Upload
seguntaiwo
View
224
Download
0
Embed Size (px)
Citation preview
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 1/7
1
Nigeria OPL 209PROPRIETARY
FPSO Offshore Execution
Week Ending 31 Mar-06
Drill Center East - Risers
First Oil – 27 March-2006
Drill Center East
Well Startup Sequence
Opened PE15 Well: 8:15 am
Opened PE 18 Well: 9:15 am
Flowing through 6 in. Test Riser
First Oil Received onboard the
FPSO at 10:40 am March 27, 2006 6 in. Test Riser
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 2/7
2
Nigeria OPL 209PROPRIETARY
FPSO Offshore Execution
Week Ending 31 Mar-06
Valve Lineup to Test Separator
Verifying Separator Levels
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 3/7
3
Nigeria OPL 209PROPRIETARY
FPSO First Oil – 27 March 2006
First Oil in Separator – 10:40 am
Crude to Cargo Oil Tank 4
Center
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 4/7
4
Nigeria OPL 209PROPRIETARY
FPSO Offshore Execution
Drill Center West SCR Completion
DLB Seaway Polaris – Laying
DCW – 10 In. Production SCR
towards FPSO
M/V Milton McCall
Approaching
FPSO SIMOPS
Zone (500 Meter )
Riser Pull in
system ready
for Handoff to
FPSO
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 5/7
5
Nigeria OPL 209PROPRIETARY
FPSO Offshore Execution
Week Ending 31-Mar-06
Preparing HP Gas
Compressor No. 2 for
Commissioning
Multi-Purpose Pump – Opened for Plunger
inspection after riser pigging
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 6/7
6
Nigeria OPL 209PROPRIETARY
FPSO Flare Ignition – 31 March 2006
FPSO Offshore Execution
Week Ending 31-Mar-06
8/18/2019 Erha Execution Photos 06-03-31[1]
http://slidepdf.com/reader/full/erha-execution-photos-06-03-311 7/7
7
Nigeria OPL 209PROPRIETARY
FPSO Offshore Execution
Week Ending 31-Mar-06
Ar rival of the PO1B Replacement
Jumper to Onne Quay via Panelpina
Trailers
Load out of the PO1B Replacement
Jumper onto the CB19 in Onne