RES Americas / Nordex Energy Storage A Presentation for the Colorado Rural Electric Association October 28nd, 2013

RES Americas / Nordex

  • Upload
    ordell

  • View
    66

  • Download
    0

Embed Size (px)

DESCRIPTION

Energy Storage A Presentation for the Colorado Rural Electric Association. October 28nd, 2013. RES Americas / Nordex. Who is RES Americas?. Colorado Based Engineering, Procurement & Construction Constructed 10% of USA Wind (> 6000MW) 250MW in Colorado (Xcel) - PowerPoint PPT Presentation

Citation preview

Page 1: RES Americas /  Nordex

RES Americas / Nordex

Energy StorageA Presentation for the Colorado Rural Electric Association

October 28nd, 2013

Page 2: RES Americas /  Nordex

Who is RES Americas?

Colorado Based

Engineering, Procurement &Construction

Constructed 10% of USA Wind (> 6000MW)

250MW in Colorado (Xcel)

Constructed > 100MW of PV Solar

Now constructing:

The Biggest Battery in the Province of Ontario (4/2014)

The 2nd Biggest Battery in the State of Ohio (2/2014)

Page 3: RES Americas /  Nordex

Where Did RES Come From? – McAlpine Construction

London Underground

World’s Largest Geodesic Domes

Torness Nuclear Power Station 2012 Olympic Stadium

2013 Renewable Energy Systems Americas Inc. - Proprietary and Confidential

RES Group / RES Americas spawned from 150 years of McAlpine Engineering & Construction experience.

Nuclear power plants, oil refineries, port facilities, the 2012 Olympic Stadium and more..

Nuclear Reprocessing Facility

Page 4: RES Americas /  Nordex

Utility Energy Storage in 90 seconds

Compressed Air Energy Storage

(CAES) [non-fuel]Thermal

Electrical Storage

New Technology Batteries (high temp,

flow, aqueous Na)

Lithium Batteries based on electric

vehicle production

NOT AVAILABLE TODAY

NOT AVAILABLE TODAY EARLY

PRODUCTIONAVAILABLE

~5MW Demo Projects – 2015Utility Ready Products - 2018

~5MW Demo Projects – 2016Utility Ready Products - 2019

~5MW Demo Projects – 2014Utility Ready Products – 2016

Utility Grade Products Available Today

New ES technologies show great promise (RES is presently involved in 2 CAES projects and one Thermal ES project), but are mostly not available today, except as demonstration projects.

Because of the huge investment in Electric Vehicle batteries, lithium based grid energy storage systems are available and reliable.

Page 5: RES Americas /  Nordex

How can Energy Storage Help CREA Members?

Distribution Deferral

Providing local power to defer the construction of transformers, substations, and new distribution lines.

Cost effectively handle incremental load growth

Same equipment can provide islanding / UPS capabilities

Providing 3rd Party Ancillary Services

CREA members are being charged for Ancillary services (regulation, spinning reserve, etc.) in Schedule 3, 5, and 6 of TriState and WAPA tariffs. These services can be provided through energy storage.

Members can avoid these charges through 3rd party supply.

FERC ruling 784 (a FERC Energy Storage order July 2013) makes this easier and more cost effective.

Page 6: RES Americas /  Nordex

Distribution Deferral

Energy Storage

Energy Storage

Energy Storage

Transmission Transformer or HV line overloading?

Inject energy storage power as required downstream of HV

transformer

Distribution transformer or 69kV

line overloading? Inject energy storage

power as required downstream on low side of substation.

Voltage support needed at end of distribution line?

Inject energy storage at load end instead of more distribution

lines.

Page 7: RES Americas /  Nordex

3rd Party Ancillary Services

FERC 784 (July 18th, 2013)

“Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies”

Schedule 3, 5, and 6 of Transmission provider tariffs. These services can be provided through energy storage, often at less cost.

TriState could own or contract these services less expensively, and pass on savings to members.

Page 8: RES Americas /  Nordex

Final Words on Energy Storage

Energy Storage can serve several functions at once.

Several new low cost Energy Storage options should be available as utility products within 5-7 years.

RES can provide technical and financial analysis of any potential distribution deferral project. Questions?