CITY OF NORTH POLE Estimating Building Permit Fee Guide April 2016 edition City of North Pole 125 Snowman Lane North Pole, AK 99705 Tel.: 907-488-2288

Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

CITY OF NORTH POLE

Estimating Building

Permit Fee Guide

April 2016 edition

City of North Pole 125 Snowman Lane

North Pole, AK 99705 Tel.: 907-488-2288

Page 2: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 1

Table of Contents

Page

Introduction ........................................................................................................................................ 2

Fee Calculation Worksheet ................................................................................................................ 3

Determining Value of a Project ......................................................................................................... 4

Step 1: Determine the total value of your project .................................................................. 4

Step 2: Calculate Building Permit Fee and Plan Review Fee ................................................ 5

Step 3: Calculate Electrical, Mechanical and Plumbing Permit Fees .................................... 5

Step 4: Additional Permits ..................................................................................................... 6

Step 4a: Strom Water Permit ..................................................................................... 6

Step 4b: Water and Sewer Connection Permit ........................................................... 6

Step 4c: Excavation of a City Right-of-Way Permit ................................................. 6

Appendix A: Building Groups List .................................................................................................... 7

Appendix B: Types of Construction .................................................................................................. 17

Table 1. Square Foot Construction Cost ............................................................................................ 21

Table 2. Building Permit Fees ........................................................................................................... 22

Table 3. Building Permit Fee Estimating Table ................................................................................. 23

Table 4. Electrical Permit Fees .......................................................................................................... 51

Table 5. Mechanical Permit Fees ....................................................................................................... 54

Table 6. Plumbing Permit Fees .......................................................................................................... 56

Table 7. Storm Water Permit Fees ..................................................................................................... 58

Table 8. Utility Tie-In Fees ................................................................................................................ 59

Table 9a. Excavation Permit Fees ...................................................................................................... 60

Table 9b. Excavation Bond ................................................................................................................ 61

Page 3: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 2

Introduction

The City of North Pole has adopted by reference the 1997 Uniform Administrative Code,

including its methodology for calculating permit fees. According to the City of North Pole

Municipal Code amendment to the Administrative Code:

The determination of value or valuation under any of the provisions of these codes shall be made

by the building official. The value to be used in computing the building permit and building plan

review fees shall be the total value of all construction work for which the permit is issued as well

as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators,

fire-extinguishing systems and other permanent equipment. Valuation shall be determined in

accordance with the latest edition of the Building Safety Journal data chart as published by the

International Code Council or based on the final contract amount, whichever is greater. When

calculating the valuation utilizing the building valuation data chart the regional modifier shall

be (1.3). A copy of the bid award may be required by the building official. In any case the final

determination of value or valuation under any of the provisions of these codes shall be made by

the building official. (Title 15, Section 15.04.050)

The Building Department has made the Building Fee Guide to help customers estimate permit

and plan review fees. Any figures you generate are only estimates and the Building Department

makes the final determination of permit fees. A worksheet is included with this guide to help you

estimate your permit fees.

Each building project is unique and the permits required may vary. The permit fees for a project

will depend upon the permits it requires. The total permit fees for a project may be a combination

of one or more of the following:

Building Permit and Plan Review

Electrical Permit and Plan Review

Mechanical Permit and Plan Review

Plumbing Permit and Plan Review

Storm Water Permit and Plan Review

Utility Tie-In Permit and Utility Tie-In Inspection

Excavation Permit and Plan Review

Excavation Bond (returned if right-of-way restored)

Fire Marshal Permit1

The simplest way to estimate Building Permit and Plan Review fees is to use the Building Permit

Fee Estimation Table. Using this method does not provide estimates for any other permits that

the Building Department may require for your project. If you want to refine your cost estimate,

you can find additional guidance and resources in this guide.

1 Multi-Family, Commercial, Industrial and Institutional projects may require a Fire Marshal’s Permit. The Building

Department DOES NOT issue Fire Marshal Permits. Contact the Fire Marshal’s office at 907-451-5200 to determine

if your project requires a Fire Marshal Permit.

Page 4: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 3

Permit Fee Calculation Worksheet

Category Data

Group .............................................................................................................

Type of Construction .....................................................................................

Square foot construction cost .........................................................................

Contractor’s bid price ....................................................................................

Project valuation method (using Table 2) ......................................................

Construction contractor bid cost method (using Table 3) ..............................

Fees

Building Permit Fee ....................................................................................... $

Plan review fee (75% of Building Permit Fee) .............................................. $

Electrical Permit application fee ($23.50) ..................................................... $

Electrical Permit fee ....................................................................................... $

Electrical plan review fee ............................................................................... $

Mechanical Permit application fee ($23.50) .................................................. $

Mechanical Permit fee ................................................................................... $

Mechanical plan review fee ($23.50) ............................................................. $

Plumbing Permit application fee ($23.50) ..................................................... $

Plumbing Permit fee ...................................................................................... $

Plumbing plan review fee .............................................................................. $

Total Building Permit fees........................................................................... $

Storm Water Permit fee .............................................................................. $

Water tie-in fee .............................................................................................. $

Water tie-in inspection fee ($50.00) .............................................................. $

Sewer tie-in fee .............................................................................................. $

Sewer tie-in inspection fee ($50.00) .............................................................. $

Total Utility Permit Fees ............................................................................. $

Excavation Permit application fee ($50.00 ).................................................. $

Excavation Permit fee .................................................................................... $

Total Excavation Permit fees ...................................................................... $

Excavation bond (refundable upon satisfactory restoration or ROW) ......... $

Page 5: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 4

Determining Value of Project

The complexity of your project and how good an estimate you want will affect the effort you will

need to invest when estimating the permitting fees. Below are directions you can use to help you

estimate the value of your project and to calculate permit fees.

Step 1: Determine the total value of your project.

There are two approaches to estimate the value of a project—square footage cost of the project or

contractor’s bid price. The Building Department most frequently uses the square foot approach to

estimate the value of projects like new construction of a building or an addition. The Building

Department most frequently uses the contractor’s bid approach for projects like renovation of a

building, a “small” project like replacing a roof, adding a deck or installation of new heating

system. The contractor’s bid approach is also used for very large and complex projects where the

square foot approach does not provide a reliable valuation. By City Code, the City uses the

method that assigns the highest value to your project. The Building Department makes the final

determination of the value of the improvement.

Square Footage Approach

First, identify what “Group” best describes your project. According to the 2009 International

Building Code (IBC), Chapter 3: Use and Occupancy Classification, Section 302 Classification:

Structures or portions of structures shall be classified with respect to occupancy in one or more

of the groups listed below. A room or space that is intended to be occupied at different times for

different purposes shall comply with all of the requirements that are applicable to each of the

purposes for which the room or space will be occupied. Structures with multiple occupancies or

uses shall comply with Section 508. Where a structure is proposed for a purpose that is not

specifically provided for in this code, such structure shall be classified in the group that the

occupancy most nearly resembles, according to the fire safety and relative hazard involved.

1. Assembly (see Section 303): Groups A-1, A-2, A-3, A-4 and A-5

2. Business (see Section 304): Group B

3. Educational (see Section 305): Group E

4. Factory and Industrial (see Section 306): Groups F-1 and F-2

5. High Hazard (see Section 307): Groups H-1, H-2, H-3, H-4 and H-5

6. Institutional (see Section 308): Groups I-1, I-2, I-3 and I-4

7. Mercantile (see Section 309): Group M

8. Residential (see Section 310): Groups R-1, R-2, R-3 and R-4

9. Storage (see Section 311): Groups S-1 and S-2

10. Utility and Miscellaneous (see Section 312): Group U

You can find summary descriptions of the different groups in Appendix A: Building Groups List.

Review the Building Groups List to identify the group that most closely matches your project.

Page 6: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 5

Second, determine the Type of Construction you will use for your project. According to the 2009

International Building Code Council, Chapter 6, Section 602, Construction Classification:

Buildings and structures erected or to be erected, altered or extended in height or area shall be

classified in one of the five construction types defined in Sections 602.2 through 602.5. The

building elements shall have a fire-resistance rating not less than that specified in Table 601 and

exterior walls shall have a fire-resistance rating not less than that specified in Table 602. Where

required to have a fire-resistance rating by Table 601, building elements shall comply with the

applicable provisions of Section 703.2. The protection of openings, ducts and air transfer

openings in building elements shall not be required unless required by other provisions of this

code.

There are five types identified by Roman numerals—I, II, III, IV and V. Most of these types

have sub-types labeled A or B. Historically, most projects in the City of North Pole have been

Type VB. You can use the IBC definitions to identify your Type of Construction. The sections of

the IBC related to determining the building type can be found in Appendix B: Types of

Construction.

Third, use Table 1 Square Foot Construction Cost to determine square foot cost of your project.

The Group is listed in the left-hand column and Type Construction is listed across the top of the

table. Where the two categories intersect is the square foot cost of your project. Multiple the

square footage of your project by the square foot cost to get an estimated value of the

improvement. All tables are found at the back of the guide.

Contractor’s Bid Approach

Not all projects’ value can be easily determined with the Square Footage Approach. As described

above. If you have a contractor’s bid you can use this value to estimate your project’s permit

fees. The Building Department will require you to submit this bid if you want to use this

approach to determine the value of your improvement.

Step 2: Calculate Building Permit Fee and Plan Review Fee

With the value of your project determined in Step 1, you can estimate your Building Permit Fee.

The Building Department uses Table 2 Building Permit Fees to calculate a Building Permit Fee.

You can do the math as described in Table 2 to estimate the value of your project. A simpler way

to estimate the Building Permit Fee or your project, is to use Table 3 Building Permit Fee

Estimation Table. In the right-hand column of Table 3, find the value that most closely matches

the value of your project. Read across the table to find the estimated Building Permit Fee and

Plan Review Fee. The Building Department calculates the Plan Review Fee as 75% of the

Building Permit Fee.

Step 3: Calculate Electrical, Mechanical and Plumbing Permit Fees

The Building Department uses the 1997 Uniform Administrative Code tables to determine

Electrical, Mechanical and Plumbing Permit Fees. The Building Department calculates the plan

Page 7: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 6

review fees for each of these permits as 25% of the individual permit fees. The tables the

Building Department uses to calculate these fees are the following:

Table 4. Electrical Permit Fees

Table 5. Mechanical Permit Fees

Table 6. Plumbing Permit Fees

Step 4: Additional Permits

Depending upon your project, other permitting fees may apply.

Step 4a. If your project is privately funded; it will disturb a cumulative acre or more of ground;

and storm water runoff from the project will flow into “waters of the United States” your project

is likely to require a storm water permit. The North Pole Municipal Code, Title 15; Chapter

15.66 Construction Site Storm Water Runoff details storm water permitting requirements. In

addition, if your project will discharge storm water runoff directly into “waters of the US” or the

storm water conveyance system, it must comply with Title 15; Chapter 15.74 Post-Construction

Storm Water Management. If your project requires a storm water permit, you will also be

required to submit a storm water pollution prevention plan (SWPPP). Storm Water Permit Fees

include SWPPP plan review and inspection fees. You can estimate these fees based upon Table 7

Storm Water Permit Fees.

Step 4b. Water and/or Sewer Utility Connection Fees

If your project includes connecting to the City of North Pole water and/or sewer system, you

must get a Utility Tie-In Permit and have the work inspected by the Utility Department.

According to the North Pole Municipal Code, any occupied structure within 200 feet of a water

or sewer main must connect to the utility system; otherwise, the property owner will be charged

monthly the flat utility rate. See the North Pole Municipal Code, Title 13, Chapter 13.12; Section

13.12.090 Compulsory connection to City water and sewer utility. Utility tie-in fees are

presented in Table 8 Utility Tie-In Fees.

Step 4c. Excavation of a City Right-of-Way Fees

If your project includes excavation of a City-owned right-of-way (ROW), for example, road,

sidewalk or alley, there are fees associated with the excavation. Excavation of a City ROW also

requires submission of a bond to ensure that the ROW is reconstructed. You can estimate

excavation permit fees using Table 9a Excavation Permit Fees and the required Excavation Bond

using Table 9b.

Page 8: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 7

Appendix A: IBC Building Group Summary Descriptions

ASSEMBLY GROUP A

Assembly Group A. Assembly Group A occupancy includes, among others, the use of a

building or structure, or a portion thereof, for the gathering of persons for purposes such as civic,

social or religious functions; recreation, food or drink consumption or awaiting transportation.

A-1 Assembly uses, usually with fixed seating, intended for the production and viewing of the

performing arts or motion pictures including, but not limited to:

Motion picture theaters

Symphony and concert halls

Television and radio studios admitting an

audience

Theaters

A-2 Assembly uses intended for food and/or drink consumption including, but not limited to:

Banquet halls

Night clubs

Restaurants

Taverns and bars

A-3 Assembly uses intended for worship, recreation or amusement and other assembly uses not

classified elsewhere in Group A including, but not limited to:

Amusement arcades

Art galleries

Bowling alleys

Community halls

Courtrooms

Dance halls (not including food or drink

consumption)

Exhibition halls

Funeral parlors

Gymnasiums (without spectator seating)

Indoor swimming pools (without spectator

seating)

Indoor tennis courts (without spectator

seating)

Lecture halls

Libraries

Museums

Places of religious worship

Pool and billiard parlors

Waiting areas in transportation terminals

A-4 Assembly uses intended for viewing of indoor sporting events and activities with spectator

seating including, but not limited to:

Arenas

Skating rinks

Swimming pools

Tennis courts

A-5 Assembly uses intended for participation in or viewing outdoor activities including, but not

limited to:

Amusement park structures

Bleachers

Grandstands

Stadiums

Page 9: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 8

BUSINESS GROUP B

Business Group B. Business Group B occupancy includes, among others, the use of a building

or structure, or a portion thereof, for office, professional or service-type transactions, including

storage of records and accounts. Business occupancies shall include, but not be limited to, the

following:

Airport traffic control towers

Ambulatory health care facilities

Animal hospitals, kennels and pounds

Banks

Barber and beauty shops

Car wash

Civic administration

Clinic—outpatient

Dry cleaning and laundries: pick-up and

delivery stations

and self-service

Educational occupancies for students above

the 12th grade

Electronic data processing

Laboratories: testing and research

Motor vehicle showrooms

Post offices

Print shops

Professional services (architects, attorneys,

dentists, physicians,

engineers, etc.)

Radio and television stations

Telephone exchanges

Training and skill development not within a

school or academic program

Page 10: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 9

EDUCATIONAL GROUP E

Educational Group E. Educational Group E occupancy includes, among others, the use of a

building or structure, or a portion thereof, by six or more persons at any one time for educational

purposes through the 12th grade. Religious educational rooms and religious auditoriums, which

are accessory to places of religious worship and have occupant loads of less than 100, shall be

classified as A-3 occupancies.

Page 11: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 10

FACTORY GROUP F

Factory Industrial Group F. Factory Industrial Group F occupancy includes, among others, the

use of a building or structure, or a portion thereof, for assembling, disassembling, fabricating,

finishing, manufacturing, packaging, repair or processing operations that are not classified as a

Group H hazardous or Group S storage occupancy.

Factory Industrial F-1 Moderate-hazard Occupancy.

Factory industrial uses which are not classified as Factory Industrial F-2 Low Hazard shall be

classified as F-1 Moderate Hazard and shall include, but not be limited to, the following:

Aircraft (manufacturing, not to include

repair)

Appliances

Athletic equipment

Automobiles and other motor vehicles

Bakeries

Beverages: over 16-percent alcohol content

Bicycles

Boats

Brooms or brushes

Business machines

Cameras and photo equipment

Canvas or similar fabric

Carpets and rugs (includes cleaning)

Clothing

Construction and agricultural machinery

Disinfectants

Dry cleaning and dyeing

Electric generation plants

Electronics

Engines (including rebuilding)

Food processing

Furniture

Hemp products

Jute products

Laundries

Leather products

Machinery

Metals

Millwork (sash and door)

Motion pictures and television filming

(without spectators)

Musical instruments

Optical goods

Paper mills or products

Photographic film

Plastic products

Printing or publishing

Recreational vehicles

Refuse incineration

Shoes

Soaps and detergents

Textiles

Tobacco

Trailers

Upholstering

Wood; distillation

Woodworking (cabinet)

Factory Industrial F-2 Low-hazard Occupancy. Factory industrial uses that involve the

fabrication or manufacturing of noncombustible materials which during finishing, packing or

processing do not involve a significant fire hazard shall be classified as F-2 occupancies and

shall include, but not be limited to, the following:

Beverages: up to and including 16-percent

alcohol content

Brick and masonry

Ceramic products

Foundries

Glass products

Gypsum

Ice

Metal products (fabrication and assembly)

Page 12: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 11

HIGH-HAZARD GROUP H

High-hazard Group H. High-hazard Group H occupancy includes, among others, the use of a

building or structure, or a portion thereof, that involves the manufacturing, processing,

generation or storage of materials that constitute a physical or health hazard. Hazardous

occupancies are classified in Groups H-1, H-2, H-3, H-4 and H-5 the International Fire Code.

Hazardous materials stored, or used on top of roofs or canopies shall be classified as outdoor

storage or use and shall comply with the International Fire Code.

Page 13: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 12

INSTITUTIONAL GROUP I

Institutional Group I. Institutional Group I occupancy includes, among others, the use of a

building or structure, or a portion thereof, in which people are cared for or live in a supervised

environment, having physical limitations because of health or age are harbored for medical

treatment or other care or treatment, or in which people are detained for penal or correctional

purposes or in which the liberty of the occupants is restricted. Institutional occupancies shall be

classified as Group I-1, I-2, I-3 or I-4.

Group I-1. This occupancy shall include buildings, structures or parts thereof housing more than

16 persons, on a 24-hour basis, who because of age, mental disability or other reasons, live in a

supervised residential environment that provides personal care services. The occupants are

capable of responding to an emergency situation without physical assistance from staff. This

group shall include, but not be limited to, the following:

Alcohol and drug centers

Assisted living facilities

Congregate care facilities

Convalescent facilities

Group homes

Halfway houses

Residential board and care facilities

Social rehabilitation facilities

A facility such as the above with five or fewer persons shall

be classified as a Group R-3 or shall comply with the International Residential Code. A facility

such as above, housing at least six and not more than 16 persons, shall be classified as Group R-

4.

Group I-2. This occupancy shall include buildings and structures used for medical, surgical,

psychiatric, nursing or custodial care for persons who are not capable of self-preservation. This

group shall include, but not be limited to, the following:

Child care facilities

Detoxification facilities

Hospitals

Mental hospitals

Nursing homes

Group I-3. This occupancy shall include buildings and structures that are inhabited by more than

five persons who are under restraint or security. An I-3 facility is occupied by persons who are

generally incapable of self-preservation due to security measures not under the occupants’

control. This group shall include, but not be limited to, the following:

Correctional centers

Detention centers

Jails

Prerelease centers

Prisons

Reformatories

Page 14: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 13

MERCANTILE GROUP M

309.1 Mercantile Group M. Mercantile Group M occupancy includes, among others, the use of

a building or structure or a portion thereof, for the display and sale of merchandise and involves

stocks of goods, wares or merchandise incidental to such purposes and accessible to the public.

Mercantile occupancies shall include, but not be limited to, the following:

Department stores

Drug stores

Markets

Motor fuel-dispensing facilities

Retail or wholesale stores

Sales rooms

Page 15: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 14

RESIDENTIAL GROUP R

310.1 Residential Group R. Residential Group R includes, among others, the use of a building

or structure, or a portion thereof, for sleeping purposes when not classified as an Institutional

Group I or when not regulated by the International Residential Code in accordance with Section

101.2. Residential occupancies shall include the following:

R-1 Residential occupancies containing sleeping units where the occupants are primarily

transient in nature, including:

Boarding houses (transient) Hotels (transient) Motels (transient) Congregate living facilities

(transient) with 10 or fewer occupants are permitted to comply with the construction

requirements for Group R-3.

R-2 Residential occupancies containing sleeping units or more than two dwelling units where the

occupants are primarily permanent in nature, including:

Apartment houses Boarding houses

(nontransient)

Convents

Dormitories

Fraternities and sororities

Hotels (nontransient)

Live/work units

Monasteries

Motels (nontransient)

Vacation timeshare properties

Congregate living facilities with 16 or fewer

occupants are permitted to comply with the

construction requirements for Group R-3.

R-3 Residential occupancies where the occupants are primarily permanent in nature and not

classified as Group R-1, R-2, R-4 or I, including: Buildings that do not contain more than two

dwelling units. Adult care facilities that provide accommodations for five or fewer persons of

any age for less than 24 hours. Child care facilities that provide accommodations for five or

fewer persons of any age for less than 24 hours. Congregate living facilities with 16 or fewer

persons. Adult care and child care facilities that are within a single-family home are permitted to

comply with the International Residential Code.

R-4 Residential occupancies shall include buildings arranged for occupancy as residential

care/assisted living facilities including more than five but not more than 16 occupants, excluding

staff. Group R-4 occupancies shall meet the requirements for construction as defined for Group

R-3, except as otherwise provided for in this code or shall comply with the International

Residential Code provided the building is protected by an automatic sprinkler system.

Page 16: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 15

STORAGE GROUP S

Storage Group S. Storage Group S occupancy includes, among others, the use of a building or

structure, or a portion thereof, for storage that is not classified as a hazardous occupancy.

Moderate-hazard storage, Group S-1. Buildings occupied for storage uses that are not

classified as Group S-2, including, but not limited to, storage of the following:

Aerosols, Levels 2 and 3 Aircraft hangar

(storage and repair)

Bags: cloth, burlap and paper

Bamboos and rattan

Baskets

Belting: canvas and leather

Books and paper in rolls or packs

Boots and shoes

Buttons, including cloth covered, pearl or

bone

Cardboard and cardboard boxes

Clothing, woolen wearing apparel

Cordage

Dry boat storage (indoor)

Furniture

Furs

Glues, mucilage, pastes and size

Grains

Horns and combs, other than celluloid

Leather

Linoleum

Lumber

Motor vehicle repair garages

Photo engravings

Resilient flooring

Silks

Soaps

Sugar

Tires, bulk storage of

Tobacco, cigars, cigarettes and snuff

Upholstery and mattresses

Wax candles

Low-hazard storage, Group S-2. Includes, among others, buildings used for the storage of

noncombustible materials such as products on wood pallets or in paper cartons with or without

single thickness divisions; or in paper wrappings. Such products are permitted to have a

negligible amount of plastic trim, such as knobs, handles or film wrapping. Group S-2 storage

uses shall include, but not be limited to, storage of the following:

Asbestos

Beverages up to and including 16-percent

alcohol in metal, glass or ceramic containers

Cement in bags

Chalk and crayons

Dairy products in nonwaxed coated paper

containers

Dry cell batteries

Electrical coils

Electrical motors

Empty cans

Food products

Foods in noncombustible containers

Fresh fruits and vegetables in nonplastic

trays or containers

Frozen foods

Glass

Glass bottles, empty or filled with

noncombustible liquids

Gypsum board

Inert pigments

Ivory

Meats

Metal cabinets

Metal desks with plastic tops and trim

Metal parts

Metals

Mirrors

Oil-filled and other types of distribution

transformers

Parking garages, open or enclosed

Porcelain and pottery

Stoves

Talc and soapstones

Washers and dryers

Page 17: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 16

UTILITY AND MISCELLANEOUS GROUP U

General. Buildings and structures of an accessory character and miscellaneous structures not

classified in any specific occupancy shall be constructed, equipped and maintained to conform to

the requirements of this code commensurate with the fire and life hazard incidental to their

occupancy. Group U shall include, but not be limited to, the following:

Agricultural buildings

Aircraft hangars, accessory to a one- or two-

family

residence

Barns

Carports

Fences more than 6 feet (1829 mm) high

Grain silos, accessory to a residential

occupancy

Greenhouses

Livestock shelters

Private garages

Retaining walls

Sheds

Stables

Tanks

Towers

Page 18: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 17

Appendix B: IBC Type of Construction Descriptions

Page 19: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 18

Page 20: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 19

Page 21: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 20

Page 22: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 21

Table 1. Building Valuation Data a,b,c,d Adjusted for Interior Alaska Construction Costs

Group IA IB IIA IIB IIIA IIIB IV VA VB

A-1 Assembly, theaters,

with stage 297.74 287.96 280.93 269.18 253.08 245.79 260.13 231.34 222.57

A-1 Assembly, theaters,

without stage 272.83 263.06 256.02 244.27 228.31 221.01 235.22 206.56 197.80

A-2 Assembly, nightclubs 231.26 224.71 218.49 209.94 197.57 192.11 202.54 178.98 172.89

A-2 Assembly,

restaurants, bars, banquet

halls 229.96 223.41 215.89 208.64 194.97 190.81 201.24 176.38 171.59

A-3 Assembly, churches 275.54 265.76 258.73 246.97 231.34 224.04 237.93 209.59 200.82

A-3 Assembly, general,

community halls,

libraries, museums 229.94 220.17 211.84 201.38 184.25 178.26 192.34 162.50 155.04

A-4 Assembly, arenas 271.53 261.76 253.42 242.97 225.71 219.71 233.92 203.96 196.50

B Business 237.76 229.03 221.41 210.45 191.82 184.59 202.14 168.34 160.88

E Educational 249.98 241.12 234.19 223.75 208.94 198.32 216.04 182.59 177.03

F-1 Factory and

industrial, moderate

hazard 141.67 135.19 127.18 122.42 109.68 104.73 117.21 90.35 85.07

F-2 Factory and

industrial, low hazard 140.37 133.89 127.18 121.12 109.68 103.43 115.91 90.35 83.77

H-1 High Hazard,

explosives 132.61 126.13 119.42 113.36 102.18 95.93 108.15 82.85 NP

H234 High Hazard 132.61 126.13 119.42 113.36 102.18 95.93 108.15 82.85 76.27

H-5 HPM 237.76 229.03 221.41 210.45 191.82 184.59 202.14 168.34 160.88

I-1 Institutional,

supervised environment 237.29 228.64 222.26 211.55 195.72 190.42 211.55 175.53 169.94

I-2 Institutional, hospitals 401.06 392.32 384.71 373.75 353.79 NP 365.43 330.31 NP

I-2 Institutional, nursing

homes 277.63 268.90 261.29 250.32 232.99 NP 242.01 209.52 NP

I-3 Institutional,

restrained 270.89 262.15 254.54 243.57 226.90 218.38 235.26 203.42 193.37

I-4 Institutional, day care

facilities 237.29 228.64 222.26 211.55 195.72 190.42 211.55 175.53 169.94

M Mercantile 172.39 165.84 158.33 151.07 138.26 134.10 143.68 119.67 114.87

R-1 Residential, hotels 239.34 230.70 224.32 213.60 198.09 192.80 213.60 177.91 172.32

R-2 Residential, multiple

family 200.69 192.05 185.67 174.95 160.23 154.93 174.95 140.04 134.45

R-3 Residential, one- and

two-family 187.10 181.96 177.46 172.68 166.33 161.99 169.74 155.65 146.45

R-4 Residential,

care/assisted living

facilities 237.29 228.64 222.26 211.55 195.72 190.42 211.55 175.53 169.94

S-1 Storage, moderate

hazard 131.31 124.83 116.82 112.06 99.58 94.63 106.85 80.25 74.97

S-2 Storage, low hazard 130.01 123.53 116.82 110.76 99.58 93.33 105.55 80.25 73.67

U Utility, miscellaneous 101.17 95.52 89.76 85.18 77.00 71.90 81.36 60.88 58.02

a. Private Garages use Utility, miscellaneous

b. Unfinished basements (all use group) = $15.00 per sq. ft.

c. For shell only buildings deduct 20 percent

d. N.P. = not permitted

Page 23: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 22

Table 2: Building Permit Fee Calculator

Total project valuation Fee calculation formula

$1.00 to $500 $23.50

$501 to $2,000 $23.50 for the first $500 plus $3.05 for each additional $100, or

fraction thereof, to and including $2,000

$2,001 to $25,000 $69.25 for the first $2,000 plus $ 14.00 for each additional $1,000, or

fraction thereof, to and including $25,000

$25,001 to $50,000 $391.75 for the first $25,000 plus $10.10 for each additional $1,000,

or fraction thereof to and including $50,000

$50,001 to $100,000 $643.75 for the first $50,000 plus for each additional or fraction

thereof, to and including $100,000

$100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional

$1,000.00, or fraction thereof, to and including $500,000

$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional

$1,000, or fraction thereof, to and including $1,000,000

$1,000,001 and up $5,608.75 for the first $1,000,000 plus $3.65 for each additional

$1,000, or fraction thereof

Other Inspections Fees*

1. Inspections outside of normal business hours $330.00 for the first hour; $165.00 per hour

for each additional hour; charged in full-

hour increments only

2. Re-inspection fees assessed under provisions

of Section 305.8*

$165.00 per hour; charged in full-hour

increments only

3. Inspections for which no fee is specifically

indicated.

$165.00 per hour; minimum charge—one

hour

4. Additional plan review required by changes,

additions or revisions to plans

$165.00 per hour; minimum charge—one

hour

5. For use of outside consultants for checking

and inspections, or both.

Actual costs

*Fees represent City of North Pole consultant costs--$150/hour plus 10% administrative charge.

Page 24: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Table 3. Building Permit Fee Estimation

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

1 to $500.00 $23.50 $17.63 $38.78

$501.00 to $600.00 $26.55 $19.91 $43.81

$601.00 to $700.00 $29.60 $22.20 $48.84

$701.00 to $800.00 $32.65 $24.49 $53.87

$801.00 to $900.00 $35.70 $26.78 $58.91

$901.00 to $1,000.00 $38.75 $29.06 $63.94

$1,001.00 to $1,100.00 $41.80 $31.35 $68.97

$1,101.00 to $1,200.00 $44.85 $33.64 $74.00

$1,201.00 to $1,300.00 $47.90 $35.93 $79.04

$1,301.00 to $1,400.00 $50.95 $38.21 $84.07

$1,401.00 to $1,500.00 $54.00 $40.50 $89.10

$1,501.00 to $1,600.00 $57.05 $42.79 $94.13

$1,601.00 to $1,700.00 $60.10 $45.08 $99.17

$1,701.00 to $1,800.00 $63.15 $47.36 $104.20

$1,801.00 to $1,900.00 $66.20 $49.65 $109.23

$1,901.00 to $2,000.00 $69.25 $51.94 $114.26

$2,001.00 to $3,000.00 $83.25 $62.44 $137.36

$3,001.00 to $4,000.00 $97.25 $72.94 $160.46

$4,001.00 to $5,000.00 $111.25 $83.44 $183.56

$5,001.00 to $6,000.00 $125.25 $93.94 $206.66

$6,001.00 to $7,000.00 $139.25 $104.44 $229.76

$7,001.00 to $8,000.00 $153.25 $114.94 $252.86

$8,001.00 to $9,000.00 $167.25 $125.44 $275.96

$9,001.00 to $10,000.00 $181.25 $135.94 $299.06

$10,001.00 to $11,000.00 $195.25 $146.44 $322.16

$11,001.00 to $12,000.00 $209.25 $156.94 $345.26

$12,001.00 to $13,000.00 $223.25 $167.44 $368.36

$13,001.00 to $14,000.00 $237.25 $177.94 $391.46

$14,001.00 to $15,000.00 $251.25 $188.44 $414.56

$15,001.00 to $16,000.00 $265.25 $198.94 $437.66

$16,001.00 to $17,000.00 $279.25 $209.44 $460.76

$17,001.00 to $18,000.00 $293.25 $219.94 $483.86

$18,001.00 to $19,000.00 $307.25 $230.44 $506.96

$19,001.00 to $20,000.00 $321.25 $240.94 $530.06

$20,001.00 to $21,000.00 $335.25 $251.44 $553.16

$21,001.00 to $22,000.00 $349.25 $261.94 $576.26

$22,001.00 to $23,000.00 $363.25 $272.44 $599.36

Page 25: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$23,001.00 to $24,000.00 $377.25 $282.94 $622.46

$24,001.00 to $25,000.00 $391.25 $293.44 $645.56

$25,001.00 to $26,000.00 $401.85 $301.39 $663.05

$26,001.00 to $27,000.00 $411.95 $308.96 $679.72

$27,001.00 to $28,000.00 $422.05 $316.54 $696.38

$28,001.00 to $29,000.00 $432.15 $324.11 $713.05

$29,001.00 to $30,000.00 $442.25 $331.69 $729.71

$30,001.00 to $31,000.00 $452.35 $339.26 $746.38

$31,001.00 to $32,000.00 $462.45 $346.84 $763.04

$32,001.00 to $33,000.00 $472.55 $354.41 $779.71

$33,001.00 to $34,000.00 $482.65 $361.99 $796.37

$34,001.00 to $35,000.00 $492.75 $369.56 $813.04

$35,001.00 to $36,000.00 $502.85 $377.14 $829.70

$36,001.00 to $37,000.00 $512.95 $384.71 $846.37

$37,001.00 to $38,000.00 $523.05 $392.29 $863.03

$38,001.00 to $39,000.00 $533.15 $399.86 $879.70

$39,001.00 to $40,000.00 $543.25 $407.44 $896.36

$40,001.00 to $41,000.00 $553.35 $415.01 $913.03

$41,001.00 to $42,000.00 $563.45 $422.59 $929.69

$42,001.00 to $43,000.00 $573.55 $430.16 $946.36

$43,001.00 to $44,000.00 $583.65 $437.74 $963.02

$44,001.00 to $45,000.00 $593.75 $445.31 $979.69

$45,001.00 to $46,000.00 $603.85 $452.89 $996.35

$46,001.00 to $47,000.00 $613.95 $460.46 $1,013.02

$47,001.00 to $48,000.00 $624.05 $468.04 $1,029.68

$48,001.00 to $49,000.00 $634.15 $475.61 $1,046.35

$49,001.00 to $50,000.00 $644.25 $483.19 $1,063.01

$50,001.00 to $51,000.00 $650.75 $488.06 $1,073.74

$51,001.00 to $52,000.00 $657.75 $493.31 $1,085.29

$52,001.00 to $53,000.00 $664.75 $498.56 $1,096.84

$53,001.00 to $54,000.00 $671.75 $503.81 $1,108.39

$54,001.00 to $55,000.00 $678.75 $509.06 $1,119.94

$55,001.00 to $56,000.00 $685.75 $514.31 $1,131.49

$56,001.00 to $57,000.00 $692.75 $519.56 $1,143.04

$57,001.00 to $58,000.00 $699.75 $524.81 $1,154.59

$58,001.00 to $59,000.00 $706.75 $530.06 $1,166.14

$59,001.00 to $60,000.00 $713.75 $535.31 $1,177.69

Page 26: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$60,001.00 to $61,000.00 $720.75 $540.56 $1,189.24

$61,001.00 to $62,000.00 $727.75 $545.81 $1,200.79

$62,001.00 to $63,000.00 $734.75 $551.06 $1,212.34

$63,001.00 to $64,000.00 $741.75 $556.31 $1,223.89

$64,001.00 to $65,000.00 $748.75 $561.56 $1,235.44

$65,001.00 to $66,000.00 $755.75 $566.81 $1,246.99

$66,001.00 to $67,000.00 $762.75 $572.06 $1,258.54

$67,001.00 to $68,000.00 $769.75 $577.31 $1,270.09

$68,001.00 to $69,000.00 $776.75 $582.56 $1,281.64

$69,001.00 to $70,000.00 $783.75 $587.81 $1,293.19

$70,001.00 to $71,000.00 $790.75 $593.06 $1,304.74

$71,001.00 to $72,000.00 $797.75 $598.31 $1,316.29

$72,001.00 to $73,000.00 $804.75 $603.56 $1,327.84

$73,001.00 to $74,000.00 $811.75 $608.81 $1,339.39

$74,001.00 to $75,000.00 $818.75 $614.06 $1,350.94

$75,001.00 to $76,000.00 $825.75 $619.31 $1,362.49

$76,001.00 to $77,000.00 $832.75 $624.56 $1,374.04

$77,001.00 to $78,000.00 $839.75 $629.81 $1,385.59

$78,001.00 to $79,000.00 $846.75 $635.06 $1,397.14

$79,001.00 to $80,000.00 $853.75 $640.31 $1,408.69

$80,001.00 to $81,000.00 $860.75 $645.56 $1,420.24

$81,001.00 to $82,000.00 $867.75 $650.81 $1,431.79

$82,001.00 to $83,000.00 $874.75 $656.06 $1,443.34

$83,001.00 to $84,000.00 $881.75 $661.31 $1,454.89

$84,001.00 to $85,000.00 $888.75 $666.56 $1,466.44

$85,001.00 to $86,000.00 $895.75 $671.81 $1,477.99

$86,001.00 to $87,000.00 $902.75 $677.06 $1,489.54

$87,001.00 to $88,000.00 $909.75 $682.31 $1,501.09

$88,001.00 to $89,000.00 $916.75 $687.56 $1,512.64

$89,001.00 to $90,000.00 $923.75 $692.81 $1,524.19

$90,001.00 to $91,000.00 $930.75 $698.06 $1,535.74

$91,001.00 to $92,000.00 $937.75 $703.31 $1,547.29

$92,001.00 to $93,000.00 $944.75 $708.56 $1,558.84

$93,001.00 to $94,000.00 $951.75 $713.81 $1,570.39

$94,001.00 to $95,000.00 $958.75 $719.06 $1,581.94

$95,001.00 to $96,000.00 $965.75 $724.31 $1,593.49

$96,001.00 to $97,000.00 $972.75 $729.56 $1,605.04

Page 27: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$97,001.00 to $98,000.00 $979.75 $734.81 $1,616.59

$98,001.00 to $99,000.00 $986.75 $740.06 $1,628.14

$99,001.00 to $100,000.00 $993.75 $745.31 $1,639.69

$100,001.00 to $101,000.00 $999.35 $749.51 $1,648.93

$101,001.00 to $102,000.00 $1,004.95 $753.71 $1,658.17

$102,001.00 to $103,000.00 $1,010.55 $757.91 $1,667.41

$103,001.00 to $104,000.00 $1,016.15 $762.11 $1,676.65

$104,001.00 to $105,000.00 $1,021.75 $766.31 $1,685.89

$105,001.00 to $106,000.00 $1,027.35 $770.51 $1,695.13

$106,001.00 to $107,000.00 $1,032.95 $774.71 $1,704.37

$107,001.00 to $108,000.00 $1,038.55 $778.91 $1,713.61

$108,001.00 to $109,000.00 $1,044.15 $783.11 $1,722.85

$109,001.00 to $110,000.00 $1,049.75 $787.31 $1,732.09

$110,001.00 to $111,000.00 $1,055.35 $791.51 $1,741.33

$111,001.00 to $112,000.00 $1,060.95 $795.71 $1,750.57

$112,001.00 to $113,000.00 $1,066.55 $799.91 $1,759.81

$113,001.00 to $114,000.00 $1,072.15 $804.11 $1,769.05

$114,001.00 to $115,000.00 $1,077.75 $808.31 $1,778.29

$115,001.00 to $116,000.00 $1,083.35 $812.51 $1,787.53

$116,001.00 to $117,000.00 $1,088.95 $816.71 $1,796.77

$117,001.00 to $118,000.00 $1,094.55 $820.91 $1,806.01

$118,001.00 to $119,000.00 $1,100.15 $825.11 $1,815.25

$119,001.00 to $120,000.00 $1,105.75 $829.31 $1,824.49

$120,001.00 to $121,000.00 $1,111.35 $833.51 $1,833.73

$121,001.00 to $122,000.00 $1,116.95 $837.71 $1,842.97

$122,001.00 to $123,000.00 $1,122.55 $841.91 $1,852.21

$123,001.00 to $124,000.00 $1,128.15 $846.11 $1,861.45

$124,001.00 to $125,000.00 $1,133.75 $850.31 $1,870.69

$125,001.00 to $126,000.00 $1,139.35 $854.51 $1,879.93

$126,001.00 to $127,000.00 $1,144.95 $858.71 $1,889.17

$127,001.00 to $128,000.00 $1,150.55 $862.91 $1,898.41

$128,001.00 to $129,000.00 $1,156.15 $867.11 $1,907.65

$129,001.00 to $130,000.00 $1,161.75 $871.31 $1,916.89

$130,001.00 to $131,000.00 $1,167.35 $875.51 $1,926.13

$131,001.00 to $132,000.00 $1,172.95 $879.71 $1,935.37

$132,001.00 to $133,000.00 $1,178.55 $883.91 $1,944.61

$133,001.00 to $134,000.00 $1,184.15 $888.11 $1,953.85

Page 28: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$134,001.00 to $135,000.00 $1,189.75 $892.31 $1,963.09

$135,001.00 to $136,000.00 $1,195.35 $896.51 $1,972.33

$136,001.00 to $137,000.00 $1,200.95 $900.71 $1,981.57

$137,001.00 to $138,000.00 $1,206.55 $904.91 $1,990.81

$138,001.00 to $139,000.00 $1,212.15 $909.11 $2,000.05

$139,001.00 to $140,000.00 $1,217.75 $913.31 $2,009.29

$140,001.00 to $141,000.00 $1,223.35 $917.51 $2,018.53

$141,001.00 to $142,000.00 $1,228.95 $921.71 $2,027.77

$142,001.00 to $143,000.00 $1,234.55 $925.91 $2,037.01

$143,001.00 to $144,000.00 $1,240.15 $930.11 $2,046.25

$144,001.00 to $145,000.00 $1,245.75 $934.31 $2,055.49

$145,001.00 to $146,000.00 $1,251.35 $938.51 $2,064.73

$146,001.00 to $147,000.00 $1,256.95 $942.71 $2,073.97

$147,001.00 to $148,000.00 $1,262.55 $946.91 $2,083.21

$148,001.00 to $149,000.00 $1,268.15 $951.11 $2,092.45

$149,001.00 to $150,000.00 $1,273.75 $955.31 $2,101.69

$150,001.00 to $151,000.00 $1,279.35 $959.51 $2,110.93

$151,001.00 to $152,000.00 $1,284.95 $963.71 $2,120.17

$152,001.00 to $153,000.00 $1,290.55 $967.91 $2,129.41

$153,001.00 to $154,000.00 $1,296.15 $972.11 $2,138.65

$154,001.00 to $155,000.00 $1,301.75 $976.31 $2,147.89

$155,001.00 to $156,000.00 $1,307.35 $980.51 $2,157.13

$156,001.00 to $157,000.00 $1,312.95 $984.71 $2,166.37

$157,001.00 to $158,000.00 $1,318.55 $988.91 $2,175.61

$158,001.00 to $159,000.00 $1,324.15 $993.11 $2,184.85

$159,001.00 to $160,000.00 $1,329.75 $997.31 $2,194.09

$160,001.00 to $161,000.00 $1,335.35 $1,001.51 $2,203.33

$161,001.00 to $162,000.00 $1,340.95 $1,005.71 $2,212.57

$162,001.00 to $163,000.00 $1,346.55 $1,009.91 $2,221.81

$163,001.00 to $164,000.00 $1,352.15 $1,014.11 $2,231.05

$164,001.00 to $165,000.00 $1,357.75 $1,018.31 $2,240.29

$165,001.00 to $166,000.00 $1,363.35 $1,022.51 $2,249.53

$166,001.00 to $167,000.00 $1,368.95 $1,026.71 $2,258.77

$167,001.00 to $168,000.00 $1,374.55 $1,030.91 $2,268.01

$168,001.00 to $169,000.00 $1,380.15 $1,035.11 $2,277.25

$169,001.00 to $170,000.00 $1,385.75 $1,039.31 $2,286.49

$170,001.00 to $171,000.00 $1,391.35 $1,043.51 $2,295.73

Page 29: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$171,001.00 to $172,000.00 $1,396.95 $1,047.71 $2,304.97

$172,001.00 to $173,000.00 $1,402.55 $1,051.91 $2,314.21

$173,001.00 to $174,000.00 $1,408.15 $1,056.11 $2,323.45

$174,001.00 to $175,000.00 $1,413.75 $1,060.31 $2,332.69

$175,001.00 to $176,000.00 $1,419.35 $1,064.51 $2,341.93

$176,001.00 to $177,000.00 $1,424.95 $1,068.71 $2,351.17

$177,001.00 to $178,000.00 $1,430.55 $1,072.91 $2,360.41

$178,001.00 to $179,000.00 $1,436.15 $1,077.11 $2,369.65

$179,001.00 to $180,000.00 $1,441.75 $1,081.31 $2,378.89

$180,001.00 to $181,000.00 $1,447.35 $1,085.51 $2,388.13

$181,001.00 to $182,000.00 $1,452.95 $1,089.71 $2,397.37

$182,001.00 to $183,000.00 $1,458.55 $1,093.91 $2,406.61

$183,001.00 to $184,000.00 $1,464.15 $1,098.11 $2,415.85

$184,001.00 to $185,000.00 $1,469.75 $1,102.31 $2,425.09

$185,001.00 to $186,000.00 $1,475.35 $1,106.51 $2,434.33

$186,001.00 to $187,000.00 $1,480.95 $1,110.71 $2,443.57

$187,001.00 to $188,000.00 $1,486.55 $1,114.91 $2,452.81

$188,001.00 to $189,000.00 $1,492.15 $1,119.11 $2,462.05

$189,001.00 to $190,000.00 $1,497.75 $1,123.31 $2,471.29

$190,001.00 to $191,000.00 $1,503.35 $1,127.51 $2,480.53

$191,001.00 to $192,000.00 $1,508.95 $1,131.71 $2,489.77

$192,001.00 to $193,000.00 $1,514.55 $1,135.91 $2,499.01

$193,001.00 to $194,000.00 $1,520.15 $1,140.11 $2,508.25

$194,001.00 to $195,000.00 $1,525.75 $1,144.31 $2,517.49

$195,001.00 to $196,000.00 $1,531.35 $1,148.51 $2,526.73

$196,001.00 to $197,000.00 $1,536.95 $1,152.71 $2,535.97

$197,001.00 to $198,000.00 $1,542.55 $1,156.91 $2,545.21

$198,001.00 to $199,000.00 $1,548.15 $1,161.11 $2,554.45

$199,001.00 to $200,000.00 $1,553.75 $1,165.31 $2,563.69

$200,001.00 to $201,000.00 $1,559.35 $1,169.51 $2,572.93

$201,001.00 to $202,000.00 $1,564.95 $1,173.71 $2,582.17

$202,001.00 to $203,000.00 $1,570.55 $1,177.91 $2,591.41

$203,001.00 to $204,000.00 $1,576.15 $1,182.11 $2,600.65

$204,001.00 to $205,000.00 $1,581.75 $1,186.31 $2,609.89

$205,001.00 to $206,000.00 $1,587.35 $1,190.51 $2,619.13

$206,001.00 to $207,000.00 $1,592.95 $1,194.71 $2,628.37

$207,001.00 to $208,000.00 $1,598.55 $1,198.91 $2,637.61

Page 30: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$208,001.00 to $209,000.00 $1,604.15 $1,203.11 $2,646.85

$209,001.00 to $210,000.00 $1,609.75 $1,207.31 $2,656.09

$210,001.00 to $211,000.00 $1,615.35 $1,211.51 $2,665.33

$211,001.00 to $212,000.00 $1,620.95 $1,215.71 $2,674.57

$212,001.00 to $213,000.00 $1,626.55 $1,219.91 $2,683.81

$213,001.00 to $214,000.00 $1,632.15 $1,224.11 $2,693.05

$214,001.00 to $215,000.00 $1,637.75 $1,228.31 $2,702.29

$215,001.00 to $216,000.00 $1,643.35 $1,232.51 $2,711.53

$216,001.00 to $217,000.00 $1,648.95 $1,236.71 $2,720.77

$217,001.00 to $218,000.00 $1,654.55 $1,240.91 $2,730.01

$218,001.00 to $219,000.00 $1,660.15 $1,245.11 $2,739.25

$219,001.00 to $220,000.00 $1,665.75 $1,249.31 $2,748.49

$220,001.00 to $221,000.00 $1,671.35 $1,253.51 $2,757.73

$221,001.00 to $222,000.00 $1,676.95 $1,257.71 $2,766.97

$222,001.00 to $223,000.00 $1,682.55 $1,261.91 $2,776.21

$223,001.00 to $224,000.00 $1,688.15 $1,266.11 $2,785.45

$224,001.00 to $225,000.00 $1,693.75 $1,270.31 $2,794.69

$225,001.00 to $226,000.00 $1,699.35 $1,274.51 $2,803.93

$226,001.00 to $227,000.00 $1,704.95 $1,278.71 $2,813.17

$227,001.00 to $228,000.00 $1,710.55 $1,282.91 $2,822.41

$228,001.00 to $229,000.00 $1,716.15 $1,287.11 $2,831.65

$229,001.00 to $230,000.00 $1,721.75 $1,291.31 $2,840.89

$230,001.00 to $231,000.00 $1,727.35 $1,295.51 $2,850.13

$231,001.00 to $232,000.00 $1,732.95 $1,299.71 $2,859.37

$232,001.00 to $233,000.00 $1,738.55 $1,303.91 $2,868.61

$233,001.00 to $234,000.00 $1,744.15 $1,308.11 $2,877.85

$234,001.00 to $235,000.00 $1,749.75 $1,312.31 $2,887.09

$235,001.00 to $236,000.00 $1,755.35 $1,316.51 $2,896.33

$236,001.00 to $237,000.00 $1,760.95 $1,320.71 $2,905.57

$237,001.00 to $238,000.00 $1,766.55 $1,324.91 $2,914.81

$238,001.00 to $239,000.00 $1,772.15 $1,329.11 $2,924.05

$239,001.00 to $240,000.00 $1,777.75 $1,333.31 $2,933.29

$240,001.00 to $241,000.00 $1,783.35 $1,337.51 $2,942.53

$241,001.00 to $242,000.00 $1,788.95 $1,341.71 $2,951.77

$242,001.00 to $243,000.00 $1,794.55 $1,345.91 $2,961.01

$243,001.00 to $244,000.00 $1,800.15 $1,350.11 $2,970.25

$244,001.00 to $245,000.00 $1,805.75 $1,354.31 $2,979.49

Page 31: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$245,001.00 to $246,000.00 $1,811.35 $1,358.51 $2,988.73

$246,001.00 to $247,000.00 $1,816.95 $1,362.71 $2,997.97

$247,001.00 to $248,000.00 $1,822.55 $1,366.91 $3,007.21

$248,001.00 to $249,000.00 $1,828.15 $1,371.11 $3,016.45

$249,001.00 to $250,000.00 $1,833.75 $1,375.31 $3,025.69

$250,001.00 to $251,000.00 $1,839.35 $1,379.51 $3,034.93

$251,001.00 to $252,000.00 $1,844.95 $1,383.71 $3,044.17

$252,001.00 to $253,000.00 $1,850.55 $1,387.91 $3,053.41

$253,001.00 to $254,000.00 $1,856.15 $1,392.11 $3,062.65

$254,001.00 to $255,000.00 $1,861.75 $1,396.31 $3,071.89

$255,001.00 to $256,000.00 $1,867.35 $1,400.51 $3,081.13

$256,001.00 to $257,000.00 $1,872.95 $1,404.71 $3,090.37

$257,001.00 to $258,000.00 $1,878.55 $1,408.91 $3,099.61

$258,001.00 to $259,000.00 $1,884.15 $1,413.11 $3,108.85

$259,001.00 to $260,000.00 $1,889.75 $1,417.31 $3,118.09

$260,001.00 to $261,000.00 $1,895.35 $1,421.51 $3,127.33

$261,001.00 to $262,000.00 $1,900.95 $1,425.71 $3,136.57

$262,001.00 to $263,000.00 $1,906.55 $1,429.91 $3,145.81

$263,001.00 to $264,000.00 $1,912.15 $1,434.11 $3,155.05

$264,001.00 to $265,000.00 $1,917.75 $1,438.31 $3,164.29

$265,001.00 to $266,000.00 $1,923.35 $1,442.51 $3,173.53

$266,001.00 to $267,000.00 $1,928.95 $1,446.71 $3,182.77

$267,001.00 to $268,000.00 $1,934.55 $1,450.91 $3,192.01

$268,001.00 to $269,000.00 $1,940.15 $1,455.11 $3,201.25

$269,001.00 to $270,000.00 $1,945.75 $1,459.31 $3,210.49

$270,001.00 to $271,000.00 $1,951.35 $1,463.51 $3,219.73

$271,001.00 to $272,000.00 $1,956.95 $1,467.71 $3,228.97

$272,001.00 to $273,000.00 $1,962.55 $1,471.91 $3,238.21

$273,001.00 to $274,000.00 $1,968.15 $1,476.11 $3,247.45

$274,001.00 to $275,000.00 $1,973.75 $1,480.31 $3,256.69

$275,001.00 to $276,000.00 $1,979.35 $1,484.51 $3,265.93

$276,001.00 to $277,000.00 $1,984.95 $1,488.71 $3,275.17

$277,001.00 to $278,000.00 $1,990.55 $1,492.91 $3,284.41

$278,001.00 to $279,000.00 $1,996.15 $1,497.11 $3,293.65

$279,001.00 to $280,000.00 $2,001.75 $1,501.31 $3,302.89

$280,001.00 to $281,000.00 $2,007.35 $1,505.51 $3,312.13

$281,001.00 to $282,000.00 $2,012.95 $1,509.71 $3,321.37

Page 32: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$282,001.00 to $283,000.00 $2,018.55 $1,513.91 $3,330.61

$283,001.00 to $284,000.00 $2,024.15 $1,518.11 $3,339.85

$284,001.00 to $285,000.00 $2,029.75 $1,522.31 $3,349.09

$285,001.00 to $286,000.00 $2,035.35 $1,526.51 $3,358.33

$286,001.00 to $287,000.00 $2,040.95 $1,530.71 $3,367.57

$287,001.00 to $288,000.00 $2,046.55 $1,534.91 $3,376.81

$288,001.00 to $289,000.00 $2,052.15 $1,539.11 $3,386.05

$289,001.00 to $290,000.00 $2,057.75 $1,543.31 $3,395.29

$290,001.00 to $291,000.00 $2,063.35 $1,547.51 $3,404.53

$291,001.00 to $292,000.00 $2,068.95 $1,551.71 $3,413.77

$292,001.00 to $293,000.00 $2,074.55 $1,555.91 $3,423.01

$293,001.00 to $294,000.00 $2,080.15 $1,560.11 $3,432.25

$294,001.00 to $295,000.00 $2,085.75 $1,564.31 $3,441.49

$295,001.00 to $296,000.00 $2,091.35 $1,568.51 $3,450.73

$296,001.00 to $297,000.00 $2,096.95 $1,572.71 $3,459.97

$297,001.00 to $298,000.00 $2,102.55 $1,576.91 $3,469.21

$298,001.00 to $299,000.00 $2,108.15 $1,581.11 $3,478.45

$299,001.00 to $300,000.00 $2,113.75 $1,585.31 $3,487.69

$300,001.00 to $301,000.00 $2,119.35 $1,589.51 $3,496.93

$301,001.00 to $302,000.00 $2,124.95 $1,593.71 $3,506.17

$302,001.00 to $303,000.00 $2,130.55 $1,597.91 $3,515.41

$303,001.00 to $304,000.00 $2,136.15 $1,602.11 $3,524.65

$304,001.00 to $305,000.00 $2,141.75 $1,606.31 $3,533.89

$305,001.00 to $306,000.00 $2,147.35 $1,610.51 $3,543.13

$306,001.00 to $307,000.00 $2,152.95 $1,614.71 $3,552.37

$307,001.00 to $308,000.00 $2,158.55 $1,618.91 $3,561.61

$308,001.00 to $309,000.00 $2,164.15 $1,623.11 $3,570.85

$309,001.00 to $310,000.00 $2,169.75 $1,627.31 $3,580.09

$310,001.00 to $311,000.00 $2,175.35 $1,631.51 $3,589.33

$311,001.00 to $312,000.00 $2,180.95 $1,635.71 $3,598.57

$312,001.00 to $313,000.00 $2,186.55 $1,639.91 $3,607.81

$313,001.00 to $314,000.00 $2,192.15 $1,644.11 $3,617.05

$314,001.00 to $315,000.00 $2,197.75 $1,648.31 $3,626.29

$315,001.00 to $316,000.00 $2,203.35 $1,652.51 $3,635.53

$316,001.00 to $317,000.00 $2,208.95 $1,656.71 $3,644.77

$317,001.00 to $318,000.00 $2,214.55 $1,660.91 $3,654.01

$318,001.00 to $319,000.00 $2,220.15 $1,665.11 $3,663.25

Page 33: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$319,001.00 to $320,000.00 $2,225.75 $1,669.31 $3,672.49

$320,001.00 to $321,000.00 $2,231.35 $1,673.51 $3,681.73

$321,001.00 to $322,000.00 $2,236.95 $1,677.71 $3,690.97

$322,001.00 to $323,000.00 $2,242.55 $1,681.91 $3,700.21

$323,001.00 to $324,000.00 $2,248.15 $1,686.11 $3,709.45

$324,001.00 to $325,000.00 $2,253.75 $1,690.31 $3,718.69

$325,001.00 to $326,000.00 $2,259.35 $1,694.51 $3,727.93

$326,001.00 to $327,000.00 $2,264.95 $1,698.71 $3,737.17

$327,001.00 to $328,000.00 $2,270.55 $1,702.91 $3,746.41

$328,001.00 to $329,000.00 $2,276.15 $1,707.11 $3,755.65

$329,001.00 to $330,000.00 $2,281.75 $1,711.31 $3,764.89

$330,001.00 to $331,000.00 $2,287.35 $1,715.51 $3,774.13

$331,001.00 to $332,000.00 $2,292.95 $1,719.71 $3,783.37

$332,001.00 to $333,000.00 $2,298.55 $1,723.91 $3,792.61

$333,001.00 to $334,000.00 $2,304.15 $1,728.11 $3,801.85

$334,001.00 to $335,000.00 $2,309.75 $1,732.31 $3,811.09

$335,001.00 to $336,000.00 $2,315.35 $1,736.51 $3,820.33

$336,001.00 to $337,000.00 $2,320.95 $1,740.71 $3,829.57

$337,001.00 to $338,000.00 $2,326.55 $1,744.91 $3,838.81

$338,001.00 to $339,000.00 $2,332.15 $1,749.11 $3,848.05

$339,001.00 to $340,000.00 $2,337.75 $1,753.31 $3,857.29

$340,001.00 to $341,000.00 $2,343.35 $1,757.51 $3,866.53

$341,001.00 to $342,000.00 $2,348.95 $1,761.71 $3,875.77

$342,001.00 to $343,000.00 $2,354.55 $1,765.91 $3,885.01

$343,001.00 to $344,000.00 $2,360.15 $1,770.11 $3,894.25

$344,001.00 to $345,000.00 $2,365.75 $1,774.31 $3,903.49

$345,001.00 to $346,000.00 $2,371.35 $1,778.51 $3,912.73

$346,001.00 to $347,000.00 $2,376.95 $1,782.71 $3,921.97

$347,001.00 to $348,000.00 $2,382.55 $1,786.91 $3,931.21

$348,001.00 to $349,000.00 $2,388.15 $1,791.11 $3,940.45

$349,001.00 to $350,000.00 $2,393.75 $1,795.31 $3,949.69

$350,001.00 to $351,000.00 $2,399.35 $1,799.51 $3,958.93

$351,001.00 to $352,000.00 $2,404.95 $1,803.71 $3,968.17

$352,001.00 to $353,000.00 $2,410.55 $1,807.91 $3,977.41

$353,001.00 to $354,000.00 $2,416.15 $1,812.11 $3,986.65

$354,001.00 to $355,000.00 $2,421.75 $1,816.31 $3,995.89

$355,001.00 to $356,000.00 $2,427.35 $1,820.51 $4,005.13

Page 34: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$356,001.00 to $357,000.00 $2,432.95 $1,824.71 $4,014.37

$357,001.00 to $358,000.00 $2,438.55 $1,828.91 $4,023.61

$358,001.00 to $359,000.00 $2,444.15 $1,833.11 $4,032.85

$359,001.00 to $360,000.00 $2,449.75 $1,837.31 $4,042.09

$360,001.00 to $361,000.00 $2,455.35 $1,841.51 $4,051.33

$361,001.00 to $362,000.00 $2,460.95 $1,845.71 $4,060.57

$362,001.00 to $363,000.00 $2,466.55 $1,849.91 $4,069.81

$363,001.00 to $364,000.00 $2,472.15 $1,854.11 $4,079.05

$364,001.00 to $365,000.00 $2,477.75 $1,858.31 $4,088.29

$365,001.00 to $366,000.00 $2,483.35 $1,862.51 $4,097.53

$366,001.00 to $367,000.00 $2,488.95 $1,866.71 $4,106.77

$367,001.00 to $368,000.00 $2,494.55 $1,870.91 $4,116.01

$368,001.00 to $369,000.00 $2,500.15 $1,875.11 $4,125.25

$369,001.00 to $370,000.00 $2,505.75 $1,879.31 $4,134.49

$370,001.00 to $371,000.00 $2,511.35 $1,883.51 $4,143.73

$371,001.00 to $372,000.00 $2,516.95 $1,887.71 $4,152.97

$372,001.00 to $373,000.00 $2,522.55 $1,891.91 $4,162.21

$373,001.00 to $374,000.00 $2,528.15 $1,896.11 $4,171.45

$374,001.00 to $375,000.00 $2,533.75 $1,900.31 $4,180.69

$375,001.00 to $376,000.00 $2,539.35 $1,904.51 $4,189.93

$376,001.00 to $377,000.00 $2,544.95 $1,908.71 $4,199.17

$377,001.00 to $378,000.00 $2,550.55 $1,912.91 $4,208.41

$378,001.00 to $379,000.00 $2,556.15 $1,917.11 $4,217.65

$379,001.00 to $380,000.00 $2,561.75 $1,921.31 $4,226.89

$380,001.00 to $381,000.00 $2,567.35 $1,925.51 $4,236.13

$381,001.00 to $382,000.00 $2,572.95 $1,929.71 $4,245.37

$382,001.00 to $383,000.00 $2,578.55 $1,933.91 $4,254.61

$383,001.00 to $384,000.00 $2,584.15 $1,938.11 $4,263.85

$384,001.00 to $385,000.00 $2,589.75 $1,942.31 $4,273.09

$385,001.00 to $386,000.00 $2,595.35 $1,946.51 $4,282.33

$386,001.00 to $387,000.00 $2,600.95 $1,950.71 $4,291.57

$387,001.00 to $388,000.00 $2,606.55 $1,954.91 $4,300.81

$388,001.00 to $389,000.00 $2,612.15 $1,959.11 $4,310.05

$389,001.00 to $390,000.00 $2,617.75 $1,963.31 $4,319.29

$390,001.00 to $391,000.00 $2,623.35 $1,967.51 $4,328.53

$391,001.00 to $392,000.00 $2,628.95 $1,971.71 $4,337.77

$392,001.00 to $393,000.00 $2,634.55 $1,975.91 $4,347.01

Page 35: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$393,001.00 to $394,000.00 $2,640.15 $1,980.11 $4,356.25

$394,001.00 to $395,000.00 $2,645.75 $1,984.31 $4,365.49

$395,001.00 to $396,000.00 $2,651.35 $1,988.51 $4,374.73

$396,001.00 to $397,000.00 $2,656.95 $1,992.71 $4,383.97

$397,001.00 to $398,000.00 $2,662.55 $1,996.91 $4,393.21

$398,001.00 to $399,000.00 $2,668.15 $2,001.11 $4,402.45

$399,001.00 to $400,000.00 $2,673.75 $2,005.31 $4,411.69

$400,001.00 to $401,000.00 $2,679.35 $2,009.51 $4,420.93

$401,001.00 to $402,000.00 $2,684.95 $2,013.71 $4,430.17

$402,001.00 to $403,000.00 $2,690.55 $2,017.91 $4,439.41

$403,001.00 to $404,000.00 $2,696.15 $2,022.11 $4,448.65

$404,001.00 to $405,000.00 $2,701.75 $2,026.31 $4,457.89

$405,001.00 to $406,000.00 $2,707.35 $2,030.51 $4,467.13

$406,001.00 to $407,000.00 $2,712.95 $2,034.71 $4,476.37

$407,001.00 to $408,000.00 $2,718.55 $2,038.91 $4,485.61

$408,001.00 to $409,000.00 $2,724.15 $2,043.11 $4,494.85

$409,001.00 to $410,000.00 $2,729.75 $2,047.31 $4,504.09

$410,001.00 to $411,000.00 $2,735.35 $2,051.51 $4,513.33

$411,001.00 to $412,000.00 $2,740.95 $2,055.71 $4,522.57

$412,001.00 to $413,000.00 $2,746.55 $2,059.91 $4,531.81

$413,001.00 to $414,000.00 $2,752.15 $2,064.11 $4,541.05

$414,001.00 to $415,000.00 $2,757.75 $2,068.31 $4,550.29

$415,001.00 to $416,000.00 $2,763.35 $2,072.51 $4,559.53

$416,001.00 to $417,000.00 $2,768.95 $2,076.71 $4,568.77

$417,001.00 to $418,000.00 $2,774.55 $2,080.91 $4,578.01

$418,001.00 to $419,000.00 $2,780.15 $2,085.11 $4,587.25

$419,001.00 to $420,000.00 $2,785.75 $2,089.31 $4,596.49

$420,001.00 to $421,000.00 $2,791.35 $2,093.51 $4,605.73

$421,001.00 to $422,000.00 $2,796.95 $2,097.71 $4,614.97

$422,001.00 to $423,000.00 $2,802.55 $2,101.91 $4,624.21

$423,001.00 to $424,000.00 $2,808.15 $2,106.11 $4,633.45

$424,001.00 to $425,000.00 $2,813.75 $2,110.31 $4,642.69

$425,001.00 to $426,000.00 $2,819.35 $2,114.51 $4,651.93

$426,001.00 to $427,000.00 $2,824.95 $2,118.71 $4,661.17

$427,001.00 to $428,000.00 $2,830.55 $2,122.91 $4,670.41

$428,001.00 to $429,000.00 $2,836.15 $2,127.11 $4,679.65

$429,001.00 to $430,000.00 $2,841.75 $2,131.31 $4,688.89

Page 36: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$430,001.00 to $431,000.00 $2,847.35 $2,135.51 $4,698.13

$431,001.00 to $432,000.00 $2,852.95 $2,139.71 $4,707.37

$432,001.00 to $433,000.00 $2,858.55 $2,143.91 $4,716.61

$433,001.00 to $434,000.00 $2,864.15 $2,148.11 $4,725.85

$434,001.00 to $435,000.00 $2,869.75 $2,152.31 $4,735.09

$435,001.00 to $436,000.00 $2,875.35 $2,156.51 $4,744.33

$436,001.00 to $437,000.00 $2,880.95 $2,160.71 $4,753.57

$437,001.00 to $438,000.00 $2,886.55 $2,164.91 $4,762.81

$438,001.00 to $439,000.00 $2,892.15 $2,169.11 $4,772.05

$439,001.00 to $440,000.00 $2,897.75 $2,173.31 $4,781.29

$440,001.00 to $441,000.00 $2,903.35 $2,177.51 $4,790.53

$441,001.00 to $442,000.00 $2,908.95 $2,181.71 $4,799.77

$442,001.00 to $443,000.00 $2,914.55 $2,185.91 $4,809.01

$443,001.00 to $444,000.00 $2,920.15 $2,190.11 $4,818.25

$444,001.00 to $445,000.00 $2,925.75 $2,194.31 $4,827.49

$445,001.00 to $446,000.00 $2,931.35 $2,198.51 $4,836.73

$446,001.00 to $447,000.00 $2,936.95 $2,202.71 $4,845.97

$447,001.00 to $448,000.00 $2,942.55 $2,206.91 $4,855.21

$448,001.00 to $449,000.00 $2,948.15 $2,211.11 $4,864.45

$449,001.00 to $450,000.00 $2,953.75 $2,215.31 $4,873.69

$450,001.00 to $451,000.00 $2,959.35 $2,219.51 $4,882.93

$451,001.00 to $452,000.00 $2,964.95 $2,223.71 $4,892.17

$452,001.00 to $453,000.00 $2,970.55 $2,227.91 $4,901.41

$453,001.00 to $454,000.00 $2,976.15 $2,232.11 $4,910.65

$454,001.00 to $455,000.00 $2,981.75 $2,236.31 $4,919.89

$455,001.00 to $456,000.00 $2,987.35 $2,240.51 $4,929.13

$456,001.00 to $457,000.00 $2,992.95 $2,244.71 $4,938.37

$457,001.00 to $458,000.00 $2,998.55 $2,248.91 $4,947.61

$458,001.00 to $459,000.00 $3,004.15 $2,253.11 $4,956.85

$459,001.00 to $460,000.00 $3,009.75 $2,257.31 $4,966.09

$460,001.00 to $461,000.00 $3,015.35 $2,261.51 $4,975.33

$461,001.00 to $462,000.00 $3,020.95 $2,265.71 $4,984.57

$462,001.00 to $463,000.00 $3,026.55 $2,269.91 $4,993.81

$463,001.00 to $464,000.00 $3,032.15 $2,274.11 $5,003.05

$464,001.00 to $465,000.00 $3,037.75 $2,278.31 $5,012.29

$465,001.00 to $466,000.00 $3,043.35 $2,282.51 $5,021.53

$466,001.00 to $467,000.00 $3,048.95 $2,286.71 $5,030.77

Page 37: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$467,001.00 to $468,000.00 $3,054.55 $2,290.91 $5,040.01

$468,001.00 to $469,000.00 $3,060.15 $2,295.11 $5,049.25

$469,001.00 to $470,000.00 $3,065.75 $2,299.31 $5,058.49

$470,001.00 to $471,000.00 $3,071.35 $2,303.51 $5,067.73

$471,001.00 to $472,000.00 $3,076.95 $2,307.71 $5,076.97

$472,001.00 to $473,000.00 $3,082.55 $2,311.91 $5,086.21

$473,001.00 to $474,000.00 $3,088.15 $2,316.11 $5,095.45

$474,001.00 to $475,000.00 $3,093.75 $2,320.31 $5,104.69

$475,001.00 to $476,000.00 $3,099.35 $2,324.51 $5,113.93

$476,001.00 to $477,000.00 $3,104.95 $2,328.71 $5,123.17

$477,001.00 to $478,000.00 $3,110.55 $2,332.91 $5,132.41

$478,001.00 to $479,000.00 $3,116.15 $2,337.11 $5,141.65

$479,001.00 to $480,000.00 $3,121.75 $2,341.31 $5,150.89

$480,001.00 to $481,000.00 $3,127.35 $2,345.51 $5,160.13

$481,001.00 to $482,000.00 $3,132.95 $2,349.71 $5,169.37

$482,001.00 to $483,000.00 $3,138.55 $2,353.91 $5,178.61

$483,001.00 to $484,000.00 $3,144.15 $2,358.11 $5,187.85

$484,001.00 to $485,000.00 $3,149.75 $2,362.31 $5,197.09

$485,001.00 to $486,000.00 $3,155.35 $2,366.51 $5,206.33

$486,001.00 to $487,000.00 $3,160.95 $2,370.71 $5,215.57

$487,001.00 to $488,000.00 $3,166.55 $2,374.91 $5,224.81

$488,001.00 to $489,000.00 $3,172.15 $2,379.11 $5,234.05

$489,001.00 to $490,000.00 $3,177.75 $2,383.31 $5,243.29

$490,001.00 to $491,000.00 $3,183.35 $2,387.51 $5,252.53

$491,001.00 to $492,000.00 $3,188.95 $2,391.71 $5,261.77

$492,001.00 to $493,000.00 $3,194.55 $2,395.91 $5,271.01

$493,001.00 to $494,000.00 $3,200.15 $2,400.11 $5,280.25

$494,001.00 to $495,000.00 $3,205.75 $2,404.31 $5,289.49

$495,001.00 to $496,000.00 $3,211.35 $2,408.51 $5,298.73

$496,001.00 to $497,000.00 $3,216.95 $2,412.71 $5,307.97

$497,001.00 to $498,000.00 $3,222.55 $2,416.91 $5,317.21

$498,001.00 to $499,000.00 $3,228.15 $2,421.11 $5,326.45

$499,001.00 to $500,000.00 $3,233.75 $2,425.31 $5,335.69

$500,001.00 to $501,000.00 $3,238.50 $2,428.88 $5,343.53

$501,001.00 to $502,000.00 $3,243.25 $2,432.44 $5,351.36

$502,001.00 to $503,000.00 $3,248.00 $2,436.00 $5,359.20

$503,001.00 to $504,000.00 $3,252.75 $2,439.56 $5,367.04

Page 38: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$504,001.00 to $505,000.00 $3,257.50 $2,443.13 $5,374.88

$505,001.00 to $506,000.00 $3,262.25 $2,446.69 $5,382.71

$506,001.00 to $507,000.00 $3,267.00 $2,450.25 $5,390.55

$507,001.00 to $508,000.00 $3,271.75 $2,453.81 $5,398.39

$508,001.00 to $509,000.00 $3,276.50 $2,457.38 $5,406.23

$509,001.00 to $510,000.00 $3,281.25 $2,460.94 $5,414.06

$510,001.00 to $511,000.00 $3,286.00 $2,464.50 $5,421.90

$511,001.00 to $512,000.00 $3,290.75 $2,468.06 $5,429.74

$512,001.00 to $513,000.00 $3,295.50 $2,471.63 $5,437.58

$513,001.00 to $514,000.00 $3,300.25 $2,475.19 $5,445.41

$514,001.00 to $515,000.00 $3,305.00 $2,478.75 $5,453.25

$515,001.00 to $516,000.00 $3,309.75 $2,482.31 $5,461.09

$516,001.00 to $517,000.00 $3,314.50 $2,485.88 $5,468.93

$517,001.00 to $518,000.00 $3,319.25 $2,489.44 $5,476.76

$518,001.00 to $519,000.00 $3,324.00 $2,493.00 $5,484.60

$519,001.00 to $520,000.00 $3,328.75 $2,496.56 $5,492.44

$520,001.00 to $521,000.00 $3,333.50 $2,500.13 $5,500.28

$521,001.00 to $522,000.00 $3,338.25 $2,503.69 $5,508.11

$522,001.00 to $523,000.00 $3,343.00 $2,507.25 $5,515.95

$523,001.00 to $524,000.00 $3,347.75 $2,510.81 $5,523.79

$524,001.00 to $525,000.00 $3,352.50 $2,514.38 $5,531.63

$525,001.00 to $526,000.00 $3,357.25 $2,517.94 $5,539.46

$526,001.00 to $527,000.00 $3,362.00 $2,521.50 $5,547.30

$527,001.00 to $528,000.00 $3,366.75 $2,525.06 $5,555.14

$528,001.00 to $529,000.00 $3,371.50 $2,528.63 $5,562.98

$529,001.00 to $530,000.00 $3,376.25 $2,532.19 $5,570.81

$530,001.00 to $531,000.00 $3,381.00 $2,535.75 $5,578.65

$531,001.00 to $532,000.00 $3,385.75 $2,539.31 $5,586.49

$532,001.00 to $533,000.00 $3,390.50 $2,542.88 $5,594.33

$533,001.00 to $534,000.00 $3,395.25 $2,546.44 $5,602.16

$534,001.00 to $535,000.00 $3,400.00 $2,550.00 $5,610.00

$535,001.00 to $536,000.00 $3,404.75 $2,553.56 $5,617.84

$536,001.00 to $537,000.00 $3,409.50 $2,557.13 $5,625.68

$537,001.00 to $538,000.00 $3,414.25 $2,560.69 $5,633.51

$538,001.00 to $539,000.00 $3,419.00 $2,564.25 $5,641.35

$539,001.00 to $540,000.00 $3,423.75 $2,567.81 $5,649.19

$540,001.00 to $541,000.00 $3,428.50 $2,571.38 $5,657.03

Page 39: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$541,001.00 to $542,000.00 $3,433.25 $2,574.94 $5,664.86

$542,001.00 to $543,000.00 $3,438.00 $2,578.50 $5,672.70

$543,001.00 to $544,000.00 $3,442.75 $2,582.06 $5,680.54

$544,001.00 to $545,000.00 $3,447.50 $2,585.63 $5,688.38

$545,001.00 to $546,000.00 $3,452.25 $2,589.19 $5,696.21

$546,001.00 to $547,000.00 $3,457.00 $2,592.75 $5,704.05

$547,001.00 to $548,000.00 $3,461.75 $2,596.31 $5,711.89

$548,001.00 to $549,000.00 $3,466.50 $2,599.88 $5,719.73

$549,001.00 to $550,000.00 $3,471.25 $2,603.44 $5,727.56

$550,001.00 to $551,000.00 $3,476.00 $2,607.00 $5,735.40

$551,001.00 to $552,000.00 $3,480.75 $2,610.56 $5,743.24

$552,001.00 to $553,000.00 $3,485.50 $2,614.13 $5,751.08

$553,001.00 to $554,000.00 $3,490.25 $2,617.69 $5,758.91

$554,001.00 to $555,000.00 $3,495.00 $2,621.25 $5,766.75

$555,001.00 to $556,000.00 $3,499.75 $2,624.81 $5,774.59

$556,001.00 to $557,000.00 $3,504.50 $2,628.38 $5,782.43

$557,001.00 to $558,000.00 $3,509.25 $2,631.94 $5,790.26

$558,001.00 to $559,000.00 $3,514.00 $2,635.50 $5,798.10

$559,001.00 to $560,000.00 $3,518.75 $2,639.06 $5,805.94

$560,001.00 to $561,000.00 $3,523.50 $2,642.63 $5,813.78

$561,001.00 to $562,000.00 $3,528.25 $2,646.19 $5,821.61

$562,001.00 to $563,000.00 $3,533.00 $2,649.75 $5,829.45

$563,001.00 to $564,000.00 $3,537.75 $2,653.31 $5,837.29

$564,001.00 to $565,000.00 $3,542.50 $2,656.88 $5,845.13

$565,001.00 to $566,000.00 $3,547.25 $2,660.44 $5,852.96

$566,001.00 to $567,000.00 $3,552.00 $2,664.00 $5,860.80

$567,001.00 to $568,000.00 $3,556.75 $2,667.56 $5,868.64

$568,001.00 to $569,000.00 $3,561.50 $2,671.13 $5,876.48

$569,001.00 to $570,000.00 $3,566.25 $2,674.69 $5,884.31

$570,001.00 to $571,000.00 $3,571.00 $2,678.25 $5,892.15

$571,001.00 to $572,000.00 $3,575.75 $2,681.81 $5,899.99

$572,001.00 to $573,000.00 $3,580.50 $2,685.38 $5,907.83

$573,001.00 to $574,000.00 $3,585.25 $2,688.94 $5,915.66

$574,001.00 to $575,000.00 $3,590.00 $2,692.50 $5,923.50

$575,001.00 to $576,000.00 $3,594.75 $2,696.06 $5,931.34

$576,001.00 to $577,000.00 $3,599.50 $2,699.63 $5,939.18

$577,001.00 to $578,000.00 $3,604.25 $2,703.19 $5,947.01

Page 40: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$578,001.00 to $579,000.00 $3,609.00 $2,706.75 $5,954.85

$579,001.00 to $580,000.00 $3,613.75 $2,710.31 $5,962.69

$580,001.00 to $581,000.00 $3,618.50 $2,713.88 $5,970.53

$581,001.00 to $582,000.00 $3,623.25 $2,717.44 $5,978.36

$582,001.00 to $583,000.00 $3,628.00 $2,721.00 $5,986.20

$583,001.00 to $584,000.00 $3,632.75 $2,724.56 $5,994.04

$584,001.00 to $585,000.00 $3,637.50 $2,728.13 $6,001.88

$585,001.00 to $586,000.00 $3,642.25 $2,731.69 $6,009.71

$586,001.00 to $587,000.00 $3,647.00 $2,735.25 $6,017.55

$587,001.00 to $588,000.00 $3,651.75 $2,738.81 $6,025.39

$588,001.00 to $589,000.00 $3,656.50 $2,742.38 $6,033.23

$589,001.00 to $590,000.00 $3,661.25 $2,745.94 $6,041.06

$590,001.00 to $591,000.00 $3,666.00 $2,749.50 $6,048.90

$591,001.00 to $592,000.00 $3,670.75 $2,753.06 $6,056.74

$592,001.00 to $593,000.00 $3,675.50 $2,756.63 $6,064.58

$593,001.00 to $594,000.00 $3,680.25 $2,760.19 $6,072.41

$594,001.00 to $595,000.00 $3,685.00 $2,763.75 $6,080.25

$595,001.00 to $596,000.00 $3,689.75 $2,767.31 $6,088.09

$596,001.00 to $597,000.00 $3,694.50 $2,770.88 $6,095.93

$597,001.00 to $598,000.00 $3,699.25 $2,774.44 $6,103.76

$598,001.00 to $599,000.00 $3,704.00 $2,778.00 $6,111.60

$599,001.00 to $600,000.00 $3,708.75 $2,781.56 $6,119.44

$600,001.00 to $601,000.00 $3,713.50 $2,785.13 $6,127.28

$601,001.00 to $602,000.00 $3,718.25 $2,788.69 $6,135.11

$602,001.00 to $603,000.00 $3,723.00 $2,792.25 $6,142.95

$603,001.00 to $604,000.00 $3,727.75 $2,795.81 $6,150.79

$604,001.00 to $605,000.00 $3,732.50 $2,799.38 $6,158.63

$605,001.00 to $606,000.00 $3,737.25 $2,802.94 $6,166.46

$606,001.00 to $607,000.00 $3,742.00 $2,806.50 $6,174.30

$607,001.00 to $608,000.00 $3,746.75 $2,810.06 $6,182.14

$608,001.00 to $609,000.00 $3,751.50 $2,813.63 $6,189.98

$609,001.00 to $610,000.00 $3,756.25 $2,817.19 $6,197.81

$610,001.00 to $611,000.00 $3,761.00 $2,820.75 $6,205.65

$611,001.00 to $612,000.00 $3,765.75 $2,824.31 $6,213.49

$612,001.00 to $613,000.00 $3,770.50 $2,827.88 $6,221.33

$613,001.00 to $614,000.00 $3,775.25 $2,831.44 $6,229.16

$614,001.00 to $615,000.00 $3,780.00 $2,835.00 $6,237.00

Page 41: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$615,001.00 to $616,000.00 $3,784.75 $2,838.56 $6,244.84

$616,001.00 to $617,000.00 $3,789.50 $2,842.13 $6,252.68

$617,001.00 to $618,000.00 $3,794.25 $2,845.69 $6,260.51

$618,001.00 to $619,000.00 $3,799.00 $2,849.25 $6,268.35

$619,001.00 to $620,000.00 $3,803.75 $2,852.81 $6,276.19

$620,001.00 to $621,000.00 $3,808.50 $2,856.38 $6,284.03

$621,001.00 to $622,000.00 $3,813.25 $2,859.94 $6,291.86

$622,001.00 to $623,000.00 $3,818.00 $2,863.50 $6,299.70

$623,001.00 to $624,000.00 $3,822.75 $2,867.06 $6,307.54

$624,001.00 to $625,000.00 $3,827.50 $2,870.63 $6,315.38

$625,001.00 to $626,000.00 $3,832.25 $2,874.19 $6,323.21

$626,001.00 to $627,000.00 $3,837.00 $2,877.75 $6,331.05

$627,001.00 to $628,000.00 $3,841.75 $2,881.31 $6,338.89

$628,001.00 to $629,000.00 $3,846.50 $2,884.88 $6,346.73

$629,001.00 to $630,000.00 $3,851.25 $2,888.44 $6,354.56

$630,001.00 to $631,000.00 $3,856.00 $2,892.00 $6,362.40

$631,001.00 to $632,000.00 $3,860.75 $2,895.56 $6,370.24

$632,001.00 to $633,000.00 $3,865.50 $2,899.13 $6,378.08

$633,001.00 to $634,000.00 $3,870.25 $2,902.69 $6,385.91

$634,001.00 to $635,000.00 $3,875.00 $2,906.25 $6,393.75

$635,001.00 to $636,000.00 $3,879.75 $2,909.81 $6,401.59

$636,001.00 to $637,000.00 $3,884.50 $2,913.38 $6,409.43

$637,001.00 to $638,000.00 $3,889.25 $2,916.94 $6,417.26

$638,001.00 to $639,000.00 $3,894.00 $2,920.50 $6,425.10

$639,001.00 to $640,000.00 $3,898.75 $2,924.06 $6,432.94

$640,001.00 to $641,000.00 $3,903.50 $2,927.63 $6,440.78

$641,001.00 to $642,000.00 $3,908.25 $2,931.19 $6,448.61

$642,001.00 to $643,000.00 $3,913.00 $2,934.75 $6,456.45

$643,001.00 to $644,000.00 $3,917.75 $2,938.31 $6,464.29

$644,001.00 to $645,000.00 $3,922.50 $2,941.88 $6,472.13

$645,001.00 to $646,000.00 $3,927.25 $2,945.44 $6,479.96

$646,001.00 to $647,000.00 $3,932.00 $2,949.00 $6,487.80

$647,001.00 to $648,000.00 $3,936.75 $2,952.56 $6,495.64

$648,001.00 to $649,000.00 $3,941.50 $2,956.13 $6,503.48

$649,001.00 to $650,000.00 $3,946.25 $2,959.69 $6,511.31

$650,001.00 to $651,000.00 $3,951.00 $2,963.25 $6,519.15

$651,001.00 to $652,000.00 $3,955.75 $2,966.81 $6,526.99

Page 42: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$652,001.00 to $653,000.00 $3,960.50 $2,970.38 $6,534.83

$653,001.00 to $654,000.00 $3,965.25 $2,973.94 $6,542.66

$654,001.00 to $655,000.00 $3,970.00 $2,977.50 $6,550.50

$655,001.00 to $656,000.00 $3,974.75 $2,981.06 $6,558.34

$656,001.00 to $657,000.00 $3,979.50 $2,984.63 $6,566.18

$657,001.00 to $658,000.00 $3,984.25 $2,988.19 $6,574.01

$658,001.00 to $659,000.00 $3,989.00 $2,991.75 $6,581.85

$659,001.00 to $660,000.00 $3,993.75 $2,995.31 $6,589.69

$660,001.00 to $661,000.00 $3,998.50 $2,998.88 $6,597.53

$661,001.00 to $662,000.00 $4,003.25 $3,002.44 $6,605.36

$662,001.00 to $663,000.00 $4,008.00 $3,006.00 $6,613.20

$663,001.00 to $664,000.00 $4,012.75 $3,009.56 $6,621.04

$664,001.00 to $665,000.00 $4,017.50 $3,013.13 $6,628.88

$665,001.00 to $666,000.00 $4,022.25 $3,016.69 $6,636.71

$666,001.00 to $667,000.00 $4,027.00 $3,020.25 $6,644.55

$667,001.00 to $668,000.00 $4,031.75 $3,023.81 $6,652.39

$668,001.00 to $669,000.00 $4,036.50 $3,027.38 $6,660.23

$669,001.00 to $670,000.00 $4,041.25 $3,030.94 $6,668.06

$670,001.00 to $671,000.00 $4,046.00 $3,034.50 $6,675.90

$671,001.00 to $672,000.00 $4,050.75 $3,038.06 $6,683.74

$672,001.00 to $673,000.00 $4,055.50 $3,041.63 $6,691.58

$673,001.00 to $674,000.00 $4,060.25 $3,045.19 $6,699.41

$674,001.00 to $675,000.00 $4,065.00 $3,048.75 $6,707.25

$675,001.00 to $676,000.00 $4,069.75 $3,052.31 $6,715.09

$676,001.00 to $677,000.00 $4,074.50 $3,055.88 $6,722.93

$677,001.00 to $678,000.00 $4,079.25 $3,059.44 $6,730.76

$678,001.00 to $679,000.00 $4,084.00 $3,063.00 $6,738.60

$679,001.00 to $680,000.00 $4,088.75 $3,066.56 $6,746.44

$680,001.00 to $681,000.00 $4,093.50 $3,070.13 $6,754.28

$681,001.00 to $682,000.00 $4,098.25 $3,073.69 $6,762.11

$682,001.00 to $683,000.00 $4,103.00 $3,077.25 $6,769.95

$683,001.00 to $684,000.00 $4,107.75 $3,080.81 $6,777.79

$684,001.00 to $685,000.00 $4,112.50 $3,084.38 $6,785.63

$685,001.00 to $686,000.00 $4,117.25 $3,087.94 $6,793.46

$686,001.00 to $687,000.00 $4,122.00 $3,091.50 $6,801.30

$687,001.00 to $688,000.00 $4,126.75 $3,095.06 $6,809.14

$688,001.00 to $689,000.00 $4,131.50 $3,098.63 $6,816.98

Page 43: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$689,001.00 to $690,000.00 $4,136.25 $3,102.19 $6,824.81

$690,001.00 to $691,000.00 $4,141.00 $3,105.75 $6,832.65

$691,001.00 to $692,000.00 $4,145.75 $3,109.31 $6,840.49

$692,001.00 to $693,000.00 $4,150.50 $3,112.88 $6,848.33

$693,001.00 to $694,000.00 $4,155.25 $3,116.44 $6,856.16

$694,001.00 to $695,000.00 $4,160.00 $3,120.00 $6,864.00

$695,001.00 to $696,000.00 $4,164.75 $3,123.56 $6,871.84

$696,001.00 to $697,000.00 $4,169.50 $3,127.13 $6,879.68

$697,001.00 to $698,000.00 $4,174.25 $3,130.69 $6,887.51

$698,001.00 to $699,000.00 $4,179.00 $3,134.25 $6,895.35

$699,001.00 to $700,000.00 $4,183.75 $3,137.81 $6,903.19

$700,001.00 to $701,000.00 $4,188.50 $3,141.38 $6,911.03

$701,001.00 to $702,000.00 $4,193.25 $3,144.94 $6,918.86

$702,001.00 to $703,000.00 $4,198.00 $3,148.50 $6,926.70

$703,001.00 to $704,000.00 $4,202.75 $3,152.06 $6,934.54

$704,001.00 to $705,000.00 $4,207.50 $3,155.63 $6,942.38

$705,001.00 to $706,000.00 $4,212.25 $3,159.19 $6,950.21

$706,001.00 to $707,000.00 $4,217.00 $3,162.75 $6,958.05

$707,001.00 to $708,000.00 $4,221.75 $3,166.31 $6,965.89

$708,001.00 to $709,000.00 $4,226.50 $3,169.88 $6,973.73

$709,001.00 to $710,000.00 $4,231.25 $3,173.44 $6,981.56

$710,001.00 to $711,000.00 $4,236.00 $3,177.00 $6,989.40

$711,001.00 to $712,000.00 $4,240.75 $3,180.56 $6,997.24

$712,001.00 to $713,000.00 $4,245.50 $3,184.13 $7,005.08

$713,001.00 to $714,000.00 $4,250.25 $3,187.69 $7,012.91

$714,001.00 to $715,000.00 $4,255.00 $3,191.25 $7,020.75

$715,001.00 to $716,000.00 $4,259.75 $3,194.81 $7,028.59

$716,001.00 to $717,000.00 $4,264.50 $3,198.38 $7,036.43

$717,001.00 to $718,000.00 $4,269.25 $3,201.94 $7,044.26

$718,001.00 to $719,000.00 $4,274.00 $3,205.50 $7,052.10

$719,001.00 to $720,000.00 $4,278.75 $3,209.06 $7,059.94

$720,001.00 to $721,000.00 $4,283.50 $3,212.63 $7,067.78

$721,001.00 to $722,000.00 $4,288.25 $3,216.19 $7,075.61

$722,001.00 to $723,000.00 $4,293.00 $3,219.75 $7,083.45

$723,001.00 to $724,000.00 $4,297.75 $3,223.31 $7,091.29

$724,001.00 to $725,000.00 $4,302.50 $3,226.88 $7,099.13

$725,001.00 to $726,000.00 $4,307.25 $3,230.44 $7,106.96

Page 44: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$726,001.00 to $727,000.00 $4,312.00 $3,234.00 $7,114.80

$727,001.00 to $728,000.00 $4,316.75 $3,237.56 $7,122.64

$728,001.00 to $729,000.00 $4,321.50 $3,241.13 $7,130.48

$729,001.00 to $730,000.00 $4,326.25 $3,244.69 $7,138.31

$730,001.00 to $731,000.00 $4,331.00 $3,248.25 $7,146.15

$731,001.00 to $732,000.00 $4,335.75 $3,251.81 $7,153.99

$732,001.00 to $733,000.00 $4,340.50 $3,255.38 $7,161.83

$733,001.00 to $734,000.00 $4,345.25 $3,258.94 $7,169.66

$734,001.00 to $735,000.00 $4,350.00 $3,262.50 $7,177.50

$735,001.00 to $736,000.00 $4,354.75 $3,266.06 $7,185.34

$736,001.00 to $737,000.00 $4,359.50 $3,269.63 $7,193.18

$737,001.00 to $738,000.00 $4,364.25 $3,273.19 $7,201.01

$738,001.00 to $739,000.00 $4,369.00 $3,276.75 $7,208.85

$739,001.00 to $740,000.00 $4,373.75 $3,280.31 $7,216.69

$740,001.00 to $741,000.00 $4,378.50 $3,283.88 $7,224.53

$741,001.00 to $742,000.00 $4,383.25 $3,287.44 $7,232.36

$742,001.00 to $743,000.00 $4,388.00 $3,291.00 $7,240.20

$743,001.00 to $744,000.00 $4,392.75 $3,294.56 $7,248.04

$744,001.00 to $745,000.00 $4,397.50 $3,298.13 $7,255.88

$745,001.00 to $746,000.00 $4,402.25 $3,301.69 $7,263.71

$746,001.00 to $747,000.00 $4,407.00 $3,305.25 $7,271.55

$747,001.00 to $748,000.00 $4,411.75 $3,308.81 $7,279.39

$748,001.00 to $749,000.00 $4,416.50 $3,312.38 $7,287.23

$749,001.00 to $750,000.00 $4,421.25 $3,315.94 $7,295.06

$750,001.00 to $751,000.00 $4,426.00 $3,319.50 $7,302.90

$751,001.00 to $752,000.00 $4,430.75 $3,323.06 $7,310.74

$752,001.00 to $753,000.00 $4,435.50 $3,326.63 $7,318.58

$753,001.00 to $754,000.00 $4,440.25 $3,330.19 $7,326.41

$754,001.00 to $755,000.00 $4,445.00 $3,333.75 $7,334.25

$755,001.00 to $756,000.00 $4,449.75 $3,337.31 $7,342.09

$756,001.00 to $757,000.00 $4,454.50 $3,340.88 $7,349.93

$757,001.00 to $758,000.00 $4,459.25 $3,344.44 $7,357.76

$758,001.00 to $759,000.00 $4,464.00 $3,348.00 $7,365.60

$759,001.00 to $760,000.00 $4,468.75 $3,351.56 $7,373.44

$760,001.00 to $761,000.00 $4,473.50 $3,355.13 $7,381.28

$761,001.00 to $762,000.00 $4,478.25 $3,358.69 $7,389.11

$762,001.00 to $763,000.00 $4,483.00 $3,362.25 $7,396.95

Page 45: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$763,001.00 to $764,000.00 $4,487.75 $3,365.81 $7,404.79

$764,001.00 to $765,000.00 $4,492.50 $3,369.38 $7,412.63

$765,001.00 to $766,000.00 $4,497.25 $3,372.94 $7,420.46

$766,001.00 to $767,000.00 $4,502.00 $3,376.50 $7,428.30

$767,001.00 to $768,000.00 $4,506.75 $3,380.06 $7,436.14

$768,001.00 to $769,000.00 $4,511.50 $3,383.63 $7,443.98

$769,001.00 to $770,000.00 $4,516.25 $3,387.19 $7,451.81

$770,001.00 to $771,000.00 $4,521.00 $3,390.75 $7,459.65

$771,001.00 to $772,000.00 $4,525.75 $3,394.31 $7,467.49

$772,001.00 to $773,000.00 $4,530.50 $3,397.88 $7,475.33

$773,001.00 to $774,000.00 $4,535.25 $3,401.44 $7,483.16

$774,001.00 to $775,000.00 $4,540.00 $3,405.00 $7,491.00

$775,001.00 to $776,000.00 $4,544.75 $3,408.56 $7,498.84

$776,001.00 to $777,000.00 $4,549.50 $3,412.13 $7,506.68

$777,001.00 to $778,000.00 $4,554.25 $3,415.69 $7,514.51

$778,001.00 to $779,000.00 $4,559.00 $3,419.25 $7,522.35

$779,001.00 to $780,000.00 $4,563.75 $3,422.81 $7,530.19

$780,001.00 to $781,000.00 $4,568.50 $3,426.38 $7,538.03

$781,001.00 to $782,000.00 $4,573.25 $3,429.94 $7,545.86

$782,001.00 to $783,000.00 $4,578.00 $3,433.50 $7,553.70

$783,001.00 to $784,000.00 $4,582.75 $3,437.06 $7,561.54

$784,001.00 to $785,000.00 $4,587.50 $3,440.63 $7,569.38

$785,001.00 to $786,000.00 $4,592.25 $3,444.19 $7,577.21

$786,001.00 to $787,000.00 $4,597.00 $3,447.75 $7,585.05

$787,001.00 to $788,000.00 $4,601.75 $3,451.31 $7,592.89

$788,001.00 to $789,000.00 $4,606.50 $3,454.88 $7,600.73

$789,001.00 to $790,000.00 $4,611.25 $3,458.44 $7,608.56

$790,001.00 to $791,000.00 $4,616.00 $3,462.00 $7,616.40

$791,001.00 to $792,000.00 $4,620.75 $3,465.56 $7,624.24

$792,001.00 to $793,000.00 $4,625.50 $3,469.13 $7,632.08

$793,001.00 to $794,000.00 $4,630.25 $3,472.69 $7,639.91

$794,001.00 to $795,000.00 $4,635.00 $3,476.25 $7,647.75

$795,001.00 to $796,000.00 $4,639.75 $3,479.81 $7,655.59

$796,001.00 to $797,000.00 $4,644.50 $3,483.38 $7,663.43

$797,001.00 to $798,000.00 $4,649.25 $3,486.94 $7,671.26

$798,001.00 to $799,000.00 $4,654.00 $3,490.50 $7,679.10

$799,001.00 to $800,000.00 $4,658.75 $3,494.06 $7,686.94

Page 46: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$800,001.00 to $801,000.00 $4,663.50 $3,497.63 $7,694.78

$801,001.00 to $802,000.00 $4,668.25 $3,501.19 $7,702.61

$802,001.00 to $803,000.00 $4,673.00 $3,504.75 $7,710.45

$803,001.00 to $804,000.00 $4,677.75 $3,508.31 $7,718.29

$804,001.00 to $805,000.00 $4,682.50 $3,511.88 $7,726.13

$805,001.00 to $806,000.00 $4,687.25 $3,515.44 $7,733.96

$806,001.00 to $807,000.00 $4,692.00 $3,519.00 $7,741.80

$807,001.00 to $808,000.00 $4,696.75 $3,522.56 $7,749.64

$808,001.00 to $809,000.00 $4,701.50 $3,526.13 $7,757.48

$809,001.00 to $810,000.00 $4,706.25 $3,529.69 $7,765.31

$810,001.00 to $811,000.00 $4,711.00 $3,533.25 $7,773.15

$811,001.00 to $812,000.00 $4,715.75 $3,536.81 $7,780.99

$812,001.00 to $813,000.00 $4,720.50 $3,540.38 $7,788.83

$813,001.00 to $814,000.00 $4,725.25 $3,543.94 $7,796.66

$814,001.00 to $815,000.00 $4,730.00 $3,547.50 $7,804.50

$815,001.00 to $816,000.00 $4,734.75 $3,551.06 $7,812.34

$816,001.00 to $817,000.00 $4,739.50 $3,554.63 $7,820.18

$817,001.00 to $818,000.00 $4,744.25 $3,558.19 $7,828.01

$818,001.00 to $819,000.00 $4,749.00 $3,561.75 $7,835.85

$819,001.00 to $820,000.00 $4,753.75 $3,565.31 $7,843.69

$820,001.00 to $821,000.00 $4,758.50 $3,568.88 $7,851.53

$821,001.00 to $822,000.00 $4,763.25 $3,572.44 $7,859.36

$822,001.00 to $823,000.00 $4,768.00 $3,576.00 $7,867.20

$823,001.00 to $824,000.00 $4,772.75 $3,579.56 $7,875.04

$824,001.00 to $825,000.00 $4,777.50 $3,583.13 $7,882.88

$825,001.00 to $826,000.00 $4,782.25 $3,586.69 $7,890.71

$826,001.00 to $827,000.00 $4,787.00 $3,590.25 $7,898.55

$827,001.00 to $828,000.00 $4,791.75 $3,593.81 $7,906.39

$828,001.00 to $829,000.00 $4,796.50 $3,597.38 $7,914.23

$829,001.00 to $830,000.00 $4,801.25 $3,600.94 $7,922.06

$830,001.00 to $831,000.00 $4,806.00 $3,604.50 $7,929.90

$831,001.00 to $832,000.00 $4,810.75 $3,608.06 $7,937.74

$832,001.00 to $833,000.00 $4,815.50 $3,611.63 $7,945.58

$833,001.00 to $834,000.00 $4,820.25 $3,615.19 $7,953.41

$834,001.00 to $835,000.00 $4,825.00 $3,618.75 $7,961.25

$835,001.00 to $836,000.00 $4,829.75 $3,622.31 $7,969.09

$836,001.00 to $837,000.00 $4,834.50 $3,625.88 $7,976.93

Page 47: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$837,001.00 to $838,000.00 $4,839.25 $3,629.44 $7,984.76

$838,001.00 to $839,000.00 $4,844.00 $3,633.00 $7,992.60

$839,001.00 to $840,000.00 $4,848.75 $3,636.56 $8,000.44

$840,001.00 to $841,000.00 $4,853.50 $3,640.13 $8,008.28

$841,001.00 to $842,000.00 $4,858.25 $3,643.69 $8,016.11

$842,001.00 to $843,000.00 $4,863.00 $3,647.25 $8,023.95

$843,001.00 to $844,000.00 $4,867.75 $3,650.81 $8,031.79

$844,001.00 to $845,000.00 $4,872.50 $3,654.38 $8,039.63

$845,001.00 to $846,000.00 $4,877.25 $3,657.94 $8,047.46

$846,001.00 to $847,000.00 $4,882.00 $3,661.50 $8,055.30

$847,001.00 to $848,000.00 $4,886.75 $3,665.06 $8,063.14

$848,001.00 to $849,000.00 $4,891.50 $3,668.63 $8,070.98

$849,001.00 to $850,000.00 $4,896.25 $3,672.19 $8,078.81

$850,001.00 to $851,000.00 $4,901.00 $3,675.75 $8,086.65

$851,001.00 to $852,000.00 $4,905.75 $3,679.31 $8,094.49

$852,001.00 to $853,000.00 $4,910.50 $3,682.88 $8,102.33

$853,001.00 to $854,000.00 $4,915.25 $3,686.44 $8,110.16

$854,001.00 to $855,000.00 $4,920.00 $3,690.00 $8,118.00

$855,001.00 to $856,000.00 $4,924.75 $3,693.56 $8,125.84

$856,001.00 to $857,000.00 $4,929.50 $3,697.13 $8,133.68

$857,001.00 to $858,000.00 $4,934.25 $3,700.69 $8,141.51

$858,001.00 to $859,000.00 $4,939.00 $3,704.25 $8,149.35

$859,001.00 to $860,000.00 $4,943.75 $3,707.81 $8,157.19

$860,001.00 to $861,000.00 $4,948.50 $3,711.38 $8,165.03

$861,001.00 to $862,000.00 $4,953.25 $3,714.94 $8,172.86

$862,001.00 to $863,000.00 $4,958.00 $3,718.50 $8,180.70

$863,001.00 to $864,000.00 $4,962.75 $3,722.06 $8,188.54

$864,001.00 to $865,000.00 $4,967.50 $3,725.63 $8,196.38

$865,001.00 to $866,000.00 $4,972.25 $3,729.19 $8,204.21

$866,001.00 to $867,000.00 $4,977.00 $3,732.75 $8,212.05

$867,001.00 to $868,000.00 $4,981.75 $3,736.31 $8,219.89

$868,001.00 to $869,000.00 $4,986.50 $3,739.88 $8,227.73

$869,001.00 to $870,000.00 $4,991.25 $3,743.44 $8,235.56

$870,001.00 to $871,000.00 $4,996.00 $3,747.00 $8,243.40

$871,001.00 to $872,000.00 $5,000.75 $3,750.56 $8,251.24

$872,001.00 to $873,000.00 $5,005.50 $3,754.13 $8,259.08

$873,001.00 to $874,000.00 $5,010.25 $3,757.69 $8,266.91

Page 48: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$874,001.00 to $875,000.00 $5,015.00 $3,761.25 $8,274.75

$875,001.00 to $876,000.00 $5,019.75 $3,764.81 $8,282.59

$876,001.00 to $877,000.00 $5,024.50 $3,768.38 $8,290.43

$877,001.00 to $878,000.00 $5,029.25 $3,771.94 $8,298.26

$878,001.00 to $879,000.00 $5,034.00 $3,775.50 $8,306.10

$879,001.00 to $880,000.00 $5,038.75 $3,779.06 $8,313.94

$880,001.00 to $881,000.00 $5,043.50 $3,782.63 $8,321.78

$881,001.00 to $882,000.00 $5,048.25 $3,786.19 $8,329.61

$882,001.00 to $883,000.00 $5,053.00 $3,789.75 $8,337.45

$883,001.00 to $884,000.00 $5,057.75 $3,793.31 $8,345.29

$884,001.00 to $885,000.00 $5,062.50 $3,796.88 $8,353.13

$885,001.00 to $886,000.00 $5,067.25 $3,800.44 $8,360.96

$886,001.00 to $887,000.00 $5,072.00 $3,804.00 $8,368.80

$887,001.00 to $888,000.00 $5,076.75 $3,807.56 $8,376.64

$888,001.00 to $889,000.00 $5,081.50 $3,811.13 $8,384.48

$889,001.00 to $890,000.00 $5,086.25 $3,814.69 $8,392.31

$890,001.00 to $891,000.00 $5,091.00 $3,818.25 $8,400.15

$891,001.00 to $892,000.00 $5,095.75 $3,821.81 $8,407.99

$892,001.00 to $893,000.00 $5,100.50 $3,825.38 $8,415.83

$893,001.00 to $894,000.00 $5,105.25 $3,828.94 $8,423.66

$894,001.00 to $895,000.00 $5,110.00 $3,832.50 $8,431.50

$895,001.00 to $896,000.00 $5,114.75 $3,836.06 $8,439.34

$896,001.00 to $897,000.00 $5,119.50 $3,839.63 $8,447.18

$897,001.00 to $898,000.00 $5,124.25 $3,843.19 $8,455.01

$898,001.00 to $899,000.00 $5,129.00 $3,846.75 $8,462.85

$899,001.00 to $900,000.00 $5,133.75 $3,850.31 $8,470.69

$900,001.00 to $901,000.00 $5,138.50 $3,853.88 $8,478.53

$901,001.00 to $902,000.00 $5,143.25 $3,857.44 $8,486.36

$902,001.00 to $903,000.00 $5,148.00 $3,861.00 $8,494.20

$903,001.00 to $904,000.00 $5,152.75 $3,864.56 $8,502.04

$904,001.00 to $905,000.00 $5,157.50 $3,868.13 $8,509.88

$905,001.00 to $906,000.00 $5,162.25 $3,871.69 $8,517.71

$906,001.00 to $907,000.00 $5,167.00 $3,875.25 $8,525.55

$907,001.00 to $908,000.00 $5,171.75 $3,878.81 $8,533.39

$908,001.00 to $909,000.00 $5,176.50 $3,882.38 $8,541.23

$909,001.00 to $910,000.00 $5,181.25 $3,885.94 $8,549.06

$910,001.00 to $911,000.00 $5,186.00 $3,889.50 $8,556.90

Page 49: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$911,001.00 to $912,000.00 $5,190.75 $3,893.06 $8,564.74

$912,001.00 to $913,000.00 $5,195.50 $3,896.63 $8,572.58

$913,001.00 to $914,000.00 $5,200.25 $3,900.19 $8,580.41

$914,001.00 to $915,000.00 $5,205.00 $3,903.75 $8,588.25

$915,001.00 to $916,000.00 $5,209.75 $3,907.31 $8,596.09

$916,001.00 to $917,000.00 $5,214.50 $3,910.88 $8,603.93

$917,001.00 to $918,000.00 $5,219.25 $3,914.44 $8,611.76

$918,001.00 to $919,000.00 $5,224.00 $3,918.00 $8,619.60

$919,001.00 to $920,000.00 $5,228.75 $3,921.56 $8,627.44

$920,001.00 to $921,000.00 $5,233.50 $3,925.13 $8,635.28

$921,001.00 to $922,000.00 $5,238.25 $3,928.69 $8,643.11

$922,001.00 to $923,000.00 $5,243.00 $3,932.25 $8,650.95

$923,001.00 to $924,000.00 $5,247.75 $3,935.81 $8,658.79

$924,001.00 to $925,000.00 $5,252.50 $3,939.38 $8,666.63

$925,001.00 to $926,000.00 $5,257.25 $3,942.94 $8,674.46

$926,001.00 to $927,000.00 $5,262.00 $3,946.50 $8,682.30

$927,001.00 to $928,000.00 $5,266.75 $3,950.06 $8,690.14

$928,001.00 to $929,000.00 $5,271.50 $3,953.63 $8,697.98

$929,001.00 to $930,000.00 $5,276.25 $3,957.19 $8,705.81

$930,001.00 to $931,000.00 $5,281.00 $3,960.75 $8,713.65

$931,001.00 to $932,000.00 $5,285.75 $3,964.31 $8,721.49

$932,001.00 to $933,000.00 $5,290.50 $3,967.88 $8,729.33

$933,001.00 to $934,000.00 $5,295.25 $3,971.44 $8,737.16

$934,001.00 to $935,000.00 $5,300.00 $3,975.00 $8,745.00

$935,001.00 to $936,000.00 $5,304.75 $3,978.56 $8,752.84

$936,001.00 to $937,000.00 $5,309.50 $3,982.13 $8,760.68

$937,001.00 to $938,000.00 $5,314.25 $3,985.69 $8,768.51

$938,001.00 to $939,000.00 $5,319.00 $3,989.25 $8,776.35

$939,001.00 to $940,000.00 $5,323.75 $3,992.81 $8,784.19

$940,001.00 to $941,000.00 $5,328.50 $3,996.38 $8,792.03

$941,001.00 to $942,000.00 $5,333.25 $3,999.94 $8,799.86

$942,001.00 to $943,000.00 $5,338.00 $4,003.50 $8,807.70

$943,001.00 to $944,000.00 $5,342.75 $4,007.06 $8,815.54

$944,001.00 to $945,000.00 $5,347.50 $4,010.63 $8,823.38

$945,001.00 to $946,000.00 $5,352.25 $4,014.19 $8,831.21

$946,001.00 to $947,000.00 $5,357.00 $4,017.75 $8,839.05

$947,001.00 to $948,000.00 $5,361.75 $4,021.31 $8,846.89

Page 50: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$948,001.00 to $949,000.00 $5,366.50 $4,024.88 $8,854.73

$949,001.00 to $950,000.00 $5,371.25 $4,028.44 $8,862.56

$950,001.00 to $951,000.00 $5,376.00 $4,032.00 $8,870.40

$951,001.00 to $952,000.00 $5,380.75 $4,035.56 $8,878.24

$952,001.00 to $953,000.00 $5,385.50 $4,039.13 $8,886.08

$953,001.00 to $954,000.00 $5,390.25 $4,042.69 $8,893.91

$954,001.00 to $955,000.00 $5,395.00 $4,046.25 $8,901.75

$955,001.00 to $956,000.00 $5,399.75 $4,049.81 $8,909.59

$956,001.00 to $957,000.00 $5,404.50 $4,053.38 $8,917.43

$957,001.00 to $958,000.00 $5,409.25 $4,056.94 $8,925.26

$958,001.00 to $959,000.00 $5,414.00 $4,060.50 $8,933.10

$959,001.00 to $960,000.00 $5,418.75 $4,064.06 $8,940.94

$960,001.00 to $961,000.00 $5,423.50 $4,067.63 $8,948.78

$961,001.00 to $962,000.00 $5,428.25 $4,071.19 $8,956.61

$962,001.00 to $963,000.00 $5,433.00 $4,074.75 $8,964.45

$963,001.00 to $964,000.00 $5,437.75 $4,078.31 $8,972.29

$964,001.00 to $965,000.00 $5,442.50 $4,081.88 $8,980.13

$965,001.00 to $966,000.00 $5,447.25 $4,085.44 $8,987.96

$966,001.00 to $967,000.00 $5,452.00 $4,089.00 $8,995.80

$967,001.00 to $968,000.00 $5,456.75 $4,092.56 $9,003.64

$968,001.00 to $969,000.00 $5,461.50 $4,096.13 $9,011.48

$969,001.00 to $970,000.00 $5,466.25 $4,099.69 $9,019.31

$970,001.00 to $971,000.00 $5,471.00 $4,103.25 $9,027.15

$971,001.00 to $972,000.00 $5,475.75 $4,106.81 $9,034.99

$972,001.00 to $973,000.00 $5,480.50 $4,110.38 $9,042.83

$973,001.00 to $974,000.00 $5,485.25 $4,113.94 $9,050.66

$974,001.00 to $975,000.00 $5,490.00 $4,117.50 $9,058.50

$975,001.00 to $976,000.00 $5,494.75 $4,121.06 $9,066.34

$976,001.00 to $977,000.00 $5,499.50 $4,124.63 $9,074.18

$977,001.00 to $978,000.00 $5,504.25 $4,128.19 $9,082.01

$978,001.00 to $979,000.00 $5,509.00 $4,131.75 $9,089.85

$979,001.00 to $980,000.00 $5,513.75 $4,135.31 $9,097.69

$980,001.00 to $981,000.00 $5,518.50 $4,138.88 $9,105.53

$981,001.00 to $982,000.00 $5,523.25 $4,142.44 $9,113.36

$982,001.00 to $983,000.00 $5,528.00 $4,146.00 $9,121.20

$983,001.00 to $984,000.00 $5,532.75 $4,149.56 $9,129.04

$984,001.00 to $985,000.00 $5,537.50 $4,153.13 $9,136.88

Page 51: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Estimated Project Value Range Estimated

Permit Fee

Estimated

Plan Review

Fee

Estimated

Total

$985,001.00 to $986,000.00 $5,542.25 $4,156.69 $9,144.71

$986,001.00 to $987,000.00 $5,547.00 $4,160.25 $9,152.55

$987,001.00 to $988,000.00 $5,551.75 $4,163.81 $9,160.39

$988,001.00 to $989,000.00 $5,556.50 $4,167.38 $9,168.23

$989,001.00 to $990,000.00 $5,561.25 $4,170.94 $9,176.06

$990,001.00 to $991,000.00 $5,566.00 $4,174.50 $9,183.90

$991,001.00 to $992,000.00 $5,570.75 $4,178.06 $9,191.74

$992,001.00 to $993,000.00 $5,575.50 $4,181.63 $9,199.58

$993,001.00 to $994,000.00 $5,580.25 $4,185.19 $9,207.41

$994,001.00 to $995,000.00 $5,585.00 $4,188.75 $9,215.25

$995,001.00 to $996,000.00 $5,589.75 $4,192.31 $9,223.09

$996,001.00 to $997,000.00 $5,594.50 $4,195.88 $9,230.93

$997,001.00 to $998,000.00 $5,599.25 $4,199.44 $9,238.76

$998,001.00 to $999,000.00 $5,604.00 $4,203.00 $9,246.60

$999,001.00 to $1,000,000.00 $5,608.75 $4,206.56 $9,254.44

Above $1,000,000 use formula

Page 52: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 51

Table 4. Electrical Permit Fees

1. For the issuance of each electrical permit ...................................................................... $23.50

2. For the issuing of each supplemental permit for which the original permit has

not expired, been canceled, or finale ..............................................................................

$7.25

System Fee Schedule

Note: The following do not include $23.50 permit-issuing fee.

1. New Residential Buildings

The following fees shall include all wiring and electrical equipment in or on

each building, or other electrical equipment on the same premises constructed at

the same time.

Multifamily. For new multifamily buildings (apartments and condominiums)

having three or more dwelling units constructed at the same time, not including

the area of garages, carports and accessory buildings, per square foot (0.09 m2) ..........

$0.050

Single- and two-family. For new single- and two-family residential buildings

constructed at the same time and not including the area of garages, carports and

accessory buildings, per square foot (0.09 m2) ..............................................................

$0.056

For other types of residential occupancies and for alterations, additions and

modifications to existing residential buildings, use the Unit Fee Schedule.

2. Private Swimming Pools

For new private. in-ground swimming pools for single··family and multi-family

occupancies, including a complete system of necessary branch circuit wiring.

bonding, grounding, underwater lighting, water pumping and other similar

electrical equipment directly related to the operation of a swimming pool, each

pool .................................................................................................................................

$49.50

3. Carnivals and Circuses

Carnivals, circuses, or other traveling shows or exhibitions utilizing

transportable-type rides, booths, displays and attractions

For electrical generators and electrically driven rides, each .......................................... $23.50

For mechanically driven rides and walk-through attractions or displays having

electric lighting, each .....................................................................................................

$7.25

For a system of area and booth lighting, each ................................................................ $7.25

For permanently installed rides, booths, displays and attractions, use the Unit

Fee Schedule.

4. Temporary Power Service

For a temporary service pole or pedestal, including all pole or pedestal-mounted

receptacle outlets and appurtenances, each .................................................................................

$23.50

For a temporary distribution system and temporary lighting and receptacle

outlets for construction sites, decorative lights, Christmas tree sales lots,

fireworks stands, ........................................................................................................... etc., each

$12.30

Page 53: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 52

Unit Fee Schedule

Note: The following do not include $23.50 permit-issuing fee.

1. Receptacle, Switch and Light Outlets

For receptacle, switch, light or other outlets at which current is used or

controlled, except services, feeders and meters:

First 20 fixtures, each .................................................................................................................. $1.10

Additional fixtures, each ............................................................................................................. $0.73

Note: For multi-outlet assemblies, each 5 feet (1524 mm) or fraction thereof

may be considered as one outlet.

2. Lighting fixtures

For lighting fixtures, sockets or other lamp-holding devices: first 20 fixtures,

each .............................................................................................................................................

$1.10

Additional fixtures, each ............................................................................................................. $0.73

For pole or platform-mounted lighting fixtures, each ................................................................. $1.10

For theatrical-type lighting fixtures or assemblies, each ............................................................ $1.10

3. Residential Appliances

For fixed residential appliances or receptacle outlets for same, including wall-

mounted electric ovens; counter-mounted cooking tops; electric ranges; self-

contained room, console or through-wall air conditioners; space heaters; food

waste grinders; dishwashers; washing machines; 10 water heaters; clothes

dryers; or other motor-operated appliances not exceeding I horsepower (HP)

(746 W) in rating, each................................................................................................................

$4.75

Note: For other types of air conditioners and other motor-driven appliances

having larger electrical ratings, see Power Apparatus.

4. Nonresidential Appliances

For nonresidential appliances and self-contained factory-wired, nonresidential

appliances not exceeding l horsepower (HP), kilowatt (kW) or kilovolt-ampere

(kVA), in rating, including medical and dental devices; food, beverage and ice

cream cabinets; illuminated show cases; drinking fountains; vending machines;

laundry machines; or other similar types of equipment, each .....................................................

$4.75

Note: For other types of air conditioners and other motor-driven appliances

having larger electrical ratings, see Power Apparatus.

5. Power Apparatus

For motors, generators, transformers, rectifiers, synchronous converters,

capacitors, industrial heating, air conditioners and heal pumps, cooking or baking

equipment and other apparatus, as follows: Rating in horsepower (HP), kilowatts

(kW), kilovolt-amperes (kVA) or kilovolt-amperes-reactive (kVAR):

Up to and including 1, each......................................................................................................... $4.75

Over 1 and not over 10, each ...................................................................................................... $12.30

Over 10 and not over 50, each .................................................................................................... $24.60

Page 54: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 53

Over 50 and not over 100, each .................................................................................................. $49.50

Over 100, each ............................................................................................................................ $74.50

Notes:

1. For equipment or appliances having more than one motor, transformer,

heater, etc., the sum of the combined ratings may be used.

2. These fees include all switches, circuit breakers, contactors, thermostats,

relays and other directly related control equipment.

6. Busways

For trolley and plug-in-type busways, each 100 feet (30 480 mm) or fraction

thereof .........................................................................................................................................

$7.25

Note: An additional fee is required for lighting fixtures, motors and other

appliances that are connected to trolley and plug-in-type busways. A fee is not

required for portable tools.

7. Signs, Outline Lighting and Marquees

For signs, outline lighting systems or marquees supplied from one branch

circuit, each .................................................................................................................................

$24.60

For additional branch circuits within the same sign, outline lighting system or

marquee, each ..............................................................................................................................

$4.75

8. Services

For services of 600 volts or less and not over 200 amperes in rating, each ................................ $30.50

For services of 600 volts or less and over 200 amperes to 1,000 amperes, each ........................ $62.15

For services over 600 volts or over 1,000 amperes in rating, each ............................................. $124.30

9. Miscellaneous Apparatus, Conduits and Conductors

For electrical apparatus, conduits and conductors for which a permit is required

but for which no fee is herein set forth .......................................................................................

$18.20

Note: This fee is not applicable when a fee is paid for one or more services,

outlets, fixtures, appliances, power apparatus, busways, signs or other

equipment.

10. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two

hours)* ........................................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .................. $165.00

C. Inspections for which no fee is specifically indicated, per hour (minimum

charge, one hour)* .......................................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or

to plans for which an initial review has been completed (minimum charge--one

hour)* ..........................................................................................................................................

$165.00

*Reflects the Building Department’s actual cost for consultant costs plus a 10%

administrative fee.

Page 55: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 54

Table 5. Mechanical Permit Fees

Permit Issuance and Heaters

1. For the issuance of each mechanical permit ................................................................... $23.50

2. For the issuing of each supplemental permit for which the original permit has not

expired, been canceled, or finale ....................................................................................

$7.25

Unit Fee Schedule

Note: The following do not include $23.50 permit-issuing fee.

1. Furnaces

For the installation or relocation of each forced-air or gravity-type furnace or

burner, including ducts and vents attached to such appliance, up to and including

100,000 Btu/h (29.3 kW)

$14.80

For the installation or relocation of each forced-air or gravity-type furnace or

burner, including ducts and vents attached to such appliance over 100,000 Btu/h

(29.3 kW).....................................................................................................................................

$8.20

For the installation or relocation of each floor furnace, including vent ............................... $14.80

For the installation or relocation of each suspended heater, recessed wall heater or

floor-mounted unit heater ...............................................................................................

$14.80

2. Appliance Vents

For the installation, relocation or replacement of each appliance vent installed and

not included in an appliance permit .............................................................................5

$7.25

3. Repairs or Additions

For the repair of, alteration of, or addition to each heating appliance, refrigeration

unit, cooling unit, absorption unit, or each heating, cooling, absorption or

evaporative cooling system, including installation of controls regulated by the

Mechanical Code ............................................................................................................

$13.70

4. Boilers, Compressors and Absorption Systems

For the installation or relocation of each boiler or compressor to and including 3

horsepower (10.6 kW), or each absorption system to and including 100,000 Btu/h

(29.3 kW) ........................................................................................................................

$14.70

For the installation or relocation of each boiler or compressor over 3 horsepower

(10.6 kW) to and including 15 horsepower (52.7 kW), or each absorption system

over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW) .................

$27.15

For the installation or relocation of each boiler or compressor over 15 horsepower

(52.7 kW) to and including 30 horsepower (105.5 kW), or each absorption system

over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.l kW) .........................

$37.25

For the installation or relocation of each boiler or compressor over 30 horsepower

(105.5 kW) to and including 50 horsepower (176 kW), or each absorption system

over 1 ,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) .....................

$55.45

For the installation or relocation of each boiler or compressor over 50 horsepower

(176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW) ...................................

$92.65

Page 56: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 55

5. Air Handlers

For each air-handling unit to and including 10,000 cubic feet per minute (cfm)

(4719 L/s), including ducts attached thereto ...............................................................

$10.65

Note: This fee does not apply to an air-handling unit which is a portion of a

factory-assembled appliance, cooling unit, evaporative cooler or absorption unit

for which a permit is required elsewhere in the Mechanical Code.

For each air-handling unit over 10,000 cfm (4719 L/s) .............................................. $18.10

6. Evaporative Coolers

For each evaporative cooler other than portable type ................................................. $10.65

7. Ventilation and Exhaust

For each ventilation fan connected to a single duct .................................................... $7.25

For each ventilation system which is not a portion of any heating or air-

conditioning system authorized by a permit ................................................................

$10.65

For the installation of each hood which is served by mechanical exhaust,

including the ducts for such hood ................................................................................

$10.65

8. Incinerators

For the installation or relocation of each domestic-type incinerator ............................... $18.20

For the installation or relocation of each commercial or industrial-type incinerator ...... $14.50

9. Miscellaneous

For each appliance or piece of equipment regulated by the Mechanical Code but

not classed in other appliance categories, or for which the fee is listed in the table .......

$10.65

10. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two

hours)* ........................................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .................. $165.00

C. Inspections for which no fee is specifically indicated, per hour (minimum

charge, one hour)* .......................................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or

to plans for which an initial review has been completed (minimum charge--one

hour)* ..........................................................................................................................................

$165.00

*Reflects the Building Department’s actual cost for consultant costs plus a 10%

administrative fee.

Page 57: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 56

Table 6. Plumbing Permit Fees

Permit Issuance and Heaters

3. For the issuance of each plumbing permit ...................................................................... $23.50

4. For the issuing of each supplemental permit for which the original permit has not

expired, been canceled, or finale ....................................................................................

$7.25

Unit Fee Schedule

Note: The following do not include $23.50 permit-issuing fee.

11. Fixtures and Vents

For each plumbing fixture or trap or set of fixtures on one trap (including water,

drainage piping and backflow protection thereof) .........................................................

$9.80

For repair or alteration of drainage or vent piping, each fixture .................................... $4.75

12. Sewers, Disposal Systems and Interceptors

For each building sewer and each trailer park sewer ..................................................... $24.65

For each cesspool ........................................................................................................... $37.25

For each private sewage disposal system ....................................................................... $74.50

For each industrial waste pretreatment interceptor, including its trap and vent,

excepting kitchen-type grease interceptors functioning as fixture traps ........................

$19.90

Rainwater systems-per drain (inside building) ............................................................. $9.80

13. Water Piping and Water Heaters

For installation, alteration, or repair of water piping or water-treating equipment,

or both, each ...................................................................................................................

$4.75

For each water heater including vent ............................................................................. $12.30

For vents only, see Table 3-C

14. Gas Piping Systems

For each gas piping system of one to five outlets .......................................................... $6.15

For each additional outlet over five, each ...................................................................... $1.10

15. Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices

For each lawn sprinkler system on any one meter, including backflow protection

devices thereof ............................................................................................................................

$14.80

For atmospheric-type vacuum breakers or backflow protection devices not

included in Item 1

1 to 5 devices ............................................................................................................ $12.30

Over 5 devices, each ................................................................................................. $2.25

For each backflow-protection device other than atmospheric-type vacuum

breakers:

2 inches (50.8 mm) and smaller ............................................................................... $12.30

Over 2 inches (50.8 mm) .......................................................................................... $24.65

Page 58: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 57

16. Swimming Pools

For each swimming pool or spa:

Public pool ................................................................................................................. $91.25

Public spa .................................................................................................................. $60.75

Private pool................................................................................................................ $60.75

Private spa ................................................................................................................. $30.25

17. Miscellaneous

For each appliance or piece of equipment regulated by the Plumbing Code but not

classed in other appliance categories, or for which no other fee is listed in this

code .................................................................................................................................

$9.80

18. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two

hours)* ........................................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .................. $165.00

C. Inspections for which no fee is specifically indicated, per hour (minimum

charge, one hour)* .......................................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or

to plans for which an initial review has been completed (minimum charge--one

hour)* ..........................................................................................................................................

$165.00

*Reflects the Building Department’s actual cost for consultant costs plus a 10%

administrative fee.

Page 59: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 58

Table 7. Storm Water Permit Fees

Storm Water Fee Schedule Amount Land Disturbance

SWPPP Plan Review $480 1 acre or greater

SWPPP Site Inspection $240 1 to 5 acres

SWPPP Site Inspection $480 5 to 10 acres

SWPPP Site Inspection $720 10 to 20 acres

SWPPP Site Inspection Actual Cost Over 20 acres

Storm Water Treatment/Connection/

Discharge Plan Review

$300 Includes engineering plan review,

developer agreement, and site inspection

Cooling Water Discharge and

Connection to Storm Drain System

$500 Annual Fee

Page 60: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 59

Table 8. Utility Tie-In Fees

Service Fee

Water Connection Inspection Fee $50

Sewer Connection Inspection Fee $50

Residential and commercial properties water and sewer fees shall be the following

Water tie-in fee – water line 3/4 inches to 2 inches $200

Sewer tie-in fee – water line 3/4 inches to 2 inches $200

Water tie-in fee – water line greater than 2 inches up to 4 inches $250

Sewer tie-in fee – water line greater than 2 inches up to 4 inches $250

Water tie-in fee– water line greater than 4 inches $300

Sewer tie-in fee– water line greater than 4 inches $300

Page 61: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 60

Table 9a. Street Excavation and Work within the Public Rights-of-Way

and Easements Permit Application Process

All contractors submitting plans for review are required to comply with the following

procedures.

The administrative charge for a permit is $50.00.

Cost of a permit: When the City deems at its sole discretion that plan review and inspection of a

construction project exceeds the expertise of the City to perform, the City shall retain external

expertise to perform plan review and inspections services. When the City determines that a

project requires the use of external expertise to conduct plan review and/or inspections, the City

shall negotiate a Reimbursable Services Agreement (RSA) between the City and the

construction contractor. The RSA shall fully cover the City’s costs plus a five (5) percent

administrative charge.

1. Permits are valid for one hundred twenty (120) days, after which they automatically become

void and must be updated and re-approved by the City before any construction will be

permitted.

2. The Contractor shall have one (1) copy of the approved permit, the approved construction

plans, and the approved traffic control plan (if required) at the job site at all times.

3. Two (2) complete sets of prints of the project drawings or schematics shall be submitted to

the City for review.

4. The following items shall be included on the plan:

a. North arrow and scale

b. Existing and proposed streets with names and widths

c. Driveway locations with accurate width

d. Easement and right-of-way information recorded with the Borough

e. All existing utilities (type and location)

f. Proposed utility location showing approximate dimensions in relation to right-of-way

and/or easement line

g. Legend of symbols

h. Minor construction notes indicating the type of excavation and or boring

under streets and driveways or other permanent structures. Additional

information may be required by the City as necessary.

i. A traffic control plan will be required for all work that includes temporary lane

reductions or closures. The traffic control plan shall be approved by the City of North

Pole prior to any permit being issued.

Page 62: Estimating Building Permit Fee Guide...The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting

Page 61

Table 9b. Excavation Bond

Type of Work

Square feet of

project

Total

Road, unpaved; $75/square foot ($1,000 minimum) sq. ft. $

Road, paved; $150/square foot ($5,000 minimum) sq. ft. $

Sidewalk, unpaved: $25/square foot ($500 minimum) sq. ft. $

Sidewalk, paved: $75/square foot ($2,000 minimum) sq. ft. $

Alley; $50/square foot ($1,000 minimum) sq. ft. $

Road shoulder: $10/square foot ($1,000 minimum) sq. ft. $

Other, e.g., City property, undeveloped right-of-way etc.;

contact City

sq. ft. $

Total $