ETO Order Processing in Discrete Manufacturing
Somnath Majumdar, CPIM
Infosys Technologies
ETO Environment in Discrete Manufacturing
• High customer involvement in Design of the product• Long lead times for order processing and fulfillment• Design changes throughout the life cycle of product
manufacturing• The Order to Cash cycle may be preceded by a Quote• The BOM and Routing of the product is not frozen at Order
Entry• The product to be manufactured may be in a project
environment where the costs may be tracked onto a project• Custom Engineering calculations may be required to be
performed before the Bill and the Routing are frozen• Sometimes the BOM and Routing may change even after
production has started
Typical Challenges faced in an ETO Environment
• Pre-Quote Stage– Estimating for the ETO Order– Multiple feeder Product Life Cycle Management systems– Seamless Integration between CAD and ERP Systems
• Post Quote Stage– Orders need to be put on hold to finalize the design and then freeze
the BOM and the Routings– The Bill and the Routing may change after the WIP Job is released– In a Standard Costing environment huge variances may occur
between the Standard and Actuals
ETO Solution Mapping – Possible Scenarios
• In Discrete Manufacturing space following two scenarios can occur– ETO in a Project Manufacturing Environment– ETO in a non-project Environment
ETO Solution – In Project Environment
• A typical project environment is one where the design, delivery and post-delivery activities include a combination of products and services engineered specifically to provide a unique solution for the customer.
• The other characteristics of this business are– Long execution times with the normal duration ranging from 2-5 years– Large capital spends and longer time-to–profit– Involvement of the Engineering functions (Design, Prototyping and Testing)
throughout the lifecycle of the project– Higher levels of risk across technical solutions, costs and timelines
Industries that follow this business model include
•Aerospace & Defense industries
•Infrastructure Development and Construction
•Process Control and Automation for Manufacturing and Utility Plants
Process Flows
ORACLE
External
Start
Enter Sales Order Header and Line
Part, Price, Quantity, Commission ,Project and
Task Number
Order Validation & Booking
Generate Order Acknowledgement
End
Pass
No
System Sales Rep
Customer Credit check
Create Configured Item
Place Order on Engg. Hold
Create Items, BOMs, Routings
Create Final Assembly
Work order
Inform Customer regarding Bad
Credit
FailApproval from
Accounts Receivable
Yes
Configure To ScheduleMake selections
from Sales Configurator
Accounts Executive
Roles
Invoke Sales Configurator
Release Engg. Hold
Run Data Collection for
ASCPRun ASCP Plan
Review and Action upon exception
messages XX
EngineerPlanner
ORACLE
External
Start
Purchase Requisitions fromASCP with project and task reference Approve
RequisitionSend Purchase
Order to Supplier
System
PO Manager
Create Purchase Order using Auto
create functionality
Approve thePurchase
Order
Supplier Invoice is received
Supplier ProcessesReceiving done in a project locator
and PO Receipt is generated
Enter Invoice Header/lines
Create Purchase RequisitionEnter Requisition Headers, Line details including project and task
reference
Match Invoice to PO/Receipt
Account Invoice and transfer to GL
Buyer
Receiving
Shipping
Validate the Invoice
Payables
End
Shipment arrives
Procure To Pay
Roles
Start
Release Planned order suggestion
from Planning System(ASCP)
Need to Build part is identified
Discrete Job Created
Run Discrete JobShortage Report
Review and update Job BOM &
Routing, if required
Run Resource Load Report
Release Discrete Job
Print Job Routing Sheet and Pick List
Issue push components to
WIP Job
Min-Max, Reorder Point, Kanban Replenishment
Pick components from stock room
OSP Operation?
Outside processing
Process
Yes
AA
BB
No
ORACLE
External
Custom
System Supervisor Stockroom Shop floor
Release To Build - 1
Roles
ORACLE
External
Custom
End
AA
System Supervisor Stockroom Shop floor
Perform Parts & Sub-assembly or
Test operation
Perform Move Transaction
Invoke and Record Data in Quality
Collection Plan (if any)
Nonconform ance?
No
Yes
More Operations?
Yes
No
BB
Send Assembly to Stock room
Nonconforma nce Process
Invoke and Record Data in Quality
Collection Plan (if any)
Close WIP Job (Batch Request)
WIP Alert for material
issue discrepancy
YesCorrect material discrepancy
No
Perform Completion Transaction
Release To Build - 2
Roles
StartRun Auto-Create Final Assembly to create discrete job
Modify Discrete Job BOM &
Routing, if required
Print Job Routing Sheet and Pick List
Pick components from stock room
Issue Push parts to discrete job
OSP Operation?
Perform Assembly or Test operation
Outside processing
Process
Yes
No
BB
Run Discrete Job Shortage Report
Release Discrete Job
AA
ORACLE
External
Custom
System Supervisor Stockroom Shop floor
Run Resource Load Report
Discrete Job Created
Release To Assemble - 1
Roles
Nonconform ance?
No
Nonconforma nce Process
Yes
More Operations?AA
Yes
No
BB
Send Assembly to stock
room/shipping
Perform Completion Transaction
Enter Serial Nos. (if serialized)
Invoke and Record Data in Quality
Collection Plan (if any)
Perform Move Transaction
Invoke and Record Data in Quality
Collection Plan (if any)
ORACLE
External
Custom
System Supervisor Stockroom Shop floor
CC
Release To Assemble - 2
Roles
CC
ORACLE
External
Custom
System Supervisor Stockroom Shop floor
EndClose Discrete Job (Batch Request)
YesCorrect material
discrepancy
No
WIP Alert for material
issue discrepancy
Release To Assemble - 3
Roles
Challenges in Project Environment The key challenges are• Visibility and control of the work breakdown structure, budgets, revenues, task
status and other Key Performance Indicators (KPI) across various business functions.
• Cost Capture and assignment to the project from various modules like Purchasing, WIP, Service and Finance (Timecards and Expense Reports)
• Integration between project management applications and the supply chain to ensure control and optimum fulfillment of project demands
Oracle Project Manufacturing supports the following key areas:• Project manufacturing sales management and fulfillment, costing, Advanced
supply chain planning.• Project manufacturing procurement and shop floor execution, including Flow
Manufacturing integration• Assemble-To-Order and Pick-To-Order environments
ETO Solution – In non-Project Environment • This is typically employed by organizations that manufacture Engineer
to Order products based on customer specifications but they typically don’t use projects to track the product manufacturing
• In most cases a design close to the product being requested by the customer would have been manufactured before but there would be significant effort in designing for their current order as well
• This would involved creation of new items, Bills and Routings as part of the design process before the order is progressed
• The actual Bill and Routing for the ETO Product may eventually change based on changing requirements from the customer through the Order to Ship process
• Typical Industries in this non project space include:– Industrial Manufacturing units– Custom Electronic Equipment Manufacturing
Process Flows
StartNew Product
Requirement by customer
Create Quote for an ETO
product
Prepare engineering drawings for ETO product
Identify new items and
BOMs
Create new items, BOMs and Routings
Perform full level cost rollup
for ETO final assembly
Create Price list entry for ETO final assembly
Convert quote into order
Import Order for ETO final
assembly with ETO hold
Validate order and remove ETO hold
Create Discrete Job for ETO
final assembly
Complete Discrete Job
Credit Check Schedule Order
Order AckShip ETO final assembly
End ORACLE
External
Sales
Finance
Engg.
Mfg
PlannerInvoice Customer
Customer
Process Flow – ETO Sales Order Processing
Challenges in non-Project Environment • Estimating for the Quote to the customer• Continuous changes in the Bill and Routing for the end product even
after WIP Job is released• Cost Rollup Issues due to continual changes in Bills and Routings• Planning for the Raw Material for ETO Orders• Managing lead times for purchasing. In most cases buyers don’t have
time to negotiate good prices with suppliers as most ETO jobs are special and already running late in terms of customer promise dates
Typical Issues faced• Bills and Routings change after the Job is released to the floor• Engineering hours spent on the design is so significant that it
needs to be somehow built into the product standard cost as direct labor cost
• Costing accounting does not want to see variances in all ETO Jobs. Some organizations keep rolling up the standard cost till job is completed
• Product lead times management• Complex Materials purchase• Planning for raw materials• Integration between CAD and ERP Systems
Solutions to some of the Gaps in ETO Order Processing
• Automatic Holds on Sales Orders based on certain conditions that are fulfilled using Holds API. The logic for this could be derived from– Engineering calculations that are run automatically which put the
Order Line on Hold– One of the options in the configurator selects an item that puts the
item on hold based of an Item attribute or flexfield setup• Automatic Notification to Engineer when the Order is put on hold• Custom program to release holds based on certain conditions
that are fulfilled• Customization of ECO Workflow to notify and execute certain
actions for work to be done for the ECO by the concerned departments
Typical Benefits reaped by companies who implemented the ETO Solution
• Cycle time reduction in processing ETO Orders• Coordination among various departments involved like
Engineering, Purchasing and Operations to schedule ETO Orders in advance using the ECO Workflow
• In a ETO Project based scenario the costs for the ETO Order are collected onto a project
• Oracle PLM solution implementation helped to reduce the cycle time for creation of Items, BOMs and Routings for new ETO Orders
• Semantic search/ attribute catalog category based search capabilities helped designers to search for already existing BOMs/Items in the system to make sure the new item being created did not exist in the system
The Road Ahead…There is no complete solution available in this area as yet. Some of the areas that could definitely be improved upon in the coming years include
1)Backward and Forward integration between ERP and CAD systems2)Better estimation capabilities for ETO Orders the pre-quote stage3)Whenever an ETO Order is to be manufactured using Project Manufacturing there are way too many steps required in Projects area to process the same. Need is for a simpler interface4)Enhanced search capabilities for Designers to search for ETO Items, BOMs and Routings
Q & A