

Cost will be included in the maintenance BoQ

No additional cost

B-2.3 Erosion of road platform from drainage discharge

-Regular maintenance of retaining walls, gabions and rip rap

Contractor Environment and Social Specialist of RMF

Cost will be included in the maintenance BoQ

No additional cost

B-2.4 Pollution from Vehicle leakage or accidents

-Timely clean up following spills or accidents Contractor Environment and Social Specialist of RMF

Cost will be included in the maintenance BoQ

No additional cost

B-3 Socio-Economic Resources

B-3.1 Increased Road Accidents

-Maintain speed reduction signs and bumps Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-3.2 Public Health and Safety during Maintenance

- Safety rules maintained

-Appointment of a safety officer

-Health and safety regulations displayed in English and Arabic in the maintenance plant

Contractor Environment and Social Specialist of RMF

Cost will be included in the maintenance BoQ

No additional cost

B-3.3 Chance finds Cultural Resources or Other Socio-Economic Resources

- If found during maintenance, the local Authority should be contacted GOAM

Contractor Environment and Social Specialist of RMF

Cost will be included in the maintenance BoQ

No additional cost

Page 22: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

1 Project Description

1.1 Introduction to the Project

Environmental and Social Impact Assessment (ESIA) study has been prepared for the

Project " Attahriah – Al Ka’ka’ – Je’wal” Rural Road" for the Rural Access Program (RAP) as a

variation order under a contract signed between the Ministry of Public Works and

Highways, Rural Access Program Central Management Office (RAPCMO) and Arabtech-

Jardanah - Engineers and Architects. This Environmental and Social Impact Assessment

(ESIA) study was prepared in conformance with category B requirements of the World

Bank’s Environmental Assessment Policy OP 4.01. In addition, this ESIA complies with the

Environment Protection Law No 26 of 1995 (EPL), and according to the guidelines set forth

in the Sectoral Environmental Assessment (SEA) document prepared during phase 2 of the

Rural Access Program (RAP 2) which was approved by the WB in November 2009,

depending on the nature of road impacts.

The ESIA study reviewed and updated by the Environmental and Social Unit Staff at

RAPCMO in November 2014 addressing all comments raised by the World Bank Safeguard

Team.

Figure 1.1 General location of Al-Baida Governorate in the R.Y

Source: Screening Report: For ATTAHRIAH – AL kA’kA – JE’WAL - (RAPCMO) office, 2005

Page 23: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

1.1 Description of the Project

Arabtech-Jardanah - Engineers and Architects is commissioned to undertake the study of

upgrading Attahriah – Al Ka’ka’ – Je’wal” Road. This road section is located in the North

West part of Al Baidah Governorate within the As-Sowadiah District; with a total length

of 11.89 Km, which starts at about 17.5 km from the As-Sowadiah town. The proposed

road serves 10 villages directly and indirectly, among them “Boukhor village at km 1.7, Al

Ka’ka’ village at km 4.5, Je’wal village at Km 8.6, and Dhahebah village at Km 9.65.

The overall objective of this project is to connect the populated communities and areas

located along “Attahriah – Al Ka’ka’ – Je’wal” road with the other parts of Al Baidah

Governorate, and the national roads network. In general, the design will follow the

existing track and the work will comprise earthworks, drainage works, protection works,

relocation of existing utility services if necessary and the provision of road pavement

layers, including base course and bituminous surfacing. This road is classified as category

(B) because the expected adverse environmental and social impacts will be limited and

temporary in most cases, while it is reversible for the most part. Meetings were

conducted with the local community’s representatives including the women within the

project area.

The design alignment is based on the existing alignment. Since the existing road has

been excavated, the road works will not involve any widening as it has a current width

varying from 6 to 8m consequently; no land acquisition or donation is needed.

Figure 1.2: Typical view of the first part of Section 1

Page 24: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Figure 1.3: Attahriah – Al Ka’ka’ – Je’wal” Road Rural Road Project starting point

Figure 1.4 Attahriah – Al Ka’ka’ – Je’wal” Rural Road Project ending point

The main works that will be necessary for the construction of the road are: earthworks

as a result of the re-profiling of the horizontal and vertical profiles of the road, filling,

grading, and leveling of sub-grade, base course layer, asphalt layer, and the construction

of several culverts for stream water crossings.

Page 25: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

1.1 Objectives of the ESIA

The Environmental and Social Impact Assessment (ESIA) is intended to identify and

suggest mitigation measures for the potential environmental and social impacts

associated with the project " Attahriah – Al Ka’ka’ Rural Road". It is also expected to

assist the RAPCMO in addressing the potential environmental and social issues related

to the road project and approve it to proceed.

The measures to mitigate the potential impacts on the environment are identified in the

Environmental and Social Management Plan (ESMP). ESMP provides guidance to

contractors how to implement project in compliance with the ESMP.

1.4 Environmental Screening

Arabtech-Jardanah - Engineers and Architects appointed in 2007 by RAPCMO to prepare an

Environmental and Social Impact Assessment (ESIA) for the Project followed the ESIA

accordance with the World Bank Guidelines for Conducting Environmental and Social

Impact Assessment as per WB OP 4.01. The proposed Project is classified under Category

B. RAPCMO Environmental and Social Unit Staff reviewed this ESIA and updated it based

on the recent field visit to the site to ensure that no land acquisition would occur as a

result of project activities and in compliance with OP 4.12.

1.5 Existing Alignment

The proposed road “Attahriah – Al Ka’ka’ – Je’wal” is located in the North West part of Al

Baidah Governorate within the As-Sowadiah District, with a total length of 11.89 Km,

and its starting point is about 17.5 km from As-Sowadiah town. The proposed road

serves 10 villages directly and indirectly, among them “Boukhor village at km 1.7, Al

Ka’ka’ village at km 4.5, Je’wal village at Km 8.6, and Dhahebah village at Km 9.65.

Geomorphology wise, the track can be divided into two sections:

Section (1): 0+00-4+400:

This section (Plate-1 & Plate-2) can be considered as a flat to simple rolling terrain

with 6-9 m as it was prepared up to top sub-grade layer by a previous local

contractor. The end point of this section is at the entrance of Al Ka’ka’ village.

Section (2): 4+400-11+900:

This section (Plate-3 & Plate-4) can be considered as a smooth rolling terrain, with

6-8 variable track widths.

Page 26: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

The following table gives a description of the different sections of the road and the following

figure shows its general road profile.

Section Length

(km)

Width

(m) Main Features

1 4,400 6-9

The existing alignment is an earth road and excavated

before to variable widths. The alignment is considered

as flat to rolling (in most of its part. Land use is vacant

agricultural and houses.

2 7.500 6-8

The existing alignment is an earth alignment not

excavated well. The alignment considered as flat with

low and mild gradients. Land use in vacant, agricultural

land and villages.

11.9 Total

Table 1.1 Characteristics of the road alignment.

Figure 1.5 Photo shows typical view from Section 1&2

Page 27: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

Figure 1.6 Location Map

Figure 1.7 Topographic map of Road Alignment

Page 28: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

H

Figure 1.8 Road crossing flat to rolling terrain.

Plate -1: The Project Road’s Entrance

Plate-2: St.1+325: Flat terrain

Plate-3: St. 7+700, Smooth Rolling Terrain

Page 29: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

1.1 Proposed Works

In general, the design will follow the existing track and the work will comprise earthworks,

mostly embankment construction, filling, grading, leveling of sub-grade, base course layer,

asphalt layer, drainage works, installation of culverts, protection works, and the

construction of base course and road pavement layers, including prime coat and wearing

coarse surfacing.

Table below is the summary Bill of Quantities (BOQ) developed for Attariah - Al ka’ka’ rural

road. It gives a brief overview of works that will be done during the execution stage.

DESCRIPTION OF ITEMS

UNIT QUANTITY

ENGINEER'S FACILITIES

Provide a rented site office, housing and accommodation for the

Engineer staff as describe in Specific Specification

Monthly

Rate

12

Provide a rented three (2) vehicle for the Engineer staff including

Operation cost such as, fuel, oil, lubricants, Driver, insurance, and

maintenance. …Etc. as describe in Specific Specification

Monthly

Rate /

Vehicle

20

Provide a rented laboratory equipment for the Engineer staff including

Operation cost as describe in Specific Specification

Monthly

Rate

12

Provide a rented Survey Equipment for the Engineer staff including

Operation cost describe in Specific Specification

Monthly

Rate

12

EARTH WORKS - EXCAVATION

Roadway Common excavation m3 9,160

Roadway Rock excavation m3 970

Fill of suitable material from common excavation and/or rock

excavation within all haulage distance.

m3 8610

Fill of borrow material including excavation of the borrow pits and

hauling the material to fill locations within all haulage distance

m3 16,820

EARTH WORKS - OTHERS

Disposal of surplus and/or unsuitable excavated material outside the

right- of- way to the locations approved by the engineer

m3 0

Reconstruct the existing layer to regain the compacted thickness (20

cm), the work shall include scarifying existing layer, mixing with new

(borrow) suitable granular materials (new materials may reach 50 % of

which the compacted layer suppose to composed of), watering and

rolling and doing all what it needs to finish the work as per design and

specifications.

m2 64800

PAVEMENT WORKS

BASE COURSE AND SURFACING

Granular Base Course layer 150mm thick compacted to specified

AASHTO modified density as per Specification

m3 9,700

Provide and Spray Bitumen Prime Coat as per Specification m2 89,500

Provide and Lay Asphalt Concrete Wearing Course 40mm thick m3 5,920

Stone pavement (250mm thick) m2 4.400

Page 30: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

STRUCTURAL WORKS

Structural Excavation (Culverts, Retaining Walls, Irish Crossings ) m3 1500

Concrete Class 110/25 (Blinding for Culverts, Retaining Walls & Irish

Crossings etc...)

m3 32

Concrete Class 210/20 (Culvert Top Slab, Irish Crossings Cut off Wall &

Slab etc...)

m3 260

Cyclopean Concrete Class 210/20 (Culvert / Retaining Walls Beds,

barriers, Paving, etc.. )

ton 930

High Tensile steel bar reinforcement (Grade - 40) for Irish Crossings and

pavement

ton 0

High Tensile steel bar reinforcement grade – 60 (Culvert Top Slab, Road

Pavement)

m2 22

Grouted Riprap at Irish crossing, roadside ditches, slope Protection, and

Culverts Inlet & Outlet. ( 25cm thick)

m3 9300

Gabions for Irish crossings, Slope Protection & Mudarrajat complete as

per Specification and shown on Drawings.

m3 0

Stone masonry Dressed Coursed as per Specification and shown on

Drawings (Retaining Walls, Culverts & Safety Barriers).

m3 700

Boulder Masonry for Retaining Walls, Culverts & Safety Barriers m3 220

INCIDENTAL CONSTRUCTION

Project Name Board (Comprised of 7 reflected 3 mm thick Aluminum

sheets with their support, fittings and concrete foundation). No. 2

Small Signs (not exceeding 1sqm area) No. 12

Single post sign support No. 12

Reflectorized Pavement Marking (Thermoplastic) m 28,000

Relocation of Existing walls m 0

Relocation of Existing fences m 0

Relocation of Existing Electric Pole No. 0

Relocation of Existing Telephone Pole No. 0

Removal of existing water pipe No. 0

ENVIRONMENTAL WORKS

Provide and lay Irrigation Pipes MS 300mm dia. Including Excavation

and Backfilling

m 1300

Provide and lay Reinforced Concrete Pipe Culvert 120cm dia. including

plain concrete for cradle & sand for fill as per typical drawings

m 1200

Random Dry Stone Masonry for agriculture Land as Retaining Walls

With Thickness not less than 25cm for each Stone including excavation

and filling

m2 1200

Table 1.2 Bill of Quantities for the Attariah – Al Ka Ka road project

1.1 Land Acquisition and Compensation

In roads development project, the issue of land acquisition, especially in rural areas, is

considered sensitive. Land acquisition is an easy issue when implemented in vacant and

/ or grazing lands. While it became a very sensitive issue when dealing with private lands

Page 31: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Sowadiah District Al Baidah Governorate

owned by people living below poverty level, whom using this land as a source for their

income.

With regard to this project, it is not expected that land acquisition would occur based on

the following facts:

The project depends on upgrading the current road alignment and status.

The project designers will work on reducing the rate of encroachment upon

private lands.

No widening of the road design is required; accordingly no land acquisition is

expected as a result of road implementation.

The design alignment is based on the existing alignment. The road works will not involve

any widening as it has a current width varying from 6 to 9m. As the proposed road will be

constructed on the current gravel road, no disputes are anticipated due to the construction

process. The local community have assured that there are no tribal conflicts in the area

currently, especially around the road alignment. They appreciate the benefit of the

proposed road. Also, the officials in the region assured that the locals have agreed to

provide a temporary land for the contractor’s camp and storage of equipment free of

charge and all the required help and assistant towards successful execution of the road.

1.1 Land Donation

No land acquisition or donation will be needed, as the road will not be widened.

Page 32: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

32

2 Legal and administrative framework

2.1 National Legal Framework

The most relevant national laws related to road projects and environmental management are presented in the tables below.

Year Law No. Description

1990 Decree of the Prime Minister 94

Establishment of the Environment Protection Council (EPC).

1995

Adoption of the National Environmental Action Plan (NEAP)

1995 Law No.26 Protection of the Environment

2002 Law No.33 Water Law (9 chapters and 82 articles)

1991 Yemeni Constitution (articles 7, 18, 19 and 20) Land Acquisition and Private Property

2002 Civil Law (articles 118, 119 and 120) Land Acquisition and public ownership

1995 Law No. 21 State Land and Real Estate

1995 Law No.1 (Articles 12 – 16 on temporary acquisition, Articles 21, 27 provisions for land acquisition Land acquisition for the public interest

1992 Waqf Law no 23 year 1992 and The Republican Decree 99, 1996) Waqf/Endowment Land

1991 Civil Law, Articles 761, 765, 770, 1159) Agriculture Land

Table 2.1 List of Major Laws/Decrees/Orders relevant to roads Projects

Also, following are the major laws and By-Laws related to the road sector policy:

Construction Law No. 19/2002;

Road safety Law No. 119/1976;

Weights and Dimension of Transport Vehicles Law No. 23/1994 with its Executive Regulations no. 282/2002;

The Road Maintenance Law (No.22/1995) with its two amendments n. 7 of 1997 and 27 of 2000.

Yemen ratified a large number of International Environmental Agreements and Conventions; these are listed in table 3 below.

Ratification Date

Name

1980 Convention Concerning the Protection of World Cultural and Natural Heritage

1992 Convention on the Control of Trans-boundary Movements of Hazardous Wastes and their Disposal

1995 Convention on Biological Diversity

1995 Convention for the Protection of the Ozone Layer

1995 Protocol on Substances that Deplete the Ozone Layer

1995 Convention on the Control of the Trans boundary Movement of Hazardous Wastes and their Disposal

1995 Framework Convention on Climate Change

1995 Convention on Biological Diversity

1996 United Nations Convention to Combat Desertification UNCCD

1997 Convention on International Trade in Endangered Species of Wild Fauna and Flora

2002 The Convention on the Conservation of Migratory Species of Wild Animals

2004 Kyoto protocol (Framework Convention on Climate Change)

Table 2.2: List of Conventions and International Agreements that were ratified by Yemen

Page 33: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

33

The Environment Protection Law consists of five chapters and 95 articles. The law's

objectives are to protect the environment, to combat pollution, and to protect natural

resources, society, human health, and living beings from activities that damage the

environment. In addition, the law is designed to protect the national environment from

activities practiced beyond the national boundaries and to implement international

commitments ratified by the Republic of Yemen in relation to environmental protection,

control of pollution, conservation of natural resources, and the protection of such globally

important environmental elements as the ozone layer and climatic changes.

Also, the law specify the incorporation of environmental considerations in economic

development plans at all levels and stages of planning for all sectors. It also, requires the

preparation of environmental assessment for all projects proposed by government, public,

private, and cooperative agencies, and foreign companies. No licenses are to be issued for

projects that degrade the environment. However, there is as yet no regulatory framework to

support the implementation of the Environment Protection Law and the provision of

undertaking environmental assessment for projects is not enforced.

The competent bodies for EIA defined in the EPL are those government bodies with powers

under other legislation to approve development activities. The Environment Protection

Council (EPC) was given the responsibility of coordinating the activities of the competent

bodies, and providing advice to them. In 2001 the Government transformed the EPC into the

Environmental Protection Authority (EPA).

Environmental standards and specifications have been prepared by the former EPC as

annexes to the Executive Regulations, covering potable water quality, wastewater quality

for agriculture, and ambient air quality, emissions, noise, biodiversity and protected areas.

2.2 Environmental Institutions

Environmental Protection Authority (EPA), established by Decree 329/2001, (derives from

the Environment Protection Council (EPC), established in 1990) is the official and specialized

governmental agency for environmental protection and natural resources conservation

according to the EPL and other legislation in force, with statutory planning, licensing,

monitoring and auditing functions. The headquarters of the Authority is in Sana’a and it has

the authority to establish branches in the governorates if prescribed by a Decree from the

Minister based on a proposal approved by the Minister of Civil Services and Insurance. The

EPA is lead by a Chairman and a Deputy Chairman managing 3 Directorates (Natural

Resource; Control and Monitoring; Planning and Environmental Data) and 4 units (Climate

Change; Ozone Unit; Women and Environment; Local Environment Issues). The Authority

has also 2 departments: one for Legal Affairs and one for Awareness Raising, NGOs and

Information. The new EPA has a clear mandate to implement the environmental legislation

and to execute projects with the following objectives:

Protect the environment and conserve its balance and maintaining the ecosystems;

Combat the different kinds of pollution and avoiding any damage or negative impacts of various development projects,

Page 34: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

34

Protect and develop the natural resources and conserve the life qualities in national environment from the damages coming from outside the national environment;

Protect the society, human health and other organisms from the different non-environmentally activities;

Eliminate air pollution and the impacts of climate changes.

2.3 Environmental Applications to the Road Sector

The current Government Policy in the road sector is mainly related to road maintenance

and development occurs in the following projects and programs:

The Rural Access Program (RAP) with the aim to improve livelihood for the rural

population and reduce rural isolation.

The creation of the Road Maintenance Fund (1995) with the aim to improve the

maintenance of roads and to enhance cost recovery in the road sector.

The Transport Rehabilitation Project -1995- (financed by the World Bank) to

undertake urgent rehabilitation needs in the roads and civil aviation sectors;

2.4 Involved Authorities

The central organization responsible for the coordination of decisions and actions related

to the road projects is the Ministry of Public Works and Highways (MoPWH) that

administers among others, the Rural Access Program.

Several organizations are directly involved in road related projects:

The Ministry of Water and Environment (MoWE) is responsible for water supply and

sanitation.

o The National Water Resources Authority (NWRA) manages water resources

on a sustainable basis, ensures satisfaction of basic water needs and

establishes a system of water allocation

o The National Water and Sewerage Authority (NWSA) manages urban water

supply,

o The General Authority for Rural Water Supply (GARWSP) manages rural

water supply, and

o The Environment Protection Authority (EPA).

The Ministry of Agriculture and Irrigation (MAI): is responsible for the sustainable

water management in the irrigation sector and the setting up of operation and

maintenance of irrigation structures. Moreover, MAI should provide protection from

floods, and erosion of soil, maintain agricultural terraces and prevent the

uncontrolled expansion of industrial or other infrastructure.

The Ministry of Finance (MoF), and within it the Department of Public Domain,

maintains urban land records such as registers of transactions, sales, and purchase

leases.

Page 35: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

35

The General Authority for Land Survey and Urban Planning (GALSUP) is responsible

for all land related tasks such as planning, preparation, concession/ownership

contracts, notarization and the execution of expropriation processes.

Local Councils, represent executive authority on the level of governorates (local

Administration Law number 4/2002). They play a role in the control and the solving

of land donation issues.

Non-Governmental Organizations (NGOs) play roles in increasing public awareness

on environmental or health matters; others support people in need.

2.5 World Bank environmental and social safeguards and policies

The World Bank has ten operational safeguard policies, which apply to various

development projects that the Bank is either implementing or funding. The purpose of

these policies is to ensure that social and environmental risks are prevented or at least

minimized while increasing socio-economic benefits of approved projects in addition to

preserving the environment. These policies have been a means to increase the

effectiveness and positive impacts of development projects supported by the Bank. The

World Bank Safeguard Policy triggered for the Attariah – AL Kaka road project is the

Environmental Assessment OP 4.01. As the proposed road was excavated to sufficient

width during the previous contract, no land is needed for the road project. In addition, the

temporary land use for the contractor’ camp and storage of equipment is voluntary

provided by the local community at no cost for the successful execution of the road project.

Accordingly, the WB Safeguard Policy on Involuntary Resettlement OP 4.12 is not triggered.

Table 2.3. World Bank Safeguard Policies Triggered in Attahriah – Al Ka’ka’ Rural Road

Policy Reference Applicability

1 Environmental Assessment OP 4.01 Yes

2 Involuntary Resettlement OP 4.12 No

3 Natural Habitats OP 4.04 No

4 Physical Cultural Resources OP 4.11 No

5 Pest Management OP 4.09 No

6 Indigenous Peoples OP 4.10 No

7 Forests OP 4.36 No

8 Safety of Dams OP 4.37 No

9 Projects in Disputed Areas OP 7.60 No

10 Projects on International Waterways OP 7.50 No

Page 36: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

36

The scope of works and the expected minor environmental and social impacts of the

project allow classifying the project as category B under the Bank Safeguards Policy on

Environmental Assessment OP 4.01.

The Environmental Assessment takes into account the natural environment (air, water, and

land); human health and safety; and social aspects (involuntary resettlement, physical

cultural resources, etc.) in addition to trans-boundary and global environmental aspects.

Useful guidelines and manuals that need to be considered during the ESMP phase of the

project include:

The World Bank Participation Sourcebook

Safeguard Policy Basics – Redbook

Environmental, Health and Safety (EHS) General Guidelines issued by the World Bank

Roads and the Environment. A Handbook. World Bank Technical Paper 376.

Doing Better Business through Effective Public Consultation and Disclosure – A good

Practice Manual, issued by IFC.

Page 37: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

37

3 Baseline Data

This section will discuss the existing conditions of the Attahriah – Al Ka’ka’ Rural Road area.

It comprises a description of the physical, biological and socio-economic environment.

3.1 Land Resources (Physical Region, Geology and Land use)

The project is located within the central/southern highlands of Yemen, which is dominated

by intrusive and metamorphic rocks of the Precambrian basement complex. The main rock

types within the direct vicinity of the project route were gneissic granite, intruded by many

mafic dikes, and some marble outcrops were also observed near Al Ka’ka’ village. These

outcrops are overlaid by soil deposits (up to 2 m thickness).The outcropping geological

formation reflects a complicated structural setting that includes faults, joints and bedding

plan systems. The overall area of the valley where the planned track is located is

tectonically controlled by two sets of faults oriented N-S and SW-NE.

The elevation of the Attahriah – Al Ka’ka’ rural road varies between 751m and 849m above

MSL. The topography is almost flat with average low slopes of around 5%.

The project area is dominated by agricultural and residential land use pattern. Most of the

plots along the road are non arable or built up. Some plots are cultivated mainly with corn

but only between springtime and summer time as they rely for irrigation on the rainfall.

3.2 Climate and Rainfall

The climate within the project area resembles the rest of Al-Baidah Governorate Climate (Table 3.1), which is relatively cold in winter and moderate in summer, monsoon rains come in rainy seasons, between Mar – May and from July to Aug.

Table 3.1 Climate in Al Baidah Governorate

1800-2200 M asl Elevation

31-34 º C Max. temperature (Jun-Aug)

25-27 º C Max. temperature (Nov-Feb)

4-7 º C Min. temperature Jul-Aug)

13-17 º C Mini temperature degrees in cold months (Nov-Feb)

232 mm Annual yearly rainfall average

255 mm Annual yearly rainfall average in (R.O.Y)

The general climatic pattern of the catchment areas concerned is sub-tropical and dry

where the rainfalls are rather low to medium over the region, but at the mountains, to the

orographical effects, the rainfall is higher, especially in the western and northern parts of

the catchments.

Page 38: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

38

The area is characterized by two rainy seasons. The average yearly rainfall varies between

300 and 400mm as shown in the isohyetal map below (figure 3.1). The first rainy season

starts in March and stops by the end of May and the second starts in July and stops by the

end of September; the wettest month being July.

The mean monthly temperature ranges between 21 to 31 degrees centigrade. The hottest

months are June and July and the coldest months from December to February (figure 4.3).

Figure 3.1 shows the different climatic zones in Yemen. Al- Baidah governorate has an arid

climate.

Figure 3.1 Climatic Zones in the project area

Figure 3.2 Average temperature graph for Al-Baidah

Project

area

Page 39: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

39

Figure 3.3: Average annual rainfall in the Project Area

3.3 Absorption and Runoff Zones

The project area is of low to medium rainfall intensity and of limited relief. Thus it is

considered to be a relatively low energy environment that tends to be rainfall absorbing

area allowing for rainfall percolation through wadi beds and finally recharging the local

groundwater aquifer systems. In general the expected runoff zones within the project area

are the following:

From St. 6+300 to St. 6+375 with a length of 75.0 m

From St. 7+725 to St. 7+850 with a length of 125.0 m

From St. 9+310 to St. 9+365 with a length of 55.0 m

3.4 Catchment Characteristics

The topography of the catchments are characterized by a mountainous terrain with a

considerably high general slopes in most parts of the catchments and more gentle slopes in

lower parts near to the road location. Slopes near the wadi sides in the upstream are much

higher and can reach more than 100%.

The catchments of the wadis draining in the study area consist of as large as 7.1 Km2 such as

in the point where the road crosses wadi (6) to smaller areas less than 0.1 Km2 as in some

un-named wadis as included in numbered catchments.

Project

area

Page 40: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

40

Table 3.2 Catchment Characteristics of the Road area

Wadi

Name /

Number

Approx.

Station

[km]

Area

[km2]

L [km] H1 [m] H2 [m] Slope [%]

1 1+307 0.350 1.045 2070 2015 5.26

2 1+432 0.250 0.300 2050 2015 11.67

3 2+100 0.675 1.800 2050 2000 2.78

4 2+625 1.080 1.550 2050 1995 3.55

5 2+891 0.125 0.550 2032 1997 6.36

6 3+592 7.100 3.600 2070 1990 2.22

7 4+506 0.425 1.000 2030 1995 3.50

8 5+000 2.125 2.400 2045 1990 2.29

9 8+110 2.950 2.650 2045 1995 1.89

10 9+775 2.100 1.700 2045 1975 4.12

11 10+500 0.300 0.650 2010 1970 6.15

12 10+893 0.150 0.550 1990 1975 2.73

13 11+250 1.000 1.900 2020 1978 2.21

Source: Hydrological study for The Project Route -2010

Figure 3.4 Sub- Catchments of the Road Project

Page 41: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

41

3.5 Groundwater Resources

Within the project area, the main source for water is the shallow local aquifer systems.

These aquifers may be formed by direct precipitation recharge and/or by seepage from

other regional groundwater aquifer systems. Such aquifers are generally unstable and

characterized of having fluctuated groundwater level, as it is recharged during the rainy

seasons, and discharged by the locals during the dry seasons.

Water demands for the scattered villages along the road alignment are provided from

several shallow groundwater wells drilled in the area. The depth of these wells varies

between 15-20 m. Abstracted water from these wells is used for domestic and agricultural

demands. Water is transported to the houses through an irregular water distribution pipe

system. As for surface water, its only source in the project area is the runoff during the rainy

periods through the local wadis system.

3.6 Water Harvesting

The shortage of rainfall forces the local communities within the project area to use different

water harvesting techniques.

Within the project area water harvesting technique is practiced, based on collecting and

retaining overland flow in zones where soils permit agriculture. The receiving zone is always

smaller than the zone where overland flow is produced, thus a multiplier effect is produced

which permits agricultural production in low precipitation zones.

Such techniques are a major source for irrigating the farmed crops in the area. Thus, water

harvesting structures are important for the local economy in the project area. Rainwater

harvesting is a major source of water for irrigating the cultivated land (table 4.3). More than

50% of the total cultivated lands in Al-Baidah governorate are irrigated through rainwater

harvesting.

Cultivated Land by Type of Irrigation (ha) Area (Ha)

Rain Water Harvesting 13,622

Flood Water Harvesting (Spate) 3,205

Groundwater irrigation (Spring Irrigation) 801

Groundwater irrigation (Well Irrigation ) 9,082

Total Cultivated areas (ha) 26,710

Table 3.3 Cultivated Land by Type of Irrigation in Al-Baidah Governorate (Source: Draft

Sectorial Environmental Assessment, Volume-1 , Oct.2011).

Page 42: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

42

3.7 Air Quality and Noise Nuisance

Data on air quality in Yemen is scarce, and is unlikely to be used in any RAP project analysis,

and not enough studies are available to present the effects of rural roads on air quality.

Recent studies indicate that as the number of vehicles continues to grow, motor vehicle

emissions are becoming increasingly important contributors to air pollution. Within the

project area such issue is expected to be of minimal impact due to the limited number of

vehicles that will use this road compared to the number of vehicles in the major cities.

Overall, the air quality in the project area is high as there are no significant sources of air

pollution.

Noise nuisance is seen as a minor concern in Yemen. The concept of noise pollution is not

readily recognized, and the potential adverse impacts on health are not generally

understood. Within the project area, baseline noise level is low due very limited number

noise sources (including vehicles typical existing noise levels near the project site are

generally limited because the project site is located in a relatively underdeveloped area.

Cars encountered were relatively old and slowly driven at low gear due to the rough terrain.

Noise comes from the engines, transmission, exhaust and suspension of the vehicles and

from frictional contact between the tires and the hard road. There are 2 schools, at 10m and

100m distance to the road and they are considered as noise sensitive facilities.

3.8 Biological Resources

Yemen has a rich and diverse flora and fauna is primarily due to the wide range of habitats

in the country that vary from the highest mountains, to the plains, dry sand-deserts,

marshes, coastal habitats and volcanic ocean islands Yemen is positioned at the juncture of

three major biogeography regions, the Palaearctic, Afrotropical and Oriental regions.

According to the Ministry of Water and Environment (MoWE), about 2,810 plant species

were recorded in Yemen. The major threats to flora are agriculture, over-grazing,

urbanization, tree cutting and wind erosion. The fauna comprises 71 recorded mammal

species, 5 species of gazelle and more than 363 species of birds. The major threats to fauna

are hunting and destruction of habitats due to deforestation and urbanization and killing of

animals perceived as dangerous.

In the considered Project area, some scattered trees can be observed but none will be

affected by the road works. Cattle and goats are found in the area. During the site visit, the

observed fauna and flora are not those of particular interest to the environment and no

protected or endangered species were identified. The road does not cross or run near any

sensitive, specially designated or protected areas.

With regard to the project area, major part has only very sparse natural vegetation;

scattered crops exist mostly near the wadi courses or at terraces where some rock barriers

or bare soil. Regarding the fauna, the dominant types of species within the project area are

the reptiles and the domestic mammals. Furthermore, the project area doesn’t include any

endangered or protected species.

Page 43: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

43

Figure 3.5 Natural vegetation in the Project area.

As an overall conclusion, the project route is of no ecological importance, thus, the project

activities will not cause any major negative impacts on the biodiversity setting.

3.9 Population and Community Structure

3.9.1 Administrative Structure and Population

The road passes through Dhahebah and Attahriah villages of As- Sowadiah district within Al

Baidah Governorate (Area: 9,280 km2). As Sowadiah district includes 104 village with a total

population of 46,404 persons and a population density of 62 person/Km2. It is estimated

that the road would serve (directly & indirectly) about 16,ooo persons. Population dynamics

for As-Sowadiah district and Al Baidah Governorate are presented in (table below).

Table 3.4. Population dynamics within the Project Area.

Source: Population Projection of the R.Y2005-2025(population growth is 4.4%)

25,956 ROY population, 2014

2,216,000 Population (Al Baida

Governorate)

46,404 Population (As-Sowadiah)

9,280 km2 Area (Al Baida Governorate)

444 km2 ِ Area (As-Sowadiah)

62. ِ Density (As-Sowadiah)

104 No. of villages (As-Sowadiah)

Page 44: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

44

3.9.2 Social Structure

The road’s area inhabitants are part of the Qayfah tribe, and there are no tribal conflicts

that may affect the road construction. As the road’s alignment will not be changed from its

current one, thus no conflicts because of the road are expected to arise especially that the

inhabitants feel a real need for the road and will not do anything that would delay or harm

the project. The inhabitants in the area are settled and there are no nomads among them

even among those whose main activity is herding. Furthermore, the following issues were

recognized during conducting the field survey in the area:

The arms carrying phenomenon is widely spread among the inhabitants and indicates a

strong tribal structure in the area as carrying arms is a main symptom of tribal society

indicating the fighting attitude which is typical in tribal societies.

The tribal norms are strong and effective in the inhabitants' social life. This is apparent

during the quarrels, which are often settled in accordance with the tribal norms and the

absence of any government judiciary components or system such as police stations and

general prosecution offices.

The tribal chieftains (sheikhs) play a great role in leading the society in this area. Their role

in administrating the local affairs is still significant and apparent more than the role of the

central government representatives.

3.9.3 Waste Disposal

From the site visit and discussions with the residents in the area of the Project, it was

noticed that the common practice is to discard the solid waste in pits near the houses and to

burn it when it accumulates. Strong wind causes littering of the surrounded area and smoke

spreading.

Meanwhile a blowing wind may spread waste in the surrounding environment. The nearest

common waste disposal site is a waste dump in Al-Baidah, at some 35 km distance from the

site.

3.9.4 Economic Activities and Poverty Status

Farming and residential are the two major land use patterns a presented within the project

area and along the road route (table 3.5), where the major economical activities within the

project area is farming and herding.

Left Side Right Side

Farming 1+950—2+100 Farming 2+00—2+650

Farming 2+200—2+650 Farming 3+600—3+700

Farming 7+750—7+850

Residential 8+700—8+900

Farming 9+470—9+610 Farming 9+300—9+350

Page 45: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

45

Table 3.5 Major Land Use Patterns Along and Close to the Project Route

In general the poverty level is high and has enforced many of the locals to look for jobs in other

parts of Yemen and even to migrate outside Yemen for better job opportunities. Those emigrants

are considered the main source for currency that supports their families and relatives. (table 3.6)

illustrates the governorate and district poverty level in the project area.

% of Population Under

Basic Needs Poverty

% of Population Under

Food Poverty Al Baidah

Governorate

42.1 35.1

As-Sowadiah District 42.2 38.4

Table 3.6 Governorate and District Poverty Level in the Project Area

Figure 3.6 Under/ Upper Poverty Map

Figure 3.7 Food Poverty Map

Residential 9+650—9+950 Farming 9+400—9+700

Residential 10+100—10+350

Graveyard 10+050-10+100

Residential Spot 11+550 Farming 10+050—11+00

Graveyard 11+558

Farming 11+300-11+890

Page 46: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

46

3.9.5 Agriculture

Farming and herding respectively are the major main economic activities within the project

area. Agriculture activities within the road project area are entirely dependent on rain, which

is not stable every year both in quantity and duration. As such, the crops in the area are also

entirely dependents on rain conditions.

The area is an agricultural one although the cultivated land area is medium when compared to

population. The land ownership is 3.99 hectares/P. Area wise, about 96% of the total land in

the directorate is cultivable, where 41% of it is actually cultivated. Moreover, the cultivated

land at As-Sowadiah district represents 0.44% of the total cultivated land in ROY.

Grains are grown on 84% of the cultivated land, where Maize represents 70%, and Wheat

represents on 12% of the cultivated land in the area. Maize is the main crop in the area and

the main nutrition source of the inhabitants, the production of the land is not sufficient for

the local consumption; so, the people imports wheat which is an important source for

nutrition.

Qat and coffee are the main crops, where the farmed area by these two crops is about 23% of

the cultivated lands. And they are the main source of income.

About 60% of the Cultivable land is not used which mean the cultivated land would be

expanded in the future.

3.9.6 Additional Income Sources

In addition to the above activities, the inhabitants depend on cash remittances from family

members employed outside the area. Most of them work in Yemen and some work outside

Yemen, especially in the Gulf state. This income source is a crucial source of cash income for

the inhabitants and balances their import/export deficit

3.9.7 Type and Volume of Exports and Dependency on Import

Although the area is an agricultural one, its output is not sufficient for local consumption. So,

the area imports a big portion of its need from outside the area especially wheat, rice, sugar,

vegetable oil, diesel, kerosene, and fuel. There are no important souks (market) in the area.

So, there is not any significant commercial activity in the area. On the other hand, Qat and

coffee are the two main exported crops from this area, representing one of the income

sources for the local population.

3.9.1 Services and Facilities

Infrastructure

According to the socio-economic survey, the main water sources in the Project area are

wells and small springs. Runoff water is also collected mainly for irrigation. There isn`t water

supply networks in the villages. Residents rely on cisterns transporting water at a price

ranging from 5 to 7 $ per m3 of water in case of network breakage.

Page 47: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

47

Water Resources and Sanitation Services

Water demands for the scattered villages along the road route are provided from several

shallow groundwater wells drilled in the area. The depth of these wells varies between 15-20

m. Abstracted water from these wells is used for domestic and agricultural demands. Water is

transported to the houses through an irregular water distribution pipes system. There is no

sanitation drainage network in the area. Also, there is no authority for collection and disposal

of domestic waste.

Electricity and Telephone

There is central or local electricity grid in the area. However, Some families own small

generators that they share the output with their neighbors. But, most of the inhabitants non-

electrical use lamps. There is a central telephone network in the area, where most of the

villages are covered by it. Also, the area is covered by cellular phone but only one of the

mobile companies has a good coverage. The extension of the electrical grid system within the

governorate is presented. There isn`t electric poles exist along and/or adjacent to road

project to be relocated during construction stage. See figure (3.8).

Education

Six schools providing Basic and Secondary level education are established within the project,

area statistical information about these schools is presented in (table 3.7). The extension of

the educational establishments within the governorate is presented in Figure (3.9). The

extension of these schools will not be affected by road construction.

Area No Level No of Students Male Female

Dhahebah 2 Basic 1-9 620 190 430

Dhahebah 1 Basic / Secondary 400 350 50

Attahriah 3 Basic 1-9 1,073 715 358

Total 6 1 Basic Secondary 2,093 1,255 865

Table 3.7 Statistical Presentation for the Educational Services Within the Road Project Area

Figure 3.8: Photo shows electric pole location

Page 48: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

48

The other key information collected about the educational system include:

Number of students in the area is acceptable compared to other Yemeni rural area.

Female students represent 41% of total student numbers, which indicates that the female enrollment ratio is becoming acceptable.

There is only one secondary school in the area, and the number of female students is only 50 students, which indicate the female enrollment ratio in this level is bad.

The number of schools is not enough to cater for the needs.

Health Care

There are no governmental health care establishments in the project area. So, locals need to

transfer their patients to As-Sowadiah or Rada’a city, which cost them a lot of money (about

2000 YR/ trip) and effort. Women and children are the most impacted by this situation as they

do not get the basic vaccines when needed in the area (except for Paralysis vaccine which is

provided during government national campaigns). However, the easy access to the proposed

paved road helps the inhabitants to reach the health Facilities in Rada’a city. The extension of

the health establishments within the governorate is presented in Figure (3.10).

Figure 3.9 Distribution of Education Institutions within the project area

Page 49: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

49

Biological Environment

According to the Ministry of Water and Environment (MoWE), about 2810 plant species

were recorded in Yemen. The major threats to flora are agriculture, over-grazing,

urbanization, tree cutting and wind erosion. The fauna comprises 71 recorded mammal

species, 5 species of gazelle and more than 363 species of birds. The major threats to fauna

are hunting and destruction of habitats due to deforestation and urbanization and killing of

animals perceived as dangerous.

In the considered Project, some scattered trees can be observed in the project area but

none will be affected by the road works. Cattle and goats are found in the area. During the

site visit, the observed fauna and flora are not those of one particular interest to the

environment and no protected or endangered species were identified. The road does not

cross or run near any sensitive, specially designated area or protected areas. The following

photos present such species observed during site visits.

Figure 3.10 Distribution of the Health Services within the Project Area

Page 50: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

50

Figure 3.11 Photographs of Flora taken along the road.

Figure 3.12 Photographs of Fauna taken during site visit.

Employment

Agriculture is the main source of income for the population served by the road, with the

main agricultural crop being corn. Soils are fertile but agriculture is mainly rain fed and

consequently, yields are very limited and almost nil in a dry year. The project area is known

for the high number of imigrants that left the area looking for job opportunities. The main

income of the population in the area comes from money transfers.

Page 51: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

51

Figure 3.11 Photo of agriculture land adjacent to road

Access to services

According to the socio-economic survey, the main water sources in the Project area are

wells and small springs. Runoff water is also collected mainly for irrigation. There isn`t water

supply networks in the villages. Residents rely on cisterns transporting water at a price

ranging from 5 to 7 $ per m3 of water in case of network breakage.

There is no telephone network (land line) in the area of the Project; residents rely on mobile

phones as 3 telecommunication companies cover the area.

Archaeology and cultural heritage

There are no known sites of archaeological or cultural significance identified within the

Project site.

Page 52: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment

Attahriah / Al-Ka’’ka’ / Je’wal Road Potential Impacts

52

4 Potential Environmental and Social Impacts

4.1 Scoping of Impacts

The scoping matrix (adopted from the SEA-RAP2) presented in table 4.1 was used to identify impacts that should be given attention. Input from the public consultation was considered and incorporated in the list of potential impacts.

These impacts are classified in terms of: Type (negligible, uncertain, positive, negative), Effect (direct, indirect), Duration (temporary, permanent), Extent (localized, extensive) and Degree (minor, major reversible or major irreversible).

None of the impacts identified were evaluated as major irreversible. Most impacts are considered negligible. Impacts of more significance are short-term and reversible.

4.2 Potential Impacts

This section of the report presents and discusses the expected Environmental and Social impacts of this project (both positive & negative) during the Design/Construction phase and the operation phase. The Environmental and Social checklist presented in Table (4.1) is used as a guiding tool for evaluating the expected impacts of this project. The discussed potential impacts within this section cover:

Land Resources

Hydrology and Water Resources

Air Quality and Noise

Biologic Resources

Socio-Economic and Cultural

Page 53: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

53

Table 4.1 Checklist of Potential Impacts Associated with Road Project

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

A-1.1 Permanent Land Acquisition

A-1.1.1 Local Re-Alignment

/ New Alignment

O

The current width of the road track is sufficient for construction of the planed

project

A-1.1.2 Dumping Sites O O O O O Not to dump in Ag lands & near residential spots.

A-1.2 Temporary Land Acquisition

A-1.2.1 Site Compound O

Local communities promise to provide temporary community land free of charge

and to provide full support to the project

implementation

A-1.2.2 Diversion and Haul

Road O

LA

ND

RE

SO

UR

CE

S

A1

- D

esig

n /

C

on

str

ucti

on

A-1.3 Slope Stabilization O

A-1.4 Management of Construction

Site Compound

A-1.4.1 Solid and Liquid

Waste Disposal o o o o O

Collect, separate recyclable and compost

organic waste

A-1.4.2 Handling of Petroleum Products

and Paving Material

o o o o O Properly collect and dispose products

Page 54: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

54

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

A-1.4.3

Safety And

Emergency Response

Procedures

O

A-1.4.4 Living and Sanitation Facilities

o o o o O Prepare treatment and disposal of wastewater

A-1.4.5 Rehabilitation of Site

o o o o O

The public safety and mainly kids, because: (i) harmful materials can be found

and used in an inappropriate way, (ii) The

risk of falling in any excavated holes within the construction site.

A-1.5 Disposal of Cut Material and Surplus Fill

o o o o O Avoid dumping in Ag lands & nearby residential spots.

A-1.6 Borrow Pits and Quarry Areas o o o o O To be selected away from the Ag lands & Residential spots with the approval of the

RE and the local communities

LA

ND

RE

SO

UR

CE

S

B1

- O

pe

rati

on

B- 1.1 Slope Stabilization O Most of the road passes by flat and semi flat areas

B- 1.2 Agricultural Land or Terrace

Damage During Maintenance O

Care should be given not to impact any of

the agricultural lands and terrace by the maintenance operation

B- 1.3 Maintenance Contractor Site

Compound, Material and Equipment Storage

O Implement a public safety plan within the

compound

B- 1.4 Management of Induced

Development O

This project will help in upgrading the life

indexes within the project area and will not cause induced development.

Page 55: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

55

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

HY

DR

OLO

GY

AN

D W

AT

ER

RE

SO

UR

CE

S

A2

- D

esig

n /

Co

nstr

ucti

on

A-2.1 Sources of Construction water o o o o o The contractor should arrangements with

the local communities

A-2.2 Pollution from Wastewater, Diesel

or Asphalt Spills from Site Compound and Machinery

o o o o o Shallow groundwater level

A-2.3 Flood Protection in Wadi O Culverts and Irish crossing will be established along the project route

A-2.4 Alteration of Water Harvesting Patterns

0 Minimal impacts , concentrated in the agricultural zones along the project route

A-2.5 Cross Drainage and Scour Effects o o o o O Hydraulic structures will be constructed to

help in overcoming this issue.

A-2.6 Discharge to Adjacent Lands:

A-2.6.1 Discharge to Unstable

Slopes O

Major part of the road route is passing by

flat to semi- flat area.

HY

DR

OLO

GY

AN

D

WA

TE

R R

ES

OU

RC

ES

A2

- D

esig

n /

C

on

str

ucti

on

A-2.6.2 Discharge to Rock Surface

O

Major part of the road route is passing by

flat to semi- flat area. With the absence of

any major unstable rock surfaces

A-2.6.3 Discharge to Channel

in a Stack O

No Channel in a Stack were identified along

the project route

A-2.6.4 Discharge to Graveyards

O

A-2.6.5 Discharge to Terraces O

Page 56: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

56

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

A-2.6.6 Discharge to Other

Sensitive Areas or Structures

O No sensitive areas were identified along the

project route.

B2

- O

pe

rati

on

B-2.1 Work in Water Harvesting system 0 0 0 0 Hydraulic structures will be used as a water harvesting system

B-2.2 Blockage of Cross Drainage / Culverts from Uncontrolled

Discharges

o o o O Measure should be taken into account(Such

as periodic cleaning)

B-2.3 Erosion of Road Platform from Drainage Discharge

o o o O Measure should be taken into account(if it is happened)

B-2.4 Pollution from Vehicles Diesel and Oil Spills or Accidents with

Hazardous Cargo

o o o o O Measure should be taken into account(if it is happened)

AIR

QU

ALIT

Y A

ND

NO

ISE

NU

ISA

NC

E

A3

- D

esig

n /

C

on

str

ucti

on

A-3.1 Dust & Potential Pollution from

Construction Machinery, Stored Materials and Spoil Heaps

o o o o O Temporary & Low

A-3.2 Smoke from Burning of Waste

Materials o o o o O Temporary & Low

A-3.3 Noise Nuisance o o o o O Temporary & Low

B3

-

Op

er

ati

on

B-3.1 Air Pollution from Increased Traffic

0 Very minimal

Page 57: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

57

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

B-3.2 Noise Nuisance 0 Very minimal

BIO

LO

GIC

RE

SO

UR

SE

S

A4

- D

esig

n /

C

on

str

ucti

on

A-4.1 Conversion or Degradation of a

Critical or non-Critical Natural Habitats

0 Negligible

A-4.2 Damage to Biological Resources by Construction Equipment

o Low Temporary Impact

A-4.3 Damage to Biological Resources by Construction Workers

o Low Temporary Impact

B4

- O

pe

rati

on

B-4.1 Increased Pressure on Biological Resources from Induced

Development

B-4.1.1 Animal Road Kill 0 very minimal impact

B-4.1.2 Destruction of Vegetation

0 very minimal impact

SO

CIO

-EC

ON

OM

IC

AN

D

CU

LT

UR

AL

A5

- D

esig

n /

C

on

str

ucti

on

A-5.1 Tribal Tensions 0 Local communities offer full support to the project.

A-5.2 Land Acquisition and Resettlement 0 No needed.

A-5.3 Destruction or Re-Location of

Utility Services (Electricity and Phone Pole Lines, Water Pipes)

0 No utility services found near road alignment

A-5.4 Public Health and Safety at

Construction Site

Page 58: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

58

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

A-5.4.1 Safety and Health for

the Construction Workers

0 0 0 0 0

Health and measures instated at work

compound. Also, measures taken to

minimize workers-locals interaction A-5.4.2

Public Safety at the

Site and Interaction between the Workers

and the Public

0

A-5.5 Road Closure and Detours 0 To be announced to population when

needed. Current traffic not heavy.

A-5.6 Graveyards and Burials 0 None

A-5.7 Known Archaeological and Historic Sites

0 No Archaeological and Historic Sites where identified along the project route.

A-5.8 Chance Finds of Cultural Resources or Other Socio-

Economic Resources

0 None

A-5.9 Gender Considerations 0 The project will upgrade the life indices along the project route area

A-5.10 Locating the Project Compound 0

The locals offer all help to the project. the

site should be away from the agricultural lands or the residential spots

A-5.11 Employment 0 Temporary job opportunities will be available for the local communities within

the project area.

S O CI

O-

EC O N O M IC

A N D

C U LT U R AL

B5

-

Op

era

tio

n

B-5.1 Increased Road Accidents

0 0 0 0 0 Signage and proper speed limiting bumps include n the design

Page 59: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental & Social Impact Assessment Attahriah / Al-Ka’’ka’ / Je’wal Road

59

AS

PE

CT

PH

AS

E

Ite

m N

o.

POTENTIAL IMPACTS

POTENTIAL IMPACT CHARACTERISTICS

Comments

Type Effect Chang

e Extent Degree

Ne

gli

gib

le

Po

sit

ive

Ne

ga

tive

Dir

ect

Ind

ire

ct

Te

mp

ora

ry

Pe

rman

en

t

Lo

ca

lize

d

Ex

ten

siv

e

Min

or

&

reve

rsib

le

Ma

jor

&

reve

rsib

le

Ma

jor&

Irre

ve

rsib

le

B-5.2 Public Health and Safety During

Maintenance

B-5.2.1 Maintenance Works

Site Risks to Workers

and the Public

0

The contractor should provide all health and

safety measures to the workers and the

road users

B-5.2.2

Health Risks from

Compound Sanitation and Communicable

Diseases

0 0 0 0 0 The contractor should provide clean water and food to the workers in addition to

implement an appropriate sanitation system

B-5.3 Socio-Economic Benefits

B-5.3.1 Reduce time needed to reach educational

establishments.

0 This project will upgrade the life indices and the socio-economic conditions within the

project areas

B-5.3.2 Reduce time needed to reach health

establishments

0 This project will upgrade the life indices

and the socio

B-5.3.3 Reduce travel time to

the nearby districts 0

This project will upgrade the life indices

and the socio

B-5.3.3

Establishment of new

businesses (small commercial

establishment &

Farming)

0 This project will upgrade the life indices

and the socio

B-5.4 Chance Finds of Cultural

Resources or Other Socio-

Economic Resources

0 Minimal chance to find Cultural Resources or Other Socio-Economic Resources

Page 60: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

60

4.3 Environmental and Social Impacts during Construction Phase

4.3.1 Land Resources

A-1.1 Permanent Land Acquisition

Further to the development of the detailed design, it was clear that land acquisition is not

needed, as the width of the existing road is sufficient to accommodate two passing vehicles.

A-1.1.4 Dumping Sites: such issue is of low magnitude. Waste dumping along the road will be temporary and conducted away from the agricultural and residential spots along the project route.

A-1.2 Temporary land Use

Temporary Land use is of negligible impact and expected to be implemented during

construction phase for:

- Establishing the project offices, storage of equipment and materials.

The local community representatives ensured that, they will provide a temporary

community land free of charge and full support and help needed from them for

implementing this project.

Temporary land use will be needed for the establishment of site offices and plants. It will

have an impact on land use, however, limited in space (around 5,000 m2) and time (around

10 months). To minimize the impacts of the temporary land acquisition, the site used by a

contractor who made previous works could be re-used. The site compound, if not located

and managed properly could have negative impacts on the environment such as disturbance

of the natural flora and fauna, contamination of ground water and soils and disturbance of

the local communities. Temporary land acquisition will not be needed for diversion and haul

roads as the actual road width is 6 to 8m and the excavation works were completed.

A-1.4 Management of Construction Site Compound A-1.4.1 Solid and Liquid Wastes Disposal

This type of wastes will be generated by the work manpower, and wastes from the routine

maintenance and repair of vehicles and construction machinery. Such issue is of low

magnitude, where the contractor should not dump any type of domestic wastes close to

residential area and/or the agricultural lands.

From the site visit and discussions with the residents in the area of the Project, it was noticed

that the common practice is to discard the solid waste in pits near the houses and to burn it

when it accumulates. Meanwhile a blowing wind may spread waste in the surrounding

environment. The nearest common waste disposal facility is a waste dump in Al-Baidah, at

some 35 km distance from the site.

Page 61: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

61

A-1.4.2 Absence of Safety Measures for Petroleum Products & Paving Materials

During this phase, storing the used Petroleum materials, products and Paving materials, in

the construction operation without implementing appropriate management and safety

plans can be of high impact on the safety of the workers in the project and any nearby

residential areas. Such issue is of low magnitude.

A-1.4.4 Living Standards and sanitation Facilities

The absence of adequate living standards (clean water, sanitation system and wastes

collection system) in the consecution camp can cause serious health problems to the

workers and to the nearby local communities.

A-1.4.5 Rehabilitation of the Construction Site

Leaving the construction compound without rehabilitation after the end of the construction phase can impact the public safety of the locals living close to or passing by it, especially the children, because: (i) harmful materials can be found and used in an inappropriate way, (ii) The risk of falling in any excavated holes within the construction site.

A-1.5. Disposal of Cut Materials and Surplus Fill

According to the project design the estimated quantity of cut materials that will result from

the different construction activities is about 45,000 m3, while the needed quantity of fill

materials is about 22,000 m3. The project design focused on using the cut materials to cover

the required quantity of fill materials. Nevertheless, such materials might be a major source

of solid waste during the construction phase. Unmanaged dumping process for these

materials will have several negative impacts, represented by:

(i) Permanent destruction of the soil layers;

(ii) Reducing of productivity of the agricultural lands along the project route;

(iii) Slope stability Problems.

The magnitude of this impact is medium along the agricultural sections of the project route.

The dumping site for such materials should be away from the agricultural sectors and also

away from the residential areas.

A-1.6 Borrow Pits and Quarry Area

Defining the Borrow pits and the quarry areas for the project usage is an important issue of

concern for the contractor as he preferred these areas to be close to the work area to

reduce the transportation cost. Thus, within the project area the magnitude of this issue is

low to medium especially within the agricultural zones along the project route. Under any

condition, the contractor should not be allowed to use any of the agricultural lands as a

borrow pits or quarry areas.

4.3.2 Hydrology and Water Resources.

A-2.1 Source of Construction Water

It is expected that the contractor will depend on meeting his water demands (Domestic and

for the different construction activities) from the limited available local groundwater

Page 62: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

62

resources. Such condition will affect the availability of the existing limited water quantities

for the local communities in the area. Without appropriate arrangements with these

communities, such actions can cause the contractor social problems and conflicts with the

local communities. This issue is of high concern.

A-2.2 Pollution from Wastewater, Diesel or Asphalt Spills from Site Compound and

Machinery

Domestic liquid waste will be generated from the following three different sources:

- The working manpower

- The routine maintenance, and repair of vehicles and construction machines

- From the asphalting process (asphalt, bitumen and other related petroleum-based

products).

Inappropriate management system for disposing of these liquids, might leads to soil and

water resources contamination, and negatively affects the public health within the project

area.

Thus, polluting groundwater resources could occur from diesel and other spills during

construction. The magnitude can be considered moderate and needs to be taken into

consideration, as the depth to groundwater is shallow, and doesn’t exceed 20m from the

land surface.

A-2.5 Cross drainage and Scour Effects on New Fills

During the construction operations, if new fills weren’t well compacted, a lot of scour points

will be created on both the road’s edge and on the fill slope edge. Omitting this issue will

eventually erode the roadbed. Remedial treatment will therefore be required.

Such case may occur where newly cut roads will create new catchment (which is not the

case of the subject project). The absence of a professional supervision for the construction

activities can cause (among many others) that new fill is not adequately compacted and lead

to roadbed erosion. Such issue is of limited very low magnitude as major part of the road

route is passing by flat to semi- flat area. Nevertheless, sufficient hydraulic structures will be

constructed along the sensitive zones within the project route to help in overcoming this

issue.

4.3.3 Air quality and Noise Nuisance

A-3.1 Dust and Potential Pollution from Construction Machinery, Stored materials and

Spoil Heaps

The effect of such impact is expected to be temporary and limited. Appropriate mitigation

measures implemented by the contractor can highly control such impact.

The primary source of potential air quality impacts during the construction phase is fugitive

dust emissions generated from earthworks activities. Dust (or particulate matter) may be

generated from the following activities:

- Blasting and crushing of rocks;

Page 63: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

63

- Excavation of soils;

- Movement of construction vehicles on unsealed pathways;

Wind blowing over stockpiled and exposed soils;

- Loading and unloading of materials on site; and

- Emissions from uncovered truckloads.

The generation of high levels of dust has the potential to negatively impact the health and

safety of earthwork laborers and residents of the villages, reduce visibility, and retard plant

growth in the surrounding areas.

Increases in exhaust emissions are expected at the Project site, as a result of construction

vehicles and machinery. Exhaust emissions are likely to include nitrogen oxides (NOx),

carbon monoxide (CO), sulphur oxides (SO2), hydrocarbons (HC), and total suspended

particulates (TSP). These emissions have the potential to negatively impact the health of

workers at the Project site.

Volatile emissions may also be expected during the earthworks phase, from solvents and

fuels stored or used on the Project site. Volatile emissions have the potential to negatively

impact the health of workers at the Project site.

A-3.2 Smoke from Burning of Waste materials

The effect of such impact is expected to be temporary and limited. Burning of waste

material during the construction period may lead to air pollution from smoke emissions.

A-3.3 Noise Nuisance

The scattered residential spots penetrated by the road will experience negative impacts of

dust, particulates, and gaseous emissions from the construction operations and from

Burning of Waste Materials. Also such areas will be impacted by and noise during this phase.

Such impacts are considered limited and of temporary effects.

Earthwork activities and heavy machines are expected to elevate ambient noise levels in

areas within the Project site for certain periods. Construction works are likely to occur for 8

to 9 hours a day, 5 to 6 days a week. Potential sources of noise during bulk earthworks

include truck and vehicle movements to, from and across the Project site.

The existing sensitive receivers to noise in the Project site are mainly the villages and in

particular the schools that are directly along the road. They will probably remain in

operation throughout the Project, and as such, will be impacted by the construction noise

and additional traffic, which will need to be mitigated against. Noise may also disturb

wildlife in the vicinity of the work area.

4.3.4 Biological Resources

As parts of the Project site are developed, and the alignment is known not to traverse any

biodiversity sensitive areas such as natural reserves or wetlands, the potential impacts that

may occur during construction include:

Page 64: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

64

Soil disturbance through the use of heavy trucks;

Dust and exhaust emissions from vehicles and machinery;

Destruction of small bushes.

Considering that the road exists, the construction phase will not pose a serious impact to

the neighboring habitats. A minor disturbance to cattle and sheep crossings might occur

during short periods of works.

4.3.5 Socio-Economic and Cultural Impacts

A-5.4 Safety and Health Measures at Construction Site

Different sources of risks are expected to affect the public safety of the local communities

and workers, due to: (i) The usage and movement of the construction vehicles and

machinery, (ii) the risk of blasting the rock or excavated material. The magnitude of this

issue is low. Nevertheless, the contractor should provide appropriate protection measures.

A-5.9 Gender considerations

Three meetings consultation have been conducted with women and during the meeting most

of women attended have welcomed the establishment of the new road and hoped that it will

participate highly in improving the life indices in their villages. Expected advantages from

establishing the road as reported by the consulted women are the following:

Provide easy accessibility to get the medical care during the pregnancy and delivery,

through easy access to the health care centers in the nearby towns.

Reduce the cost of living through reducing the prices of goods such as cooking gas,

and other types of food.

Participate in increasing the social interaction with the nearby local communities,

especially as the road will make their visit to their family easier.

Increase the number of students who can continue their secondary school education

(especially girls).

Help in establishing infrastructure (water and electricity) projects.

Provide temporary job opportunities during the construction phase.

A-5.10 Employment Opportunities

During the construction phase, the construction activities can be considered as a temporary

positive impact, as work opportunities can be provided to the local labor living close to the

project route.

Employing a certain number of construction workers at the anticipated peak of the

construction phase;

Providing employment opportunities for a number of people within the region such

as security guards and driver;

Providing indirect income from construction work and purchase of material and

supplies.

Page 65: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

65

4.4 Environmental and Social Impacts during Maintenance and Operation Phase

The operation of the road will be associated with some negative and several positive

impacts discussed in the coming subsections.

4.4.1 Land Resources: No impacts are expected.

4.4.2 Hydrology and Water Resources

B-2.1 Affecting Water Harvesting Structures

Water harvesting structures will be not impacted by direct damage or by the road user’s

misuse. Along the project route this issue is positive impact.

B-2.2 Blockage of Cross Drainage / Culverts from Uncontrolled Discharged

The absence of a regular maintenance program for “Cross Drainage / Culverts” from

Uncontrolled Discharges, may lead to destroying these structures and negatively impacting

the nearby agricultural and residential spots along the project route. Such issue is of low

magnitude.

B-2.3 Erosion of Road Platform from Drainage Discharge

The absence of a regular maintenance program for the road platform, in addition to the

inappropriate design for the hydraulic structures along the project route might cause

erosion for the road platform.

B-2.4 Pollution from Vehicle Leakage

Surface or groundwater pollution may occur from routine spillage or leakage from vehicles

using the road. Considering that the projected traffic is expected to be limited, thus,

discharges impact from road users on the groundwater quality is going to be minimal.

Furthermore, the quantity of routine leakage is not expected to have a major impact.

B-3.2 Noise Nuisance

Although considered minimal, noise nuisance might have negative impacts on sensitive receptors, such as schools located 10m from the road alignment.

4.4.1 Socio-Economic Resources

B-5.3 Anticipated Socio Economic Benefits

Based on the conducted site visits to the project area, and the conducted meetings with the

local communities, the expected socio-economic benefits are the following:

Improvement of the standard of living for local residets in the region by the generation of additional commercial opportunities and access to new employment centers

Induced development: roadside commercial, industrial, residential, etc.

Reduction in the transport costs

Increased access to markets for local products

Better access to health care and other social services

Increase in local land values

Easier access to schools

Reduction in the travel time

Reduction in the operation costs of vehicles.

Page 66: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

66

5 Analysis of Alternatives

Alternatives to the project have negative environmental impacts. Consequently, the "No

Action Scenario" would be compared to the Project implementation scenario.

The present low standard of living in the villages within the road alignment will continue to

worsen.

Further to the development of the detailed design, it was clear that land acquisition is not

needed, as the width of the existing road is sufficient to accommodate two passing vehicles.

5.1 No Action Alternative

The No-Action Alternative assumes that the present state of the road proposed would

pertain. This would imply that the road would be left in its current state of poor riding

surface and unacceptable geometric alignment.

Under this alternative, the present low standard of living in the villages within the road

alignment will continue to worsen. All development opportunities such as easy movement

of agricultural products and passengers, and reduced vehicles operating cost would not be

realized. Furthermore, uneven road surface and sharp curves causing the movement of

vehicles to be difficult and dangerous will continue.

5.2 Improving the Existing Road

This alternative will improve the road alignment to an acceptable level of safety, speed and

environmental standards. This alternative seems to be more realistic, since there would be

minor environmental impacts, as compared to the benefits that would be accrued from its

implementation.

5.3 Assessment of Alternatives

Although there are environmental implications associated with improving the existing road,

appropriate mitigation measures would be implemented to minimize them especially that

major part of these impacts characterized by one or more of the following characteristics:

Temporary and of low magnitude especially during the construction phase.

Low magnitude and of localized impacts.

In addition to that, the full support for the project for the local communities in the project

area will provide a strong base for solving any social impacts that will result for establishing

this road. Furthermore, in spite of its medium initial cost, the benefits to be accrued far

outweigh that of the other alternative. Analysis of Alternatives for the project major impacts

are presented in table 5.1.

Page 67: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

67

Table 5.1 Alternatives Analysis for the Project Major Impacts

The previous section showed clearly that the project would be associated with several positive impacts and some minor negative impacts during the construction phase. The latter, if properly mitigated, will have their magnitude certainly decrease and will enhance the benefits of the project. The main benefit will be the contribution to the improvement of the socio-economic conditions of the area and the reduction in dust pollution. The following table shows a comparison of the two scenarios based on different parameters. Evidently, the benefits that will arise from the project will outweigh its negative impacts.

Parameter Project Implementation “No Action Scenario”

Land Resources No significant impact (0)

No significant impact (0)

Hydrology and Water Resources Low negative impact (-)

High negative impact (---)

Air Quality and Noise Nuisance Low negative impact (-)

High negative impact (---)

Biological resources No significant impact (0)

No significant impact (0)

Socio-economic and Cultural High positive impact (+++) High negative impact (---)

Table 5.2: Comparative Evaluation of the project's alternatives

Action Do-Action No- Action Best

Alternative

Rehabilitate and upgrade the current road

-Upgrade living standards.

- Easy access to health and educational establishments.

- Reduce the cost of living.

-Attract economical investment from outside the project area.

All development opportunities such as easy movement of agricultural products, passengers, and reduced vehicles operating cost would not be realized.

Do- Action

Establishing culverts and Irish crossings

-Assist the water harvesting mechanism

-Implementing appropriate discharge method

- Keeping the road in good condition for a long time.

- Contribute in groundwater recharge of the local aquifers.

- loss of water. - impacting agricultural lands. - Impacting the public safety of the nearby residential spots Do- Action

Page 68: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

68

6 Environmental and Social Management Plan (ESMP)

The Environmental and Social Management Plan (ESMP) aims at addressing the

environmental and social safeguards required during the Project implementation. The

presence of a proper environmental and social management plan is extremely useful so

that recommendations in terms of mitigation and monitoring are effectively implemented.

The ESMP is essentially a guidance document to be continually referred to during the

construction phase (see table 6.2) and maintenance phase (see table 6.3) of the Project.

6.1 Responsibilities for implementation and monitoring

The Implementing Contractor has the responsibility to ensure that all persons working on

the Project (including subcontractors and their employees) comply with the environmental

requirements outlined in this ESMP. The Contractor must prepare a Construction Plan that

meets these requirements. He shall fully coordinate with the World Bank, RAPCMO and the

Consultant during site inspections.

The Supervising Consultant has the responsibility to monitor the project works, report

compliance (or otherwise) with ESMP, and request mitigation measures in cases of non-

compliance.

The MoPWH shall contract, through the Supervising Engineer, a social and an environmental

specialist for the total duration of the construction work (estimated at 10 months) on part

time basis. Their fees are estimated at 12,000 US$ for the total project duration. The social

and environmental specialists shall be responsible for the supervision of the implementation

of all the mitigation measures identified in the ESMP and the solution of environmental and

social issues that may be encountered during the execution of works. The task comprises:

Weekly Site inspection

Documentation of the feedback from stakeholders and other affected people

Photographic documentation

Reporting on-site inspections clearly identifying areas of Contractor's compliance and non-compliance with the ESMP and recommendation on actions to be taken

Production of monthly progress monitoring reports.

The World Bank will monitor the implementation of road specific ESIAs/ESMPs and other

Safeguard related documents (SFAs). In particular, the Bank will ensure that proper

monitoring takes place and that the reports are filed regularly.

The MoPWH and in particular the Environmental and Social Unit (E&SU) of RAPCMO is

responsible for the supervision of the monitoring of the implementation of the proposed

environmental and social measures for Attahriah – Al Ka’ka’ Project. Being the executing

agency, it is understood that it has access to any component of the project. However, it is

advisable to have a clear clause in the TORs that states that authorized officers from

RAPCMO may at any time enter any premises to examine, inspect, control, monitor, take

samples, examine books, records or documents and take photos. Access to all sites of the

project shall be assured. The RAPCMO will also review the reports submitted by the

Page 69: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

69

Consultant.

The Beneficiary Committee is responsible for the coordination with RAPCMO authorized

officers, the Consultant, in particular the Social and Environmental Specialist (ESS) and the

Contractor to solve arising issues resulting from road construction and maintenance.

The Road Maintenance Fund (RMF) and those institutions responsible for road safety will be

coordinated with during post construction road maintenance activities.

6.2 Mitigation Plan

The Mitigation Measures lists the actions needed to mitigate the previously identified

negative impacts and enhance the positive impacts. The mitigation plan shall make sure that

all reasonable measures are taken to ensure that the construction and maintenance of the

road are compatible with the protection of the existing environment and maintain the

welfare of the people affected by the Project.

The mitigation measures, including those in the BOQ, will be included in the works contract.

The total cost of mitigation measures during the construction phase (excluding monitoring)

is estimated to reach 20,793 USD.

The majority of the proposed ESMP mitigation activities is part of the works contract and

listed in the BOQ under Environmental Works.

The General Specifications and Regulations (attached as annex to volume II of the contract

documents) contain specific environmental, health and safety requirements for:

Proper management of construction waste;

Control measures for waste fuel;

Oil and lubricants;

Reduction of noise and dust levels;

Rehabilitation of areas used for construction detours;

Sites used for temporary storage of construction materials; and

Use and proper maintenance of equipment with appropriate noise and smoke abatement controls.

Clause Subject

4.1 to 4.10 General Requirements

5.1 to 5.16 Safety Requirements

6.1 to 6.5 Environmental and Health Requirements

7.1 to 7.5 Additional Requirements for Work in Public Areas

8 Contractor's Site Check List

Table 6.1 Clauses relevant to mitigation measures in the Standard Construction Contracts

Page 70: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

70

6.3 Mitigation of Impacts during Construction Phase

6.3.1 Land Resources

(A-1.2) Temporary Land Use

The local community representatives ensured that, they will provide a temporary

community land free of charge and full support and help needed from them for

implementing this project. Temporary land use will be needed for the establishment of site

offices and plants. The location of the site plant shall be agreed upon with the Beneficiary

Committee and the Project Manager before the start of the works. It should be located at

distance far enough from the nearest residential area in order to minimize the disturbance

to the local communities. The site plant shall be managed properly to prevent disturbance

of the natural flora and fauna, contamination of ground water and soils, and disturbance to

the local communities. After completion of the works, the Contractor shall re-instate the

location of the camp to its initial conditions.

The mitigation measures for solid and liquid waste disposal, spillage of fuel and lubricants

and the inappropriate discharge of sewage are to comply with clauses 6.4 and 17.2.2 of the

Environmental and Safety Regulations regarding solid waste and general housekeeping. The

contractor must comply with the safety, health and environmental requirements in terms of

the management of all solid and liquid wastes, material and equipment storage and

possibility of fuel leakage. In general, the site compound must be kept clean and tidy at all

times during the implementation stage for possible site inspection and monitoring.

(A-1.3) Management of Construction Site Compound

The construction site should be located to avoid damage to the land and should be managed

properly. Solid and liquid waste should be disposed off adequately to prevent nuisance to

the workers themselves, to the local communities and the local environment. The mitigation

measures for solid and liquid waste disposal, spillage of fuel and lubricants and discharge of

sewage, are to comply with clauses 6.4 of the General Safety, Health & Environmental

Regulations regarding solid waste and general housekeeping. The contractor must comply

with safety, health and environmental requirements in terms of the management of all solid

and liquid wastes, material and equipment storage and the possibility of fuel leakage. In

general, the site compound must be kept clean and tidy at all times during the

implementation stage for possible site inspection and monitoring. The site must be located

at a far enough distance from the nearest residential areas so as to minimize disturbance to

the local communities.

(A-1.4) Borrow Pits and Quarry areas

It is recommended to get the base course material for the road from local already eroded

material or from existing quarries, rather than establish new quarries next to the site to

prevent disruption of visual amenities.

Page 71: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

71

In case new borrow pits or local quarry needs to be opened, the contractor has to obtain

permits from the governorate authorities for site selection and operation, address land

ownership issue and comply with environmental regulations of the Law 26/1995.

6.3.2 Hydrology and Water Resources

(A-2.1) Sources of Construction Water

The contractor will have to negotiate access to water with the locals to avoid conflicts with

the local communities.

(A2.2) Pollution by Wastewater, Diesel or Asphalt Spills from the Site compound and

Machinery

The groundwater quality may be protected from potential contamination sources by

applying the following measures:

- Manage the equipment stationing areas and the site compound in general according to the

Health, Safety and Environmental Regulations Clauses. Spill control measures should be

implemented to prevent spills from infiltrating into the groundwater. Measures should

include proper materials handling and storage procedures, development of contingency

plans in the event of a spill.

Fuel and oil must be stored in safely sealed containers. Refueling and small repairs of

equipment must be undertaken in sealed areas with a sump.

Do not use contaminated water for dust suppression and wash down of vehicles and

machinery on site;

Do not keep the soil exposed in the rainy season;

Maintain and contain waste storage areas to eliminate the potential for leached or

run-off to contaminate soils and water;

Locate stockpiles on flat areas, away from storm water. Ensure that sediment or

erosion cannot reach a waterway;

Limit the height and slope of stockpiles to minimize erosion of unconsolidated

materials during rainfall events;

Divert overland flow around work areas / construction sites;

Regularly inspect of all erosion and sedimentation controls during the construction

period to ensure their continued effectiveness;

Develop a contingency plans to be followed in the event of a spill.

Special care should be taken during execution of works near watercourses to prevent

pollution.

(A-2.4) Alteration of Water Harvesting Patterns

Several mitigation measures have been incorporated into the design and the project works

such as the installation of steel irrigation pipes at locations determined by farmers. The

Page 72: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

72

contractor must avoid the irreversible destruction of water patterns during implementation,

which may lead to social conflicts regarding the established water rights among the farmers.

(A-2.5) Cross Drainage and Scour effects

Culverts have been assigned in the design at required locations in accordance with a

hydrological study. If properly installed, the scour effects are mitigated.

6.3.3 Air Quality and Noise Nuisance

(A-3.1)Dust & Potential Pollution from Construction Machinery, Stored materials and Soil

Heaps

The following measures should be implemented during the construction phase of the

Project to minimize the potential for dust generation:

Minimize the area of land to be disturbed at any one time by staging of construction

activities and the progressive implementation of the works;

Cover and do not overload dusty vehicle loads transported to, from and within the

Project site with sheets;

Restrict the movement of vehicles to defined routing emissions;

Regularly use water trucks to suppress dust while ensuring no run off from operation;

Enclosures and cover, by impervious sheeting, any aggregate or other dusty material

stockpiles;

Minimize excavation and transfer operations of surface materials on windy days,

Limit the drop height of excavated materials to a minimum to limit fugitive dust

generation from unloading as far as practicable;

Minimize the height and slope of stockpiles to ensure erosion of unconsolidated

materials during rainfall events does not occur;

Construction Project Manager to visually inspect dust generation and to recommend

other mitigation measures.

A number of mitigation and management measures can be initiated to reduce air quality

impacts from construction machinery, vessels and vehicle exhausts. These include:

Use of modern machinery, with adequate pollution control devices;

Proper and efficient use and operation of construction machinery and vehicles by

qualified and workers;

Implementation of a regular maintenance and inspection program for all

construction plant and vehicles (Inspection to be done by the Construction Project

Manager);

Minimization of unnecessary operations of construction machinery, including

efficiency of trip times and reduction of double handling through appropriate

placement of stockpiles, haul roads, works depots and work areas. This will also aid

Page 73: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

73

in fuel efficiency and will assist in reducing the overall costs associated with

unnecessary fuel consumption;

Daily visual checking by inspectors or site supervisors to ensure the above

recommendations is followed, particularly with regards to smoky emissions from

vehicles and plants. Smoky equipment should be given defect notices and taken out

of service until repaired and approved for re-deployment.

The above mitigation measures will also assist in minimizing the emissions of greenhouse

gases.

The following mitigation measures will control volatile emissions during the construction

phase. Many of these measures will also be required from a safety viewpoint with regards to

the use and storage of dangerous goods:

Ensure all machinery is in working order and not leaking fuel or volatile emissions

from fuel tanks or fuel lines;

Minimize and properly manage the number of fuel and chemical storage areas;

Ensure proper on site storage of volatile fuels and chemicals in appropriately sealed

containers, in cool, covered areas with adequate venting;

Equip and maintain construction vehicles and machinery during the works to

minimize exhaust emissions.

(A-3.2) Smoke from Burning of Waste Materials

The waste material shall not be burned but be disposed of properly;

Temporary waste storage areas should be located in a cleared area outside of

identified drainage lines, and should be afforded protection from wind to prevent

wind driven litter on site;

Wastes should be regularly transported from the Project site to a designated disposal

site.

(A-3.3) Noise nuisance from construction works

The following management measures should be adopted to minimize noise impacts during

earthworks:

Make sure all machinery and vehicles are regularly maintained and broken parts are

replaced immediately;

Make sure all machinery and vehicles are operated efficiently and according to the

manufacturers specifications, by trained and qualified operators;

Make sure that activities likely to cause noise emission are restricted to day time

hours (in consultation with the Beneficiary Committee), especially within or near

residential areas and sensitive facilities such as schools and hospitals);

All personnel are provided with hearing protection and trained for proper use;

Page 74: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

74

Make sure contingency plans are in place to deal with noise control if complaints are

received during the earthworks phase.

To address the potential impacts on schools, during construction, the following

mitigation measures are recommended:

Construction works within 100m of schools should be restricted to outside school

hours (such as before and after school, during school holidays or weekends, or left as

the final stage of works);

Wire fence meshing, dust screens or wooden hoardings should be installed along the

boundaries of the construction areas to delineate it and therefore decrease impacts

and the potential for interaction between them, the school and the construction

works;

The access points for construction vehicles should be at a minimum distance of 100m

from the school access point.

6.3.4 Socio-Economic and Cultural

(A-5.1) Public Health and Safety at construction site

The contractor shall abide by the Health, Safety and Environmental Regulations.

Barriers erected in high risk areas to protect project laborers and visitors;

Installation of warning signs;

The contractor should apply measures to avoid accidents around the school areas:

Speed limits and traffic regulations

Cautionary sign posts around school areas.

(A-5.2) Chance Finds of cultural resources or other socio-economic resources

If cultural resources are found during construction works, then the excavation works should

cease and local authorities and experts should be contacted directly for site inspection.

(A-5.3) Gender Considerations

Installation of traffic signs and bumps, as requested by the consulted women, for road

safety especially near schools and where animals are crossing the road are already included

in the design.

(A-5.4) Employment

As the impact of the road on employment is positive, there is no need for mitigation

measures addressing negative impacts. To strengthen the positive impacts, local residents

should be employed during the construction phases when feasible; and local companies

should be contracted to supply construction goods and services whenever feasible.

Page 75: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

75

6.4 Mitigation of Impacts during Maintenance Phase

6.4.1 Land Resources

B-1.1 Maintenance of contractor site compounds, materials and equipment storage

The contractor should follow General Regulations on Safety, Health and Environmental

Regulations Clauses 6.1, 6.4; and 2) other Regulations and Requirements Clauses 17.3, 17.4,

17.5 are followed.

6.4.2 Hydrology and Water Resources

B-2.1 Water harvesting

Regular maintenance of the water harvesting structures.

B-2.2 Blockage of cross drains/culverts - Uncontrolled discharge

Regular maintenance of the drainage structures.

B-2.3 Erosion of road platform from drainage discharge

Regular maintenance of retaining walls, gabions and rip rap

B-2.4 Pollution from vehicle leakage or accidents with hazardous cargo

The Contractor shall immediately and appropriately clean up following spills or accidents

with hazardous cargo.

6.4.3 Air Quality and Noise

B-3.1 Dust and Potential Pollution from Construction Machinery

Negligible emissions are expected accordingly no special mitigation measure is needed.

B-3.2 Noise Nuisance from Maintenance Works and Operation

Noise generation is expected to be minimal and for a short period. Maintenance works in or

near residential areas and sensitive locations (schools, medical sites) should be restricted to

day time hours. During operation, noise nuisance is also expected to be minimal,

nevertheless, signs should be installed near schools and other sensitive receptors to instruct

vehicle drivers not to use horn near sensitive receptors.

6.4.4 Socio-Economic Resources

B-4.1 Road Accidents

The speed reduction measures such as the signs and bumps must be maintained. The

contractor should also apply measures to avoid accidents around the school areas during

maintenance works:

Speed limits and traffic regulations;

Cautionary sign posts around school areas.

Page 76: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

76

B-4.2 Public health and safety during maintenance

The safety rules for work operations, such as equipment operation procedures, safety

barriers, warning signs, protective hard hats, shoes and clothing for workers shall be

enforced. First aid and medical kits shall be provided. A safety Officer shall be appointed.

Health and safety regulations shall be clearly displayed in English and Arabic in the

maintenance plant.

B-4.3 Chance finds of Cultural Resources or Other Socio-Economic Resources

If found during maintenance, the local Authority MPWH should be contacted

6.5 Monitoring Plan

The Monitoring program is a vital aspect of the Environmental and Social Management Plan

to ensure that mitigation measures are being performed as described in the previous

section and to make sure they are effective. The main purpose of the conduction of a

monitoring plan is the warning of responsible authorities of unforeseen negative impacts or

when an impact indicator approaches a critical level and the provision of information such

as about the responsible agencies, frequency, location and indicators for each measure.

Responsibilities for monitoring are detailed under Responsibilities for implementation and

monitoring (section 6.1) above.

The monitoring program will comprise site inspections and photographic documentation on

weekly basis designed to determine contractor compliance or otherwise with the ESMP and

other applicable regulations. It also anticipated that additional inspections would be

required in response to complaints by local communities. An additional two visits per

quarter may be required.

The costs of the monitoring program during the construction works include the costs of 1

part time environmental specialist and 1 part time social specialist with vehicle and camera.

They are expected to reach 12,000 USD.

The following tables 6.2 and 6.3 summarize the environmental and social management plan

for the Project during construction and maintenance phases.

Page 77: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

77

Table 6.2: Summary Environmental Management Plan (ESMP) during construction phase

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A.1 Land Resources

A-1.1 Temporary Land Use

-Voluntary land donation through beneficiary committee -Location of site offices and plants away from residential areas -Re-instatement of the used lot to its initial condition -Collection, temporary storage and disposal of all solid and liquid wastes

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist, car and camera USD 10,000 A-1.2Management

of Construction site Compound

-Location of camp away from residential area -Proper management of the construction site compound to keep the site clean

Contractor Environment and Social Specialist of the Supervision Engineer

Part of contractor’s responsibility

Cost included in salary of 1 part time social & environmental specialist

A-1.3 Borrow Pits and Quarry Areas

-Get the base course from existing quarries and from nearby borrow area to prevent disruption of visual amenities - In case new borrow pits or local quarry needs to be opened, the contractor has to obtain permits from the governorate authorities, address land ownership issue and comply with environmental regulations of the Law 26/1995. -

Contractor Environment and Social Specialist of the Supervision Engineer

7,619 USD Cost included in salary of 1 part time social & environmental specialist

A-2 Hydrology and Water Resources

A-2.1 Sources of construction water

-Contractor to negotiate access to water with the local Communities

Contractor, Consultant and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

Page 78: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

78

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-2.2 Pollution from wastewater, diesel or asphalt spills from site compounds and machinery

- Store fuel and oils in sealed containers

- Refueling and small repairs to be conducted in sealed sites with sump

-Do not use contaminated water for dust suppression

-Do not keep the soil exposed in the rainy season

- Locate stockpiles away from storm water

-Limit the height & slope of stockpiles

-Divert the overflow around work areas

-Inspect regularly the erosion/sedimentation incidents

-Develop contingency plans in the event of a spill

Contractor

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

A-2.3 Flood protection in Wadi

-Install culverts as per the design Contractor Environment and Social Specialist of the Supervision Engineer

3,000 USD Cost included in salary of 1 part time social & environmental specialist

A-2.4 Alteration of water harvesting patterns

-Install irrigation steel pipes for encasing water pipes

- Prevent damage by earth works to water harvesting and irrigation system

-Avoid irreversible destruction of water patterns

Contractor, Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

7,000 USD Cost included in salary of 1 part time social & environmental specialist

A-2.5 Cross drainage and scour effects

-Install culverts at designated locations and sizes as per the hydrological study

Contractor Environment and Social Specialist of the Supervision Engineer

Added under A.2-3 Cost included in salary of 1 part time social & environmental specialist

A-2.6 Discharge to Adjacent Lands: - Plain Terraces

-Install irrigation steel pipes to accommodate channel flow Contractor, and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Added under A.2-4 Cost included in salary of 1 part time social & environmental specialist

Page 79: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

79

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-3 Air Quality and Noise Nuisance

A-3.1 Dust & Potential air pollutants from construction, Machinery, stored material and spoil heaps

-Minimize the land disturbance by staging the work

-Cover dusty vehicles

-Restrict works to day time hours in and near residential areas

-Regular spraying of water

-Cover material stockpiles

-Minimize excavation and transfer during windy days

-Control drop height of excavated materials

-Minimize the height & slope of stockpiles

-Visually inspect dust generation

-Efficient use of machinery

-Regular maintenance and inspection of vehicles

-Minimize the number of fuel & chemical storage places

-Ensure sealed storage of volatile fuels

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

Indirect Cost included in the BoQ

Cost included in salary of 1 part time social & environmental specialist

A-3.2 Smoke from burning of waste materials

-Do not burn waste material

-Locate storage areas away from sensitive recipients

-Regularly transfer project waste to designated dumpsites

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

A-3.3 Noise Nuisance from Construction Works

-Regular maintenance of construction equipment

-Work in day time near settlements

-Work outside of school hours near schools

-Make sure all personnel have and use hearing protection

-Prepare contingency plans to deal with noise complaints

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

Page 80: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

80

Potential Impact

Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

A-4 Biological Resources

A-4.1 Conversion of Degradation of a critical or non-critical Natural habitat.

-The Contractor is not allowed to cut trees other than those necessary to conduct the works

-Plant new bushes and provide necessary irrigation if bushes are destroyed during works

- Unblocking of culverts to allow passage of small animals

Contractor and Consultant

Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social & environmental specialist

A-5 Expected Impacts on Socio-Economic Resources

A-5.1Public health and safety at construction site Health and Safety for construction workers -Interaction between the workers and the Public

-Removable Barriers erected in high risk areas

-Installation of warning signs

- Locate workers’ camps away from settlements

Contractor in coordination with the Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

3,174 USD Cost included in salary of 1 part time social & environmental specialist

A-5.2 Gender considerations

Installation of traffic signs and bumps for road safety near schools

Contractor Environment and Social Specialist of the Supervision Engineer

No additional costs Cost included in salary of 1 part time social specialist

A-5.3 Employment -Employ local residents when feasible

-Contract local companies when feasible

Contractor and Beneficiary Committee

Environment and Social Specialist of the Supervision Engineer

Indirect cost included in the BOQ

Cost included in the salary of the part time social specialist

TOTAL 20,793 USD 12,000 USD

Page 81: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA) Attahriah / Al-Ka’’ka’ / Je’wal Road

81

Table 6.3: Summary of Environmental Management Plan during Maintenance

Potential Impact Mitigation Responsibility

Additional Cost US $

Mitigation Measures Implementation Monitoring Implementation Monitoring

B-1 Land Resources

B-1.1 Maintenance of contractor site compounds, materials and equipment storage

Follow Safety, Health and Environmental Regulations in particular: - Fire protection and prevention - Protection of the Environment - Air and water pollution - Solid Waste

-Noise control

Contractor Environment and Social Specialist of RAPCMO

No additional cost No additional cost

B.2 Hydrology and Water Resources

B-2.1 Water Harvesting -Regular maintenance of water harvesting structures

Contractor and the Beneficiary Committee

Environment and Social Specialist of RAPCMO

Cost will be included in

the maintenance BoQ

No additional cost

B-2.2 Blockage of cross drains/culverts

-Regular maintenance of the drainage structures

Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-2.3 Erosion of road platform from drainage discharge

-Regular maintenance of retaining walls, gabions and rip rap

Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-2.4 Pollution from Vehicle leakage or accidents

-Timely clean up following spills or accidents Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-3 Socio-Economic Resources

B-3.1 Increased Road Accidents

-Maintain speed reduction signs and bumps Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-3.2 Public Health and Safety during Maintenance

- Safety rules maintained -Appointment of a safety officer -Health and safety regulations displayed in English and Arabic in the maintenance plant

Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

B-3.3 Chance finds Cultural Resources or Other Socio-Economic Resources

- If found during maintenance, the local Authority should be contacted GOAM

Contractor Environment and Social Specialist of RAPCMO

Cost will be included in the maintenance BoQ

No additional cost

Page 82: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

82

7 Social Consultations

7.1 Objectives of the Consultations

The objectives of the social consultations can be summarized as follows:

1. To provide a forum for the initial definition of critical environmental and social issues; in

particular the people who are likely to be affected by the Project

2. To understand, the concerns of regional stakeholders and potentially affected people

around key development issues and their linkages to the environment and social

development.

3. To identify whether the project will create social problems or tribal disputes, or destroy

sensitive areas of the population such as graveyards, and cultural attractions

4. To confirm the suitability of the initial list of beneficiary communities selected for

consultations and

5. To obtain assistance by contacting leading members of target communities whenever

necessary.

7.2 Consultation Process

The following process was implemented during consultation:

Members of the beneficiaries have been contacted and informed about the field visit

and were asked to inform the largest number of people in the region about meeting

them and consulting with them.

Survey forms were prepared to question locals about their point of view vis a vis the

asphalting of the road, along with their expectations, concerns and contributions to

the project implementation

7.3 Findings of the Consultations

7.3.1 Men Consultations

The men consultation was conducted by Environmental and Social Unit staff -RAP CMO

during the preparation of this ESIA as shown in table 7.1 below.

Villages Surveyed Survey Date No of men

Attahriah 22 Feb.. 2014.

65

Dhahebah & Hamaz Village 23 Feb. 2014.

53

Je’wal Village 23Feb. 2014.

12

Total

130

Table 7.1 Location and number of consulted men.

Page 83: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

83

During the consultation process the following information and opinions were gathered:

The road works do not require any land acquisition or destruction of any house.

All residents are convinced of the positive economic, social and health impacts of the

road paving on their lives.

Transport is expensive especially for the sick.

Some resident showed lack of confidence in the implementation of the project as

they were promised implementation several times long time ago.

Most residents showed their willingness to help during the implementation process.

Most of the population did not express concerns with the problems that accompany

the implementation process such as the noise and dust.

7.3.2 Women Consultations

The women consultation was conducted by the consultant during the preparation of this

ESIA as shown in the table 7.2 below.

The aim of this consultation was to solicit the views and concerns of women on the

construction of the road and incorporate them into this ESIA and the contract documents of

the Project. A gender expert undertook the consultations in four villages along the road,

interviewed women from different levels and discussed with them the expected impact and

the appropriate mitigation measures with regard to daily activities. Table 20 below shows

the number of women consulted in different villages.

Villages Surveyed Survey Date No of women

Attahriah Al Ka’ka’ 27 - March -2014 37

Dhahebah & Hamaz Village 28 March. 2014 45

Je’wal Village 29 March. 2014 35

Total 117

Table 7.2 Location and number of consulted women.

The results of the consultations in the villages of Attahriah Al Ka’ka’ women expressed their

concern about the safety of the road especially in the area of Dhahebah and Hamaz Village

where they use the road to bring water and in the area of Je’wal Village where they use the

road to get the firewood and they proposed to install bumps and signs in these 2 areas.

In the village of Dhahebah Hamaz women expressed their concerns about the vicinity of

the school, and their safety as they usually cross the road with their cattle and sheep when

they take them grazing and they proposed to install bumps and signs to alert drivers to

lower their speed.

Page 84: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

84

References

1. Ministry of Public Works and Highways- Rural Access Project Central Management Office (RAP CMO). Rural Access Program , Sectoral Environmental Assessment(SEA), Volume-1 , 2008

2. Screening Report: For Attahriah, Alka’ka /Jewal (RAPCMO) office, 2005

3. The Integration of Biodiversity into National Environmental Assessment Procedures. National Case Studies-Yemen, September 2011.Produced for the Biodiversity Planning Support Program. UNDP/UNEP/GEF.

4. Islamic Educational, Scientific and Cultural Organization: Water Resources management Report-2010

5. Republic of Yemen: Social Fund for Development. Annual Reports for the Years 2002 -2005

6. Republic of Yemen : Poetry Reeducation Strategy- Progress Report for Years 2003 & 2004- June-2005

7. Republic of Yemen: National Poverty Survey, 2010.

8. Republic of Yemen: Human Development Report, 2010

9. Republic of Yemen: General Statistics Annual Book 2012

10. Republic of Yemen: Houses and Population Census, 2010

11. Republic of Yemen: Yemen Human Development Report, 2010

12. Republic of Yemen: Poverty Reduction Strategy, 2010/2012

13. Gateway to Land and Water Information Yemen national report.: compiled by Abdul Maged A. Al Hemiary-Technical Director of Renewable Natural Resources Research Centre Agricultural Research and Extension Authority – DhamarL.6 June 2002

14. (Ref.National Information Center -http://www.yemen-nic.info/english_site/yemen/gover/albaidah/brife/

15. (Ref.: http://www.worldweatheronline.com/albyda-weather-averages).

Page 85: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

85

Annex 1: Update of the Social Framework Agreement (SFA) in Arabic

Page 86: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

86

Page 87: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

87

Page 88: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

88

Annex 2: List of Beneficiary Committee

Page 89: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

89

Page 90: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

90

Annex 3: List of Consulted People. Attendance Sheet

Page 91: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

91

Page 92: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

92

Page 93: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

93

Page 94: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

94

Annex 4: Findings of Social Consultations (Second Round) Consultations with men

District:As-Swadiah. Governorate :Al-Baydha

*Location of Consultation (1) at Attahriah Village. Date of Consultation: 22 Feb 2014. Number of Attendees: 65 Persons.

Attendees: Local Council representatives, Beneficiary Committee representatives, Affected People and other beneficiaries. Duration of Consultation: from 02:30 to 04:45 PM. Sample Questions: Are you concerned about: Potential loss of private property? No Increased traffic and/or speed? No Increased noise and/or air pollution? No Effect on pedestrian safety? Put speed Bump Inconveniences during execution? No Effect on agricultural areas? (if any)No, we will give up part of lands for the road Effect on natural reserves? (if any)No natural reserve in the area Effect on water resources? (if any)No effect on water resources Effect on cultural heritage sites? (if any)Far away from the area Other concerns or objections No objection at all. Our major concern is to speed up the process of implementing the works. As part of this public consultation, how do you expect to participate in the project? We are all willing to cooperate with the contactor to facilitate the work and work with him if

necessary. Interviewer by: Eng. Helal Al-raishi Eng. Hassesn Attiah, Reviewed and endorsed by Eng: Mohamed Al-Mohaya, RAPCMO General Director.

Views of the consultation in location one

Page 95: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

95

Findings of Social Consultations (Second Round). District: As- Swadiah.

Governorate :Al-Baydha *Location of Consultation (2) at Dhahebah & Hamaz Village. Date of Consultation: 23 Feb. 2014. Number of Attendees: 53 Persons. Attendees: Local Council representatives, Beneficiary Committee representatives, Affected People and other beneficiaries Duration of Consultation: from 02:45 to 5:30 PM. Sample Questions: Are you concerned about:

Potential loss of private property? No Lost Increased traffic and/or speed? No Increased noise and/or air pollution? No mind at all Effect on pedestrian safety? Put speed bumps and warning signs. Inconveniences during execution? No Effect on agricultural areas? (if any)Not at all, whatever the road width is Effect on natural reserves? (if any)No natural reserve in the area Effect on water resources? (if any)No effect on water resources Effect on cultural heritage sites? (if any)Far away from the area Other concerns or objections

No objection at all. Our major concern is to speed up the process of implementing the works. As part of this public consultation, how do you expect to participate in the project?

We are willing to solve social problems. We will cooperate with the contractor to facilitate the work during construction period. We consider the road is for all public and we all benefit. The execution will reduce travel cost The implementation will make it easy for access. Also, will ease transporting ill people. Interviewer by: Eng: Helal Al-raishi, Eng: Hassan Attiah

Reviewed and endorsed by Eng :Mohamed Al-Mohaya, RAPCMO General Director

Views of the consultation in location two

Page 96: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

96

District: As- Swadiah. Governorate :Al-Baydha

*Location of Consultation (3) at Je’wal Village. Date of Consultation: 23 Feb. 2014. Number of Attendees: 12 Persons. Attendees: Local Council representatives, Beneficiary Committee representatives, Affected

People and Shaikhs. Duration of Consultation: from 05:00 to 6:15 AM. Sample Questions: Are you concerned about:

Potential loss of private property? No Lost

Increased traffic and/or speed? No

Increased noise and/or air pollution? No mind at all

Effect on pedestrian safety? Yes, but we will take precaution during execution

Inconveniences during execution? No

Effect on agricultural areas? (if any)

Not at all, we will give up part of lands for the road

Effect on natural reserves? (if any)No natural reserve in the area

Effect on water resources? (if any)No effect on water resources

Effect on cultural heritage sites? (if any)Far away from the area

Other concerns or objections We would like the design to follow the existing track so everybody benefits. As part of this public consultation, how do you expect to participate in the project? We are all willing to cooperate with the contactor to facilitate any social problem during

execution. We will cooperate with the beneficiary committee to facilitate the work. Will the road follow the existing track? Yes. We want to widen the road at necessary places when ever needed. Interviewer: Eng. Helal Al-raishi. Eng. Hassan Attiah. Reviewed and endorsed by Eng: Mohamed Al-mohayah , RAPCMO General Director

View of men consultation at location three

Page 97: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

97

Consultations (Second Round) with Women

In March 2014 Gender expert undertook the consultations in five villages along the road and

interviewed women from different levels and discussed with them the expected impact and the

appropriate mitigation measures with regard to daily activities. Women expressed their concern

about the safety of the road near schools, where they use the road to bring water and firewood.

They proposed to install bumps and signs to alert drivers to lower their speed.

Page 98: ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT … · Reviewed and updated by: Eng. Helal Al-Raishi and Eng. Hassen Attyah Socio-Environmental Study Team . Name Specialty . 1 Ahmad

Environmental and Social Impact Assessment (ESIA)

98

General photos of women consultation