EC-01 PLOTTED: 11/12/2019 11:43:28 AM EROSION & SEDIMENTATION CONTROL DETAILS No. By Date Project No.: Date: Drawn: Designed: Reviewed: Approved: Scale: GWO No.: Sheet: #### #### #### #### #### #### #### AS NOTED American States Utility Services, Inc. - Fort Bragg 2941 Logistics Street, Bldg. N-6307 Fort Bragg, North Carolina 28310 Phone (910) 495-1311 Website: www.asusinc.com #### EROSION CONTROL NOTES EROSION CONTROL NOTES PUBLIC ROAD 12' OR WIDTH OF STREET/ DRIVEWAY, WHICHEVER IS GREATER 36'-0" MIN NOTES: 1. AGGREGATE SIZE - USE 2-3 INCH WASHED STONE. 2. GRAVEL PAD THICKNESS = 6 INCHES MINIMUM. 3. WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER. 4. LENGTH - 50 FT. MINIMUM. 5. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. 6. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT THE CONTRACTOR'S EXPENSE UNTIL FINAL ACCEPTANCE. 7. THE CONTRACTOR SHALL MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ANY OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 8. WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. SEE DETAIL EC.2B. 4'-0" 10'-0" 6" MIN. THICKNESS 2" - 3" COURSE AGGREGATE, 6" MIN. THICKNESS 50' MIN. 2" - 3" WASHED STONE FILTER FABRIC 10' MIN. RADIUS (TYP) TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY SILT FENCE SILT FENCE OUTLET FRONT VIEW SIDE VIEW GRADE FILL SLOPE SILT FENCE FABRIC WOVEN WIRE FABRIC STEEL POST (1.33 LB/FT) 36" MIN. WIDTH EXT. INTO TRENCH MINIMUM 14 GAUGE LINE WIRE SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP MINIMUM 14 GAUGE INTERMEDIATE WIRES GRADE 3'-0" 2'-0" 24" MAX. ABOVE GRADE 8'-0" MAX. STD. STRENGTH FABRIC W/WIRE FENCE 6'-0" MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE BACKFILL TRENCH & COMPACT THOROUGHLY 8" 4" MINIMUM 14 GAUGE LINE WIRE 4' MIN. STEEL FENCE POST SET MAX. 2' APART 24" MIN. 1' MIN. INSPECTION & MAINTENANCE NOTES 1. THE KEY TO A FUNCTIONAL SILT FENCE OUTLET IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. REGULAR INSPECTIONS OF SILT FENCE OUTLET SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE SILT FENCE OUTLET IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 3. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHED 1/3 THE HEIGHT OF THE SILT FENCE OUTLET. 4. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 5. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL BENEATH THE SILT FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED DUE TO THE RUNOFF OVERTOPPING THE SILT FENCE. INSTALL CHECKS/TIE-BACKS AND/OR REINSTALL SILT FENCE, AS NECESSARY. 6. CHECK FOR TEARS WITHIN THE SILT FENCE, AREAS WHERE SILT FENCE HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE SILT FENCE INEFFECTIVE. REMOVE DAMAGED SILT FENCE AND REINSTALL NEW SILT FENCE IMMEDIATELY. 7. SILT FENCE OUTLET SHOULD BE REMOVED WITHIN 30 DAYS AFTER STABILIZATION IS ACHIEVED AND ONCE IT IS REMOVED, THE RESULTING DISTURBED AREA SHALL BE PERMANENTLY STABILIZED. STEEL FENCE POSTS (1.33 LB./FT.) WIRE FENCE RIP RAP SPLASH PAD (5' X 5' X 1' DEEP) 3' FILTER FABRIC ON GROUND BURY WIRE FENCE AND FILTER FABRIC IN GROUND (SEE SILT FENCE DETAIL) FLOW FILTER OF 1" DIAMETER STONE SILT FENCE FABRIC SILT FENCE FABRIC FILTER OF 1" DIAMETER STONE FRONT VIEW SIDE VIEW NOTE: PLACE SILT FENCE OUTLETS AT LOW POINTS IN STANDARD SILT FENCE LOCATIONS. INSPECTION AND MAINTENANCE 1. THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY INSPECTION, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. REGULAR INSPECTIONS OF ALL INLET PROTECTION SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. 3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF THE INLET PROTECTION IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE BLOCKS. IF A SUMP IS USED, SEDIMENT SHOULD BE REMOVED WHEN IT FILLS APPROXIMATELY 1/3 THE DEPTH OF THE HOLE. 5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF TUBES WHEN FOUND. 7. REPLACE INLET TUBE WHEN DAMAGED OR AS RECOMMENDED BY MANUFACTURER'S SPECIFICATIONS. 8. INLET PROTECTION STRUCTURES SHOULD BE REMOVED AFTER THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. GRADE THE DISTURBED AREA TO THE ELEVATION OF THE DROP INLET STRUCTURE CREST. STABILIZE ALL BARE AREAS IMMEDIATELY. GENERAL NOTES 1. INLETS TUBES SHOULD BE COMPOSED OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBERS, A HARDWOOD MULCH, OR A MIX OF THESE MATERIALS ENCLOSED BY A FLEXIBLE NETTING MATERIAL. 2. INLETS TUBES SHOULD UTILIZE AN OUTER NETTING THAT CONSISTS OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIAL. CURLED WOOD EXCELSIOR FIBER, OR NATURAL COCONUT FIBER ROLLED EROSION CONTROL PRODUCTS ROLLED UP TO CREATE AN INLET TUBE DEVICE ARE NOT ALLOWED. 3. DO NOT USE STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES, OR LEAF MULCH AS FILL MATERIAL WITHIN INLET TUBES. 4. WEIGHTED INLET TUBES MUST BE CAPABLE OF STAYING IN PLACE WITHOUT EXTERNAL STABILIZATION MEASURES AND MAY HAVE A WEIGHTED INNER CORE OR OTHER WEIGHTED MECHANISM TO KEEP THEM IN PLACE. 5. INSTALL WEIGHTED TUBES LYING FLAT ON THE GROUND, WITH NO GAPS BETWEEN THE UNDERLYING SURFACE AND THE INLET TUBE. DO NOT STACK INLET TUBES. DO NOT COMPLETELY BLOCK INLET WITH TUBE. 6. NON-WEIGHTED INLET TUBES REQUIRE STAKING OR OTHER STABILIZATION METHODS TO KEEP THEM SAFELY IN PLACE. 7. OVERFLOW OR OVERTOPPING OF INLET TUBES MUST BE ALLOWED TO FLOW INTO INLET UNOBSTRUCTED. 8. TO AVOID POSSIBLE FLOODING, TWO OR THREE CONCRETE CINDER BLOCKS MAY BE PLACED BETWEEN THE TUBE AND THE INLET. TYPE F - INLET TUBES INLET PROTECTION WEIGHTED INLET TUBE TREE PROTECTION CROWN DRIP LINE OR AS APPROVED BY ARBORIST. 4'-0" Notes: 1. SEE SPECIFICATIONS FOR ADDITIONAL TREE PROTECTION REQUIREMENTS. 2. NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED ARBORIST. 3. NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTIVE FENCING INCLUDING DURING FENCE INSTALLATION AND REMOVAL. 4. SEE SITE PREPARATION PLAN FOR ANY MODIFICATIONS WITH TREE PROTECTION. KEEP OUT TREE PROTECTION AREA TREE PROTECTION FENCE: HIGH DENSITY POLYETHYLENE FENCING WITH 3.5" x 1.5" OPENINGS; COLOR-ORANGE. STEEL POSTS INSTALLED AT 8' O.C. 2" x 6" STEEL POSTS OR APPROVED EQUAL. MAINTAIN EXISTING GRADE WITH THE TREE PROTECTION FENCE UNLESS OTHERWISE INDICATED ON THE PLANS. 8.5" x 11" SIGN LAMINATED IN PLASTIC SPACED EVERY 50' ALONG THE FENCE. SECTION VIEW INLET PROTECTION - CURB INLET FOR CURB INLETS WITHOUT GRATES FOR CURB INLETS WITH GRATES MAINTENANCE 1. REMOVE SEDIMENT FROM BEHIND DEVICE ONCE DEPTH HAS REACHED HALF FULL. 2. CLEAN THE DEVICE AS NECESSARY WITH HIGH PRESSURE WASH OR BROOM. GUTTER EEL, GUTTER BUDDY OR APPROVED EQUAL COMPRESSED TIGHTLY AGAINST CURB PROVIDE 2' RUNOUT AGAINST CURB EXISTING CURB & GUTTER POSITION OVERFLOW FEATURE AT CENTER OF OPENING PROVIDE 2' RUN OUT AGAINST CURB EXISTING CURB INLET FLOW FLOW FLOW EXISTING PAVEMENT FLOW FLOW FLOW GUTTER EEL, GUTTER BUDDY OR APPROVED EQUAL COMPRESSED TIGHTLY AGAINST CURB & ANCHOR TO GRATE W/ PLASTIC OR WIRE TIES EXISTING PAVEMENT EXISTING CURB INLET EXISTING CURB & GUTTER CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC SIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UP-SLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. INSTALLATION 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTIONS. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN-OUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS PROPERLY STABILIZED. STONE CHECK DAM CONSTRUCTION SPECIFICATIONS 1. PLACE NONWOVEN GEOTEXTILE UNDER THE BOTTOM AND SIDES OF THE DAM PRIOR TO PLACEMENT OF STONE. CONSTRUCT THE CHECK DAM WITH WASHED 4 TO 7 INCH STONE OR EQUIVALENT RECYCLED CONCRETE (WITHOUT REBAR) WITH SIDE SLOPES OF 2:1 OR FLATTER AND A MINIMUM TOP WIDTH OF 12 INCHES. PLACE THE STONE SO THAT IT COMPLETELY COVERS THE WIDTH OF THE CHANNEL AND CHANNEL BANKS. FORM THE WEIR SO THAT TOP OF THE OUTLET CREST IS APPROXIMATELY 6 INCHES LOWER THAN THE OUTER EDGES. LINE THE UPSTREAM FACE OF THE DAM WITH A 1 FOOT THICK LAYER OF WASHED AGGREGATE ( 3 4 TO 1 1 2 INCH). 2. SET THE HEIGHT FOR THE WEIR CREST EQUAL TO ONE-HALF THE DEPTH OF THE CHANNEL OR DITCH. TO AVOID SCOUR, THE MAXIMUM HEIGHT OF THE WEIR CREST MUST NOT EXCEED 2.0 FEET. 3. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES ONE-HALF OF THE HEIGHT OF THE WEIR CREST. MAINTAIN LINE, GRADE, AND CROSS SECTION. MAINTENANCE THE STONE CHECK DAM IS NOT A SEDIMENT TAPPING PRACTICE; HOWEVER, SOME SEDIMENT MAY ACCUMULATE BEHIND THE CHECK DAM. ACCUMULATED SEDIMENT MUST BE REMOVED WHEN IT REACHES ONE-HALF OF THE HEIGHT OF THE WEIR CREST. LINE, GRADE, AND CROSS SECTION MUST BE MAINTAINED. CHECK DAM REMOVAL IN TEMPORARY SWALES AND CHANNELS, REMOVE CHECK DAM(S) WHEN NO LONGER NEEDED. IN PERMANENT CHANNELS, CHECK DAMS MAY BE REMOVED WHEN PERMANENT LINING IS INSTALLED. IN THE CASE OF GRASS-LINED CHANNELS, CHECK DAM MAY BE REMOVED WHEN THE GRASS HAS MATURED SUFFICIENTLY TO PROTECT THE SWALE OR CHANNEL. SEED AND INSTALL SOIL STABILIZATION MATTING OR SOD IN THE AREAS DISTURBED BY THE REMOVAL OF THE CHECK DAM. CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS INLET PROTECTION - GRATE INLET EROSION CONTROL NOTES 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE DESIGNED TO CONVEY OR PASS THE PEAK FLOW RESULTING FROM THE 24-HOUR DURATION 25-YEAR RETURN PERIOD STORM PER FT. BRAGG REQUIREMENTS. 2. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL DESIGN HANDBOOK (LATEST EDITION) AND FORT BRAGG REQUIREMENTS (NO SEPARATE PAYMENT). 3. THE CONTRACTOR SHALL NOTIFY NCDEQ - LAND QUALITY SECTION AND FORT BRAGG DIRECTORATE OF PUBLIC WORKS ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 4. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 5. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES AND ON FILE AT ONUS' OFFICE. THE CONTRACTOR SHALL OPERATE A NCDEQ APPROVED SELF-INSPECTION PROGRAM IN ACCORDANCE WITH THE NCDEQ APPROVED EROSION CONTROL PLAN. 6. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO ASUS FOR REVIEW AND TO FORT BRAGG AND NCDEQ REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE ONUS AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 7. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDEQ, FORT BRAGG, OR THE ENGINEER. (NO SEPARATE PAYMENT). 8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 9. SILT FENCE SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT THE TOE OF ALL FILL SLOPES AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY NCDEQ OR THE ENGINEER. 10. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 11. DURING DE-WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. ALL DISCHARGES TO SEWER SYSTEM SHALL BE PERMITTED AND APPROVED THROUGH CORRECT AUTHORITY HAVING JURISDICTION. 12. THE CONTRACTOR SHALL INSPECT AND DOCUMENT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF-PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 13. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. (NO SEPARATE PAYMENT). NCDEQ'S FINAL APPROVAL IS REQUIRED. 14. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREA. (NO SEPARATE PAYMENT). 15. WHEN CROSSING CREEKS OR DRAINAGE-WAYS, THE CONTRACTOR SHALL FOLLOW THE NCDEQ APPROVED PLAN FOR IMPLEMENTING THE CROSSING AND RESTORING THE DRAINAGE-WAY TO A PERMANENTLY STABILIZED CONDITION IMMEDIATELY AFTER CROSSING. 16. DIVERSION DITCHES SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT THE TOP OF CUT AND FILL SLOPES AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY NCDEQ OR THE ENGINEER. 17. SEDIMENT TRAPS OR BASINS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT ALL POINTS WHERE ACCUMULATED RUNOFF IS RELEASED TO NATURAL DRAINAGE CHANNELS, AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY THE ENGINEER. ALL SEDIMENT TRAPS AND BASINS SHALL BE SIZED ACCORDING TO FT. BRAGG REQUIREMENTS AND NCDEQ SEDIMENT AND EROSION CONTROL DESIGN MANUAL (LATEST EDITION). 18. TEMPORARY SEEDING IS THE USE OF RAPID GROWING SMALL GRAINS TO PROVIDE INITIAL, TEMPORARY COVER FOR EROSION CONTROL ON DISTURBED AREAS FOR LESS THAN 12 MONTHS. SEED BED PREPARATIONS AND SOIL AMENDMENTS SHALL BE IN ACCORDANCE WITH THE METHOD DESCRIBED IN THE PLANS. 19. SEEDING AND MULCHING SHALL BE DONE IMMEDIATELY FOLLOWING CONSTRUCTION IN ACCORDANCE WITH THE SPECIFICATIONS. GROUND COVER NOTES 1. PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON A SITE WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS BY THE END OF THE DAY OF THE LAST LAND DISTURBING ACTIVITY. a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. 2. OTHER SLOPE STABILIZATION REQUIREMENTS/EXEMPTIONS: a. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. b. ALL SLOPES SHALL HAVE THE GROUND COVER APPLIED BY THE END OF THE DAY. c. ALL SLOPES SHALL BE STABILIZED BY THE END OF DAY. d. ALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED UNTIL STABLE PERMANENT VEGETATION HAS BEEN ESTABLISHED. SELF-INSPECTION NOTES 1. THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER, OR THEIR AGENT SHALL CONDUCT INSPECTIONS OF ALL EROSION CONTROL DEVICES AND PRACTICES IN ACCORDANCE WITH NCDEQ DIVISION OF LAND RESOURCES REQUIREMENTS FOR SELF INSPECTION. 2. A SELF INSPECTION SHALL BE PERFORMED AFTER EACH PHASE OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN IS COMPLETE. THIS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO THE FOLLOWING: 2.1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2.2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 2.3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 2.4. INSTALLATION OF STORM DRAINAGE FACILITIES. 2.5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 2.6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. PERSON PERFORMING INSPECTION MAY USE THE STANDARD FORM PROVIDED BY NCDENR DIVISION OF LAND RESOURCES OR MAY MARK UP A SINGLE COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. ANY DOCUMENTATION OF THE SELF INSPECTIONS SHALL BE MAINTAINED ON-SITE AND MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR. 4. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF-INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF-INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 4B.0131. THE SELF-INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM http://www.dlr.enr.state.nc.us/pages/sedimentation_new.html . IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300.

EROSION CONTROL NOTES Date SELF-INSPECTION NOTES By …

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EROSION CONTROL NOTES Date SELF-INSPECTION NOTES By …

EC-01

PLOT

TED:

11/12

/2019

11:43

:28 A

M

EROS

ION

& SE

DIME

NTAT

ION

CONT

ROL D

ETAI

LS

No.

ByDa

te

Project No.:

Date:

Drawn:

Designed:

Reviewed:

Approved:Scale:

GWO No.:

Sheet:

####

####

####

####

####

####

####

AS NOTED

Amer

ican S

tates

Utili

ty Se

rvice

s, Inc

. - F

ort B

ragg

2941

Logis

tics S

treet,

Bldg

. N-6

307

Fort

Brag

g, No

rth C

aroli

na 28

310

Pho

ne (9

10) 4

95-1

311 W

ebsit

e: ww

w.as

usinc

.com

####

EROSION CONTROL NOTES EROSION CONTROL NOTES

P

U

B

L

I

C

R

O

A

D

12' OR WIDTH OF STREET/

DRIVEWAY, WHICHEVER

IS GREATER

36'-0" MIN

NOTES:

1. AGGREGATE SIZE - USE 2-3 INCH WASHED STONE.

2. GRAVEL PAD THICKNESS = 6 INCHES MINIMUM.

3. WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER.

4. LENGTH - 50 FT. MINIMUM.

5. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND

ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND

MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER.

6. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT THE CONTRACTOR'S EXPENSE UNTIL FINAL ACCEPTANCE.

7. THE CONTRACTOR SHALL MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE.

AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ANY OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO

PUBLIC ROADWAYS.

8. WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE

DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND

EFFECTIVE. SEE DETAIL EC.2B.

4'-0" 10'-0"

6" M

IN.

THIC

KNES

S

2" - 3" COURSE AGGREGATE,6" MIN. THICKNESS

50' MIN.

2" - 3" WASHED STONEFILTER FABRIC

10' MIN. RADIUS (TYP)

TEMPORARY CONSTRUCTION ENTRANCE

TEMPORARY SILT FENCE SILT FENCE OUTLET

FRONT VIEW

SIDE VIEW

GRADE

FILL SLOPE

SILT FENCE FABRIC

WOVEN WIRE FABRIC

STEEL POST (1.33 LB/FT)

36" M

IN

. W

ID

TH

EX

T. IN

TO

T

RE

NC

H

MINIMUM 14 GAUGE LINE

WIRE

SILT FENCE FABRIC INSTALLED

TO SECOND WIRE FROM TOP

MINIMUM 14 GAUGE

INTERMEDIATE WIRES

GRADE

3'-0"

2'-0"

24" M

AX.

ABOV

E GR

ADE

8'-0" MAX. STD. STRENGTH FABRIC W/WIRE FENCE6'-0" MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE

BACKFILL TRENCH &

COMPACT THOROUGHLY

8"

4"

MINIMUM 14 GAUGE LINE

WIRE

4' MIN.

STEEL FENCEPOST SET MAX.

2' APART

24" M

IN.

1' MI

N.

INSPECTION & MAINTENANCE NOTES

1. THE KEY TO A FUNCTIONAL SILT FENCE OUTLET IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL.

2. REGULAR INSPECTIONS OF SILT FENCE OUTLET SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH

OR MORE OF PRECIPITATION. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE SILT FENCE OUTLET IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED

AND REMOVED WHEN NECESSARY.

3. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHED 1/3 THE HEIGHT OF THE SILT FENCE OUTLET.

4. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED.

5. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL BENEATH THE SILT FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED DUE TO THE RUNOFF OVERTOPPING THE SILT

FENCE. INSTALL CHECKS/TIE-BACKS AND/OR REINSTALL SILT FENCE, AS NECESSARY.

6. CHECK FOR TEARS WITHIN THE SILT FENCE, AREAS WHERE SILT FENCE HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE SILT FENCE INEFFECTIVE. REMOVE

DAMAGED SILT FENCE AND REINSTALL NEW SILT FENCE IMMEDIATELY.

7. SILT FENCE OUTLET SHOULD BE REMOVED WITHIN 30 DAYS AFTER STABILIZATION IS ACHIEVED AND ONCE IT IS REMOVED, THE RESULTING DISTURBED AREA SHALL BE PERMANENTLY STABILIZED.

STEEL FENCE POSTS (1.33 LB./FT.)

WIRE FENCE

RIP RAP SPLASH PAD (5' X 5' X 1'DEEP)

3' FILTER FABRIC ON GROUNDBURY WIRE FENCE AND FILTER FABRIC IN

GROUND (SEE SILT FENCE DETAIL)

FLOW

FILTER OF 1" DIAMETERSTONE

SILT FENCEFABRIC

SILT FENCEFABRIC

FILTER OF 1" DIAMETERSTONE

FRONT VIEW

SIDE VIEW

NOTE: PLACE SILT FENCE OUTLETS AT LOW POINTS IN

STANDARD SILT FENCE LOCATIONS.

INSPECTION AND MAINTENANCE

1. THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY

INSPECTION, ROUTINE MAINTENANCE, AND REGULAR

SEDIMENT REMOVAL.

2. REGULAR INSPECTIONS OF ALL INLET PROTECTION SHALL

BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS

RECOMMENDED, WITHIN 24-HOURS AFTER EACH

RAINFALL EVENT THAT PRODUCES 1/2-INCH OR MORE OF

PRECIPITATION.

3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF

THE INLET PROTECTION IS EXTREMELY IMPORTANT.

ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY

MONITORED AND REMOVED WHEN NECESSARY.

4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3

THE HEIGHT OF THE BLOCKS. IF A SUMP IS USED,

SEDIMENT SHOULD BE REMOVED WHEN IT FILLS

APPROXIMATELY 1/3 THE DEPTH OF THE HOLE.

5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE

STORAGE AREAS OR SPREAD THINLY ACROSS

DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT

AFTER IT IS RELOCATED.

6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE

REMOVED FROM IN FRONT OF TUBES WHEN FOUND.

7. REPLACE INLET TUBE WHEN DAMAGED OR AS

RECOMMENDED BY MANUFACTURER'S SPECIFICATIONS.

8. INLET PROTECTION STRUCTURES SHOULD BE REMOVED

AFTER THE DISTURBED AREAS ARE PERMANENTLY

STABILIZED. REMOVE ALL CONSTRUCTION MATERIAL AND

SEDIMENT, AND DISPOSE OF THEM PROPERLY. GRADE

THE DISTURBED AREA TO THE ELEVATION OF THE DROP

INLET STRUCTURE CREST. STABILIZE ALL BARE AREAS

IMMEDIATELY.

GENERAL NOTES

1. INLETS TUBES SHOULD BE COMPOSED OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBERS, A

HARDWOOD MULCH, OR A MIX OF THESE MATERIALS ENCLOSED BY A FLEXIBLE NETTING MATERIAL.

2. INLETS TUBES SHOULD UTILIZE AN OUTER NETTING THAT CONSISTS OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE

MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIAL.

CURLED WOOD EXCELSIOR FIBER, OR NATURAL COCONUT FIBER ROLLED EROSION CONTROL PRODUCTS ROLLED UP TO CREATE AN INLET

TUBE DEVICE ARE NOT ALLOWED.

3. DO NOT USE STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES, OR LEAF MULCH AS FILL MATERIAL WITHIN INLET TUBES.

4. WEIGHTED INLET TUBES MUST BE CAPABLE OF STAYING IN PLACE WITHOUT EXTERNAL STABILIZATION MEASURES AND MAY HAVE A

WEIGHTED INNER CORE OR OTHER WEIGHTED MECHANISM TO KEEP THEM IN PLACE.

5. INSTALL WEIGHTED TUBES LYING FLAT ON THE GROUND, WITH NO GAPS BETWEEN THE UNDERLYING SURFACE AND THE INLET TUBE. DO

NOT STACK INLET TUBES. DO NOT COMPLETELY BLOCK INLET WITH TUBE.

6. NON-WEIGHTED INLET TUBES REQUIRE STAKING OR OTHER STABILIZATION METHODS TO KEEP THEM SAFELY IN PLACE.

7. OVERFLOW OR OVERTOPPING OF INLET TUBES MUST BE ALLOWED TO FLOW INTO INLET UNOBSTRUCTED.

8. TO AVOID POSSIBLE FLOODING, TWO OR THREE CONCRETE CINDER BLOCKS MAY BE PLACED BETWEEN THE TUBE AND THE INLET.

TYPE F - INLET TUBES INLET PROTECTION

WEIGHTED INLETTUBE

TREE PROTECTION

CROWN DRIP LINE OR AS APPROVED BY ARBORIST.

4'-0"

Notes:

1. SEE SPECIFICATIONS FOR ADDITIONAL TREE PROTECTION REQUIREMENTS.

2. NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED ARBORIST.

3. NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTIVE FENCING

INCLUDING DURING FENCE INSTALLATION AND REMOVAL.

4. SEE SITE PREPARATION PLAN FOR ANY MODIFICATIONS WITH TREE

PROTECTION.

KEEP OUT

TREE

PROTECTION

AREA

TREE PROTECTION FENCE: HIGH DENSITYPOLYETHYLENE FENCING WITH 3.5" x 1.5"OPENINGS; COLOR-ORANGE. STEEL POSTSINSTALLED AT 8' O.C.

2" x 6" STEEL POSTS OR APPROVED EQUAL.

MAINTAIN EXISTING GRADE WITH THE TREEPROTECTION FENCE UNLESS OTHERWISE INDICATEDON THE PLANS.

8.5" x 11" SIGN LAMINATED IN PLASTIC SPACEDEVERY 50' ALONG THE FENCE.

SECTION VIEW

INLET PROTECTION - CURB INLET

FOR CURB INLETS WITHOUT GRATES

FOR CURB INLETS WITH GRATES

MAINTENANCE

1. REMOVE SEDIMENT FROM BEHIND DEVICE ONCE DEPTH

HAS REACHED HALF FULL.

2. CLEAN THE DEVICE AS NECESSARY WITH HIGH PRESSURE

WASH OR BROOM.

GUTTER EEL, GUTTER BUDDY ORAPPROVED EQUAL COMPRESSEDTIGHTLY AGAINST CURB

PROVIDE 2' RUNOUTAGAINST CURB

EXISTING CURB & GUTTER

POSITION OVERFLOW FEATURE ATCENTER OF OPENING

PROVIDE 2' RUN OUTAGAINST CURB

EXISTING CURB INLET

F

L

O

W

F

L

O

W

F

L

O

W

EXISTING PAVEMENT

FLOW

FLO

W

FLOW

GUTTER EEL, GUTTER BUDDY ORAPPROVED EQUAL COMPRESSEDTIGHTLY AGAINST CURB & ANCHOR TOGRATE W/ PLASTIC OR WIRE TIESEXISTING PAVEMENT

EXISTING CURB INLET

EXISTING CURB & GUTTER

CONSTRUCTION

1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH

SYNTHETIC FILTER FABRICS.

2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES

ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER

SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.)

3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF

BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE

FILTER CLOTH ONLY AT SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT

POST.

4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY

TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE

BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE

UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC SIP TIES SHOULD HAVE MINIMUM

50 POUND TENSILE STRENGTH.

5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET

APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM

OF 24 INCHES.

6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE

MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS.

WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH.

7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE

PROPOSED LINE OF POSTS AND UP-SLOPE FROM THE BARRIER.

8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.

9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT.

THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE.

10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.

INSTALLATION

1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF

THE FENCE. CHECK WITH LEVEL IF NECESSARY.

2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD

APPLICATIONS.

3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE AND AS CLOSE AS

POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER

PRESSURE.

4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC.

5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF

THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH

PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO

HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING.

6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES.

7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL.

8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE

COMPACTIONS.

9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL

IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID

STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE

UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS.

MAINTENANCE

INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REPAIRS

IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR

BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO

PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE

FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN-OUT. REMOVE ALL FENCING

MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT

AFTER THE CONTRIBUTING DRAINAGE AREA HAS PROPERLY STABILIZED.

STONE CHECK DAM

CONSTRUCTION SPECIFICATIONS

1. PLACE NONWOVEN GEOTEXTILE UNDER THE BOTTOM AND SIDES OF THE DAM PRIOR TO

PLACEMENT OF STONE. CONSTRUCT THE CHECK DAM WITH WASHED 4 TO 7 INCH STONE

OR EQUIVALENT RECYCLED CONCRETE (WITHOUT REBAR) WITH SIDE SLOPES OF 2:1 OR

FLATTER AND A MINIMUM TOP WIDTH OF 12 INCHES. PLACE THE STONE SO THAT IT

COMPLETELY COVERS THE WIDTH OF THE CHANNEL AND CHANNEL BANKS. FORM THE

WEIR SO THAT TOP OF THE OUTLET CREST IS APPROXIMATELY 6 INCHES LOWER THAN

THE OUTER EDGES. LINE THE UPSTREAM FACE OF THE DAM WITH A 1 FOOT THICK

LAYER OF WASHED AGGREGATE (

3

4

TO 1

1

2

INCH).

2. SET THE HEIGHT FOR THE WEIR CREST EQUAL TO ONE-HALF THE DEPTH OF THE

CHANNEL OR DITCH. TO AVOID SCOUR, THE MAXIMUM HEIGHT OF THE WEIR CREST

MUST NOT EXCEED 2.0 FEET.

3. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES ONE-HALF OF THE HEIGHT OF

THE WEIR CREST. MAINTAIN LINE, GRADE, AND CROSS SECTION.

MAINTENANCE

THE STONE CHECK DAM IS NOT A SEDIMENT TAPPING PRACTICE; HOWEVER, SOME

SEDIMENT MAY ACCUMULATE BEHIND THE CHECK DAM. ACCUMULATED SEDIMENT MUST BE

REMOVED WHEN IT REACHES ONE-HALF OF THE HEIGHT OF THE WEIR CREST. LINE, GRADE,

AND CROSS SECTION MUST BE MAINTAINED.

CHECK DAM REMOVAL

IN TEMPORARY SWALES AND CHANNELS, REMOVE CHECK DAM(S) WHEN NO LONGER

NEEDED. IN PERMANENT CHANNELS, CHECK DAMS MAY BE REMOVED WHEN PERMANENT

LINING IS INSTALLED. IN THE CASE OF GRASS-LINED CHANNELS, CHECK DAM MAY BE

REMOVED WHEN THE GRASS HAS MATURED SUFFICIENTLY TO PROTECT THE SWALE OR

CHANNEL. SEED AND INSTALL SOIL STABILIZATION MATTING OR SOD IN THE AREAS

DISTURBED BY THE REMOVAL OF THE CHECK DAM.

CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS

INLET PROTECTION - GRATE INLET

EROSION CONTROL NOTES

1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE DESIGNED TO CONVEY OR PASS THE PEAK FLOW RESULTING FROM THE 24-HOUR DURATION 25-YEAR RETURN PERIOD STORM PER FT. BRAGG REQUIREMENTS.

2. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTHCAROLINA EROSION AND SEDIMENT CONTROL DESIGN HANDBOOK (LATEST EDITION) AND FORT BRAGG REQUIREMENTS (NO SEPARATE PAYMENT).

3. THE CONTRACTOR SHALL NOTIFY NCDEQ - LAND QUALITY SECTION AND FORT BRAGG DIRECTORATE OF PUBLIC WORKS ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBINGACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION.

4. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE.

5. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES AND ON FILE AT ONUS' OFFICE. THE CONTRACTOR SHALL OPERATE A NCDEQ APPROVED SELF-INSPECTIONPROGRAM IN ACCORDANCE WITH THE NCDEQ APPROVED EROSION CONTROL PLAN.

6. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPAREAND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO ASUS FOR REVIEW AND TO FORT BRAGG AND NCDEQ REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NOSEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE ONUS AND THE ENGINEER A COPY OF THE AMENDED PERMIT.

7. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDEQ, FORT BRAGG, OR THE ENGINEER. (NOSEPARATE PAYMENT).

8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.

9. SILT FENCE SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT THE TOE OF ALL FILL SLOPES AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY NCDEQ OR THE ENGINEER.

10. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED.

11. DURING DE-WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. ALL DISCHARGES TO SEWER SYSTEM SHALL BE PERMITTED AND APPROVED THROUGH CORRECTAUTHORITY HAVING JURISDICTION.

12. THE CONTRACTOR SHALL INSPECT AND DOCUMENT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF-PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROLDEVICES SHALL BE MADE IMMEDIATELY.

13. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. (NO SEPARATE PAYMENT). NCDEQ'S FINALAPPROVAL IS REQUIRED.

14. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREA. (NO SEPARATE PAYMENT).

15. WHEN CROSSING CREEKS OR DRAINAGE-WAYS, THE CONTRACTOR SHALL FOLLOW THE NCDEQ APPROVED PLAN FOR IMPLEMENTING THE CROSSING AND RESTORING THE DRAINAGE-WAY TO A PERMANENTLY STABILIZED CONDITION IMMEDIATELYAFTER CROSSING.

16. DIVERSION DITCHES SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT THE TOP OF CUT AND FILL SLOPES AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY NCDEQ OR THE ENGINEER.

17. SEDIMENT TRAPS OR BASINS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AT ALL POINTS WHERE ACCUMULATED RUNOFF IS RELEASED TO NATURAL DRAINAGE CHANNELS, AND ANY OTHER NECESSARY LOCATIONS AS DIRECTED BY THEENGINEER. ALL SEDIMENT TRAPS AND BASINS SHALL BE SIZED ACCORDING TO FT. BRAGG REQUIREMENTS AND NCDEQ SEDIMENT AND EROSION CONTROL DESIGN MANUAL (LATEST EDITION).

18. TEMPORARY SEEDING IS THE USE OF RAPID GROWING SMALL GRAINS TO PROVIDE INITIAL, TEMPORARY COVER FOR EROSION CONTROL ON DISTURBED AREAS FOR LESS THAN 12 MONTHS. SEED BED PREPARATIONS AND SOIL AMENDMENTS SHALLBE IN ACCORDANCE WITH THE METHOD DESCRIBED IN THE PLANS.

19. SEEDING AND MULCHING SHALL BE DONE IMMEDIATELY FOLLOWING CONSTRUCTION IN ACCORDANCE WITH THE SPECIFICATIONS.

GROUND COVER NOTES

1. PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON A SITE WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS BY THE END OFTHE DAY OF THE LAST LAND DISTURBING ACTIVITY.

a. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLEBUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY.

2. OTHER SLOPE STABILIZATION REQUIREMENTS/EXEMPTIONS:

a. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE.b. ALL SLOPES SHALL HAVE THE GROUND COVER APPLIED BY THE END OF THE DAY.c. ALL SLOPES SHALL BE STABILIZED BY THE END OF DAY.d. ALL APPLICABLE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED UNTIL STABLE PERMANENT VEGETATION HAS BEEN ESTABLISHED.

SELF-INSPECTION NOTES

1. THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER, OR THEIR AGENT SHALL CONDUCT INSPECTIONS OF ALL EROSION CONTROL DEVICES AND PRACTICES IN ACCORDANCE WITH NCDEQ DIVISION OF LAND RESOURCES REQUIREMENTS FOR SELFINSPECTION.

2. A SELF INSPECTION SHALL BE PERFORMED AFTER EACH PHASE OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN IS COMPLETE. THIS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO THE FOLLOWING:

2.1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES.2.2. CLEARING AND GRUBBING OF EXISTING GROUND COVER.2.3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS.2.4. INSTALLATION OF STORM DRAINAGE FACILITIES.2.5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT.2.6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION.

3. PERSON PERFORMING INSPECTION MAY USE THE STANDARD FORM PROVIDED BY NCDENR DIVISION OF LAND RESOURCES OR MAY MARK UP A SINGLE COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. ANY DOCUMENTATION OF THESELF INSPECTIONS SHALL BE MAINTAINED ON-SITE AND MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR.

4. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVEDEROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF-INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLYSELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF-INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURESACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC4B.0131. THE SELF-INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM http://www.dlr.enr.state.nc.us/pages/sedimentation_new.html . IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THEFAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300.

Page 2: EROSION CONTROL NOTES Date SELF-INSPECTION NOTES By …

EC-02

PLOT

TED:

11/12

/2019

11:43

:30 A

M

EROS

ION

& SE

DIME

NTAT

ION

CONT

ROL D

ETAI

LS

No.

ByDa

te

Project No.:

Date:

Drawn:

Designed:

Reviewed:

Approved:Scale:

GWO No.:

Sheet:

####

####

####

####

####

####

####

AS NOTED

Amer

ican S

tates

Utili

ty Se

rvice

s, Inc

. - F

ort B

ragg

2941

Logis

tics S

treet,

Bldg

. N-6

307

Fort

Brag

g, No

rth C

aroli

na 28

310

Pho

ne (9

10) 4

95-1

311 W

ebsit

e: ww

w.as

usinc

.com

####

6 IN DEEP (MIN.)KEY IN TRENCH

PREPARED SLOPE(SEEDBED) WITHSEED IN PLACE

OVERLAP OR ABUT ROLLEDGES (TYP.)

CONSTRUCTION SPECIFICATIONS

1. USE MATTING THAT HAS A SHEAR STRESS RATING EQUAL TO OR GREATER

THAN 2.25 LB/SF. MATTING WILL BE EXCELSIOR CURLEX II OR UTILITY

APPROVED EQUIVALENT.

2. USE TEMPORARY SOIL STABILIZATION MATTING MADE OF DEGRADABLE

(LASTS 6 MONTHS MINIMUM) NATURAL OR MAN-MADE FIBERS (MOSTLY

ORGANIC). MAT MUST HAVE UNIFORM THICKNESS AND DISTRIBUTION OF

FIBERS THROUGHOUT AND BE SMOLDER RESISTANT. CHEMICALS USED IN

THE MAT MUST BE NON-LEACHING AND NON-TOXIC TO VEGETATION AND

SEED GERMINATION AND NON-INJURIOUS TO THE SKIN. IF PRESENT,

NETTING MUST BE EXTRUDED PLASTIC WITH A MAXIMUM MESH OPENING

OF 2x2 INCHES AND SUFFICIENTLY BONDED OR SEWN ON 2 INCH CENTERS

ALONG LONGITUDINAL AXIS OF THE MATERIAL TO PREVENT SEPARATION

OF THE NET FROM THE PARENT MATERIAL.

3. SECURE MATTING USING STEEL STAPLES, WOOD STAKES, OR

BIODEGRADABLE EQUIVALENT. STAPLES MUST BE "U" OR "T" SHAPED STEEL

WIRE HAVING A MINIMUM GAUGE OF NO. 11 AND NO. 8 RESPECTIVELY. "U"

SHAPED STAPLES MUST AVERAGE 1 TO 1

1

2

INCHES WIDE AND BE A MINIMUM

OF 6 INCHES LONG. "T" SHAPED STAPLES MUST HAVE A MINIMUM 8 INCH

MAIN LEG, A MINIMUM 1 INCH SECONDARY LEG, AND A MINIMUM 4 INCH

HEAD. WOOD STAKES MUST BE ROUGH-SAWN HARDWOOD,

12 TO 24 INCHES IN LENGTH, 1x3 INCH IN CROSS SECTION, AND WEDGE

SHAPED AT THE BOTTOM.

4. PERFORM FINAL GRADING, TOPSOIL APPLICATION, SEEDBED PREPARATION,

AND PERMANENT SEEDING IN ACCORDANCE WITH SPECIFICATIONS. PLACE

MATTING WITHIN 48 HOURS OF COMPLETING SEEDING OPERATIONS

UNLESS END OF WORKDAY STABILIZATION IS SPECIFIED ON THE APPROVED

EROSION & SEDIMENT CONTROL PLAN.

5. UNROLL MATTING DOWNSLOPE. LAY MAT SMOOTHLY AND FIRMLY UPON

THE SEEDED SURFACE. AVOID STRETCHING THE MATTING.

6. OVERLAP OR ABUT ROLL EDGES PER MANUFACTURER

RECOMMENDATIONS. OVERLAP ROLL ENDS BY

6 INCHES (MINIMUM), WITH THE UPSLOPE MAT OVERLAPPING ON TOP OF

THE DOWNSLOPE MAT.

7. KEY IN THE UPSLOPE END OF MAT 6 INCHES (MINIMUM) BY DIGGING A

TRENCH, PLACING THE MATTING ROLL END IN THE TRENCH, STAPLING THE

MAT IN PLACE, REPLACING THE EXCAVATED MATERIAL, AND TAMPING TO

SECURE THE MAT END IN THE KEY.

8. STAPLE/STAKE MAT IN A STAGGERED PATTERN ON 4 FOOT (MAXIMUM)

CENTERS THROUGHOUT AND

2 FOOT (MAXIMUM) CENTERS ALONG SEAMS, JOINTS, AND ROLL ENDS.

9. ESTABLISH AND MAINTAIN VEGETATION SO THAT REQUIREMENTS FOR

ADEQUATE VEGETATIVE ESTABLISHMENT ARE CONTINUOUSLY MET IN

ACCORDANCE WITH SECTION B-4 VEGETATIVE STABILIZATION.

6 IN MIN. OVERLAPAT ROLL END (TYP.)

EROSION CONTROL MATTING

FORT BRAGG SEEDING SPECIFICATIONSFORT BRAGG SEEDING SPECIFICATIONS

FORT BRAGG SEEDING SPECIFICATION

(RV. 9 JUNE 2017)

APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS, APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.1. AREA WILL BE TILLED TO 4” DEPTH2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER ACRE3. APPLY 10-20-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20 POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF PLANTING AND THE SECOND HALF AFTER

PERMANENT SEED GERMINATES.4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES OF SOIL PRIOR TO SEEDING.5. SEED MIX AND RATE:

PERMANENT SEEDING

“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 2850 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), UNHULLED

“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 31 AUGUST50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)50 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED

TEMPORARY SEEDING

“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28120 POUNDS PER ACRE WINTER WHEAT (TRITICUM SPELTA)

“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 31 AUGUST 65 POUNDS PER ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL MILLET (BRACHIARIA RAMOSUM)

FOR ALL LINEAR UTILITY PROJECTS

APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS, APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.1. AREA WILL BE TILLED TO 4” DEPTH2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER ACRE3. APPLY 10-20-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20 POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF PLANTING AND THE SECOND HALF AFTER

PERMANENT SEED GERMINATES.4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES OF SOIL PRIOR TO SEEDING.5. SEED MIX AND RATE:

“PERMANENT SEEDING ONLY”

“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 2850 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), UNHULLED

“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 31 AUGUST50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)50 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED

FOR PROJECTS IN THE VICINITY OF POPE ARMY AIRFIELD, MACKALL ARMY AIRFIELD, OR SIMMONS ARMY AIRFIELD

PERMANENT SEEDING

“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 2850 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), UNHULLED

“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 31 AUGUST50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)50 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED

MAINTENANCE DURING ESTABLISHMENT PERIOD

MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE PROTECTING EMBANKMENTS AND DITCHES FROM SURFACE EROSION; MAINTAINING EROSION CONTROL MATERIALS AND MULCH; PROTECTING INSTALLED AREAS FROM TRAFFIC; MOWING; WATERING; ANDPOST-FERTILIZATION. MOWINGTURF AREAS: TURF AREAS SHALL BE MOWED TO A MINIMUM 3-INCH HEIGHT WHEN THE TURF IS A MAXIMUM 4 INCHES HIGH. CLIPPINGS SHALL BEREMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING THE GROUND SURFACE.b. EROSION CONTROL AREAS: EROSION CONTROL AREAS SHALL BE MOWED TO A MINIMUM 4-INCH HEIGHT WHEN THE PLANTS ARE A MAXIMUM 8 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING

THE GROUND SURFACE.POST-FERTILIZATIONAFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND BETWEEN THE DATES OF APRIL 15 AND OCTOBER 15, APPLY 425 POUNDS OF FERTILIZER PER ACRE.REPAIR OR REINSTALLUNSATISFACTORY STAND OF GRASS PLANTS AND MULCH SHALL BE REPAIRED OR REINSTALLED, AND ERODED AREAS SHALL BE REPAIRED UNTIL A SATISFACTORY STAND OF GRASS RESULTS.

FORT BRAGG SEEDING SPECIFICATION (CONTINUED)

TEMPORARY SEEDING“COOL SEASON”: PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 2850 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)“WARM SEASON”: PLANTED BETWEEN 1 MARCH AND 31 AUGUST50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA)

STRAW MULCH: APPLY AT 4,000 POUNDS PER ACRE; LEAVING NO BARE SPOT LARGER THAN A QUARTER. STRAW MUST BE STABILIZED BY EITHER USE OF EMULSIFIED ASPHALT OR BY CRIMPING THE STRAW INTO THE GROUND.EMULSIFIED ASPHALT: EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE HEAVY ENOUGH THAT THE ENTIRE AREA APPEARS BLACK IN COLOR; WITH PARTICULAR ATTENTION PAID TO THE EDGES OF AREAS, CRESTS OF RIDGES, AND BANKS TO PREVENT WIND DAMAGE.CRIMPING: STRAW MAY BE CRIMPED WITH A MULCH ANCHORING TOOL OR A WHEEL DISK WITH DULL BLADES SET NEARLY STRAIGHT MAY BE USED AS A MULCH ANCHORING TOOL. CRIMPING IS NOT PERMITTED ON SLOPES STEEPER THAN 3:1.HYDROSEEDING: HYDROSEEDING SHALL ONLY BE ALLOWABLE ON SLOPES STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. STEPS 1 THROUGH 4 MUST BE COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN TWO APPLICATIONS. THE FIRSTAPPLICATION WILL CONSIST OF 1/3 OF THE MULCH AND 2/3 OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF 2/3 OF THE MULCH AND 1/3 OF THE SEED. THE MULCH WILL INCLUDE A TACKIFIER AND WILL BE APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THEMANUFACTURER'S RECOMMENDATION, WHICHEVER IS HIGHER.6. EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS, FLOOD PLAINS, GENERAL OFFICER QUARTERS AND THE HISTORIC DISTRICT. CONTACT THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT 910-396-2301/2823 WHEN SEEDING THESE

AREAS.7. UPON COMPLETION OF THE PROJECT, PRIOR TO LEAVING THE SITE, THE WATER MANAGEMENT BRANCH SHALL BE NOTIFIED TO INSPECT THE PROJECT. POC MR. JACK WILSON AT 910-396-2301/2823.NOTE: G.S. 113A-57: NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING MANDATORY REQUIREMENTS:(1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL GRADE).(2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 14

CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.ALL PERIMETER DIKES, DITCHES, SWALES, PERIMETER SLOPES OR SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7CALENDAR DAYS.

1) Ground Stabilization

*

Site Area Description

Stabilization

Time Frame

Stabilization Time Frame Exceptions

7 DAYS

None

None

Slopes steeper than 3:1

If slopes are 10’ or less in length and are not

steeper than 2:1, 14 days are allowed.

Slopes 3:1 or flatter7 days for slopes greater than 50 feet in length

None (except for Perimeters and HQW Zones)

*"Extensions of time may be approved by the permitting authority based on weather or other site specific conditions thatmake compliance impractical.” (Section II.B(2)(b))

Perimeter dikes, swales, ditchesand slopes

High Quality Water (HQW) Zones

All other areas with slopes flatterthan 4:1

7 DAYS

7 DAYS

14 DAYS

14 DAYS

CONSTRUCTION SPECIFICATIONS

1. MATERIALS USED IN THE COMPOST SOCK MUST MEET THE SPECIFICATIONS OUTLINED IN THE COMPOST BLANKETS.

2. COMPOST SOCKS SHOULD BE LOCATED AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN.

3. PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND OTHER DEBRIS GREATER THAN ONE INCH THAT MAY INTERFERE WITH PROPER FUNCTION OF THE COMPOST SOCK.

4. COMPOST SOCKS SHOULD BE INSTALLED PARALLEL TO THE TOE OF A GRADED SLOPE A MINIMUM OF 10 FEET BEYOND THE TOE OF THE SLOPE. SOCKS LOCATED BELOW FLOAT AREAS SHOULD BE LOCATED

AT THE EDGE OF THE LAND-DISTURBANCE. THE ENDS OF THE SOCKS SHOULD BE TURNED SLIGHTLY UP SLOPE TO PREVENT RUNOFF FROM GOING AROUND THE END OF THE SOCKS.

5. FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM.

6. OAK OR OTHER DURABLE HARDWOOD STAKES 2" X 2" IN CROSS SECTION SHOULD BE DRIVEN VERTICALLY PLUMB, THROUGH THE CENTER OF THE COMPOST SOCK. STAKES SHOULD BE PLACED AT A MAXIMUM

INTERVAL OF 4 FEET, OR A MAXIMUM INTERVAL OF 8 FEET IF THE SOCK IS PLACED IN A 4 INCH TRENCH. THE STAKES SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3 INCHES

PROTRUDING ABOVE THE COMPOST SOCK.IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD IT IN

PLACE DURING RUNOFF EVENTS.

7. IF THE COMPOST SOCK IS TO BE LEFT AS PART OF THE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR ESTABLISHMENT OF PERMANENT VEGETATION USING THE SEEDING

SPECIFICATION IN THE EROSION AND SEDIMENTATION CONTROL PLAN.

8. COMPOST SOCKS ARE NOT TO BE USED IN PERENNIAL OR INTERMITTENT STREAMS.

MAINTENANCE

INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (

1

2

INCH OR GREATER). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK MUST BE REPLACED IF

CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR

DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED.

DISPOSAL/RECYCLING

COMPOST MEDIA IS A COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS. ONCE ALL SOIL HAS BEEN

STABILIZED AND CONSTRUCTION ACTIVITY HAS BEEN COMPLETED, THE COMPOST MEDIA MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS

AN AMENDMENT OR LEFT ON THE SOIL SURFACE TO AID IN PERMANENT SEEDING OR LANDSCAPING. LEAVING THE COMPOST MEDIA ON SITE REDUCES REMOVAL AND DISPOSAL COSTS COMPARED TO OTHER

SEDIMENT CONTROL DEVICES. THE MESH NETTING MATERIAL WILL BE EXTRACTED FROM THE MEDIA AND DISPOSED OF PROPERLY. THE PHOTODEGRADABLE MESH NETTING MATERIAL WILL DEGRADE IN 2 TO 5

YEARS IF LEFT ON SITE. BIODEGRADABLE MESH NETTING MATERIAL IS AVAILABLE AND DOES NOT NEED TO BE EXTRACTED AND DISPOSED OF, AS IT WILL COMPLETELY DECOMPOSE IN APPROXIMATELY 6 TO 12

MONTHS. USING BIODEGRADABLE COMPOST SOCKS COMPLETELY ELIMINATES THE NEED AND COST OF REMOVAL AND DISPOSAL.

4

'

M

A

X

.

COMPOST SOCK

CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS

AutoCAD SHX Text
%%UISOMETRIC VIEW
Page 3: EROSION CONTROL NOTES Date SELF-INSPECTION NOTES By …

EC-03

PLOT

TED:

11/12

/2019

11:43

:31 A

M

No.

ByDa

te

Project No.:

Date:

Drawn:

Designed:

Reviewed:

Approved:Scale:

GWO No.:

Sheet:

####

####

####

####

####

####

####

AS NOTED

Amer

ican S

tates

Utili

ty Se

rvice

s, Inc

. - F

ort B

ragg

2941

Logis

tics S

treet,

Bldg

. N-6

307

Fort

Brag

g, No

rth C

aroli

na 28

310

Pho

ne (9

10) 4

95-1

311 W

ebsit

e: ww

w.as

usinc

.com

####

NCG0

1 GRO

UND

STAB

ILIZA

TION

&MA

TERI

ALS

HAND

LING

CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS

NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19

GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITHTHE NCG01 CONSTRUCTION GENERAL PERMITImplementing the details and specifications on this plan sheet will result in the constructionactivity being considered compliant with the Ground Stabilization and Materials Handlingsections of the NCG01 Construction General Permit (Sections E and F, respectively). Thepermittee shall comply with the Erosion and Sediment Control plan approved by thedelegated authority having jurisdiction. All details and specifications shown on this sheetmay not apply depending on site conditions and the delegated authority having jurisdiction.

GROUND STABILIZATION SPECIFICATIONStabilize the ground sufficiently so that rain will not dislodge the soil. Use one of thetechniques in the table below:

POLYACRYLAMIDES (PAMS) AND FLOCCULANTS1. Select flocculants that are appropriate for the soils being exposed during

construction, selecting from the NC DWR List of Approved PAMS/Flocculants.2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.3. Apply flocculants at the concentrations specified in the NC DWR List of Approved

PAMS/Flocculants and in accordance with the manufacturer's instructions.4. Provide ponding area for containment of treated Stormwater before discharging

offsite.5. Store flocculants in leak-proof containers that are kept under storm-resistant cover

or surrounded by secondary containment structures.

HAZARDOUS AND TOXIC WASTE1. Create designated hazardous waste collection areas on-site.2. Place hazardous waste containers under cover or in secondary containment.3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.

EQUIPMENT AND VEHICLE MAINTENANCE1. Maintain vehicles and equipment to prevent discharge of fluids.2. Provide drip pans under any stored equipment.3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the

project.4. Collect all spent fluids, store in separate containers and properly dispose as

hazardous waste (recycle when possible).5. Remove leaking vehicles and construction equipment from service until the problem

has been corrected.6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products

to a recycling or disposal center that handles these materials.

LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE1. Never bury or burn waste. Place litter and debris in approved waste containers.2. Provide a sufficient number and size of waste containers (e.g dumpster, trash

receptacle) on site to contain construction and domestic wastes.3. Locate waste containers at least 50 feet away from storm drain inlets and surface

waters unless no other alternatives are reasonably available.4. Locate waste containers on areas that do not receive substantial amounts of runoff

from upland areas and does not drain directly to a storm drain, stream or wetland.5. Cover waste containers at the end of each workday and before storm events or

provide secondary containment. Repair or replace damaged waste containers.6. Anchor all lightweight items in waste containers during times of high winds.7. Empty waste containers as needed to prevent overflow. Clean up immediately if

containers overflow.8. Dispose waste off-site at an approved disposal facility.9. On business days, clean up and dispose of waste in designated waste containers.

PAINT AND OTHER LIQUID WASTE1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.2. Locate paint washouts at least 50 feet away from storm drain inlets and surface

waters unless no other alternatives are reasonably available.3. Contain liquid wastes in a controlled area.4. Containment must be labeled, sized and placed appropriately for the needs of site.5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from

construction sites.

PORTABLE TOILETS1. Install portable toilets on level ground, at least 50 feet away from storm drains,

streams or wetlands unless there is no alternative reasonably available. If 50 footoffset is not attainable, provide relocation of portable toilet behind silt fence or placeon a gravel pad and surround with sand bags.

2. Provide staking or anchoring of portable toilets during periods of high winds or in highfoot traffic areas.

3. Monitor portable toilets for leaking and properly dispose of any leaked material.Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replacewith properly operating unit.

HERBICIDES, PESTICIDES AND RODENTICIDES1. Store and apply herbicides, pesticides and rodenticides in accordance with label

restrictions.2. Store herbicides, pesticides and rodenticides in their original containers with the

label, which lists directions for use, ingredients and first aid steps in case ofaccidental poisoning.

3. Do not store herbicides, pesticides and rodenticides in areas where flooding ispossible or where they may spill or leak into wells, stormwater drains, ground wateror surface water. If a spill occurs, clean area immediately.

4. Do not stockpile these materials onsite.

CONCRETE WASHOUTS1. Do not discharge concrete or cement slurry from the site.2. Dispose of, or recycle settled, hardened concrete residue in accordance with local

and state solid waste regulations and at an approved facility.3. Manage washout from mortar mixers in accordance with the above item and in

addition place the mixer and associated materials on impervious barrier and withinlot perimeter silt fence.

4. Install temporary concrete washouts per local requirements, where applicable. If analternate method or product is to be used, contact your approval authority forreview and approval. If local standard details are not available, use one of the twotypes of temporary concrete washouts provided on this detail.

5. Do not use concrete washouts for dewatering or storing defective curb or sidewalksections. Stormwater accumulated within the washout may not be pumped into ordischarged to the storm drain system or receiving surface waters. Liquid waste mustbe pumped out and removed from project.

6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless itcan be shown that no other alternatives are reasonably available. At a minimum,install protection of storm drain inlet(s) closest to the washout which could receivespills or overflow.

7. Locate washouts in an easily accessible area, on level ground and install a stoneentrance pad in front of the washout. Additional controls may be required by theapproving authority.

8. Install at least one sign directing concrete trucks to the washout within the projectlimits. Post signage on the washout itself to identify this location.

9. Remove leavings from the washout when at approximately 75% capacity to limitoverflow events. Replace the tarp, sand bags or other temporary structuralcomponents when no longer functional. When utilizing alternative or proprietaryproducts, follow manufacturer's instructions.

10. At the completion of the concrete work, remove remaining leavings and dispose ofin an approved disposal facility. Fill pit, if applicable, and stabilize any disturbancecaused by removal of washout.

EARTHEN STOCKPILE MANAGEMENT1. Show stockpile locations on plans. Locate earthen-material stockpile areas at least

50 feet away from storm drain inlets, sediment basins, perimeter sediment controlsand surface waters unless it can be shown no other alternatives are reasonablyavailable.

2. Protect stockpile with silt fence installed along toe of slope with a minimum offset offive feet from the toe of stockpile.

3. Provide stable stone access point when feasible.4. Stabilize stockpile within the timeframes provided on this sheet and in accordance

with the approved plan and any additional requirements. Soil stabilization is definedas vegetative, physical or chemical coverage techniques that will restrain acceleratederosion on disturbed soils for temporary or permanent control needs.

A

A

BELOW GRADE WASHOUT STRUCTURE

1:1SIDE SLOPE(TYP.)

10 MILPLASTICLINING

3'-0"

MIN. & X

'MA

X.

SECTION A-A

NOT TO SCALEABOVE GRADE WASHOUT STRUCTURE

NOT TO SCALE

PLAN

SECTION B-B

HIGHCOHESIVE &LOW FILTRATIONSOIL BERM

8"

6"

2'

HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE

(TYP.)

10 MILPLASTIC LINING

B

B

3'-0"

MIN. & X

'MA

X.

A

SANDBAGS (TYP.)OR STAPLES

SANDBAGS (TYP.)OR STAPLES

SANDBAGS (TYP.)OR STAPLES

SANDBAGS (TYP.)OR STAPLES

NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD

2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINEDWHEN THE LIQUID AND/OR SOLID REACHES 75% OF THESTRUCTURES CAPACITY.

3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKEDWITH SIGNAGE NOTING DEVICE.

NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD

2. THE CONCRETE WASHOUT STRUCTURES SHALL BEMAINTAINED WHEN THE LIQUID AND/OR SOLIDREACHES 75% OF THE STRUCTURES CAPACITY TOPROVIDE ADEQUATE HOLDING CAPACITY WITH AMINIMUM 12 INCHES OF FREEBOARD.

3.CONCRETE WASHOUT STRUCTURE NEEDS TO BECLEARY MARKED WITH SIGNAGE NOTING DEVICE.

ONSITE CONCRETE WASHOUTSTRUCTURE WITH LINER

CONCRETEWASHOUT

CONCRETEWASHOUT

PLAN

CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)

CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)

SILT FENCE

10' M

IN

10' MIN

SECTION E: GROUND STABILIZATIONRequired Ground Stabilization Timeframes

Note: After the permanent cessation of construction activities, any areas with temporaryground stabilization shall be converted to permanent ground stabilization as soon aspracticable but in no case longer than 90 calendar days after the last land disturbingactivity. Temporary ground stabilization shall be maintained in a manner to render thesurface stable against accelerated erosion until permanent ground stabilization is achieved.

Site Area Description Timeframe variations

-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQW Zones-10 days for Falls Lake Watershed unlessthere is zero slope

Stabilize within thismany calendardays after ceasingland disturbance

7

7

7

14

None

None

(a) Perimeter dikes,swales, ditches, andperimeter slopes

(b) High Quality Water(HQW) Zones

(c) Slopes steeper than3:1

If slopes are 10' or less in length and arenot steeper than 2:1, 14 days areallowed

(d) Slopes 3:1 to 4:1

(e) Areas with slopesflatter than 4:1 14

-7 days for slopes greater than 50' inlength and with slopes steeper than 4:1-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQWZones-10 days for Falls Lake Watershed

Page 4: EROSION CONTROL NOTES Date SELF-INSPECTION NOTES By …

EC-04

PLOT

TED:

11/12

/2019

11:43

:33 A

M

No.

ByDa

te

Project No.:

Date:

Drawn:

Designed:

Reviewed:

Approved:Scale:

GWO No.:

Sheet:

####

####

####

####

####

####

####

AS NOTED

Amer

ican S

tates

Utili

ty Se

rvice

s, Inc

. - F

ort B

ragg

2941

Logis

tics S

treet,

Bldg

. N-6

307

Fort

Brag

g, No

rth C

aroli

na 28

310

Pho

ne (9

10) 4

95-1

311 W

ebsit

e: ww

w.as

usinc

.com

####NCG01 SELF-INSPECTION, RECORD KEEPING AND REPORTING EFFECTIVE: 04/01/19

PART IIISELF-INSPECTION, RECORD KEEPING AND REPORTING

SECTION A: SELF-INSPECTIONSelf-inspections are required during normal business hours in accordance with the tablebelow. When adverse weather or site conditions would cause the safety of the inspectionpersonnel to be in jeopardy, the inspection may be delayed until the next business day onwhich it is safe to perform the inspection. In addition, when a storm event of equal to orgreater than 1.0 inch occurs outside of normal business hours, the self-inspection shall beperformed upon the commencement of the next business day. Any time when inspectionswere delayed shall be noted in the Inspection Record.

NOTE: The rain inspection resets the required 7 calendar day inspection requirement.

PART IIISELF-INSPECTION, RECORD KEEPING AND REPORTING

SECTION B: RECORD KEEPING1. E&SC Plan Documentation

The approved E&SC plan as well as any approved deviation shall be kept on the site. Theapproved E&SC plan must be kept up-to-date throughout the coverage under this permit.The following items pertaining to the E&SC plan shall be documented in the mannerdescribed:

2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical:

(a) This general permit as well as the certificate of coverage, after it is received.

(b) Records of inspections made during the previous 30 days. The permittee shall recordthe required observations on the Inspection Record Form provided by the Division or asimilar inspection form that includes all the required elements. Use ofelectronically-available records in lieu of the required paper copies will be allowed ifshown to provide equal access and utility as the hard-copy records.

(c) All data used to complete the Notice of Intent and older inspection records shall bemaintained for a period of three years after project completion and made availableupon request. [40 CFR 122.41]

PART IIISELF-INSPECTION, RECORD KEEPING AND REPORTING

SECTION C: REPORTING1. Occurrences that must be reported

Permittees shall report the following occurrences:(a) Visible sediment deposition in a stream or wetland.

(b) Oil spills if:· They are 25 gallons or more,· They are less than 25 gallons but cannot be cleaned up within 24 hours,· They cause sheen on surface waters (regardless of volume), or· They are within 100 feet of surface waters (regardless of volume).

(a) Releases of hazardous substances in excess of reportable quantities under Section 311of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA(Ref: 40 CFR 302.4) or G.S. 143-215.85.

(b) Anticipated bypasses and unanticipated bypasses.

(c) Noncompliance with the conditions of this permit that may endanger health or theenvironment.

2. Reporting Timeframes and Other RequirementsAfter a permittee becomes aware of an occurrence that must be reported, he shall contactthe appropriate Division regional office within the timeframes and in accordance with theother requirements listed below. Occurrences outside normal business hours may also bereported to the Division's Emergency Response personnel at (800) 662-7956, (800)858-0368 or (919) 733-3300.

NCG0

1 SEL

F-IN

SPEC

TION

,RE

CORD

KEE

PING

& R

EPOR

TING

CUI//FEDCON - PROPRIETARY AND CONFIDENTIAL - DO NOT DUPLICATE OR REDISTRIBUTE WITHOUT THE EXPLICIT CONSENT OF ASUS