Environmentally Sustainable Planning of Large Wind Farms for Wind Power Integration Ke Meng | Research Academic Centre for Intelligent Electricity Networks The University of Newcastle [email protected]

Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

  • Upload
    votuong

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Environmentally Sustainable Planning of Large Wind Farms for Wind Power Integration

Ke Meng | Research Academic

Centre for Intelligent Electricity Networks

The University of Newcastle

[email protected]

Page 2: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Background

Wind Energy

• Wind energy, one of the fastest growing renewable energy sources for power generation, now meets a significant percentage of electrical demand worldwide.

• Along with the introduction of various emission reduction schemes, the cumulative installed wind capacity has increased markedly since the last decade around the world.

• Governments and organizations are promoting the construction of large wind farms, encouraging power companies and utilities with generous subsidies and with regulatory support.

• The ever-increasing level of wind energy with uncertainty and variability brings potential risk to power system operations.

• Furthermore, after direct participating in real-time electricity market, the high volatility of electricity price will further intensify the risk of wind energy.

2

Page 3: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Background

Wind Energy in Australia

• Australian continent boasts some of the best wind resources in the world, primarily located along coastal regions and extended hundreds of kilometres to inland.

• The Australian government acknowledges the importance of renewable energy sources and has issued a series of national policies to promote research, development, commercialization of renewable energy projects, and to improve transition of latest research results into industrial applications.

• These policies, particularly the emission trading scheme and the renewable energy target are expected to underpin solid progress of wind energy industry in Australia.

• Furthermore, some power utilities have started grid upgrade for renewable energy integration. An essential part of the upgrade work is to strengthen or replace the existing facilities to accommodate the increasing wind power generation.

3

Page 4: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

4

Background

Source: http://www.renewablessa.sa.gov.au/investor-information/resources/

Page 5: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Background

Selected Research Fields in Wind Power • Wind resource assessment

• Wind farm planning

1. Potential location selection;

2. Environmental impacts assessment;

3. Turbine model selection;

4. Wake effects modelling;

5. Micro-siting optimization;

6. Electrical layout optimization.

• Wind farm dispatch

1. Wind power forecast;

2. Flexible operational planning framework;

3. Wind farm dispatch considering carbon tax;

5

Page 6: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Background

Selected Research Fields in Wind Power (Cont.) 4. Coordinate dispatch with energy storage system;

5. Optimal allocation of energy storage system;

6. Operational risk mitigation with insurance strategy.

• Power system security

1. Low-voltage ride-through (LVRT) capability;

2. Dynamic security assessment;

3. Sub-synchronous resonance.

6

Page 7: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Resource Assessment

Page 8: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

8

Wind Forecasting and Wind Farm Planning Software

OptiWind

Page 9: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

9

Network Communicator

Client Pool Core Calculation Library

Client1 Client2

Client3 Client4

Prediction Algorithms

Planning Algorithms

Statistics Service

Thread Pool

Prediction Threads

Planning Thread

Other Threads

Request Handler

Dispatch

Request Queue

Request Request Request

Network Communicator

Functional Modules

Prediction Service

Dynamical Display Threads

Prediction Threads

Planning Thread

User Interface

Wind Farm Planning Service

NWP Assessment Service

Statistics Service

Wind Forecasting and Wind Farm Planning Software

OptiWind

Page 10: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Resource Assessment

Statistics Analysis (Wind Speed)

10

1 2 3 4 5 6 7 8 9 10 11 12

15

913

1721

3

3.5

4

4.5

5

5.5

6

Month

Month vs. Hour of Wind Speed

Hour

Win

d S

peed

(m/s

)

2001 2002 2003 2004 2005 2006 2007 2008 20094.24.44.64.8

Seasonal-mean Variability of Wind Speed

Spr

ing

2001 2002 2003 2004 2005 2006 2007 2008 20093.63.8

44.2

Sum

mer

2001 2002 2003 2004 2005 2006 2007 2008 20094

4.5

5

Aut

umn

2001 2002 2003 2004 2005 2006 2007 2008 2009

5

5.5

6

Year

Win

ter

Page 11: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Resource Assessment

Statistics Analysis (Wind Speed)

11

0 5 10 15 200

5

10

January

Wind Speed (m/s)

Freq

uenc

y (%

)

0 5 10 150

5

10

15

February

Wind Speed (m/s)

Freq

uenc

y (%

)

0 5 10 150

5

10

15

March

Wind Speed (m/s)

Freq

uenc

y (%

)

0 5 100

5

10

15

April

Wind Speed (m/s)

Freq

uenc

y (%

)

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

Wind Speed (m/s)

Freq

uenc

y (A

tlas

Sec

tor:

0o -36

0o )

Weibull Fitting: y=(a/b)*(x/b)(a-1)*exp(-(x/b)a) --- a = 1.89, b = 4.60 (m/s)

Wind DistributionWeibull Fitting

Page 12: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Resource Assessment

Statistics Analysis (Wind Direction)

January July 12

10%

20%

30%

40%

W E

S

N

0 - 22 - 44 - 66 - 88 - 1010 - 1212 - 1414 - 1616 - 18

5%

10%

15%

20%

W E

S

N

0 - 55 - 1010 - 1515 - 2020 - 2525 - 30

Page 13: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Page 14: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Power Output Estimation

• Wind Turbine Selection

Up to 20 kinds of wind turbines;

Power output ranges from 800KW to 3.6MW;

Power output curve;

• Surface Roughness Selection

Up to 17 kinds of surface roughness;

Roughness ranges from 0.0001 (water area) to 1 (city);

• Hub Height Speed Estimation

Observation station altitude, measuring height, hub height;

Air density, wind speed, surface roughness;

• Mean Power Output Calculation

14

Page 15: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

15

Index Turbine Model Diameter (m) Hub Height (m) 1 Nordex N50 (800KW) 50 50 2 Nordex N60 (1300KW) 60 50 3 Vestas V52 (850KW) 52 55 4 Vestas V66 (1650KW) 66 67 5 Vestas V66 (1750KW) 66 67 6 Vestas V66 (2000KW) 66 67 7 Vestas V80 (1800KW) 80 67 8 Vestas V80 (2000KW) 80 67 9 Vestas V80 (2000KW Offshore) 80 67

10 Vestas V90 (1800KW) 90 80 11 Vestas V90 (2000KW) 90 80 12 Vestas V90 (3000KW) 90 80 13 Vestas V112 (3000KW Offshore) 112 100 14 SWT-2.3-82 (2300KW) 82.4 80 15 SWT-2.3-93 (2300KW) 93 80 16 SWT-3.6-107 (3600KW) 107 80 17 Sinovel-30-90 (3000KW) 90 80/90 18 Sinovel-30-100 (3000KW) 100 80/90/100/110 19 Sinovel-30-105 (3000KW) 105 80/90/100/110 20 Sinovel-30-113 (3000KW) 113 90/100/110

Page 16: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

16

z0 [m] Terrain Surface Characteristics 1.00 City 0.80 Forest 0.50 Suburbs 0.40 --- 0.30 Shelter belts 0.20 Many trees and/or bushes 0.10 Farmland with closed appearance 0.05 Farmland with open appearance 0.03 Farmland with very few buildings/trees 0.02 Airport areas with buildings and trees 0.01 Airport runway areas

0.008 Mown grass 0.005 Bare soil (smooth) 0.001 Snow surfaces (smooth)

0.0003 Sand surfaces (smooth) 0.0002 --- 0.0001 Water areas (lakes, fjords, open sea)

Page 17: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Wake Effect Impacts

• Low capacity

• Limited wind farm site

• Wake losses (reduction of wind speed and increase of turbulence downwind of a turbine)

• Intermittent and stochastic nature

17

Page 18: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Wake Effect Modeling

• Wake loss is an important factor in the design of wind turbine micro-siting optimization.

• Normally, when a uniform incoming wind encounters a wind turbine, a linearly expanding wake behind the turbine occurs.

• In a wind farm, the turbines can be affected by the wakes of several turbines located upstream.

18

Y-ax

is

X-axis

T1

T2

T3

O

A

E

F

B

CD

θ

G

H

Page 19: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Wake Effect Modeling (Cont.)

• There are three different mutual effects, fully effect, no effect, and partial effect.

19

Page 20: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Wake Effect Modeling (Cont.)

• Fitness Function

Maximize mean power output;

Or minimize mean power losses.

• Challenges

Kinds of constraints;

Mixed with trigonometric function;

Mixed with definite integration;

Difficult to be solved by conventional approaches (linear programming, nonlinear programming, Quadratic programming).

20

Page 21: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

-1000 -800 -600 -400 -200 0 200 400 600 800 1000-1000

-800

-600

-400

-200

0

200

400

600

800

1000

8.13%

5.66% 5.29% 4.26%

Wind Farm Planning

21

Mean Power Output = 8.1751 MW Mean Power Losses = 0.4628 MW

Mean Power Output = 8.2034 MW Mean Power Losses = 0.4345 MW

Mean Power Output = 8.2852 MW Mean Power Losses = 0.3527 MW

Mean Power Output = 7.8700 MW Mean Power Losses = 0.7679 MW

Mean Power Output = 7.9883 MW Mean Power Losses = 0.6496 MW

Mean Power Output = 8.0725 MW Mean Power Losses = 0.5654 MW 9.76% 7.00%

Page 22: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Micro-siting Optimization (Cont.)

• Aside from the two constraints discussed above, the following criteria should be considered:

Wind predictability: Improper site selection may magnify the intense of wind power fluctuations, leading to inaccurate wind resource prediction, ending up with being penalized by electricity market;

Site accessibility: Improper site selection may cause extra costs for equipment transportation, installation, and maintenance;

Terrain complexity: Overlooking may cause extra costs relative to more transmission lines and towers to support stronger mechanical stress;

Flora and Fauna: Violation may cause damage to species in imminent danger;

Obstacles and infrastructures: Improper design may cause extra costs related to signalization equipment (aviation) or obstacle avoiding (heritage, transportation, rivers, telecommunications, etc.).

22

Page 23: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Micro-siting Optimization (Cont.)

23

Multi-criteria Assessment Framework for Turbine Micrositing Optimization

Layer III: Economic Analysis

Layer IV: Optimal Plan Selection

Layer I: Technical Constraints

Layer II: Environmental Constraints

Page 24: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Electrical Layout Optimization

• Electrical layout design is an engineering task that optimizes the equipment installation and maintenance costs subject to geographic, environmental, social, and legal constraints.

• The planner decides the path and areas crossed by the facilities taking existing constraints into account:

For small wind farms, the electrical layout problem can be solved by hand, or by using exhaust search techniques that try all possible cable types and layouts.

However, this problem quickly becomes infeasible, due to the increasing number of wind turbines. The cost of a cable connecting one turbine to another depends on the type of cable used, and the terrain where it crossed.

• We developed an efficient optimal electrical layout design approach for large-scale offshore wind farms to minimize the capital cost, power loss cost, and network maintenance cost, taking into account the constraints of wind turbines, electrical cables, substations.

24

Page 25: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Electrical Layout Optimization (Cont.)

• The topography of terrain is modelled using a grid of units, where each unit represent a certain type of terrain and will be assigned a weight (cost coefficient) by decision makers according to its characteristic.

25

2

3

4

0.00 1000.00 2000.00 3000.00 4000.00Scale in Map Units

Parallel True to Scale: -11.50

1 inch on map = 1000.00 map units

1 1.00 to 2.00

2 2.00 to 3.00

3 3.00 to 4.00

4 4.00 to 4.00

5

2

2

2

3

3

1

4

2

3

3

1

3

4

2

3

2

2

1 1

1

4

4

2

2

3

3

4

1

2

1

4

4

5

31

5 5.00 to 6.00

4

Page 26: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

Electrical Layout Optimization (Cont.)

• Constraints:

Active power flow constraints:

Reactive power flow constraints:

Capability limits of cables:

Bus voltage limits:

Radial constraints:

26

( ) ( )1

cos sinN

gi i j ij i j ij i j

jP VV G Bδ δ δ δ

=

= − + − ∑

( ) ( )1

sin cosN

gi i j ij i j ij i j

jQ VV G Bδ δ δ δ

=

= − − − ∑

max ,ijS S i N≤ ∀ ∈

min max

min max

,,

i

i

V V V i Ni Nδ δ δ

≤ ≤ ∀ ∈

≤ ≤ ∀ ∈

1,1,

N

iji i j

x j N= ≠

≤ ∀ ∈∑

START

Input Data,Initialize Parameters

Group WTs UsingFCM Clustering & BIP

method

Solve Master Problem(Cable Layout Scheme)

Feasible Solution?

Solve Slave Problem(Operation Constraint)

Feasible Solution?

Add a Benders Cutto Master Problem

Y

N

N

Y

Converged

YEND

(Optimal Solution)

END (Infeasible Solution)

N

Benders Decomposition

Page 27: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Planning

27

-2000 -1600 -1200 -800 -400 0 400 800 1200 1600 2000-2000

-1600

-1200

-800

-400

0

400

800

1200

1600

2000Electrical Layout Design for Large-scale Offshore Wind Farms

-2000 -1600 -1200 -800 -400 0 400 800 1200 1600 2000-2000

-1600

-1200

-800

-400

0

400

800

1200

1600

2000

Electrical Layout Optimization (Cont.)

Only considering cable cost Considering cable cost, power

loss cost, and maintenance cost

Page 28: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

Page 29: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

29

Wind Power Forecast

• Long-term Forecast

Numerical Weather Prediction (NWP) model;

• Short-term Forecast

K-nearest Neighbor (KNN);

Generalized Autoregressive Conditional Heteroskedasticity (GARCH);

Wavelet Decomposition (WAD);

RBF Neural Network (RBFNN);

Support Vector Machine (SVM);

Relevance Vector Machine (RVM).

Page 30: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

30

Wind Power Forecast (Cont.)

Historical Measurements

Real-time Measurements

Numerical Weather Prediction Model

OptiWind Forecast System(Statistical, Physical, Combination Models)

Wind Profile Forecasts

Page 31: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

31

Flexible Operational Planning Framework

Forecasted Result Sf

Step 3: Unit Commitment & Economic Load Dispatch

Step 4: Flexible Operational Plan Selection

Step 1: Wind Power Forecasting

Product NS Candidate

Operational Plans

Start

End

Æ Historical Wind DataÆ Numerical Weather Prediction DataÆ Wind Farm Details

Æ System DemandÆ Power Network TopologyÆ Parameters of Electric Equipment

Product NS Scenarios

Step 2: Scenario Production

...

...

O1 O2 O3 ONS

S2:p2 S3:p3 SNS:pNSS1:p1

Æ Probability Density Function

Æ The Change Time-point : tc

Part BChange Process

tc+Ti,xy

...

NT

...

...

Part A Part C

tc

...

...

...

...

, , 1i xy open iT T = +

The generation of the unit i in operational plan Ox

The change processThe generation of the unit i in operational plan Oy

, , 1i xy close iT T = +

Part BChange Process

tC+Ti,xy

...

NT

...

...

Part A Part C

tC

...

...

...

The generation of the unit i in operational planning Ox

The change processThe generation of the unit i in operational planning Oy

Page 32: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

32

Flexible Operational Planning Framework (Cont.)

Operational Plan

Combined Operational

Plan

Total Cost of Combined

Operational Plan ($) Wind Changes at

05:00

Total Cost of Combined

Operational Plan ($) Wind Changes at

13:00

A

A→A 523,126.07 523,126.07

A→B 523,463.95 522,940.60

A→C 517,618.45 517,837.46

B

B→A 518,368.36 516,225.70

B→B 519,678.92 519,678.92

B→C 513,347.13 512,756.43

C

C→A 518,758.95 515,873.99

C→B 519,583.22 517,507.86

C→C 514,224.09 514,224.09

Least Adaption Cost 517,255.16 515,869.17

Optimal Operational Plan B C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 240

5

10

15

20

25

30

35

40

45

50

55

60

Time (Hour)

Win

d P

ower

Out

put (

MW

)

Scenario AScenario BScenario C

...

NTtc

The state of the unit i is closed in Ox

EENS

... ...

...

The generation of the unit i in operational plan Ox

The generation of the unit i in operational plan Oy

The state of the unit i is open in Oy

t

Pi(t)

Because the unit i can not open within the limited time to change into operational

plan Oy , EENS is generated.CT

Page 33: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

33

Wind Farm Dispatch

Wind Farm-BESS Dispatch Scheme

• Advantages

Proven and reliable (most RE systems use them);

Many solution options (Lead-acid, NaS, NiCd, NiZn, NiMH, and Li-ion).

• Disadvantages

Relatively high capital cost;

Heavy (low energy density);

Require regular maintenance;

Low charging/discharging efficiency (70-80%);

Short lifespan (5-10 yrs.).

Page 34: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Wind Farm Dispatch

34

Wind Farm-BESS Dispatch Scheme (Cont.)

• The benefits of this idea are, the wind power output can be controlled; the maximum capacity of battery storage system can be reduced, the optimal size can be estimated; the lifetime of energy storage device can be prolonged.

Wind power source

text

BESS

ACDC

text Grid

Pwind

PBESS

PTOTAL

Power Converter

Page 35: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

35

• Technical Reports:

“Study on Transient Stability of HK Electric System with Offshore Wind Farm,” K. Meng, Z.Y. Dong, and K.P. Wong, Hong Kong Polytechnic University, Jul. 2011. To: Hong Kong Electric Company.

“Wind Forecast for Wind Power Generation in Hong Kong,” K. Meng, Z.Y. Dong, K.P. Wong, and F.J. Luo, Hong Kong Polytechnic University, Feb. 2011. To: Hong Kong Innovation and Technology Fund (ITF).

• Patents:

Z.Y. Dong, K.P. Wong, and K. Meng, “Wavelet analysis based wind speed prediction method and system for wind farms,” Assignee: The Hong Kong Polytechnic University, Chinese Patent 201010560929.1, Nov. 26, 2010.

Z.Y. Dong, K.P. Wong, and K. Meng, “Data-driven short-term wind speed prediction method and system for wind farms,” Assignee: The Hong Kong Polytechnic University, Chinese Patent 201010557609.0, Nov. 24, 2010.

Z.Y. Dong, K.P. Wong, and K. Meng, “Composite artificial neural networks based short-term wind speed prediction method and system for wind farms,” Assignee: The Hong Kong Polytechnic University, Chinese Patent 201010557446.6, Nov. 24, 2010.

Publications

Page 36: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

36

• Selected Journal Papers: Y. Zheng, Z.Y. Dong, F.J. Luo, K. Meng, J. Qiu, and K.P. Wong, “Optimal allocation of energy storage system for risk mitigation of DISCOs

with high renewable penetrations,” accepted by IEEE Transactions on Power Systems, 17 Jul. 2013.

D.L. Xie, Z. Xu, L.H. Yang, J. Østergaard, Y.S. Xue, and K.P. Wong, “A Comprehensive LVRT Control Strategy for DFIG Wind Turbines with Enhanced Reactive Power Support,” IEEE Transactions on Power Systems, vol. 28, no. 3, pp. 3302-3310, Aug. 2013.

Y. Xu, Z.Y. Dong, Z. Xu, K. Meng, and K.P. Wong, “An intelligent dynamic security assessment framework for power systems with wind power,” IEEE Transactions on Industrial Informatics, vol. 8, no. 4, pp. 995-1003, Nov. 2012.

F. Yao, Z.Y. Dong, K. Meng, Z. Xu, H. Iu, and K.P. Wong, “Quantum-inspired particle swarm optimization for power system operations considering wind power uncertainty and carbon tax in Australia,” IEEE Transactions on Industrial Informatics, vol. 8, no. 4, pp. 880-888, Nov. 2012.

L.H. Yang, Z. Xu, J. Østergaard, Z.Y. Dong, and K.P. Wong, “Advanced Control Strategy of DFIG Wind Turbines for Power System Fault Ride Through”, IEEE Transactions on Power Systems, vol. 27, no. 1, pp. 713-722, May 2012.

S. Taggart, G. James, ZY Dong and C. Russell, “The Future of Renewables Lined by a Transnational Asian Grid,” Proceedings of the IEEE, vol. 100, no. 2, pp. 348-359, Feb 2012.

L.H. Yang, Z. Xu, J. Østergaard, Z.Y. Dong, K.P Wong, and X.K. Ma, “Oscillatory Stability and Eigenvalue Sensitivity Analysis of A Doubly Fed Induction Generator Wind Turbine System,” IEEE Transaction on Energy Conversion, vol. 26, no. 1, pp. 328-339, Mar. 2011.

Y. Chen, Z. Xu, and J. Østergaard, “Security Assessment for Intentional Island Operation in Distribution Network with Distributed Generations,” Electric Power System Research, vol. 81, no. 9, pp. 1849-1857, Sep. 2011.

L.H. Yang, Z. Xu, J. Østergaard, Anders Foosnes, C. Andersen, and S. Holthusen, “Electric Vehicles in Power Systems with Large Penetration of Wind Power: the EDISON Programme in Denmark,” Automation Electric Power System (in Chinese), vol. 35, no.14, pp. 43-47, Jul. 2011.

L.Z. Xu, G.Y. Yang, Z. Xu, ZY Dong, J. Stergaard, and Y.J. Cao, “Composite microgrid dispatch considering wind power and CHP”, Automation of Electric Power Systems (in Chinese), v35, no. 9, pp. 53-60,66, May 2011.

Publications

Page 37: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

37

• Selected Journal Papers (Cont.): F.X. Li, W. Qiao, H.G. Sun, H. Wan, J.H. Wang, Y. Xia, Z. Xu, and P. Zhang, “Smart Transmission Grid: Vision and

Framework,” IEEE Transactions on Smart Grid, vol. 1, no. 2, Sep. 2010.

L.H. Yang, G.Y. Yang, Z. Xu, Z.Y. Dong, K.P. Wong, and X.K. Ma, “Optimal controller design of a doubly fed induction generator wind turbine system for small signal stability enhancement,” IET Generation, Transmission & Distribution, vol. 4, no. 5, pp. 579-597, 2010.

Y. Mishra, S. Mishra, F.X. Li, Z.Y. Dong and R.C. Bansal, “Small-Signal Stability Analysis of a DFIG-Based Wind Power System Under Different Modes of Operation”, IEEE Transactions on Energy Conversion, vol 24, no. 4, pp. 972- 982, Dec 2009.

R. Bansal, V. Kumar, S. Kong, Z.Y. Dong, W. Freitas, and HD Mathur, “Three-Phase Doubly-Fed Induction Generators: An Overview”, IET Electric Power Applications, vol. 4, no. 2, pp. 75-89, 2010.

Y. Mishra, S. Mishra, M. Tripathy, N. Senroy, and Z.Y. Dong, “Improving Stability of a DFIG-Based Wind Power System With Tuned Damping Controller”, IEEE Transactions on Energy Conversion, vol. 24, no. 3, pp. 650- 660, Sep. 2009.

L.B. Shi, Z. Xu, and Z.Y. Dong, “Wind turbine model and initialization analysis with high penetration of grid-connected wind farms of DFIG type”, Automation of Electric Power systems (in Chinese), vol. 3, pp 44-48, 2008.

L.B. Shi, Z. Xu, and Z.Y. Dong, “Wind Turbine Model and Initialization Analysis with High Penetration of Grid-connected Wind Farms of DFIG Type”, Hydropower Automation and Dam Monitoring, vol. 32, no. 3, pp. 44-48, 2008.

Publications

Page 38: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

38

• Peer Reviewed Conference Papers: F.J. Luo, Z.Y. Dong, Y.Y. Chen, K. Meng, G. Chen, H.Q. Tian, and K.P. Wong, “A novel short-term dispatch scheme for wind farm with

battery energy storage system,” PES 2013: IEEE Power Engineering Society General Meeting, Vancouver, BC, Canada, Jul. 2013.

J. Qiu, Z.Y. Dong, K. Meng, Y. Zheng, Y.Y. Chen, and H.Q. Tian, “Risk sharing strategy for minimizing imbalance costs of wind power forecast errors,” PES 2013: IEEE Power Engineering Society General Meeting, Vancouver, BC, Canada, Jul. 2013.

Y. Zheng, ZY Dong, K. Meng, F.J. Luo, H.Q. Tian and K.P. Wong, “A control strategy of battery energy storage system and allocation in distribution systems,” PES 2013: IEEE Power Engineering Society General Meeting, Vancouver, BC, Canada, Jul. 2013.

K. Meng, Z.Y. Dong, Y. Zheng, and J. Qiu, “Optimal allocation of ESS in distribution systems considering wind power uncertainties,” APSCOM2012: IET International Conference on Advances in Power System Control, Operation and Management, Hong Kong, Nov. 2012.

F. Yao, Z.Y. Dong, K. Meng, Y. Xu, H. Lu, and K.P. Wong, “Unit commitment considering probabilistic wind generation,” APSCOM2012: IET International Conference on Advances in Power System Control, Operation and Management, Hong Kong, Nov. 2012.

X.R. Li, C.W. Yu, F.J. Luo, S.Y. Ren, Z.Y. Dong, Y. Wu, K. Meng, and K.P. Wong, “Optimal decision making model for GENCO under the emission trading scheme,” PES2012: IEEE Power Engineering Society General Meeting, San Diego, USA, Jul. 2012.

F.J. Luo, Z.Y. Dong, X.R. Li, Y.Y. Chen, Y. Xu, K. Meng, and K.P. Wong, “A profit-based generation scheduling model for GENCO considering multi-markets and CO2 emission allowance,” PES2012: IEEE Power Engineering Society General Meeting, San Diego, USA, Jul. 2012.

F. Yao, K. Meng, Z.Y. Dong, Z. Xu, H. Lu, J.H. Zhao, and K.P. Wong, “Differential evolution algorithm for multi-objective economic load dispatch considering minimum emission costs,” PES2011: IEEE Power Engineering Society General Meeting, Detroit, USA, Jul. 2011.

Q.W. Wu, Z. Xu, J. Østergaard, “Grid integration issues for large scale wind power plants (WPPs), PES2010: IEEE Power Engineering Society General Meeting, Minneapolis, July2010.

D.H. Feng, Z. Xu, J Østergaard, ‘Redesign electricity market for the next generation power system of renewable energy and distributed storage technologies, PES2010: IEEE Power Engineering Society General Meeting, Minneapolis, July2010.

Publications

Page 39: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

39

• Submitted/Under Review: J. Qiu, Z.Y. Dong, J.H. Zhao, K. Meng, and Y. Zheng, “Insurance strategy for minimizing imbalance costs of wind power in real-time

markets,” submitted to IEEE Transactions on Power Systems.

Y.Y. Chen, Z.Y. Dong, K. Meng, F.J. Luo, Z.Xu, and K.P. Wong, “Optimal electrical layout design for offshore wind farms using fuzzy c-means clustering and benders decomposition,” submitted to IEEE Transactions on Power Systems.

K. Meng, Z.Y. Dong, W.X. Guo, M.H. Chen, F.S. Wen, and Y. Xu, “A flexible daily operational planning framework with intermittent wind power,” submitted to IEEE Transactions on Power Systems.

F.J. Luo, Z.Y. Dong, Y.Y. Chen, X.R. Li, Y. Xu, K. Meng, and K.P. Wong, “Fuzzy adaptive particle swarm optimization for unit commitment,” submitted to Electric Power Systems Research.

H.M. Yang, D.Q. Zhang, K. Meng, and Z.Y. Dong, “Optimal scheduling of combined cooling heating and power system considering the risk of loss in renewable energy by extreme learning machine,” submitted to ELM2013.

Publications

Page 40: Environmentally Sustainable Planning of Large Wind … · Environmentally Sustainable Planning of Large Wind Farms for Wind Power ... Nordex N50 (800KW) 50: 50: 2: Nordex N60 (1300KW)

Thanks! Any Questions?

Ke Meng | Research Academic

Centre for Intelligent Electricity Networks

The University of Newcastle

[email protected]