121
Hydro Power Projects Irrigation Projects including Lift Irrigation Schemes Thermal Power Plants Water Recourses Projects Water Supply Projects Outdoor Electrical Switchyards Gas Insulated Sub Stations Electrical Sub Stations Energy Audit and modernization of Electricity Supply Installations. Structural design of Civil & Mechanical installations. Transmission Line Projects upto 400kV Capacity. Pre bid & post bid services for bid preparation and analysis. Preparation & Review of bid documents for package wise or EPC implementation of Projects. Preparation & Review of Feasibility and Detail Project Reports for various projects. Due-Diligence study of proposed and operating projects. Financial analysis for Project implementation. Formulation of Implementation and PPA agreements. Assistance in carbon credit proposal processing of CDM projects ExStream Engineering DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to cater to the Design Engineering needs of small Civil Engineering and Electrical Engineering projects, has now growth into a full fledged Consultancy Organization, providing its Design Engineering Consultancy services in various fields of Engineering related to very large projects.

Ex Stream Eng Design Group Corporate Profile

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Ex Stream Eng Design Group Corporate Profile

Hydro Power Projects Irrigation Projects including Lift Irrigation Schemes Thermal Power Plants Water Recourses Projects Water Supply Projects Outdoor Electrical Switchyards Gas Insulated Sub Stations Electrical Sub Stations

Energy Audit and modernization of Electricity Supply Installations.

Structural design of Civil & Mechanical installations.

Transmission Line Projects upto 400kV Capacity.

Pre bid & post bid services for bid preparation and analysis.

Preparation & Review of bid documents for package wise or EPC implementation of Projects.

Preparation & Review of Feasibility and Detail Project Reports for various projects.

Due-Diligence study of proposed and operating projects.

Financial analysis for Project implementation.

Formulation of Implementation and PPA agreements.

Assistance in carbon credit proposal processing of CDM projects

ExStream Engineering DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to

cater to the Design Engineering needs of small Civil Engineering and Electrical Engineering projects, has now

growth into a full fledged Consultancy Organization, providing its Design Engineering Consultancy services in

various fields of Engineering related to very large projects.

Page 2: Ex Stream Eng Design Group Corporate Profile

Content  

Content 

Sl. No.  Description  Page No. 

1  Design Group – A Profile  1 

2  ISO Certificate  4 

3  Certificate of Consulting Engineers Association of India  5 

4  Certificate of  Incorporation  6 

5  Empanelment with BHEL   7 

6  Empanelment with Construction Industry Development 

Council 

7  Merger of M/s. Subhadra Consulting Engineers with M/s. 

Design Group Project Consultants Pvt Ltd 

8  Experience ‐ write up on Sample Projects  11 

9  List of Project on Hand  26 

10  Organization Structure   

  A. Panel of Consultants / Advisors   30 

  B. Technical Personnel   32 

11  List of Project /Assignments Successfully Completed   

  A. Desk Study Report   34 

  B. Detailed Engineering of Projects  36 

  C. Preparation of Detailed Project Reports  43 

  D. Pre‐Feasibility Studies of Power Projects  50 

  E. Pre‐ Tender Services  59 

  F. Due Diligence Report  67 

12  A few Certificates for Successfully Completed  Projects  72 

13  Brief Profile of Advisor / Consultants   

  a) Advisor   

  H.V. Eswaraiah, Hydro Power Projects  89 

  Shankar V. Nesargi, Wind Energy  90 

  P.R. Balasubramanian, Gas Based Power Plant  91 

  B.V Ramakrishnaiah,  Gates & Penstocks  92 

  Balachandran. V, Engineering Geology  93 

  C.R. Venkatesh , Hydro Power Projects  94 

Page 3: Ex Stream Eng Design Group Corporate Profile

Content  

Sl. No.  Description  Page No. 

  M.C. Rangarajan, E & M Works  95 

  S. Ramanan, Hydro Power Projects  96 

  Umashankar, Steel Structure  97 

  Narayanan V, Transmission Line  98 

  Channakeshava C, Computer aided designs  99 

  Shridhar Prabhu, Legal Advisor, PPA  100 

  Srinath. N, Environmental Engineering  101 

  b) Consultants   

  C.S. Hebli, Chairman  102 

  B.L Lakshminarasimha, Chief Executive Officer  103 

  P.R Mallikarjuna, Executive Director (Design Head)  104 

  P.K. Rupangudi , Director (Gates, Dams design)  105 

  Chikkaguddappa Director (Project Development  106 

  Raghavendra Rao H, Director (Electrical Generation)  107 

  M.M. Reddy, Director (Transmission line, 

Switchyard & Sub‐Station) 

108 

  R .Vasudevan, Deputy Director (Water & Waste 

Water) 

109 

  U.R. Raghotham , Director (Tunnel and Dam design)  111 

  G. Penchalaiah, Irrigation Project – Investigation  112 

  Suryanarayana, Engineering Geology  113 

  K. T. Sreedhara, Deputy Director (Irrigation)  114 

  Achutha Narayana, Deputy Director (Hydro civil 

design) 

116 

  T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based 

Power Plant) 

117 

  P Sudarshan Rao, Manager (Electrical Generation)  118 

Page 4: Ex Stream Eng Design Group Corporate Profile

 

A Profile 1 

 1. DESIGN GROUP –A PROFILE 

 

was  established  in  1979  to  offer  consultancy services  for  civil  and  electrical  engineering 

projects. Having completed over 100 prestigious and varied assignments in the last 5 years, DG  is a  leading consultancy  firm, offering  full‐fledged consultancy services 

across various fields of engineering in India and Abroad.   

Equipped to provide design consultancy on very large engineering projects, DG has been  providing  technical  consultancy  services  to  various  organizations  and 

companies  for  planning,  detailed  design,  and  implementation  of Hydel,  thermal, and other power projects. These services include analysis of financial aspects, design 

engineering  for  electrical  installation  of  substations,  switchyards  and  transmission lines,  design  engineering  for  civil  engineering  structures  including  large  dams, 

tunnels  ,  canals, power  canals,  cross  drainage works,  surge  tanks, penstock  ,  and power houses. DG also provides services related to other civil engineering fields of 

Irrigation, Water Supply, and Waste Water Treatment.    DG,  which  has  an  annual  turnover  of  over  Rs.400  lakhs,  provides  consultancy 

services  required  for  the  implementation  of  projects,  right  from  concept  to completion,  commissioning,  operation  and maintenance,  thereafter. DG’s  services 

have  been  utilized  by  Large  Industrial  Houses,  Firms,  and  Independent  Power Producers in India, and elsewhere, for the planning and design engineering of their 

projects.  In  year 2004, DG was honored with an  ISO 9001:2008 certification  for  its design engineering services and continues to hold the certification. 

 DG  have  entered  into MOU/  JV with  number  of  large  institution  to  name  a  few 

Messers:  1) WAPCO New Delhi. 

2) ILF Consulting Engineer, Austria 

DESIGN GROUP 

Page 5: Ex Stream Eng Design Group Corporate Profile

 

A Profile 2 

3) GEM Engineering Company Ltd., Uganda 4) IL&FS Ltd., Hyderabad  

5) NihamShand Cape town South Africa 6) Land Mark Holding Ltd. Nairobi, Kenya 

7) SSDC Damam KSA  

  

DG has been empanelled in a few public sector undertakings. 1) BHEL for extending design engineering services in Hydro Power projects  

2) Karnataka  Neeravari  Nigam  Limited  for  engineering  services  for  Water Resources Projects. 

3) PFC consulting Limited, New Delhi for Power Projects.  

Our clients include Messers 1) Nuclear Power Corporation Limited. 

2) Gammon India Limited. 3) Fichtner Limited. 

Corporate Office

Page 6: Ex Stream Eng Design Group Corporate Profile

 

A Profile 3 

4) GMR Energy Limited. 5) ILFS Infra Limited. 

6) WAPCO 7) NTPC 

8) BHEL 9) Ritwik Energy Limited Hyderabad 

10) Greenko Energy Limited Hyderabad 11) AMR Mitra JV Ltd., Hyderabad 

 More than 100 engineering software’s have been developed  in house over a period 

of 20 years. In addition, more than a dozen engineering design softwares have been acquired and are in use for day to day work .State of Art facilities have been created 

to take up large Water Resources Projects.  

Presently the major Detailed Engineering works on hand are  

1.   Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in Saudi Arabia. 

2.   Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at Rafha Saudi Arabia. 

3.   Two Irrigation Projects in Afghanistan namely  

a. Machalgho Multipurpose Project, near Kabul b.  Pashdan Multipurpose Project in Herat region. 

4.   81 MW Tinget HEP in Himachal Pradesh, India. 5.   75 MW Trishuli Galachhi HEP in Nepal, India. 

6.   25 MW Mahan‐3 HEP in Chhattisgarh, India. 7.   12 MW Gatambe HEP in Kandy Sri Lanka. 

8.   Balance  of Plant  for  32 MW wind mill  under phase  II near Chikkodi near Belgaum, Karnataka, India. 

 

In addition 31 assignments are in different stages of implementation  

Page 7: Ex Stream Eng Design Group Corporate Profile

 

A Profile 4 

 

Page 8: Ex Stream Eng Design Group Corporate Profile

 

A Profile 5 

 

 

Page 9: Ex Stream Eng Design Group Corporate Profile

 

A Profile 6 

  

Page 10: Ex Stream Eng Design Group Corporate Profile

 

A Profile 7 

 

Page 11: Ex Stream Eng Design Group Corporate Profile

 

A Profile 8 

 

 

 

Page 12: Ex Stream Eng Design Group Corporate Profile

 

A Profile 9 

 

 

 

Page 13: Ex Stream Eng Design Group Corporate Profile

 

A Profile 10 

 

 

Page 14: Ex Stream Eng Design Group Corporate Profile

 

A Profile 11 

8.  EXPERIENCE  IN  DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT PROJECTS  

8.1   Balance of Plant of Hail – 2 Power Plant  

M/s.  Alfanar  one  of  the  leading  EPC  contractors  in  Kingdom  Saudi  Arabia  was awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi 

Electric Company. M/s  ILF Abu Dubai, UAE, were  the principal consultants, M/s. DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and 

to  issue  all  construction  drawings  and  designs  for  complete  plan  except  GTG. Siemens were the GTG equipment suppliers.  

 This was a fast track project, involving  issue of more than 600 drawings  in a short 

span  of  4 months. The project was  successfully  commissioned  on  schedule  in  the month of July 2011. The assignment included interaction with clients / SEC (Owners) during approval stage. 

 The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW 

output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 kV GIS and 380 kV AIS. The extension project consisted of – 

 1. 132  kV,  220MVA  Generator  Transformer,  13.8kV  /  4.16kV  15MVA  unit 

auxiliary  transformers,  10 nos.  service  transformers, MV & LV  Switchgears and other BOP. 

2. Crude  oil  /  Distillate  oil  fired  Gas  Turbine  Generator  units  of  55/70MW output – 2nos. 

3. Crude oil treatment and forwarding and distillate oil forwarding system for new units. 

4. Associated piping, cabling & services  

 

Page 15: Ex Stream Eng Design Group Corporate Profile

 

A Profile 12 

 

  

The Engineering services for the project consisted of –   

• Civil  Engineering  involving  structural  designs,  Architectural  layouts, 

equipment  foundations,  for  GTG  Building,  FOTP  Building  &  Switchgear Building, etc,. 

• Mechanical Engineering  involving  plant Layouts, piping,  equipment  sizing, fire fighting system, HVAC, etc,.  

• Process Engineering involving overall process flow discussions, P & ID’s, etc,.  • Electrical  Engineering  involving  system  studies,  development  of  SLD’s, 

equipment  sizing,  for  transformers,  MV  &  LV,  Switchgears,  DC  &  UPS Systems, Cable & inter connection schedules. 

• IAC  illumination  Engineering  involving  interfacing  new  unit  &  BOP  to existing CLR. 

 

GTG Building under Construction

Page 16: Ex Stream Eng Design Group Corporate Profile

 

A Profile 13 

 8. 2   Sea Water Intake for PFBR Plant Systems: 

 Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling 

Water System under ambitious plan of  generating power  through Plutonium Fast Breeder  Reactor  Project  (PFBR)  to  M/s.  Gammon  India  Limited.    The  major 

components of the scheme were off‐shore  intake shaft, on‐shore outlet shaft, and a submarine tunnel connecting the two structures at about 45m below sea level.  M/s. 

Design  Group  Project  Consultants  Pvt  Limited,  were  involved  in  detailed engineering services for the sub marine tunnel and shafts.   The project is since been 

successfully completed.  

  

The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm dia  finished  diameter.    The  outer  diameter  varied  from  4300mm  to  4600mm, 

thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate rock cover  region, using M‐45 grade cement concrete.     The tunnel passes  through 

Charnockyte type II  rock medium having modulas of elasticity  is 0.46 to 3.34 x 106 tons per  square meter. The poisons’  ratio  adopted  ranged  between  0.14  to  0.25  in 

Page 17: Ex Stream Eng Design Group Corporate Profile

 

A Profile 14 

rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of insitu rock is 75.60 Mpa. 

 

  

  

  As per  report  investigation  report  the dry density of  rock  is 2.66  to 2.99  gms per cubic  centimeter.  The  tunnel  was  driven  45m  below  the  sea  level  without  any 

geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling 

Outlet Shaft as Viewed from Submarine Tunnel 

Submarine Tunnel 

Page 18: Ex Stream Eng Design Group Corporate Profile

 

A Profile 15 

the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to be 1.024 ton per cum. 

 In addition,  inlet shaft  (4250  / 5250 mm dia) and outlet shaft  (6000 / 7000 mm dia) 

were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade concrete.  

 8.3    Varahi Tail Race Mini Hydel Scheme: 

  

River  Varahi  is  an  important West  flowing  river  of  Karnataka  State with  large 

Hydel power potential. Power development  in  the Varahi Valley with an  installed capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x 

115= 230 MW at Varahi Underground Power House was completed by Karnataka Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme 

has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd. Varahi  Tail  Race  Mini  Hydel  Scheme  utilizes  the  tailrace  discharges  of  Varahi 

Underground Power house and  the available  level difference between  the point of confluence of tailrace of Under round Power House with Varahi River and the FRL 

of  Varahi  Irrigation  Dam  proposed  downstream,  for  generation  of  power.  The proposed  scheme  comprises  of  the  construction  of  a diversion weir  across Varahi 

river just downstream of the confluence of tail race of VUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m 

Dia simple  type surge  tank, 7m dia penstock  tunnel, 3 Nos. steel penstocks and a power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW capacity each under phase I and a tail race joining the Varahi River on its right flank.  

Under Phase II, two more units of similar capacity have been added.  

   

 

Page 19: Ex Stream Eng Design Group Corporate Profile

 

A Profile 16 

 

  

 

       

  

  

 

  

 

  

 

 

View of Diversion Weir Structure with radial gates

Overview of Power House

Power House under Construction 

Page 20: Ex Stream Eng Design Group Corporate Profile

 

A Profile 17 

 

 

The  cost  of  the  project  inclusive  of  escalation  in  costs  during  construction  and 

financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of completion and is to be commissioned during the year 2005.  

                                                                       

  

Penstock Tunnel, Concrete Lining under Construction 

22m dia Shaft

Page 21: Ex Stream Eng Design Group Corporate Profile

 

A Profile 18 

 8.4   AMR/ SHAMBURI Mini Hydel Scheme  

 M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24 MW  (5  x4.8 MW) Mini  Hydel 

Scheme  across  river  Nethravathi,  a  major  west  flowing  river  in  Karnataka.  The design  flood  at  the  barrage  is  11500  cumecs.  The  plant  is  situated  35  km  from 

Mangalore,  a  major  costal  city  in  west  Karnataka.  The  project  has  a  low  head fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a 

large flow. The design discharges utilized for power draft is 78.47 cumecs per unit. The  units  are  capable  of  running  at  15%  continuous  overload.  ‘S’  type  Kaplan 

turbine  coupled  to  4800  KW  synchronous  generator  through  the  gear  box  are adopted.  During  the  construction,  another  developer  M/s.  Rithwik  Energy 

Generation proposed a 24 MW capacity power plant on the other bank. After mutual discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.  

 

  Thus,  a  power house  accommodating  10  x  4.8 MW was  planned  and  developed, 

with  a  combined  annual  generation  of  115.14 GWHr. The  scheme  comprises  of,  a barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs 

flood, non‐overflow sections, a power block on the left bank, a surface power house, and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river. 

Page 22: Ex Stream Eng Design Group Corporate Profile

 

A Profile 19 

The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 KV  rating. The construction  took 27 months and  the plant was synchronized. DG 

provided the design engineering services.  

8.5   Modernisation of Shivanasamudram Power Channel.  

Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of 

the existing Shivanasamudram Hydro Power Project, had proposed to  increase the water carrying capacity of the power channel upto the Shivanasamudram Balancing 

Reservoir and also  increasing  the  live capacity of  the Shivanasamudram Balancing Reservoir to cater to the increased needs of the power channel and also the increased 

needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of planning  for  the  improvements  and  the  detailed  engineering  for  the  same  to 

Shivanasamudram Power Project is the earliest of the power projects constructed in India, way back  in  the  year 1902,  to supply electrical power  to Kolar Gold Mines 

situated 85 kms away.  

   

  

  

  

 Originally a 2000m long power channel connecting Shiva head works and the Shiva 

Balancing Reservoir had  been constructed with a central earthen divider wall and side slopes lined with  stone pitching.  

Divider wall under Construction 

Page 23: Ex Stream Eng Design Group Corporate Profile

 

A Profile 20 

 The central divider wall was an earthen bund with stone pitching on the side slopes 

the overall dimensions of the divider wall has been 3.7m at the top and 8.2m at the bottom. 

 Over a period of the  last 100 years, the water carrying capacity of the channel had 

been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, vegetation  growth, etc.    In order  to  increase  the discharge carrying capacity of  the 

channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of the side slopes was  reset and covered with RCC lining. The vegetation growth was 

completely removed.  After modernization, discharge carrying capacity of the power channel has increased to 59.5 cumecs.  The live capacity of Shiva Balancing Reservoir 

has  been  substantially  increased  by  desilting  the  reservoir  and  removal  of weed growth.    In  addition, DG was  asked  to  suggest  simple method  of desilting  of  the 

Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made out of a battery of empty steel drums was suggested and used along with ejection of 

the silt by a mud pump and a pipe  line supported on empty  floating drums, and taken to the shores. 

 8.6   Link Canal Mini Hydel Scheme:  

Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar project irrigation Canal System, took up the scheme to construct a link canal taking 

off  from  the Visveswaraya  canal  before Hulikere  tunnel  and  joining  the Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail 

end of this link canal, there is a difference in level of about 8.3m between the bed of the  link  canal  and  the  bed  of  the Cauvery  branch  canal  and  is negotiated  by  the 

construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end 

of Link Canal, for power generation.   

Page 24: Ex Stream Eng Design Group Corporate Profile

 

A Profile 21 

 

 

   Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar 

project irrigation Canal System, took up the scheme to construct a link canal taking off  from  the Visveswaraya  canal  before Hulikere  tunnel  and  joining  the Cauvery 

Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of 

the  link  canal  and  he  bed  of  the Cauvery  branch  canal  and  is  negotiated  by  the construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to 

utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.   

 The scheme is simple with minimum civil engineering works. The civil engineering 

components  comprise  of  a  70m  long  approach  channel,  intake  structure,  gated bypass weir with provision of automatic falling shutters, surface power house, tail 

channel  leading  the water  back  to  the  branch  canal.  The  installed  capacity  of  the scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The 

View of Power House as seen from Downstream

Page 25: Ex Stream Eng Design Group Corporate Profile

 

A Profile 22 

average annual energy generation  is 10.10 GWHr. The cost of the scheme  is Rs. 80 Million. The Project was completed in the year 2003 by the Developers M/s Graphite 

India Ltd., Bangalore, The civil engineering works were contracted  to M/s Mysore Construction Co., Bangalore.   The Planning and Detailed Design Engineering was 

handled by Design Group.    

8.7   Captive Power Plant  of  5.8 MW  capacity  at  John Welch Research Centre, Whitefield, Bangalore for M/s General Electric:  

 

 Design  Group  was  associated  as  a  major  leader  for  the  Planning,  Detailed Engineering  and  construction  co‐ordination  of  the  5.8 MW  Diesel  Engine  based 

Overall view of DG Plant

Inside view of Generator Room

Page 26: Ex Stream Eng Design Group Corporate Profile

 

A Profile 23 

Captive Thermal Station of the GE India Technology Centre at Bangalore, which has been completed on a time bound schedule of 6 months. 

 8.8  Windmill Power 

 M/s.  Doddanavar  Brothers,  who  have  Plan  to  develop  100MW  Wind  Farm  in 

Chikkodi, Belgaum  district  of Karnataka,  India,  availed  our  technical  support  for Engineering of balance of a plant. Critical main equipment of capacity 10 x 1.5 MW 

was sourced from M/s. Sinovel, China, while the rest was sourced locally. 

        

DG assisted  the developers by drafting  technical specifications, preparing data sheets,  floating  tender  for  fabrication  of  towers,  tower  internals  and  electrical 

right from 690 volts to the grid connection. In addition, assistance was extended for procurement activities. The Civil Raft Foundation drawings were provided 

after detail designs,  for  local sub‐surface soil conditions. The entire assignment was completed in 9 months.  

  

  

 

Foundation of Wind Mill 

Page 27: Ex Stream Eng Design Group Corporate Profile

 

A Profile 24 

  

1. DG designed 33 kV outdoor yard sub‐station at   Wind farm, 33 kV transmission 

line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard pooling  station  and  110  kV  transmission  line  from  pooling  station  to KPTCL 

evacuating 110 kV sub‐station. 2. DG prepared  technical  specification  for  33  kV  substation  at Wind  farm,  33  kV 

transmission  line,  33  /  110  kV  pooling  station  and  floated  enquiry  for  the procurement  and  scrutinized  the  Vendor  offers  and  finalized  the  orders  on 

suppliers. 3. Vendor drawings and specification scrutinized. 4. Assisted in commissioning the sub‐station and transmission line. 

 The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x 

1.6  MW  GE  machines  have  been  selected,  the  civil  foundation  is  under construction.  

 8.9  Design of Vacuum Chambers   

M/s.  Hind  High  Vacuum  Co.  Pvt.  Ltd.,  specializing  in  manufacture  of  Pressure 

Vessels  and  Vacuum  Chambers  for  defence,  pharmaceuticals,  and  solar  panels, entrusted to DG, design and preparation of fabrication drawings for a Robotic TIG 

Wind Turbine Generator Hub 

Page 28: Ex Stream Eng Design Group Corporate Profile

 

A Profile 25 

Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for negative  pressure  of  1  kg  per  sq.cm, with  a  rider  that  the  defection  of  internal 

structural members must be limited to 0.5 mm.  

  

The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit chambers, tool chambers, etc. The  robotic arm moves on rails. The welding will be 

carried out under Argon gas atmosphere. The chamber were analysed using NISA Software package and the analysis has been validated by Indian Institute of Science, 

Bangalore,  the  pioneer  research  institute,  by  using  ETAB  software.  The  analysis, design, and fabrication drawings have been forwarded to M/s. Hind High Vacuum 

Co.  Pvt.  Ltd.  The  fabrication  of  chamber  is  in  advance  state  of  complexion.  The Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the 

world.   

8.10  Design Group has  been  successfully providing  pre‐tender  and post‐tender services  for  various  public  sector  undertakings  and  several  private  sector 

undertakings,  in as much as assessment of costs, detailed specifications of various items  of  work,  conditions  of  contracts,  tender  documents,  tender  analysis  and 

reports  leading to selection of construction and supply agencies as per time bound schedules and needs of clients. 

Page 29: Ex Stream Eng Design Group Corporate Profile

 

Projects on Hand 26 

Annexure – I 

9. LIST OF PROJECTS ON HAND  

A. POWER PROJECTS – DETAILED ENGINEERING   

Sl. No. 

Name of the Project  Installed Capacity in MW 

Project Cost in Rs. Lakhs 

Clients 

1.  Lower  UHL  SHEP  Project, 

Himachal Pradesh. 13.00  9500  M/s. Trident Power Systems Ltd., 

Himachal Pradesh 

2.  Singatalur‐Huligudda Mini Hydel 

Scheme, Karnataka‐ 18.00  6000  M/s..Tungabhadra Power Projects 

Ltd., Bangalore. 

3.  Lambadug Hydro Electric Project, 

Himachal Pradesh. 

25.00  12250  M/s. Himachal Sorang Power Pvt. 

Ltd, Shimla, Himachal Pradesh 

4.  Cauvery  Small  Hydel  Project, 

Karnataka. 

24.00  13000  M/s. XS Hydro Energy Private Ltd., 

Bangalore 

5.  Huvinahedagi  Mini  Hydel 

Scheme, Karnataka. 

24.75  13500  M/s. XS Hydro Power Pvt. Ltd, 

Bangalore 

6.  Agrahara MHSI & II, Karnataka.  1.475  700  Sarovara Energy Pvt Ltd., 

Bangalore. 

7.  Water Supply System for Bharathi 

Cement  Plant  at  Cuddapha, 

Andhra Pradesh  

Water 

Supply 

Scheme 

‐  M/s. Bharathi Cement Corporation 

Ltd Andhra Pradesh 

8.  Paudital  Lassa  Hydro‐Electric 

Project, Himachal Pradesh. 

24  19200  M/s. Greenko Hatkoti Energy Pvt 

Ltd., Hyderabad. 

9.  Jeori  Lower  Mangalad  SHPP, 

Himachal Pradesh. 

15  12000  M/s. Techology House (India) Pvt 

Ltd., Hyderabad. 

10.  Nimishamba Mini Hydel  Scheme, 

Karnataka, 

3  1700  M/s. Nimishamba Energy India 

Private Ltd., Bangalore 

11.  Kollya  Mini  Hydel  Scheme, 

Karnataka. 

24  19200  M/s. Kumaradhara Power Pvt Ltd 

Bangalore 

12.  Chikkodi  Windmill  Project, 

Karnataka. 

100  6000  M/s.Doddanavar Brothers, Belgaum 

13.  Mahan  Hydro  Electric  Project, 

Chathisgard. 

24  2000  M/s.Venika Hydro projects Pvt Ltd, 

Bangalore 

Page 30: Ex Stream Eng Design Group Corporate Profile

 

Projects on Hand 27 

Sl. No.  Name of the Project 

Installed Capacity in MW 

Project Cost in Rs. Lakhs 

Clients  

14.  Trishuli  Galchhi  Hydro  Electric 

Project, Nepal. 

75  80000  M/s. Siddhakali Power Pvt. Ltd., 

Nepal 

15.  Kukke 1 & 2 MHS, Karnataka.  24  14400  M/s. Kukke Hydro Projects Pvt Ltd, 

Bangalore. 

16.  Anusha  Mini  Hydel  Scheme, 

Andhra Pradesh. 

4  1600  M/s. Dhenu Hydro Pvt Ltd 

Hyderabad 

17.  Navya  Mini  Hydel  Scheme, 

Andhra Pradesh. 

2.60  1300  M/s. Mitra Energy Pvt Ltd 

Hyderabad 

18.  Ramya MHS, Andhra Pradesh.  3.80  1900  M/s. Kurnool Energies Pvt Ltd 

Hyderabad 

19.  Koilakunte  Mini  Hydel  Scheme, 

Andhra Pradesh. 

12    M/s. Dhenu Hydro Power Private 

Ltd., Hyderabad. 

20.  Halsur  Diversion  weir  under 

Shiggon  lift  Irrigation  Scheme, 

Savanur, Karnataka 

  400  M/s. Karnataka Neeravari Nigam 

Ltd., Karnataka 

21.  River Water  Intake  Pump House 

and Approach Bridge, Punjab. 

 

2 X 270  300  M/s. GVK Ltd through M/s. Fichtner 

Consulting Engineers (India) Pvt 

Bangalore 

22.  Machalgho Multipurpose  Project, 

Machalgho, Afghanistan. 

  US $ 95 

Million 

M/s. Gulf Civil Engineering & 

construction Co. Kabul, Afghanistan 

23.  Pashdan  Irrigation  Project,  near 

Heart, Afghanistan. 

  US $ 180  M/s. Hewadwal Group Afghanistan 

24.  Tinget‐2 Hydro Electric Project  in 

Himachal Pradesh 

81  60000  M/s. AMR—Mitra JV, Hyderabad 

25.  Balance  of  Plant  for  Rafha  Gas 

based Power Plant, Saudi Arabia. 

2 x 75 + 2 x 

75 

  M/s. SSEM Riyadh through M/s. ILF 

Abu Dhabi 

26.  Study  Report  on  Gandak  Canal 

HEP  in  Valmikinagar,  West 

Champaran District, Bihar. 

3 X 5    M/s. WAPCOS New Delhi 

27.  Detailed  Design  Engineering 

services  for  Kurtha  SHP  in 

Himachal Pradesh. 

2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd., Hyderabad 

28.  Detailed  Design  Engineering 

services for Kuril SHP in Himachal 

Pradesh. 

 

2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd., Hyderabad 

Page 31: Ex Stream Eng Design Group Corporate Profile

 

Projects on Hand 28 

Sl. No. 

Name of the Project  Installed Capacity in MW 

Project Cost in Rs. Lakhs 

Clients 

29.  Detailed  Design  Engineering 

services for Chhoned SHP. 

3 X 5  1200  M/s. Parvat Hydro Power Pvt Ltd., Hyderabad 

30.  Detailed  Design  Engineering 

services  for Sangam SHP Raichur, 

Karnataka. 

3 X 8  19200  M/s. Pavanganga Power Private 

Ltd., Hyderabad. 

31.  Review  Consultants  for  Umjaut 

(70MW) & Umduma HEP (90MW) 

in Meghalaya 

160  100000  M/s ETA Star Ltd,. Dubai 

 

B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT  

Sl. No.  Name of the Project 

Installed Capacity in MW 

Project Cost in Rs. Lakhs 

Clients 

1  Bellary Solar Power Project, 

Karnataka. 

5  7500  M/s.Vishrutha Power Pvt. Ltd., 

Bellary 

2  Proposal to bring 10 TMC of Raw 

water from Sakleshpura to 

Chikkaballapur & Kolar District & 

T.G. Halli 

‐  ‐  M/s. Larsen & Toubro Limited, 

Bangalore 

 

C. PRE TENDER ENGINEERING SERVICES   

Sl. No.  Name of the Project 

Installed Capacity in MW 

Project Cost in Rs. Lakhs 

Clients 

1. Upper Narmada  Irrigation Project 

Madhya Pradesh – EPC Bid 

Irrigation 

Project 

‐  M/s. Gammon India Ltd. Mumbai 

2. 

60MGD  River  water.  Pipeline‐

73kms for VSNL Ltd, at Salboni in 

West Bengal – EPC Bid 

Water 

Supply 

‐  M/s. Gammon India Ltd. Mumbai 

3. Agra Water Supply Project in Agra 

– EPC Bid 

Water 

Supply 

‐  M/s. Gammon India Ltd. Mumbai 

4. 

Raw water  supply  system  for  4  x 

300  MW  Raigarh  SKS  Power 

Generation (Chattisgarh) Ltd 

Water 

Supply 

‐  M/s. Gammon India Ltd. Mumbai 

 

Page 32: Ex Stream Eng Design Group Corporate Profile

 

Projects on Hand 29 

 

D. PREPARATION OF TENDER DOCUMENT   

Sl. No Name of the Project 

Installed Capacity 

in MW 

Project Cost in 

Rs. Lakhs 

Clients 

1.  Dagmara HEP – Preparation of bid 

document for Civil, E&M, H&M 

Transmission Line Component 

works 

25 x 5  ‐  M/s. Bihar Electricity Board, 

through M/s. WAPCOS  

New Delhi. 

 

E. OTHERS  

Sl. No Name of the Project 

Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Clients 

1.  Design  and  drawings  of  Electrical 

System  for  Beneficiation  Plant, 

Bagalkot, Karnataka 

Electrical 

Distribution 

‐  M/s. Doddanavar Nanjinzhao 

Mining and Metallurgy (P) Ltd., 

Belgaum Karnataka. 

2.  Detailed Civil Engineering  for Two 

Transfer  points.  Tunnel  in  cut  & 

cover,  Box  Pulsing  for  coal 

conveyor system  for addition of 2 x 

250 MW  to  Sikka  Thermal  Power 

Plant in Jamnagar District Gujarat  

Coal 

Handling 

System 

‐  M/s. Multi Design Infra Works Pvt. 

Ltd. Bangalore 

3.  Design  of  35.58  MLD  capacity 

Sewage  Treatment  Plant  under 

UGD Scheme to Shimoga City  

‐  ‐  M/s. GVPR 

 

Page 33: Ex Stream Eng Design Group Corporate Profile

  

Panel of Consultants / Advisors 30 

Annexure – II (A) 

10. ORGANISATION STRUCTURE A. PANEL OF CONSULTANTS/ADVISORS 

 

Sl. No.  Name & Qualification  Designation 

1. 

 

Sri C.S. Hebli 

Director Technical (Retd), 

Karnataka Power Corporation Ltd. 

Bangalore. 

Chairman & 

Chief Consultant. 

2.  Sri H.V. Eswaraiah 

Director Technical (Retd), 

Karnataka Power Corporation Ltd., 

Bangalore. 

Consultant –Hydro Civil 

Designs. 

3.  Sri G.N. Yoganarasimhan, 

Director (Retd), 

WRTD, Rourke, 

Bangalore. 

Advisor‐Hydrology. 

4.  Sri. P.R. Balasubramanian,  

CMD (Retd), FACT,  

Triavaneore, Kerala. 

Bangalore. 

Advisor‐ Gas Based Power 

Plant. 

5.  Dr.  D.N. Seshagiri, PhD Harvard, USA.  

Director (Retd), 

Engineering Geology, 

Geological Survey of India. 

Advisor – Engineering Geology. 

6.  Sri.Vishwanath Balachandran, 

Director General, GIS (Retd). 

Chennai.   

Advisor‐ Engineering 

Geology. 

7.  Sri. Shankar Nesargi 

Managing Director (Retd.) 

VVNL, Bangalore. 

Advisor ‐Wind Energy  

8.  Sri. C. R. Venkatesh 

Executive Director (Retd.) 

NHPC Ltd., New Delhi, 

Bangalore. 

Advisor ‐Hydro Power 

Projects. 

9.  Sri. H. Rangarajan, B.Sc, B.E. 

Executive Director(Retd),  

KPCL, Bangalore. 

Executive Director (Elec.) 

Page 34: Ex Stream Eng Design Group Corporate Profile

  

Panel of Consultants / Advisors 31 

 

Sl. No.  Name & Qualification  Designation 

10.  Sri B.V. Ramakrishnaiah, 

Bangalore. Advisor – Gates. 

11.  Sri Srinath Anekal, ME (Civil), MS(Environment) 

USA. 

Bangalore. 

Advisor‐Environment. 

12.  Sri. M. M. Kamath,  

Chief Engineer (Retd), 

NMPT, Mangalore. 

Advisor – Marine Engineering. 

13.  Sanker Pradesh, M.Tech  (Roorkee),   

New Delhi. Consultant‐ Geology. 

14.  Sri. Thippeswamy 

Chief Engineer (Retd.) 

BWSSB, Bangalore. 

Advisor –Water and Waste 

Water System. 

15.  Sri. V. Suresh Kumar, M.Tech (Khargpur), 

Bangalore. 

Advisor – GIS 

 

16.  Sri V. Narayanan, 

General Manager, SAE (I) Ltd (Retd), 

Bangalore. 

Advisor – Transmission 

Lines. 

17.  Sri. Ramanan 

Chief Engineer (Retd.) 

NHPC Ltd., New Delhi, 

Bangalore. 

Consultant‐Hydro 

18.  Dr. Y. Lingaraju.  Advisor ‐  Ground Water 

19.  Sri. Umashankara , B.E. (Civil) 

Ex‐Mecon. 

 

Advisor ‐Steel Structure. 

20.  Sri. G. Rajagopalan, 

Director (Retd), 

Engineering Geology, 

Geological Survey of India, Chennai. 

Consultant – Engineering 

Geology  

21.  Sri. Krishnappa, 

Financial Controller(Retd), 

KPCL, Bangalore. 

Advisor – Finance. 

 

22.  Sri. Sridhar Prabhu – Legal Adviser   Advisor –PPA 

23.  Sri. Venkateshwar Rao 

New Delhi. Consultant (Liaison) 

24.  Sri T.S. Somanathan, B.E. (Mech). 

Foremerly NLPC Ltd., Advisor –Welding. 

Page 35: Ex Stream Eng Design Group Corporate Profile

  

Technical Personnel 32 

Annexure – II (B)  

B. TECHNICAL PERSONNEL  

Sl. No.  Name & Qualification  Designation 

1  Sri C.S. Hebli, B.E(Hons)  Chairman. 

2  Sri B.L. Lakshminarasimha,  Chief Executive Officer 

            B.Sc., B.E., M.E., MIE, AIV, MASCE.    

3  Sri. P.R.Mallikarjuna    Executive Director (Design Head) 

  M.E.(I.I.Sc.), MIE, MIWRS, MISEO.    

4  Sri. Chikkaguddappa  B.E. (Civil)  Director (Project Development) 

5  Sri. H.Raghavendra Rao B.E. (Elec)  Director (Electrical Generation.) 

6  Sri M.M. Reddy, B.E.(Elecl)  Director (Electrical Power Evacuation) 

7  Sri.P.K.Rupangudi, M.E. (Civil)  Director (Gates, Dams design) 

8  Sri.U.R.Raghotham, M.Tech. (Civil)   Director (Tunnel and Dam design) 

9  Sri.R.Vasudevan B.E. (Elec)  Deputy Director (Water & Waste Water) 

10  Sri.K.T.Sreedhara, B.Tech (Civil)  Deputy Director (Irrigation) 

11  Sri. Narayana  Achutha  Deputy Director (Hydro civil design)   M.Tech, IIT Kanpur, (Hydraulics)   

12  Sri.T.S.Srinivasa, B.E (Civil), M.E  Deputy Director ‐‐Civil (Gas)      

13  Sri.Sudarshan Rao B.E. (Elec)  Manager (Electrical Generation) 

14  Mr.Gangadar Pattanashetti  Senior Design Engineer (Irrigation) 

  M.Tech, IIT Guwahati, (Water Resources)   

15  Sri. Anantha Murthy,  B.Sc AMIE (Civil) 

General Manager (Civil Designs) 

16  Ms.Kavitha.M,  B.E, MBA  Administrative Officer  

17  Sri. R. Suryanarayana, M.Sc (Geology)  Consultants (Engineering Geology) 

18  Ms. Sneha Dandavathe., B.E.(Civil)  Design Engineer (Hydrology) 

19  Mr. K.V. Chandrakanth B.E. (Elec)  Design Engineer (Elec.) 

20  Mr. Vasanth Kumar B.E (Civil)  Design Engineer (Project Planning) 

21  Mr. Shivanand, B.E (Civil)  Design Engineer (Water conductor system) 

22  Mr. Pramod Kumar, B.E.(Civil)  Design Engineer (Power House & Tail Race) 

23  Mr. Lokesh  B.E (Civil)  Design Engineer (Dam Design) 

24  Mr. Sudeendra, M.Tech (Structures)  Design Engineer (Gas Power Plant) 

Page 36: Ex Stream Eng Design Group Corporate Profile

  

Technical Personnel 33 

Sl. No.  Name & Qualification  Designation 

25  Mr. Mohan Kumar, M.Tech (Structures)  Design Engineer (Gas Power Plant) 

26  Mr. Puneeth. S, B.E(Elec)  Design Engineer (Elec.) 

27  Mr. Naveen V. B.E.(Mech)  Piping Engineer (Mechanical) 

28  Mr. Yoghesh K ,B.E.(Civil)  Design Engineer (Planning) 

29  Ms. Anusha Hegde K. B.E.(Elec)  Design Engineer (Electrical) 

30  Ms. Smitha Nagaraj B.E.(Elec)  Design Engineer (Electrical) 

31  Ms. Kumari Diptimayee, B.E.(Civil)  Design Engineer (Irrigation) 

32  Ms. Poonam U Jadhav, B.E (Civil)  Design Engineer  

33  Mr. Pradyumna K, B.E.(Civil)  Design Engineer (Trainee) 

34   Mr. Vinay M V  B.E .(Civil)   Design Engineer (Trainee) 

35  Mr. Saravanan S   Design Engineer (Hydro Civil)  

36  Ms.Sunita G Galgali, B.E (Civil)  Assistant Design Engineer  

37  Sri Mahesh Desai  Manager (Drawings‐ Section) 

38  Mr.Prasanna.T  CAD Engineer (Electrical) 

39  Mr.M.Shashi Kumar  Junior Design Engineer (Drawings) 

40  Mr.Manthesh.M  CAD Engineer (Mechanical Piping)  

41  Mr.Praveen.S.Ladva  CAD Operator (Civil) 

42  Mr.Nagashetty S   CAD Engineer (Hydro) 

43  Mr.Sangashetty V Biradar  CAD Operator (Gas Power Plant) 

44  Mrs. Sharadhamma H   CAD Engineer (Civil) 

  Office Support Staff:   

45  Sri. Nagesh, S  Officer / Manager / Accountant 

46  Sri Suresh   Accountant 

47  Ms. Thara. R  Receptionist 

48  Mrs. Geetha N  Personal  Secretary  

49  Sri. Ravi Kumar K   Stenographer Cum Secretary 

50  Ms. Sowmya A  Personal  Secretary  

   

Page 37: Ex Stream Eng Design Group Corporate Profile

  

Desk Study Report 34 

Annexure – III (A)  

11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED  

 

A. Preparation of Desk Study Report on Hydro Power Projects self identified by DG to various IPP’s in Nepal and India. 

  

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

1.  Jaleswar HEP, Nepal.  200.00  US $400 

Million 

2008  M/s. Maytas Infra Ltd., 

Hyderabad. 

2.  Taksindu HEP, Nepal.  270.00  US $540 

Million 

2008  M/s. Nandadevi Agro‐

Farms Pvt Ltd., Hyderabad. 

3.  Syar Khola ‘A’ HEP, Nepal  140.00  US $280 

Million 

2008  M/s. Dunagiri Pvt Ltd., 

Hyderabad. 

4.  Syar Khola ‘B’ HEP, Nepal.  360.00  US $720 

Million 

2008  M/s. Harmosha Pvt Ltd., 

Hyderabad. 

5.  Prok HEP, Nepal.  480.00  US $960 

Million 

2008  M/s. Nandadevi Pvt Ltd., 

Hyderabad. 

6.  Jogimara  Trisuli  HEP, 

Nepal. 

240.00  US $480 

Million 

2008  M/s. Haramosh Agro‐Farms 

Pvt Ltd., Hyderabad. 

7.  Bihi HEP, Nepal.  270.00  US $540 

Million 

2008  M/s. Dunagiri Agro‐Farms 

Pvt Ltd., Hyderabad. 

8.  Kappe  HEP,  Arunachal 

Pradesh. 

98.00  73900  2008  M/s. Hemavathy power & 

light Pvt Ltd 

9.  Champung  Pobe  HEP, 

Arunachal Pradesh. 

140.00  105500  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

10.  Changlai  HEP,  Arunachal 

Pradesh. 

48.00  36200  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

11.  Braing  pube  HEP, 

Arunachal Pradesh. 

48.00  36200  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

12.  Pakke  HEP,  Arunachal 

Pradesh. 

70.00  52800  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

13.  Nargum  HEP,  Arunachal 

Pradesh. 

84.00  63300  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

 

14.  Chann  Siang  HEP 

Arunachal Pradesh. 

66.00  50557  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

Page 38: Ex Stream Eng Design Group Corporate Profile

  

Desk Study Report 35 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

15.  Papu  HEP  Arunachal 

Pradesh. 

110.00  88000  2008  M/s. Hemavathy power & 

light Pvt Ltd, Bangalore. 

16.  Arket Bazar HEP, Nepal.  110.00  US $220 

Million 

2007  M/s. Parasnath Greenlands 

Pvt Ltd., Hyderabad. 

17.  Uiya HEP, Nepal.  105.00  US $210 

Million 

2007  M/s. Maytas Infra Ltd., 

Hyderabad. 

18.  Phillim HEP, Nepal.  150.00  US $300 

Million 

2007  M/s. MMS Steel & Power 

Ltd.,Hyderabad. 

19.  Amras HEP, Nepal.  150.00  US $300 

Million 

2007  M/s. Maytas Properties Pvt 

Ltd., Hyderabad. 

20.  Budhi  Gandaki  HEP, 

Nepal. 

600.00  US $1200 

Million 

2007  M/s. RVK Energy Pvt Ltd., 

Andhra Pradesh 

 

Page 39: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 36 

 

B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED  

 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

1.  Balance  of  Plant  for  Hail‐2 

Gas based Power Plant, Saudi 

Arabia. 

2 x55/75    2011  M/s. Alfanar Riyadh through 

M/s. ILF Abu Dhabi 

2.  Computation  of  HFL, 

elevation capacity of barrage, 

design of barrage for Halasur 

Barrage  across Varada River 

‐  Shiggaon  Lift  Irrigation 

Scheme  Dharwar  District, 

Karnataka 

Irrigation  4000  2011  M/s. Karnataka Neeravari 

Nigama Limited, Karnataka. 

 

3.  Detailed  Analysis,Design 

and  Preparation  of 

Fabrication  of  TIG Welding 

Chamber. 

Mechanical  5200  2010  M/s. Hind High Vacuum Co. 

Pvt. Ltd. Bangalore 

 

4.  Balance  of  civil  works  for 

Horizonal  Belt  Filter  Station 

Building  including 

Equipment  and  Accessories 

Foundation Cango. 

—  —  2010  M/s. Delkor Technik India 

Pvt Ltd., Bangalore. 

5.  Al‐Gubrah  Mobile  SWRO 

Plant Civil Design, Muscat. 

—  —  2010  M/s. ILF Abu Dhabi. 

6.  Dandavathi  Reservoir 

Irrigation Project Karnataka 

Irrigation  10200  2009  M/s. Karnataka Neeravari 

Nigam Ltd., Bangalore 

7.  Varahi  Underground  Power 

House Stage‐II Karnataka. 

2 x 215  2500  2009  M/s. Karnataka Power 

Corporation Ltd., Bangalore 

8.  Energy Audit  of  Fiber Glass 

Product  Manufacturing 

Units, Bangalore 

 

Energy 

Audit 

60  2009  M/s. ICP(India) Private Ltd., 

Bangalore. 

9.  35  MLD/STP  for  Shimoga 

Town,  Shimoga  District, 

Karnataka. 

 

—  —  2009  M/s. GVPRS Hyderabad. 

Page 40: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 37 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

10.  Balance of  civil works  for 18 

mtr dia x 3.0 SWD RCC  tank 

for thickener application. 

—  —  2009  M/s. Delkor Technik India 

Pvt Ltd., Bangalore. 

11.  Detailed  Engineering  for 

Transmission  line  including 

Foundation  Designs  for  the 

20km,  double  circuit 

transmission  line  connecting 

Vajamangala  220kV  station 

to Kachakola 220kV station. 

    2009  Sharavathy Conductors Pvt 

Ltd, Bangalore 

12.  25  mtr  dia  x  3.0  SWD 

130TPH  capacity  RCC  tank 

with  tunnel  and  overflow 

launder  for  thickener 

application 

—  —  2009  M/s. Delkor Technik India 

Pvt Ltd., Bangalore. 

13.  100MW  Wind  Farm 

development‐1phase 

16.5MW  Chikkodi  Belgaum 

District, Karnataka 

10 x 1.65  10000  2009  M/s.Doddanavar Brothers, 

Belgaum Karnataka 

 

14.  Energy  Audit  of  steel 

Fabrication  Manufacturing 

Unit, Bangalore. 

Energy 

Audit 

50  2008  M/s. Goel Engineering 

Private Ltd., Bangalore. 

15.  Design and Drawing for DM 

Vessel. 

—  —  2008  M/s. Velath Engineering 

Works, Sharjah UAE 

16.  Construction  Water  supply  

for  Kamalanga  Thermal 

Power Plant, Orissa. 

3 x 350  450000  2008  M/s. GMR Energy Limited, 

Bangalore 

17.  Somanamaradi  Small  Hydel 

Project‐  Stage‐II,  in  Raichur 

District, Karnataka. 

1 x 6  1500  2007  M/s. Narayanapur Power 

Co. Pvt. Ltd, Bangalore 

18.  Balance  of  civil  works  for 

Design  and  Drawing  for 

Sulphur Storage Tank. 

—  —  2007  M/s. Velath Engineering 

Works, Sharjah UAE 

19.  Design  and Drawing  of Flue 

Gas  Scrubber  (V‐1507) 

Vessel. 

    2007  M/s. Velath Engineering 

Works, Sharjah UAE 

Page 41: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 38 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

20.  Detailed  Engineering  for 

Transmission  line  towers 

including  Foundation 

Designs for 50kms of Hiriyur 

–  Kudithini  440kV 

Transmission line. 

—  —  2007  Sharavathy Conductors Pvt 

Ltd, Bangalore 

21.  Balance  of  E&M  works  for 

Bhavani  Barrage  Hydro 

Electric Project I. 

2 x 5  3000  2007  M/s. Meclin Fabricators 

Private Limited Chennai. 

22.  Balance  of  E&M  works  for 

Bhavani  Barrage  Hydro 

Electric Project II. 

2 x 5  3000  2007  M/s. Sri Saravana 

Engineering Works 

company Pvt Ltd. Bhavani 

Tamil Nadu 

23.  Construction  of  earthen 

bund  for  Sarvaraja  Sarovara 

Reservoir  near  Cuddaph, 

Chittur  District,  Andhra 

Pradesh. 

—  —  2007  M/s. ECC‐‐CPPL Pvt Ltd., 

Hyderabad. through M/s. 

SM Constructions Bangalore. 

24.  Shamburi  MHS,  Dakshina 

Kannada District, Karnataka. 

5 x 4.80  9726  2006  M/s.Rithwik Energy 

Generation Pvt. Ltd. 

Hyderabad. 

25.  Design  and  Drawing  for 

Natural Gas Storage  (Buffer) 

Pressure vessel. 

—  —  2006  M/s. Velath Engineering 

Works, Sharjah UAE 

26.  Balance of Civil Works for 13 

mtr dia x 3.0 SWD RCC  tank 

for thickener application. 

—  —  2006  M/s. Delkor Technik India 

Pvt Ltd., Bangalore. 

27.  Balance of Civil Works  for 4  

x B35:  40V‐12G Genset Gas 

Power Plant at Sudan. 

—  —  2006  M/s.Rolls‐Royce Energy 

Systems India Pvt.Ltd., 

New Delhi 

28.  Detailed  Engineering  for 

Transmission  line  Towers 

including Foundation Design 

for  132/66/11  kV  Kolar  Sub‐

Station works. 

 

—  —  2006  Sharavathy Conductors Pvt 

Ltd, Bangalore 

Page 42: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 39 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

29.  Perla  Mini  Hydel  Scheme, 

Dakshina  Kannada  District, 

Karnataka. 

5 x 4.80  9726  2005  M/s.AMR Power Pvt. Ltd. 

Hyderabad. 

30.  Nagarjuna  Sagar  Tail  Pond 

Dam  and  Hydro  Power 

Station,  Nalgonda,  Andhra 

Pradesh 

2 x 25  42500  2005  M/s. STUP Consultants 

Private Ltd., Bangalore 

31.  Construction  of  Gandikota 

Dam  across  Pennar  River, 

Kadapa, Andhra Pradesh. 

Irrigation  5500  2005  M/s. STUP Consultants 

Private Ltd., Bangalore 

32.  Yakla  Micro  Hydel  Scheme 

in Dargeling West Bengal. 

2 x 250  100  2005  M/s. Raj Kumar and 

Company, Bangalore 

33.  Somanamaradi  Small  Hydel 

Scheme,  Raichur  District, 

Karnataka. 

2 x 6  4800  2004  M/s. Narayanapur Power 

Co. Pvt. Ltd., Bangalore 

34.  Hullahalla  Mini  Hydel 

Scheme,  Mandya  District, 

Karnataka. 

3 x 4  4740  2004  M/s.Limbavali Power Pvt. 

Ltd., Bangalore 

35.  Somavathi  Mini  Hydel 

Scheme,  Chickmagalur 

District, Karnataka. 

2 x 3  2746  2004  M/s.SRM Power Pvt. Ltd. 

Bangalore 

36.  Gugal  Small Hydel  Scheme, 

Gulbarga District, Karnataka. 

4 x 2.5  4000  2004  M/s.SRS Energy Pvt. Ltd. 

Bangalore 

37.  Design  of Anchor Blocks  for 

Birkapilli HEP Turkey  ( XLS 

generation) 

—  —  2004  M/s. Quest‐GE‐Global 

Engineering Development 

Centre,Bangalore. 

38.  Koynad  MHS,  Kodagu 

District, Karnataka. 

2 x 2  1800  2004  M/s. Sadguru Saai Energies 

Pvt. Ltd., Bangalore. 

39.  Design  and  Preparation  of 

GA  drawings  for  following 

tanks.  Crude  Oil  Tank  Slop 

Crude Oil Tank  Crude Oil  / 

Water  Tank  Product  Water 

Tank Fire Water Tank 

Diesel Oil Tank. 

Tank Farm    2004  M/s. Velath Engineering 

Works Sharju, UAE. 

Page 43: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 40 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

40.  110 kV Switchyard extension 

at  Bellary  Steels,  Bellary  

District, Karnataka. 

 

Switchyard  100  2003  M/s. Bhowalaka Steels, 

Bangalore, through LEG. 

41.  Pre‐Cast  RCC  Bridge  over 

Upper Tunga  barrage  across 

River  Tunga,  Shimoga 

District, Karnataka. 

    2003  M/s. Mysore construction Co 

Ltd., Bangalore. 

42.  Architural  and  Structural 

services  for  Construction  of 

Pediatric  Ward  at  Kidwai 

Memorial  Institute  of 

Oncology  –  Honorary  

Assignment 

  300  2003  M/s. Nandalal Mohan Lal 

Jairani Kapur Charitable 

Trust Bangalore. 

43.  Link  Canal  MHS  2001, 

Mandya District, Karnataka. 

1 x 1.5  700  2002  M/s.Graphite India Ltd., 

Bangalore. 

44.  Varahi  Tail  Race  MHS, 

Udupi District, Karnataka. 

5 x 7.5  13439  2002  M/s. Sandur Power Co. Pvt. 

Ltd., Bangalore. 

45.  Civil works  for  the proposed 

132/33kV ODY at INDALCO. 

—  —  2002  M/s. ASEA Brown Boveri 

Ltd., Bangalore. 

46.  132  KV  Switchyard 

Capacitor Bank  for HINLCO 

Renukot. 

Switchyard    2002  M/s. BHEL Bangalore. 

47.  132  kV  Switchyard  near 

Samayanallur,  Madurai, 

Tamil Nadu. 

Switchyard  300  2001  M/s.Bharat Heavy Electricals 

Ltd. 

48.  110 kV Switchyard extension 

connected with 128 MW DG 

set  installation  for  KSEB, 

Kozikhode. 

Switchyard  300  2001  M/s. BHEL, Bangalore, 

through M/s.. MECON, 

Bangalore 

49.  110  KV  Substation  at 

Navakarnataka  Steels, 

Bellary District, Karnataka. 

Substation    2001  M/s. LEG Bangalore 

50.  66  KV  outdoor  Switchyard 

and  Substation  at  NAL 

Bangalore. 

Switchyard    2001  M/s. GEPC Ltd., Bangalore 

Page 44: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 41 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

51.  DG  Plant  at  GE  ITC  Ltd., 

Whitefield, Bangalore 

7.4  4000  2000  M/s. GEITC Ltd., Bangalore 

52.  Design  of  Supplying 

Structures  of  220kV  Switch 

yard  for M/s. Nippon Denro 

Ispat Ltd., Dolvi, Maharastra. 

Switchyard  800  2000  M/s.. AEG‐NGEF Limited 

Bangalore. 

53.  110  kV  Switchyard  at 

HINDALCO,  Renukoot, 

Uttar Pradesh. 

Switchyard  250  2000  M/s. Bharat Heavy 

Electricals Ltd. Bangalore. 

54.  Design  of  Supplying 

Structures  for  the  proposed 

66  KV  Outdoor  Switchyard 

at a very Cycles Ludhiana. 

Switchyard  200  1999  M/s. Kirloskar Electric 

Company Ltd., Bangalore. 

55.  Harangi  HEP  at  Harangi 

Dam,  Kushalnagar  District, 

Karnataka 

2 x 4.5  3200 

 

1999  M/s. Sulzer Flovel Hydro 

Ltd., Faridabad, Haryana. 

56.  Sheshadri Iyer MHS Mandya 

District, Karnataka. 

3 x 2  1200 

 1999  M/s. Atria Power 

Corporation Limited, 

Bangalore. 

57.  Remodeling  of  Shiva  Power 

Channel  at 

Shivanasamudram,  Mandya 

District, Karnataka. 

—  1000  

1998  M/s. Karnataka Power 

Transmission Corporation 

Ltd., Bangalore. 

58.  Dumkar  Hydro‐Electric 

Project  at  Leh,  Ladakh,  J&K 

State. 

3 x 1.5  300  1998  Chief Project Engineer, 

Power Development 

Corporation Ltd., Kargil, 

J&K State. 

60.  Civil  works  for  De‐Bottle 

Neck  Project  MSDS‐4, 

Electrical  works  of  Bokaro 

Steel Plant, Bihar. 

—  —  1995  M/s. NGEF Ltd., Bangalore 

61.  110/33KV  Switchyard  and 

Substation  at  Xeldem 

Madgon  Goa  for  Goa 

Electricity Board. 

Switchyard  300  1989  M/s. NGEF Ltd., Bangalore 

Page 45: Ex Stream Eng Design Group Corporate Profile

  

Detailed Engineering – Completed 42 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

62.  110  KV  Outdoor  Yard 

Substation  for  M/s.  Madras 

Refineries  Ltd.,  Manali 

Chennai. 

Switchyard  150  1988  M/s. NGEF Ltd., Bangalore 

63.  132  KV  Outdoor  Yard  and 

Substation  for M/s. Petrofills 

Co‐operatives Ltd., Kalewar, 

Gujrat. 

Switchyard  200  1987  M/s. NGEF Ltd., Bangalore 

 

Page 46: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 43 

 

C. PREPARATION OF DETAILED PROJECT REPORTS   

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

 

1. 

Kukke Hydro Projects  Stage 

1  Dakshina  Kannada 

District, Karnataka 

8 x 3   

12714 

 

 

2011 

M/s. Kukke Hydro Projects 

Pvt Ltd., Bangalore 

 

2. 

Kukke Hydro Projects  Stage 

2  Dakshina  Kannada 

District, Karnataka 

4 x 3   

7113 

 

 

2011 

M/s. Kukke Hydro Projects 

Pvt Ltd., Bangalore 

 

3. 

Lower UHL, Mandi District, 

Himachal Pradesh 

2 x 7.5   

9435 

 

2011 

M/s. Trident Power Systems 

Pvt Ltd., Hyderabad 

 

4. 

Dananahalli  MHS,  Mandya 

District, Karnataka 

 

2 x 3 

4750  2011  M/s. Punam power Pvt Ltd, 

Bangalore. 

 

5. 

Feasibility  Study  on  water 

Supply  lines  for  Bharathi 

Cement  Factory  from 

Saravaraju  Sarovar  De 

Reservoir  near  Cuddaph 

Andhra Pradesh. 

    2010  M/s.Bharathi Cement 

Corporation Limited 

Hyderabad 

 

6. 

Navya  Mini  Hydel  Scheme 

near  Kurnool,  Andhra 

Pradesh 

2 x 1.3  2281   

2010 M/s. Mitra Energy Pvt Ltd 

Hyderabad 

 

7. 

Augmentation  of  Water 

Supply  Scheme  at  Hutti 

Gold Mines Raichur District, 

Karnataka 

—  —   

2010 

M/s. Hutti Gold Mines Co 

Ltd. Bangalore 

 

8. 

Kollaya  MHS  near 

Kumaradhara  Dakshina 

Kannada District, Karnataka 

 

6 x 4 

 

12000 

 

2010 

M/s. Kumaradhara Power 

Co.Pvt Ltd., Bangalore. 

 

9. 

Solar Power Plant  at Bellary 

District, Karnataka 

5 x 1   

600 

 

2009 

M/s. Vishrutha Power Pvt 

Ltd., Bangalore 

 

10. 

Anusha Mini Hydel  Scheme 

near  Kurnool,  Andhra 

Pradesh 

2 x 1.9   

2778 

 

2009 

M/s. Dhenu Hydro Pvt Ltd 

Hyderabad 

11.  Ramya  MHS  near 

Kurnool,Andhra Pradesh 

2 x 2  2900   

2009 M/s. Kurnool Energies Pvt 

Ltd Hyderabad 

Page 47: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 44 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

12.  Kodekal Basaveshwara MHS 

Near  Narayanapur  Dam, 

Gulbarga  District, 

Karnataka. 

2 x 5   

4500 

 

 

2009 

M/s. Kodekal Basaveshwara 

Power Generation Pvt 

Ltd.,Bangalore 

 

13. 

Magundi  MHS  near 

Magundi  Village,  Mudigere 

Taluk,  Chikkamangalur 

District, Karnataka. 

 

3 x 3 

 

5200 

 

2009 

M/s. Shakuntalam Power 

Pvt Ltd., Bangalore. 

 

14. 

Dabevadi  MHS  Uttara 

Kannada District, Karnataka. 

 

3 x 4 

 

6271 

 

2008 

M/s.Dabevadi Hydel Power 

Pvt. Ltd., Uttara Kannada 

Karnataka. 

 

15. 

Yadekumari  MHS  Hassan 

District, Karnataka. 

2 x 10.5  8200   

2008 

M/s. Sri Maruthi Power Gen 

India Pvt Ltd., Bangalore 

 

16. 

Devargaddi  MHS,  Uttara 

Kannada District, Karnataka. 

 

2 x 3 

 

3000 

 

2008 

M/s.Baliyan Power Private 

Limited 

Bangalore. 

 

17. 

Perdur  MHS,  Dakshina 

Kannada District, Karnataka. 

2 x 3  3000  2008  M/s. Dishaa Power 

Corporation Private Ltd., 

Bangalore. 

 

18. 

H.  Malligeri  MHS,  near 

Maddur  branch  canal, 

Mandya District, Karnataka. 

1 x 1  461  2007  M/s. Venika Green Power 

Pvt Ltd., Bangalore. 

 

19. 

Hosamatha  MHS,  near 

Hosamatha village Dakshina 

Kannada District, Karnataka. 

3 x 1.2  1807  2007  M/s.Vakkal Power 

Corporation Ltd., 

Bangalore. 

 

20. 

Devarabetta  MHS,  Hassan 

District, Karnataka. 

2 x 6.5  3910  2007  M/s. Pinnacle Green Power 

Pvt. Ltd., Bangalore. 

 

21. 

Addhole  MHS,  near  Bisale 

village,  Hassan  District, 

Karnataka. 

3 x 8  8676  2007  M/s. Trimurthy Power Pvt. 

Ltd., Bangalore. 

22.  Hongadahalli  Mini  Hydel 

Scheme,  Hassan  District, 

Karnataka. 

 

18.9 

 

7200 

 

2007 

M/s. Sri. Maruthi Power 

Gen India Pvt Ltd., 

Bangalore 

23.  Mallahalli  MHS,  near 

Patla,Kodagu  District, 

Karnataka. 

 

3 x 8.39 

 

9778 

 

2007 

M/s. Nandini Power Co. 

Bangalore Pvt. Ltd., 

Bangalore. 

Page 48: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 45 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

24.  Hathipathar MHS 

Chathisgarh State. 

 

2 x 6 

 

7000 

 

2007 

M/s. Shasta Investment and 

Initiation Company Pvt Ltd 

Hyderabad. 

25.  Benchagaddi  MHS, 

Dakshina  Kannada  District, 

Karnataka 

 

12 

 

6000 

 

2007 

M/s. Pusala Power 

Company Pvt Ltd., 

Hyderabad. 

26.  Talthare  MHS  in  Kodagu 

District, Karnataka. 

 

2 x 3.7 

 

3000 

 

2007 

M/s. GM Property 

Developers Pvt. Ltd, 

Bangalore. 

27.  Kanchimane MHS,  Shimoga 

District, Karnataka 

 

2 x 2 

 

2000 

 

2007 

M/s. Sagar Power (Dandela) 

Pvt. Ltd Hyderabad 

 

28. 

Tomabattu  MHS,  Shimoga 

District, Karnataka. 

 

2 x 2.5 

 

2500 

 

2007 

M/s. Siddhi Vinayaka 

Spechem (P) Ltd., 

Bangalore 

29.  Havinahedgi  MHS, 

Hospet,Bellary   District, 

Karnataka. 

 

4 x 6 

 

12000 

 

2007 

M/s. XS Power company 

Pvt Ltd Hyderabad. 

30.  Construction  of  weir  across 

across  River  Nethravathi  at 

Thumbe for providing Water 

Supply  to  Mangalore  City 

Mangalore  District, 

Karnataka. 

     

 

2007 

M/s. Mangalore City 

Corporation, Mangalore. 

 

31.  Shamburi  MHS,  near 

Shamburi  /  Kamthi  Bazar 

village  Dakshina  Kannada 

District, Karnataka, 

5 x 4.80  9733  2006  M/s. Rithwik Energy 

Generation Pvt. Ltd., 

Hyderabad 

32.  Varahi  MHS,  near 

Hosangadi  village  Udupi 

District, Karnataka, 

2 x 4.50  4926  2006  M/s. South Canara Electric 

Power Ltd., Bangalore. 

33.  Handihalla  MHS,  Mandya 

District, Karnataka. 

 

3 x 8.25 

12000  2006  M/s.Penna Cement 

Industries (P) Ltd., 

Bangalore 

34.  Sorang  HEP,  near 

Barakhamba  village,  Mandi 

Himachal Pradesh 

 

2 x 50 

 

58600 

 

2006 

M/s. Himachal Sorang 

Power Pvt. Ltd., Hyderabad 

Page 49: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 46 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

35.  Maranahalli  MHS  near 

Maranahalli, Hassan District, 

Karnataka. 

3 x 4.70  5313  2006  M/s.Deepak Cables, 

Bangalore. 

36.  Iggalur  Barrage  MHS,  near 

Iggalur  village,  Bangalore 

District, Karnataka. 

 

1 x1.50 

 

861 

 

2006 

M/s. Saroj Energy Co. Pvt. 

Ltd., Bangalore. 

37.  Adishakthi Maramma MHS, 

Mandya District, Karnataka. 

4 x 6   

9600 

 

2006 M/s. Pioneer Genco Private 

Ltd., Hyderabad 

38.  Shalvi MHS  Shimla District, 

Himachal Pradesh State. 

 

2 x 3.5 

 

4859 

 

2006 

M/s. Oriental Structural 

Engineers Pvt. Ltd., New 

Delhi. 

 

39. 

Yatanur  MHS,  near 

Gulbarga District Karnataka. 

2 x 3  2000  2006  M/s. SKN Hydro Energy 

Pvt Ltd. 

 

40 

Yatanur Mini Hydel Scheme, 

Bijapur District, Karnataka. 

2 x 2   

1600 

 

2005 

M/s. SKN Hydro Energy 

Pvt Ltd., Bangalore 

 

41. 

Kallaja  MHS,  near  Kallaja 

village  Dakshina  Kannada 

District, Karnataka. 

3 x 2.5  3943  2005  M/s.Srishti Power Pvt. Ltd., 

Bangalore. 

 

42. 

Kollya  MHS,  near  Kollya  / 

Veeramangala  village 

Dakshina  Kannada  District, 

Karnataka. 

6 x 3  9671  2005  M/s.SNC Power 

Corporation Pvt. Ltd., 

Bangalore 

 

43. 

Neerukatte  MHS, 

Neerukatte Village Dakshina 

Kannada District, Karnataka. 

4 x 3.75  8185  2005  M/s..Sagar Power 

(Neerukatte) Ltd., 

Bangalore. 

 

44. 

Perla  MHS,  near  Perla 

village  Dakshina  Kannada 

District, Karnataka. 

5 x 4.80  9901  2005  M/s. AMR Power Pvt. Ltd., 

Bangalore 

45.  Durgadahalla  MHS,  near 

Charmadi  village  Dakshina 

Kannada District, Karnataka. 

2 x 9  9377  2005  M/s. Corporate Hydro 

Energy Pvt. Ltd., 

Hyderabad. 

46.  Dodda  Betta  MHS,  Hassan 

District, Karnataka. 

3 x 7  7871  2005  M/s. Sanjeevini Power Pvt. 

Ltd., Bangalore. 

47.  Somavathi  MHS, 

Chikkamangalur  District, 

Karnataka. 

2 x 3  2746  2005  M/s. SRM Power Pvt. Lt., 

Bangalore. 

Page 50: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 47 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

48.  Astalakshmi  MHS,  near 

Kumbaradi  village, 

Chikkamangalur  District, 

Karnataka. 

2 x 3.5  1816  2005  M/s..Shankaranarayana 

Power Enterprises Pvt Ltd., 

Bangalore. 

49.  Uyamballi  MHS,  near 

Koggedoddi,  Bangalore 

District, Karnataka 

 

2 x 5 

 

5512 

 

2005 

M/s. SNS Power Project 

Pvt., Bangalore. 

50.  Surlabi MHS  in  Somavarpet 

Taluk,  Kodagu  District, 

Karnataka 

 

2 x 2 

 

1600 

 

2005 

M/s. Core Green Hydro 

Power India Pvt Ltd., 

Hyderabad 

51.  Gondi  MHS  near 

Sidlipura,Tarikere  Taluk 

Chikkamangalur  District, 

Karnataka 

 

2 x 1.5 

 

1500 

 

2005 

M/s. Bhadragiri Power Pvt 

Ltd., Bangalore. 

52.  Detailed  Survey  and 

Investigation  work,  EIA 

Study  and  Preparation  of 

DPR for following Projects. 

a) Belliyur HEP 

b) Neerukatte HEP 

 

 

 

 

15 

15 

 

 

 

 

8200 

8200 

 

 

 

 

2005 

2005 

M/s. NTPC Hydro Ltd., 

Noid, NCR Delhi 

53.  Adahole MHS Phase 1 and 2 

near  Dakshina  Kannada 

District, Karnataka. 

 

 

2 x 12.5 

 

 

12500 

 

 

2005 

M/s.  Trimurthi  Power  Pvt 

Ltd., Bangalore. 

54.  Gugal  Small  Hydel Scheme,Gulbarga  District, Karnataka. 

 3 x 3.34 

 4958 

 2004 

M/s. SRS Energy Private Ltd., Bangalore.  

55.  Somanamaradi  Small  Hydel Project  on  Upper  Krishna Right  Bank  Canal,  Raichur 

District, Karnataka. 

  

4 x 6 

9600  2004  M/s. Narayanapur Power Co. Pvt. Ltd., Bangalore 

56.  Baje  MHS  Udupi  District, Karnataka. 

3 x 1  1456  2004  M/s. Devar Power Pvt. Ltd., Bangalore.  

58.  Kadamane  MHS‐II,  Hassan District, Karnataka. 

2 x 7.5  8500  2004  M/s.Nagarjuna Holdings (P) Ltd., Hyderabad.  

59.  Hullahalli  MHS,  near 

Hullahalli/  Ramapura  village, Mysore District, Karnataka. 

2x1  800  2004  M/s.Karnataka Renewable 

Energy Development Ltd., Bangalore.  

Page 51: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 48 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

60.  

Shivanasamudram  MHS, Malavalli  Taluk,  Mandya District, Karnataka 

1 x 1  452  2004  M/s.Vakkal Power Corporation Ltd., Bangalore.  

61.  

Chikkmandya  MHS, Chikkmandya,  Mandya District, Karnataka. 

1 x 0.50  471  2004  M/s.Adichunchanagiri Energy Projects Pvt. Ltd., 

Mandya. 

62.  Hullahalla MHS, Dhanagere, 

Mandya District, Karnataka. 

3 x 4  4740  2004  M/s. Limbavali Power Pvt. 

Ltd., Bangalore. 

 

63. 

 

Dinnekere  MHS, 

Chikkamangalur  District, 

Karnataka. 

 

2 x 3 

 

3000 

 

2004 

M/s. Vejetha Glazed Tiles 

Industries, Hyderabad, 

Andhra Pradesh. 

64.  Afzalpur  MHS,  near 

Afzalpur,Gulbarga  District, 

Karnataka. 

 

2 x 4 

 

4520 

 

2004 

M/s. Jasper Energy Pvt Ltd., 

Bangalore 

65. 

 

Sonna  MHS,  near  soma 

villege  Gulbarga  District, 

Karnataka. 

 

2 x 3 

 

3300 

 

2004 

M/s. Jasper Energy Pvt Ltd., 

Bangalore 

66.  Singatalur‐Huligudda  MHS 

near  Thimmalapur  village, 

Bellary District, Karnataka 

 

3 x 6 

 

6000 

 

2003 

M/s. Tungabhadra Power 

Co. Private Ltd., Bangalore. 

67  Mannapitlu  MHS,  near Arambodi  village  Dakshina 

Kannada District, Karnataka. 

3 x 5  6320  2003  M/s.Bobba Power Projects, 

Bangalore. 

68.  Mulibettu  MHS,  near 

Mulibettu  village  Dakshina 

Kannada District,Karnataka. 

 

2 x 4.5 

 

4282 

 

2003 

M/s.Mount Kailash Power 

Projects Pvt. Ltd. Bangalore. 

69. 

 

Kilanjara MHS, near Kalladi 

village  Dakshina  Kannada 

District, Karnataka. 

2 x 3  3052  2003  M/s.Phalguni Power 

Projects‐1, Bangalore. 

70. 

 

Kolavur MHS., near Niralike 

village  Dakshina  Kannada 

District, Karnataka. 

 

2 x 4.5 

 

4368 

 

2003 

M/s.Phalguni Power 

Projects‐2, Bangalore. 

71. 

 

Horiabbe  MHS,  near 

Siddapur  village  Udupi 

District, Karnataka. 

2 x 3  2596  2003  M/s. S.K. Farms, Hubli. 

Page 52: Ex Stream Eng Design Group Corporate Profile

  

Preparation of DPR 49 

Sl. No 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

72.  MGHE  MHS  Shimoga 

District, Karnataka. 

2 x 10  11500  2003  M/s.Suchindra Investment 

& Financial Services, 

Bangalore 

73.  Abilbiru  MHS,  Hassan 

District, Karnataka. 

2 x 3  2273  2003  M/s. South‐West Hydro 

Power Pvt. Ltd., Bangalore. 

74. 

 

Somavathi  MHS, 

Chikkamangalur  District, 

Karnataka. 

2 x 3  2698  2003  M/s. SRM Power Pvt. Lt., 

Bangalore. 

75.  Akkihebbal  MHS,  Mandya 

District, Karnataka. 

2 x 1.25   

700 

 

2002 

M/s. Cauvery Hydro 

Energy Ltd Bangalore 

76. 

 

Kadamane  MHS‐I,  Hassan 

District, Karnataka. 

2 x 4.5  5200  2001  M/s.Paschim Hydro Energy 

(P) Ltd., Hyderabad. 

77. 

 

Kumudavati  Mini  Hydel 

Scheme,Haveri  District, 

Karnataka. 

2 x 0.250  361.98   

2001 

M/s. Krisri Power Tech Pvt 

Ltd, Bellary Karnataka 

78. 

 

Keertihole  MHS  near 

Kutupuzha  village,Virajpet 

Taluk,  Kodugu  District 

Karnataka. 

 

3 x 8 

 

7200 

 

2001 

M/s. Subash Project & 

Marketing Co Pvt Ltd., 

Bangalore, 

79. 

 

Hemavathi  High  Level 

Canal  MHP,Gorur,  Hassan 

District, Karnataka. 

2 x 2  600   

2000 

M/s. Flax India Limited 

Bangalore 

 

80. 

Hebbakawadi  MHSMandya 

District, Karnataka. 

 

2 x 1 

400  1999  M/s. Jayalakshmi Power Co 

Private Ltd., Bangalore 

81. 

 

Maddur Canal MHSMandya 

District, Karnataka. 

2 x 1.5  500  1998  M/s. Khodays Ltd., 

Bangalore 

82. 

 

New  Ganderbal  Hydro Electric  Project,  near  Jammu, 

Jammu and Kashmir State 

 

3 x 15 

 

4000 

 

 

1996 

M/s. Chief Engineer PDC 

J&K State. Through M/s. 

THC New Delhi. 

 

Page 53: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 50 

D. PRE‐FEASIBILITY STUDIES OF POWER PROJECT  

Sl. 

No. 

Name of the Project  Installed 

Capacity in MW 

Project Cost 

in Rs. Lakhs 

Year  Clients 

1  Baje‐Hiriadka MHS, Udupi 

District, Karnataka. 

 

2 x 1.5 

1425   

2011 

M/s. Aparimita Power 

Ventures PVt Ltd., 

Bangalore 

2  Gulisattenhalli  MHS, 

Hasan District, Karnataka. 

 

2 x 2.5 3185   

2011 

M/s. Aparimita Power 

Ventures PVt Ltd., 

Bangalore 3  Kuppahalli MHS, Mandya 

District, Karnataka.  

2 x 2 2123   

2011 

M/s. Aparimita Power 

Ventures PVt Ltd., 

Bangalore 4  Bellur  MHS,  Dakshina 

Kannada  District, 

Karnataka. 

 

2 x 1.5 

1500   

2010 

M/s. Muktar Power (India) 

Private Ltd., Goa 

5  Mundaja  Hole  MHS, 

Dakshina  Kannada 

District, Karnataka. 

 

2 x 1 

1000   

2010 

M/s. Muktar Power (India) 

Private Ltd., Goa 

6  Ujre  MHS,  Dakshina 

Kannada  District, 

Karnataka. 

 

2 x 1.5 

1500   

2010 

M/s. Muktar Power (India) 

Private Ltd., Goa 

7  Kumadvati  MHS  near 

Anjanapura 

Chnnarayapatna, 

Karnataka. 

 

2 x 1.5 

 

1400 

 

2010 

M/s. Brigade Infra Pvt Ltd 

Bangalore 

8  Um‐Lunar  SHEP, 

Meghalaya  Northeast 

State. 

2 x 12  20000  2009  M/s. Green Valliey 

Industries Private Ltd., 

Kolkatha. 

9  Gurkhi  MHS,  Belgaum 

District, Karnataka. 

 

3 x 6 

9000  2009  M/s. Aditya Infrastructure 

Hyderabad 

10  Potli  MHS,  Belgaum 

District, Karnataka. 

3 x 6  9000  2009  M/s. Aditya Infrastructure 

Hyderabad 11  Chagotkallu  MHS,  Raichur 

District, Karnataka.  2 

600   2009 

M/s. Samvah Energy Pvt Ltd Bangalore 

12  Hurley  MHS  Hassan  District, Karnataka. 

1  540  2009  M/s. Classic Group Pvt Ltd., Bangalore 

13.  Kangtangshiri  HEP 

Arunachal Pradesh. 

2 x 17.5  20000  2008  M/s. Raajratna Metal 

Industries, Hyderabad 

Page 54: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 51 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

14.  Ropum  HEP  Arunachal 

Pradesh. 

40  32000  2008  M/s. Raajratna Metal 

Industries, Hyderabad 

15.  Barpu  HEP  Arunachal 

Pradesh. 

135  111645   

2008 

M/s. Raajratna Metal 

Industries, Hyderabad 

16.  Par  HEP  Arunachal 

Pradesh 

96  79400  2008  M/s. Par Infra Limited, 

Hyderabad. 

17.  Dardu  HEP  Arunachal 

Pradesh. 

3 x 25  52000  2008  M/s. Dardu Power Pvt Ltd., 

Hyderabad. 

18.  Alavalli  MHS  Hassan 

District Karnataka. 

2 x2  1600  2008  M/s. Hotel Maruthi Pvt. Ltd. 

Bangalore. 

19.  Pema  Shelphu  ‐  HEP. 

Arunachal Pradesh. 

97.5  61900  2008  M/s. Raajratna Energy 

Holdings Pvt. Ltd. 

Hyderabad. 

20.  Marwari  HEP, 

Uttarakhand State. 

8  4000  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. 

Hyderabad 

21.  Balganga‐II  HEP. 

Uttarakhand State. 

7  3500  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. 

Hyderabad 

22.  Doodh  Ganga  /  Meena 

HEP. Uttarakhand State. 

6  3000  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. 

Hyderabad 

23.  Bernigad HEP, 

Uttarakhand State. 

6.5  3300  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. 

Hyderabad 

24.  Vijaya Nagar‐Rampur HEP 

Uttarakhand State. 

20  1000  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. 

Hyderabad 25.  Rampur‐Tilwari HEP 

Uttarakhand State. 25  12500  2008  M/s. R.R. Construction & 

Infrastructure India Pvt Ltd. Hyderabad 

26.  Madya  Maheshwar  HEP Uttarakhand State. 

18  9000  2008  M/s. R.R. Construction & Infrastructure India Pvt Ltd. 

Hyderabad 27.  Kepjog  Mini  Hydel 

Scheme,Jog,  Shimoga 

District Karnataka. 

10  4800  2008  M/s. Vensai Power Projects Pvt Limited, Hyderabad 

Page 55: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 52 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

28.  35  MW  Bio  Mass  Power 

Plant  near  eggbough, 

Leeds, U.K 

35  US $ 700,000  2008  M/s. Dass Green Energy 

Inc., Boston, USA. 

29.  Baipadi  MHS,  Dakshina 

Kannada  District, 

Karnataka. 

2 x 3  2682  2007  M/s. Srishti Power Pvt. Ltd., 

Bangalore. 

30.  Hemavathi  Right  Bank 

Canal  MHS  Stage‐II. 

Hassan District, Karnataka. 

 

2 x 1 

1350   

2007 

M/s. Sri Maruthi Power Gen 

India Pvt. Ltd. Bangalore. 

31.  Kela  Chavadi 

MHS,Agumbe,  Shimoga 

District, Karnataka. 

 

2 x 2 

1200   

2007 

M/s. Delmon Energy Pvt. 

Ltd. Bangalore. 

32.  Hosakambi  MHS,Uttara 

Kannada  District, 

Karnataka. 

 

2 x 2 

1200   

2007 

M/s. Mysore Mercantile Co. 

Ltd. Bangalore. 

33.  Dugganballu MHS,  Uttara 

Kannada  District, 

Karnataka. 

 

2 x 2.5 

3141   

2007 

M/s. Mysore Mercantile Co. 

Ltd. Bangalore. 

34.  Tombattu  Hole  MHS, 

Shimoga  District, 

Karnataka. 

 

1 x 2 

1000   

2007 

M/s. Siddhi Vinayaka 

Spechem Pvt Ltd., 

Bangalore 

35.  Bairekoppa MHS, Dharwar 

District, Karnataka. 

 

2 x 2.5 

3320   

2007 

M/s. Mysore Mercantile Co. 

Ltd. Bangalore. 

36.  Kalgodu  MHS, 

Chikkamagalur  District, 

Karnataka. 

 

 

2 x 1 

1080   

2007 

M/s. Saisri Power Projects & 

System Pvt Ltd Bangalore 

37.  Sondahalla  MHS,  Uttara 

Kannada  District, 

Karnataka. 

 

2 x 3.5 

2555  2007  M/s. Disha Power 

Corporation Pvt Ltd 

Bangalore 

38.  Kelasi  MHS,  Hubli‐

Dharwar  District, 

Karnataka. 

 

2 x 2.5 

3036   

2007 

M/s. Abletech Electro 

Engineers Pvt Ltd Bangalore 

39.  Kallur  B  MHS,  Gulbarga 

District, Karnataka. 

 

4 x 4 

6181   

2007 

M/s. Jasper Energy Pvt Ltd., 

Bangalore 

 

Page 56: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 53 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

40.  Gundiadka  Small 

Hydropower  Project. 

Dakshina  Kannada 

District, Karnataka. 

5  1790  2007  M/s. Saileela Power Pvt. 

Ltd. Bangalore 

41.  Kottanadka  Mini  Hydel 

Scheme,  Kodagu  District, 

Karnataka. 

2 x 1  1200  2007  M/s. AMR Power Private 

Ltd. Bangalore. 

42.  Kannadagal  MHS,Uttara 

Kannada  District, 

Karnataka. 

2 x 12  13200  2007  M/s. Trident power Systems 

Pvt Ltd., Hyderabad. 

43.  Illva MHS Uttara Kannada 

District, Karnataka. 

7.5  3771  2007  M/s. Sri Shankara Narayana 

Power Corporation Pvt Ltd., 

Bangalore. 

44.  Kalgatta  MHS  Dakshina 

Kannada  District, 

Karnataka 

2 x 2.5  2800  2007  M/s. Samvah Energy Pvt 

Ltd., Bangalore. 

45.  Kubjanadi  MHS  Udupi 

District, Karnataka 

2 x 2.5  1750  2007  M/s. PSR Hydro Energy Pvt 

Ltd., Bangalore. 

46.  Manchikeri  MHP  Uttara 

Kannada  District, 

Karnataka. 

 

3 x 6  6210  2007  M/s. PSR Hydro Energy Pvt 

Ltd 

47.  Kurkamane  Mini  Hydel 

Scheme,  Hassan  District, 

Karnataka. 

 

24  8676  2006  M/s. Trimurthy Power Pvt. 

Ltd. Bangalore. 

48.  Nanniru  Halla,  Shimoga 

District, Karnataka 

2 x 2  1800  2005  M/s. Pinnacle Renewable 

Energy Pvt. Ltd., Bangalore. 

49.  Ulippu  MHS,  Udupi 

District, Karnataka 

2 x 6  5958  2005  M/s. NTPC Hydro Ltd., 

Noida. 

50.  Kallaja  MHS,  Udupi 

District, Karnataka 

 

2 x 3  2662  2005  M/s. Srishti Power Pvt. Ltd., 

Bangalore. 

51.  Devaragundi MHS, Udupi 

District, Karnataka. 

2 x 2  1814  2005  M/s. Astra Infrastructure 

Pvt. Ltd., Secunderabad. 

 

Page 57: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 54 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

52.  Horabele  MHS,  Udupi 

District, Karnataka 

1.00  3663  2005  M/s. Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

53.  Biligere  MHS,  Udupi 

District, Karnataka. 

2  851  2005  M/s. Astra Infrastructure 

Pvt. Ltd., Secunderabad. 

54.  Surlabi  MHS,  Dakshina 

Kannada  District, 

Karnataka. 

2 x 2  1932  2005  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore., Bangalore. 55.  Haraga  Hole  MHS, 

Dakshina  Kannada  District, Karnataka. 

2 x 1.5  1363  2005  M/s.Karnataka Renewable Energy Development Ltd., 

Bangalore.  

56.  Mukkodlu  MHS  Dakshina Kannada District, Karnataka. 

1.50  681  2005  M/s.Karnataka Renewable Energy Development Ltd., 

Bangalore.  

57.  Sirangahalli MHS, Kodagu 

District, Karnataka. 

0.80  331  2005  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

58.  Bhadrakali  Mini  Hydel 

Scheme,  Kodagu  District, 

Karnataka. 

0.70  344  2005  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

59.  Chapparahalla MHS Phase 

I Karnataka. 2 x 7  4200  2005  M/s. Akasha Ganga Energy 

Pvt. Ltd., Bangalore. 60.  Chapparahalla MHS Phase 

II Karnataka. 

3  900  2005  M/s. Akasha Ganga Energy 

Pvt. Ltd., Bangalore. 

61.  Katigudde  MHS  Kodagu 

District, Karnataka. 

2  915  2005  M/s. Delta Power Projects 

Pvt. Ltd., Bangalore. 

62.  Murukannu  MHS, 

Sakeleshpura,  Hassan 

District, Karnataka. 

 

2 x 5.5 

 

4360 

2004  M/s. Paschim Holdings 

private Ltd., Hyderabad. 

63.  Balekallu MHS, Karnataka.  2 x 6  3720  2004  M/s. Paschim Holdings 

private Ltd., Hyderabad. 

64.  Hulikal Hole MHS, Udupi 

District, Karnataka. 

2 x 2  1700  2004  M/s. Devar Power Pvt. Ltd., 

Bangalore. 

65.  Vuddigudda  MHS, 

Chickmagalore  District, 

Karnataka. 

2 x 0.45  591  2004  M/s. Woodae Gooda Coffee 

Estate Mercara, Kodagu 

District Karnataka 

Page 58: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 55 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

66.  Kadamane  Mini  Hydel 

Scheme‐II,  Sakeleshpura 

Hassan District, Karnataka 

2 x 5  4500  2004  M/s. Nagarjuna Holdings 

Pvt Ltd., Hyderabad. 

67.  Durgadahallihalla  Mini 

Hydel Scheme, Karnataka. 

3 x 6  7500  2004  M/s. Nagarjuna Holdings 

Private Ltd., Hyderabad. 

68.  Koo Hole MHS, Madapura, 

Kodagu District,Karnataka. 

1  461  2004  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

69.  Napanda  Hole  MHS, 

Garavale,  Kodagu District, 

Karnataka. 

1 x 0.50  273  2004  M/s. Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

70.  Sulugodu  MHS  – 

Megaravalli,  Hosanagara 

Taluk,  Shimoga  District, 

Karnataka 

1 x 1  446  2004  M/s. Syed Ibrahim & Sons, 

Shimoga. 

71.  Koynad  MHS,  Madikeri 

Taluk,  Kodagu  Dakshina 

Kannada  District, 

Karnataka. 

2 x 1.75  1880  2004  M/s.Sadguru Sai Energies 

Pvt. Ltd., Bangalore. 

72.  Beliyur  MHS  South 

Kannada  District, 

Karnataka. 

2 x 7.5  9736  2004  M/s. NTPC Hydro Ltd., 

Noida. NCR New Delhi. 

73.  Nirkatte  MHS  Dakshina 

Kannada  District, 

Karnataka  

3 x 5  7204  2004  M/s. NTPC Hydro Ltd., 

Noida. New Delhi 

74.  Dodda  Betta  MHS 

Dakshina  Kannada 

District, Karnataka 

74  19438  2004  M/s. NTPC Hydro Ltd., 

Noida. New Delhi 

75.  Kulkunda  MHS  Dakshina 

Kannada  District, 

Karnataka 

2 x 9.5  8260  2004  M/s. NTPC Hydro Ltd., 

Noida. New Delhi 

76.  Bhimanakallu  MHS 

Dakshina  Kannada 

District, Karnataka  

3 x 4.5  6383  2004  M/s. NTPC Hydro Ltd., 

Noida. New Delhi 

77.  Kollya  MHS  Dakshina Kannada District, Karnataka 

3 x 6  9348  2004  M/s. NTPC Hydro Ltd., Noida. New Delhi 

Page 59: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 56 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

78.  Bajimane  MHS  Udupi 

District, Karnataka 

2  946  2004  M/s. Falcon Power Pvt. Ltd., 

Bangalore. 

79.  Devaragundi  MHS, 

Dharmasthala  Dakshina 

Kannada  District, 

Karnataka. 

 

2 x 2 

1814   

2004 

M/s. Aster Infrastructure 

Pvt. Ltd. Hyderabad. 

80.  Ganadahalli MHP Mandya 

District, Karnataka. 

 

2 x 2.5 

1915   

2004 

M/s. SMR power Pvt Ltd., 

Bangalore 

 

81.  Biligeri  MHS,  Madikeri, 

Kodugu  District, 

Karnataka 

 

2 x 1 

851   

2004 

M/s. Aster Infrastructure 

Pvt Ltd Hyderabad 

 

82.  Gulgal  MHS,  Gulbarga 

District, Karnataka 

3 x 3.3  3623  2004  M/s. SRS Energy Pvt Ltd., 

Bangalore 

83.  Kadamane  Mini  Hydel 

Scheme‐I,  Hassan  District, 

Karnataka. 

 

2 x 3 

 

3000 

2003  M/s. Paschim Holdings 

private Ltd., Hyderabad. 

84.  Hachinad  Mini  Hydel 

Scheme,  Kodagu  District, 

Karnataka. 

2 x 1  1118  2003  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

85.  Uyamballi MHS, Bangalore 

District, Karnataka. 

2 x 5  3663  2003  M/s.Karnataka Renewable 

Energy Development Ltd., 

Bangalore. 

86.  Abilbiru  MHS, 

Sakaleshpura  Hassan 

District, Karnataka 

2 x 2.25  1350  2003  M/s. South West Hydro Pvt 

Ltd., Bangalore. 

87.  Kunchikal  Falls  MHS, 

Dakshina  Kannada 

District, Karnataka. 

2 x 2.5  1500  2003  M/s. South Canara Electric 

Co. Pvt. Ltd., Bangalore. 

88.  Hosangadi  Mini  Hydel 

Scheme,  Dakshina 

Kannada  District, 

Karnataka 

2 x 1.5  1230  2003  M/s.Hosangadi Hydro 

Power Projects Ltd., 

Bangalore. 

89.  Upper Kaneri MHS, Uttara 

Kannada  District, 

Karnataka. 

 

2 x 5 

3000   

2003 

M/s. Sree Swarna Energy 

Ltd Hyderabad. 

Page 60: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 57 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

90.  Dinnekere  MHS, 

Chikmagalur  District, 

Karnataka. 

 

2 x 0.5 

459   

2003 

M/s. Jasper Energy Pvt Ltd 

Bangalore. 

 

91.  Mannapittlu  Hydro‐Power 

Projects Dakshina Kannada 

District, Karnataka 

3 x 3  4540  2003  M/s. Bobba Power Projects 

Pvt Ltd., Bangalore 

92.  Debewadi  MHS, 

Chandryapatana,  Hassan 

District, Karnataka. 

2 x 2.5  2569  2003  M/s. Aji Engineering 

Bangalore. 

93.  Pre‐feasibility  Report  on 

Wind  Energy  Farm  near 

Chitradurga, Karnataka. 

 

10 x 0.5 

 

2000 

2002  M/s.Khoday Ltd., 

Bangalore. 

94.  KIOC  L  Tailings 

Classification  & 

Distribution Project 

    2002  M/s. Roche Mining. (MPJV) 

Melboune Au strlia 

95.  Dodda  Halla  Mini  Hydel 

Scheme,  Chickmagalore 

District, Karnataka. 

 

3 x 6 

 

900 

2001  M/s. Klen & Marshall Ltd., 

Bangalore. 

96.  Singatalur‐Huligudda 

MHS,  Hospet,  Bellary  

District, Karnataka. 

 

3 x 6 

 

7200 

2001  M/s. Reddy Veeranna & Co., 

Private Bangalore. 

 

97.  Horiabbe  MHS,  Udupi 

District, Karnataka. 

2 x1.5 + 

1x0.5 

1877  2001  M/s. S K Farm Pvt Ltd., 

Hubli 

98.  Hebbakawadi  MH  Sin 

Mandya  District, 

Karnataka 

 

3 x 1 

 

600 

2000  M/s. Gilda Investments & 

Financing, Bangalore 

99.  Right  Bank  High  Level 

Canal  MH  Sat 

Tungabhadra  Dam, 

Hospet,  Bellary  District, 

Karnataka. 

 

2 x 1.5 

 

400 

2000  M/s. Tungabhadra Power 

Co. private Ltd., Bellary. 

 

100.  2  x  5 MW  Elaneeru Mini 

Hydel  Scheme,  Dakshina 

Kannada  District, 

Karnataka. 

 

 

2 x 5 

 

3600 

2000  M/s. Nagarjuna Engineering 

& Contracts Private Ltd., 

Hyderabad. 

Page 61: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Feasibility Study Report 58 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

101.  Elaneeru  MHS 

Chickmagalore  District, 

Karnataka. 

 

 

 

2 x 3 

3000   

 

2000 

M/s. Nagarjuna Engineering 

& Corporation Co. Pvt Ltd. 

Hyderabad. 

102.  Kabbinale  Mini  Hydel 

Scheme,  Dakshina 

Kannada  District, 

Karnataka. 

 

2 x 1 

 

700 

1999  M/s. Sanicons Engineering 

& Contracts Pvt Ltd, 

Bangalore. 

103.  Preparation  of  Executive 

Summary  report  on 

Kattepura  MHS  near 

Kattepura  village 

Arakalgud,  Hassan 

District, Karnataka. 

2 x 1  600    M/s. Bright Vidyut Co Pvt 

Ltd., Bangalore 

 

Page 62: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 59 

E. PRE‐TENDER SERVICES  

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

1.  Indrasagar  Pollavaram 

Multipurpose  Project  –  A 

project of National Interest. 

Multipurpose 

Project 

450000  2011  M/s. ILFS Hyderabad. 

2.  Ghattaprabha  HEP  at 

Ghattaprabha Dam, Karnataka 

EPC bid 

2 x 10  4000  2011  M/s. Megawin 

Switchgear Pvt. Ltd., Salem Tamil Nadu. 

3.  Pre‐Tender  service  for  Canal 

Distribution  network  and 

ancillary  structures 

preparation  of  GAD’s  for 

Bridges,  Aqueducts,  Siphons 

etc. 

Irrigation 

Project —  2011  M/s. Associated 

Engineering Consultants 

& Analysts Pvt Ltd., 

Mumbai. 

4.  Balance of Plant for Rafha Gas 

Based  Power  Plant,  Kingdom 

of Saudi Arabia. 

400  —  2011  M/s. ILF Consulting 

Engineers Abudabhi, 

UAE 

5.  Balance of Plant  for AL—Jong 

of  Gas  Based  Power  Plant, 

Kingdom of Saudi Arabia. 

400  —  2011  M/s. ILF Consulting 

Engineers Abudabhi, 

UAE 

6.  Pre‐Tender  Services  for 

Electro‐Mechanical Equipment 

for Dumajorhi SHEP 

2 x 7.5  —  2011  M/s. Megawin 

Switchgear Pvt Ltd., 

Salem, Tamil Nadu. 

7.  Pre‐Tender Services for Balgad 

SHEP, Uttarkhand State 

3 x 6.6  —  2011  M/s. Simplex 

Infrastructures Ltd., 

Mumbai. 

8.  Pre‐Tender  Services  for 

Khutani  SHEP  Uttarkhand 

State. 

3 x 7  —  2011  M/s. Simplex 

Infrastructures Ltd., 

Mumbai. 

9.  Pre‐Tender  Services  for 

Seraghat  SHEP  Uttarkhand 

State 

3 x 3.7  —  2011  M/s. Simplex 

Infrastructures Ltd., 

Mumbai. 

10.  Balance  of  Plant  for  Qassim 

Gas  Based  Power  Plant 

Qassim  Kingdom  of  Saudi 

Arabia. 

400  —  2010  M/s.ILF Consulting 

Engineers Abudabhi, 

UAE. 

Page 63: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 60 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

11.  Balance  of Plant  for Tabouk‐2 

Gas  Based  Power  Plant 

Tabouk,  Kingdom  of  Saudi 

Arabia. 

2 x 70  —  2010  M/s.ILF Consulting 

Engineers Abudabhi, 

UAE. 

12.  Basanthpur  and  Saradih 

Barrage,  Janjgir  District, 

Chhattisgarh. 

Irrigation 

Project 

—  2010  M/s. Simplex 

Infrastructure Co Pvt 

Ltd., Mumbai. 

13.  Kachchh  Branch  Canal  and 

Rewa Branch Canal‐ Gujarat. 

Irrigation 

Project 

—  2010  M/s. Simplex 

Infrastructure Co Pvt 

Ltd., Mumbai. 

14.  Bheden  ‐Jharsuguda  Water 

Supply, Orissa. 

Water Supply  —  2010  M/s. Simplex 

Infrastructure Co Pvt 

Ltd., Mumbai. 

15.  Bansagar‐1  SHEP,  Mirzapur 

District, Uttar Pradesh 

9.5  4800  2010  M/s. Simplex 

Infrastructure Co Pvt 

Ltd., Mumbai. 

16  Somavathi MHS  9  3000  2010  M/s.Velankeni 

Renewable Energy Pvt 

Ltd,.Bangalore. 

17.  Bandraun  SHEP  Lalitpur 

District, Uttar Pradesh 

14.0 MW  —  2010  M/s. Simplex 

Infrastructure Co Pvt 

Ltd., Mumbai. 

 

18.  Condenser Cooling System for 

2  x  300  MW  EMCO  TPP 

Warror Maharashtra 

2 x 300  —  2010  M/s.Gammon India Ltd., 

Mumbai 

19.  Plant  Water  System  Package 

for  Kakrapara  Atomic  Power 

Project 3 & 4 units Gujarat 

 

2 x 700    2010  M/s.Gammon India Ltd., 

Mumbai. 

20.  Dhaulasidh  HEP,  Himachal 

Pradesh. 

 

40 MW  2000  2010  M/s.Design Group + 

M/s.Feedback Ventures 

(Joint Venture) 

21.  Kalisindh  Dam  Project  in 

Rajastan 

Irrigation 

Project 

4000  2010  M/s.Simplex 

Infrastructures Ltd. 

Mumbai 

Page 64: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 61 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

23.  Detail  Construction 

Methodology  for  Vishnugad‐

Pipalkoti HEP in Uttranchal. 

—  —  2010  M/s. Rithwik Projects 

Pvt. Ltd. Hyderabad 

 

24.  Meja SHEP, Mirzapur District, 

Uttar Pradesh. 

9.00  —  2010  M/s. Simplex 

Infrastructure Co Ltd., 

Mumbai. 

25.  Pre‐Tender  Services  for 

Transportation  of Water  from 

Mahanadi River  at  Cuttack  to 

Paradip  for  Paradip  Refinery 

at Orissa. 

Water Supply  20000  2009  M/s. Gammon India Ltd., 

Mumbai 

26.  Pashdan  Irrigation  Project  in 

Afghanistan 

Irrigation 

Project 

US $ 90 

Million 

2009  M/s.Hewadwal Group 

Kabul, Afghanistan 

27  Almar  Irrigation  Project  in 

Afghanistan 

Irrigation 

Project 

US $ 190 

Million 

2009  M/s.Hewadwal Group 

Kabul, Afghanistan 

28.  Shah‐wa‐Arus  Irrigation  and 

Hydro  Power  Project  in 

Afghanistan 

Irrigation 

Project 

US $ 45 

Million 

2009  M/s.Hewadwal Group 

Kabul, Afghanistan 

29.  Sea  Water  Intake  System  for 

Ultra  Mega  Power  Project  at 

Krishnapatnam,  Andhra 

Pradesh.‐ 6 x 660 MW 

Water Supply  1200  2009  M/s. Gammon India Ltd. 

Mumbai 

30.  Raw Water Supply System for 

Alumina  Refinery  Expansion 

Project  of  M/s.Vedanta 

Aluminium  Limited  at 

Linjigarh in Kalahandi District 

of Orissa. 

 

Water Supply    2008  M/s. Gammon India Ltd., 

Mumbai 

31.  Upper Bhadra Irrigation Canal 

Network System Package II 

 

Irrigation 

Project 

  2007  M/s. Gammon India Ltd., 

Mumbai 

32.  Upper  Bhadra  Irrigation 

Project‐Package Numbers  1 & 

3 Shimoga District, Karnataka. 

 

Irrigation 

Project 

  2007  M/s. Gammon India Ltd., 

Mumbai 

Page 65: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 62 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

33.  Plant Water Supply Scheme at 

JSW‐Vijaynagar  Steel  Plant  at 

Thoranagal,  Bellary  District, 

Karnataka. 

Water Supply  —  2007  M/s. Gammon India Ltd., 

Mumbai. 

34.  Review of draft EPC for Penan 

HEP, Sikkim India 

4 x 70  10000  2007  M/s. Hemagiri Hydro 

Energy Company Pvt 

Ltd., New Delhi. 

35.  Left  Bank  of  Indrasagar 

(Pollavaram)  HEP  in 

Anguluru  Devapatnam 

Mandal,  East  Godavari 

District, Andhra Pradesh 

Irrigation 

Project 

   

2006 

M/s. Maytas Infra Pvt 

Ltd., Hyderabad 

36.  Galeru Nagari  Sulaja  Sravanti 

(GNSS)  Flow  Canal  Project, 

Phase‐I, Andhra Pradesh. 

Irrigation 

Project 

—  2006  M/s. Maytas Infra Private 

limited, Hyderabad. 

37.  Galeru Nagari  Sulaja  Sravanti 

(GNSS)  Flow  Canal  Project, 

Phase‐II, Andhra Pradesh.  

Irrigation 

Project 

—  2006  M/s. Maytas NCC JV 

Private limited, 

Hyderabad. 

38.  Galeru Nagari  Sulaja  Sravanti 

Project Andhra Pradesh 

 

Irrigation 

Project 

—  2006  M/s. Maytas Infra Private 

limited, Hyderabad 

39.  Pre‐tender  Services  for 

Velagonda  Irrigation  Project, 

Nelagunda  Dristrict  Andhra 

Pradesh. 

 

Irrigation 

Project 

—  2005  M/s. Gammon India Ltd., 

Mumbai. 

40.  Assistance  in REQ/RFQ/ Offer 

for  allotement  of  Badrinath 

HEP  near  Badrinath, 

Uttranchal State. 

 

2 x 70  80000  2004  M/s. GMR Energy Ltd., 

Bangalore. 

41.  Pre‐Tender  services  for 

Ainapur  Lift  Irrigation 

Scheme. 

 

Irrigation 

Project 

—  2003  M/s. Simplex 

Infrastructures Ltd. 

Mumbai 

Page 66: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 63 

 Sl. No. 

 Name of the Project 

 Installed Capacity in 

MW 

 Project Cost in Rs. Lakhs 

 Year 

 Clients 

42.  Pre‐Tender  service  for 

Singatalur  Lift  Irrigation 

Scheme, Karnataka. 

Irrigation 

Project 

—  2003  M/s. Chinnanachinuthu 

and Company Bangalore. 

43.  Water  Processing  Projects 

Balance of Electrical Works 

Water Supply  —  2003  M/s. Movers (India ) Pvt 

Ltd., Bangalore 

44.  Implementation  of  3  x  5 MW 

Canal  head  Power  house  on 

Left  Bank  Canal  of  Indira 

Sagar  Project,  Madhya 

Pradesh. 

3 x 5  9000  2003  M/s. SEW Constructions 

Ltd., New Delhi. 

45.  Pre‐Tender  Services  for 

Singatalur  Lift  Irrigation 

Scheme ‐ 4 Packages. 

Irrigation 

Project 

12000  2002  M/s. Engineers Projects 

India Ltd., Chennai. 

 

46.  Pre‐Tender  services  400/220 

kV  for  connected  civil  works 

of Switchyard at Nelamangala, 

Bangalore for KEB, Bangalore. 

Substation  1100  2002  M/s. ABB Ltd., 

Bangalore. 

 

47.  Bajemane  MHS  in  Kodagu 

District, Karnataka. 

2 x 1.5  450  2002  M/s. Falcon Power Pvt 

Ltd., Bangalore. 

48.  Pre‐Tender service  for Greater 

Aizawl  water  Supply  scheme 

Phase II 

Water Supply  10000  2002  M/s. Johnson Eastern 

Power Aizawl Mizoram. 

49.  Pre‐Tender  service  for 

Singatalur  Lift  Irrigation 

Scheme. 

Irrigation 

Project 

—  2002  M/s. G.J Ferandez 

Secunderbad Andhar 

Pradesh. 

50.  Dam  remodeling  studies  at 

Lyka  –Lake  at  Kudremekh 

Iron Ore Co Ltd., 

—  —  2002  M/s. Rochie Mining Mt 

India Pvt Ltd., Cochin 

Kerala State India 

51.  Pre‐Tender  service  for 

Periyapatna  Lift  Irrigation 

Scheme. 

Irrigation 

Project 

1200 

 

2001  M/s. NGEF Ltd., 

Bangalore 

52  Pre‐Tender service  for Balance 

of Civil Works  for Link Canal 

MHS,  Mandya  District, 

Karnataka. 

1.5  150  2001  M/s. Mysore 

Construction Co Pvt 

Ltd., Bangalore. 

Page 67: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 64 

 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

53.  Pre  – Tender  Services  for DG 

Captive Plants at Yemen. 

a) Sana’s (Option 1) 

b) Sana’s (Option 2 ) 

c) Hodaidah 

d) Taiz 

e) Aden 

 

 

3 x 5 

4 x 5 

2 x 5 

2 x 5 

2 x 5 

$ 40 Million.  2001  M/s. National Trading 

Co Ltd., Yemen. 

54.  Pre‐Tender service for Cooling 

Water  System  at 

Ramagundam  TPP,  Andhra 

Pradesh. 

Water Supply  —  2001  M/s. Mega Engineering 

Enterprises, Hyderabad 

55.  Technical  Apprisal  report  on 

DPR  of  Dummagudem  MHS 

across  river  Godavari  at 

Dummagudam,  Andhra 

Pradesh. 

10  2500  2001  M/s. PSM Spinng Ltd., 

Hyderabad 

56.  Pre‐Tender  service  for 

Siraguppa  MHS  near 

Kenchanagudam  Village, 

Siraguppa  Taluk  Bellary 

District, Karnataka. 

2 x 2.5  2000  2001  M/s. Krishi Power Tech 

Pvt Ltd., Bellary, 

Karnataka 

57.  Upper  Bhadra  Lift  Irrigation 

Scheme, Karnataka. 

Irrigation 

Project 

—  2001  M/s. SNC, Bangalore. 

58.  Preparation  of  RFQ  for 

Thermal  Power  Plant  at 

Baroda for M/s. GPCL. Gujarat 

500  22500  2000  M/s. Bay West Power & 

Energy Pvt Ltd., 

Bangalore. 

59.  Pre‐Tender  services  for  Co‐

generation  Captive  Power 

Plant  for  M/s.  Duncan 

Industries  Ltd.,  at  Khanpur. 

Uttar Pradesh. 

75  30000  1999  M/s. Bay West Power & 

Energy Pvt Ltd., 

Bangalore. 

60.  Chuzachen  HEP  in  East 

Sikkim State, 

2 x 40  —  1999  M/s. Nagarjuna 

Construction Co Ltd., 

Hyderabad. 

Page 68: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 65 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

61  Technical  Evaluation  Report 

on  Hemavathy  LBC  MHS, 

Hemavathy  river  bed  unit  & 

Varahi Tail Race Scheme. 

—  —  1999  M/s. Bhrouka Power 

Corporation Ltd., 

Bangalore. 

62  Pre‐Tender  services  for 

Captive  Power  Plant  at 

Kapasan,  Rajasthan  for  M/s. 

HZL, Udaipur, Rajasthan. 

60  28000  1998  M/s. Bay West Power & 

Energy Pvt Ltd., 

Bangalore. 

63  Pre‐Tender  services  for  DG 

Plant  for  Kerala  State 

Electricity Board. Kerala 

40/60  24000  1998  M/s. Bay West Power & 

Energy Pvt Ltd., 

Bangalore. 

64  Pulichintala  Irrigation  Project, 

Andhra Project. 

Irrigation 

Project 

1200  1998  M/s. Gammon India Ltd., 

Mumbai. 

65  Upper  Tunga  Canal  Head 

Regulator,  Shimoga  District, 

Karnataka. 

Irrigation 

Project 

4000  1998  M/s. Karnataka 

Neeravari Nigam Ltd., 

Shimoga, Karnataka. 

66  Pre‐bid  services  for  Koilsagar 

Lift Irrigation Scheme, Andhra 

Pradesh. 

Irrigation 

Project 

—  1998  M/s. Nagarjuna 

Construction Co Ltd., 

Hyderabad. 

67  Pre‐Tender services for 132 kV 

Switchyard at Bidanasi, Orissa 

for M/s. OPGC. Ltd. 

Switchyard  670  1995  M/s. GEPC, Bangalore. 

68  Pre‐Tender  services  for 

connected Civil Works of Port 

Yard Lighting at Chennai Port 

for Ennore Coal Port Project. 

 

Illumination  100  1995  M/s. GEPC, Bangalore. 

69  Haliyal Lift Irrigation Scheme, 

Karnataka. 

Irrigation 

Project 

160  1995  M/s.Mysore Construction 

Co., Bangalore. 

 

70  Pre‐Tender  services  for 

Substations  for  MSEB. 

Maharashtra. 

 

132 kV  900  1994  M/s. GEPC, Bangalore. 

Page 69: Ex Stream Eng Design Group Corporate Profile

  

Pre‐Tender Services 66 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

71  Pre‐Tender  services  for 

connected  civil  works  of 

Substations  at  Meerut  and 

Mandola  for  PGID.  New 

Delhi. 

400 kV/220 

kV 

600  1994  M/s. GEPC, Bangalore. 

 

72  Bhima  Lift  Irrigation  Project, 

Gulbarga District, Karnataka. 

Irrigation 

Project 

22000    M/s. Gammon India Ltd., 

Mumbai. 

  

Page 70: Ex Stream Eng Design Group Corporate Profile

  

Due Diligence Report 67 

F. Due Diligence Report‐Completed    

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

1  Technical  Apprisal  Report 

for  Palloli  MHS  –River 

Gurpur. 

2 x 2.5  2000  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

2  Technical  Apprisal  Report 

for  Alehalli  MHS‐River 

Bhadra 

2 x 2.5  2000  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

3  Technical  Apprisal  Report 

for  Shiragola  MHS‐River 

Bhadra,  Shimoga  District, 

Karnataka. 

3  1500  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

 

4  Technical  Apprisal  Report 

for  Kuskal  MHS  –River 

Bhadra,  Shimoga  District, 

Karnataka. 

2 x 2.5  2000  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

5  Technical  Apprisal  Report 

for  Jaladurga  MHS‐River 

Tunga,  Hospet,  Bellary  

District, Karnataka. 

3  1500  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

6  Technical  Apprisal  Report 

for  Kantamangala  –River 

Payaswini,Puttur  District, 

Karnataka. 

4.5  22500  2011  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

7  Updating of Financials DPR 

for Magundi MHS 

2 x 4.5  5200  2011  M/s. Continental Energy 

Services Pvt Ltd., 

Hyderabad. 

8  Concept  report  for  Water 

Recovery  from  Slime Pond 

at  JSW  Hosepet,  Bellary  

District, Karnataka. 

—  —  2010  M/s. Kelsatek Solutions 

Pvt Ltd., Bangalore. 

9  Chunchi  Doddi  MHS, 

Bangalore  Rural  District, 

Karnataka. 

3 x 3.559  4800  2010  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

Page 71: Ex Stream Eng Design Group Corporate Profile

  

Due Diligence Report 68 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

10  Bhadra  Left  Bank  Canal 

MHS,  Shimoga  District, 

Karnataka. 

1 x 1.5  1051  2010  M/s. Shree Matha 

Vaishnavi Infra‐Build Pvt 

Ltd., Mysore. 

11  Jalkoti  SHEP  in  Himachal 

Pradesh. 

2 x 6.25  10400  2010  M/s. Prajwal Energy Pvt 

Ltd., Mumbai 

12  Hemavathy MHS, 

a) Left Bank Power 

House 

b) River Bed Power 

House 

Hassan District, Karnataka 

 

4 x 4 

 

2 x 4 

 

8000 

 

 

 

 

4000 

2010  M/s. Greenko Energies 

Pvt Ltd., Hyderabad. 

13  Himani  Chamunda  SHEP 

in Himachal Pradesh. 

2 x 4.75  8000  2010  M/s. Prajwal Energy Pvt 

Ltd., Mumbai 

14  Dadupur  MHS,  near 

Dadupur, Harayana. 

4 x 4  6400  2010  M/s.Bhoruka Power 

Corporation Pvt Ltd., 

Bangalore. 

15  Techno‐Economical 

Viability  Study  on DPR  of 

Dikku HEP, Nagaland. 

165  110000  2010  M/s. Saraswathi Power 

Co Ltd., Hyderabad. 

16  Somavathi  MHS, 

Chikkamagalur  District, 

Karnataka. 

2 x 3  2963.65  2010  M/s. Velankani 

Renewable Energy Pvt 

Ltd.,Bangalore. 

17  Technical  Review  Report 

for  Chaya  Bhagawati  SHP, 

Karnataka. 

4 x 6  12000  2009  M/s.Bhoruka Power 

Corporation Pvt Ltd., 

Bangalore. 

18  Due  Diligence  report  for 

Sarju  I  MHS,  Bageshwar 

Uttarakhand. 

7.5  5300  2009  M/s. Hemavathy Power 

& Light Pvt Ltd., 

Bangalore. 

19  Sarju  II  MHS,  Bageshwar 

Uttarakhand 

15  10500  2009  M/s. Hemavathy Power 

& Light Pvt Ltd., 

Bangalore. 

 

20  Sarju  III  MHS,  Bageshwar 

Uttarakhand 

10.5  7500  2009  M/s. Hemavathy Power 

& Light Pvt Ltd., 

Bangalore. 

Page 72: Ex Stream Eng Design Group Corporate Profile

  

Due Diligence Report 69 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

21  Upper Sethi HEP, Nepal. 

 

127  100000  2009  M/s. Venika Hydro 

Projects Pvt. Ltd., 

Bangalore. 

22  Upper Modi HEP, Nepal.  30  30000  2009  M/s Maytas Infra Ltd., 

Hyderabad. 

23  Paudital  Lassa  SHP  near 

Roharu Town  in Himachal 

Pradesh. 

24  12600  2008  M/s. Tulajaa Bhavani 

Energy Projects Pvt Ltd., 

Mumbai. 

24  Palor‐I  MHS  near  village 

Lana  Palor  Sangarh  Taluk, 

Simor  District,  Himachal 

Pradesh 

2 x 1.5  1300  2008  M/s. Tulajaa Bhavani 

Energy Projects Pvt Ltd., 

Mumbai. 

 

25  Palor‐II  MHS  near  village 

Lana  Palor  Sangarh  Taluk, 

Simor  District,  Himachal 

Pradesh. 

2 x 2.25  1306  2008  M/s. Tulajaa Bhavani 

Energy Projects Pvt Ltd., 

Mumbai. 

 

26  Gundiadka  SHPP, Dakshin 

Kannada  District, 

Karnataka. 

2 x 3.5  1925  2007  M/s. Sun Technics Pvt 

Ltd., Bangalore. 

27  Burhi Gandaki HEP, Nepal  4 x 150  227618  2007  M/s. GMR Energy Ltd., 

New Delhi. 

28  Augmentation  of  water 

supply  to Mangalore  City. 

Dakshina Kannada District, 

Karnataka. 

Water 

Supply 

3940  2007  M/s. Mangalore City 

Corporation, Mangalore 

Karnataka. 

29  Kubjanadi  MHS,  near 

Coondapura, Karnataka. 

2 x 2  1600  2007  M/s.PSR Hydro Energy 

Pvt. Ltd., Bangalore. 

30  Marigundihole  MHS,  near 

Kadaba,  Chikkamagalur 

District, Karnataka. 

2 x 1.5  1250  2007  M/s.PSR Hydro Energy 

Pvt. Ltd., Bangalore. 

31  Venurhole  MHS,  near 

Moodabidri,  Dakshina 

Kannada District Karnataka 

2 x 2.5  2000  2007  M/s.PSR Hydro Energy 

Pvt. Ltd., Bangalore. 

32  Manchikere  MHS,  near 

Yellapura,Uttara  Kannada 

District, Karnataka. 

2 x 8.25  8000  2007  M/s.PSR Hydro Energy 

Pvt. Ltd., Bangalore. 

Page 73: Ex Stream Eng Design Group Corporate Profile

  

Due Diligence Report 70 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

33  Techno‐Economical 

viability  Study  for  Hanol‐

Tiuni in Uttranchal. 

100  60000  2007  M/s. Sunflag Iron and 

Steel Co Ltd., New Delhi. 

34  Baliyantrahole  MHS, 

Kodagu District, Karnataka. 

2 x 1  800  2007  M/s.Kodagu Power Pvt. 

Ltd., Bangalore. 

35  Middle Kolab SHP, Orissa.  3 x 6  9000  2006  M/s.Meenahshi Power 

Ltd., Hyderabad. 

36  Review  of  Hydrology  and 

Power  Potential  for  Dik‐

Chu HEP in Sikkim 

2 x 48  80000  2006  M/s. Indu Projects Ltd., 

Hyderabad. 

37  Samal  HEP  near  Kule 

village  Angul  District, 

Orissa. 

5 x 4  10000  2006  M/s.. KSK Energy 

Ventures Ltd., 

Hyderabad. 

38  Techno‐Economical 

viability  study  for  Bajoli 

Holi  Project  near  Holi 

village, Himachal Pradesh. 

180  108000  2006  M/s. Simplex 

Infrastructures Ltd., 

Mumbai. 

 

39  Techno‐Economical 

viability  study  for  Dibbin 

HEP, Arunachal Pradesh. 

95  60000  2006  M/s..Sunflag Iron & Steel 

Co.Ltd., New Delhi 

 

40  Kuthupuzha  MHS  in 

Kodugu  District, 

Karnataka. 

2 x 2  200  2005  M/s. Raphidiam Power 

Supplies Pvt Ltd., 

Madikere 

41  Technical  appraisal  on 

Bharmour  HEP  in 

Himachal Pradesh. 

80  34700  2005  M/s. Nagarjuna Hydro 

Energy Pvt Ltd., 

Hyderabad. 

42  Preliminary  Assessment  of 

Power  Potential  for 

Machgunda  MHS, 

Shalipura Branch Canal 1 & 

2, Karnataka. 

 

650 

 

600 

200 

 

200 

2005  M/s. Rahmhita Power 

Project Pvt Ltd., 

Hyderabad. 

43  Kelagur  MHS  Kodagu 

District, Karnataka. 

2 x 2  1600  2005  M/s Karnataka Strips Pvt. 

Ltd., Bangalore. 

44  Study of Power Potential  in 

Netravati  Basin  Western 

Ghats, Karnataka. 

—  —  2004  M/s. NTPC Hydro Ltd., 

Noida, NCR New Delhi. 

Page 74: Ex Stream Eng Design Group Corporate Profile

  

Due Diligence Report 71 

Sl. No. 

Name of the Project  Installed Capacity in 

MW 

Project Cost in Rs. Lakhs 

Year  Clients 

45.  Project Appraisal for 40MW 

Biomass  based  Thermal 

Power  Plant  in  Andhra 

Pradesh. 

40  20000  2004  M/s. Alpha Energy 

System Ltd., Chennai 

Tamil Nadu. 

46.  Techno‐Economical 

Viability  Study  on  DPR 

Jorthrang  Loop  HEP 

Sikkim. 

2 x 48  65000  2004  M/s. Nagarjuna hydro 

Energy Pvt Ltd., 

Hyderabad. 

 

Page 75: Ex Stream Eng Design Group Corporate Profile

Certificate 72 

 

Page 76: Ex Stream Eng Design Group Corporate Profile

Certificate 73 

 

Page 77: Ex Stream Eng Design Group Corporate Profile

Certificate 74 

 

 

  

Page 78: Ex Stream Eng Design Group Corporate Profile

Certificate 75 

    

    

Page 79: Ex Stream Eng Design Group Corporate Profile

Certificate 76 

  

 

  

Page 80: Ex Stream Eng Design Group Corporate Profile

Certificate 77 

    

 

Page 81: Ex Stream Eng Design Group Corporate Profile

Certificate 78 

        

Page 82: Ex Stream Eng Design Group Corporate Profile

Certificate 79 

       

Page 83: Ex Stream Eng Design Group Corporate Profile

Certificate 80 

      

Page 84: Ex Stream Eng Design Group Corporate Profile

Certificate 81 

      

Page 85: Ex Stream Eng Design Group Corporate Profile

Certificate 82 

      

Page 86: Ex Stream Eng Design Group Corporate Profile

Certificate 83 

     

      

Page 87: Ex Stream Eng Design Group Corporate Profile

Certificate 84 

  

   

Page 88: Ex Stream Eng Design Group Corporate Profile

Certificate 85 

   

       

Page 89: Ex Stream Eng Design Group Corporate Profile

Certificate 86 

      

Page 90: Ex Stream Eng Design Group Corporate Profile

Certificate 87 

       

Page 91: Ex Stream Eng Design Group Corporate Profile

Certificate 88 

 

Page 92: Ex Stream Eng Design Group Corporate Profile

Advisor 89 

13. Brief Profile of Advisors / Consultants

(a) Advisors  

Mr. H.V. Eswaraiah, is retired from Karnataka Power Corporation Limited, working as 

freelance  Consultants  for  large  Hydro  Power  Project.    Design  Group  is  availing  his 

technical  expertise  on  implementation  of  Hydro  Power  Project  related  to  contracts, 

QAC, PMC etc. 

 

Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian Institute of Science, 

had a brief stints as  lecturer, worked  in State Public Works Department before joining 

Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971, 

and  retired  as Technical Director  in  the year  1997.   He has extensively dealt with  all 

aspects of Hydro Power Projects, starting  from  field  investigation, preparation of PFR, 

DPRs, Bid preparation, technical evaluation, award of work, as Executive Engineer, he 

has worked on  a 100m high Supa Concrete gravity Dam, achieved production level of 

1000 cumecs per day of concreting production and  laying  in  the design.   At corporate 

level,  in  charge of  long  term Power Project Planning,  advising Managing Director, on 

settlements of dispute and claims of contracts, direct monitoring of   all Projects under 

construction, procurement and movement of Coal, Cement and Steel.  In his tenure, he 

has handled 15 Hydro Power Projects including a Thermal and Wind Projects.  He had 

wide experience in dealing with World Bank Funded Projects. 

 

After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor.  He 

is also assisting Banks as Lender Engineers  for various Mini Hydel Scheme  funded by 

Banks. 

Page 93: Ex Stream Eng Design Group Corporate Profile

Advisor 90 

 Mr. Shankar V. Nesargi, B.E.  (Mech), ME  (WR),  Joined Karnataka Power Corporation 

Limited,  as  an Engineer  in  the year  1970  and  retired  as Managing Director of VVNL, 

subsidiary  Company  of  KPCL  in  the  year  2005.    As  an  Assistant  Engineer  handled 

investigation works of Kali Hydro Electric Project ( 6 x 135 MW)  including drift works. 

Incharge  Executive  Engineer  for  construction,  O  &  M  of  4  x  210  MW  

Raichur Thermal Power Plant, he had extensive explosure to Coal Plant, Railways, WTP, 

Boiler,   Turbines  etc.   During  this period, he was  elevated,  as Superintending  / Chief 

Engineer.   In the year 2003, he was appointed as Executive Director totally  incharge of 

Planning  Infrastructure works  of  4  x  350 MW,  Bidadi Gas  Based  Power  Plant,  near 

Bangalore.    Subsequently,  he was  appointed,  as Managing  Director,  Vishveswaraiah 

Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R 

&  M  works.    During  his  tenure  in  KPCL,  he  has  attended  several  National  and 

International Seminar and travel world wide. 

 

After retirement he was a freelance consultant to various foreign Companies in Uganda, 

Spain etc., traveled extensively in these countries as technical consultants. 

 

Presently, he works as a Managing Director of DB Global Energy Limited, a Company 

dedicated  to Wind  Power Generation  as  IPPs,  executing  100 MW  of Windfarm  near 

Belgaum, Karnataka. 

 

 

Page 94: Ex Stream Eng Design Group Corporate Profile

Advisor 91

 

Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had 

one year  training  in Nuclear and Allied subjects  in Bhabha Automic Research Centre, 

Bombay.  Thereafter, he was absorbed in the department worked for a decade in various 

departments of BARC, before  joining Engineers  India Limited, New Delhi  in  the year 

1978.   Thereafter joined Gas Authority of  India Limited and worked  till 1990.   He was 

selected, as Director  in Neyveli Lignite Corporation Ltd,  in 1997.   He was Chairman  / 

Managing Director of Fertiliser  and  chemicals, Travancore up  to his  retirement  in  the 

year 2002. 

 

He  is a  freelance consultant, presently  independent Director of REC,  India Rare Earth 

Ltd., (Department of Atomic Energy). 

 

His  areas  of  expertise  is  overall  Corporate  Management  of  Large  Organisations, 

Development  of  Engineering  Expertise  in  the Organisation, Conceptualising  of  Turn 

Around  strategies,  over  view  the  implementation  of  the  Projects  from  Concept  to 

Commissioning, preparation of quality Project Reports, Proper appraising of the Project 

Reports, Resolving Arbitration  Issues etc., by applying  the expertise and experience  in 

managing    various  projects  in  Nuclear  Chemicals,  Fine  Chemicals,  Petrochemicals, 

Hydrocarbons, Gas Processing Plants, Cross Country Pipelines, Thermal power plants,

Fertilizer Complexes etc.

Page 95: Ex Stream Eng Design Group Corporate Profile

Advisor 92

Mr. B.V. Ramakrishnaiah, hydraulic Gates Consultants, was  ranked  4th  in Bachelor of 

Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian 

Institute of Science, Bangalore, in the year 1964.  He joined CW& PC, New Delhi, soon 

after  his Master  degree  in  the  year  1962, worked mainly  in  design  and  drawing  of 

Hydraulic Gates for Irrigation and Hydro Power Projects.  In the year 1966 joined M/s. 

Triveni Structurals Ltd., Naini, Allahabad, served over 13 years  in the organization, as 

Gates and Penstock design specialist.  During his tenure, he has designed cylinder Gates 

for Ramanaganga Project, which is only one of its kind in the country, operated by a 70 

tonnes  capacity  Hydraulic  hoist.  Another  gate  operated  by  650  tonnes  capacity 

Hydraulic  hoist  is  designed,  as  High  Pressure  slide  gates,  for  Baggi  control works, 

Sundernagar, Himachan Pradesh, High Pressure  fixed wheel Penstock emergency gate 

was designed  for  Beas Project, Punjab  for  a  clear vent  size of  10  feet  x  21  feet,  for  a 

design head of 110m.  This gate carries a total load of 2160 tonnes which is transferred to 

concrete through 12 wheels, 150 tonnes capacity hydraulic hoist  operates the gate.  Crest 

radial  gates  for  Itezhitezhi  Dam,  Zambia,  has  been  designed  which  was  vetted  by 

SWECC  Swedan.    Similarly,  Batten  outlet  radial  gates  had  been  designed  for  Great 

Reeha Power Project Tanzania. 

 

He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy 

firm, where he has designed over 100 gates of various shapes and sizes.  To name a few, 

designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro Electric Project in 

Andhra Pradesh,  first time spherical plain bearings were used  for the Tirunion  instead 

of  normal  bronze  bushes.   Designed  one  of  the  tallest Penstock  gate  of  size  6.75m  x 

15.75m in the country, for Lower Metur Project in Mettur Tamilnadu. 

 

As  regards Penstocks, Pipes,  2.743m  dia  for  a  static  head  of  405m was  designed  for 

Kaufe Gorge HEP  in Tambia Africa,  4.88m dia  to withstand static head of  51.2m was 

designed  for  Bowatena  Power  Project  in  Sri  Lanka.   He  has  distinction  of  designing 

record breaking gate size and penstocks of large diameter in India.  He is ranked as a top 

class gate designer in India. 

Page 96: Ex Stream Eng Design Group Corporate Profile

Advisor 93 

Mr. V.  Balachandran,  is  a  retired, Deputy Director General  and HOD GSI,  Southern 

Region.  He  is  a  freelance  senior  Geologist  advising  Design  Group  on  Engineering 

Geology  for  Large  Hydro  and  Irrigation  Projects  in  India  and  Abroad.  Presently 

pursuing his doctoral thesis in Osmania University. 

 

Mr. V. Balachandran, after Masters’ degree in Geology joined Geology Survey of India in 

the year  1971,  as  Junior Geologist  and  retired,  as Deputy Director General  and HOD, 

GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is 

spent in Engineering Geology, involved in conducting Preliminary Investigation to post 

construction  stage,  his  services  spread  all  over  India,  including  Supervision  and 

guidance  to Project Authorities. A  few Projects where he was directly  involved  are  : 

facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two 

regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme, 

upto upper  Siwalik  incoherent sand  rock with plethora of problems such  as seepage, 

collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam 

project which was under investigation for a protracted period (40 years). By identifying 

source of  seepage  at Kadampari Pumped  storage  scheme,  the  energy  generation was 

substantially  enhanced.  Adopted  hydraulic  jacking  of  upper  Kodayan  tunnel  and 

suggested other remedial measure. Geological  investigation was extensively carried at 

MAPS Kalpakkam  and Kundankulam  for Nuclear Power Corporation Ltd., Extensive 

field  services were  carried  out with  special  reference  to  Seismological  studies  led  to 

clearance  for  Kundakulam  Atomic  Power  Plant.  Initiated  studies  on  Korada  Atomic 

Power  Plant  and  studies  on  Plutonium  Fast  Breeder  Reactor  Project  under Madras 

Nuclear  Power  Plant  leading  to  clearance  to  the  Project.  Carried  out  Mega  thrust 

Tsunami Hazard  studies  in  South  India. Attended  several National  and  International 

seminars,  and  presented  several  technical  papers,  Traveller World Wide,  including 

undergoing  training  in Harza Engineering, USA and National Resources  (Canada) and 

Geological Survey of Canada at Vancouver Calgary and Ottawan Canada. 

Page 97: Ex Stream Eng Design Group Corporate Profile

Advisor 94 

C.R. Venkatesh B.E.  (Civil), M.E.  (Str), obtained  first class with distinction  in Masters’ 

degree,  from  the  renowned  Indian  Institute  of  Science,  Bangalore.    He  worked,  as 

lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist 

Cement Research  Institute of  India, New Delhi, before  joining National Hydro Power 

Corporation Ltd.,  as Manager  in  the year  1981, worked  till his  retirement  in  the year 

2004.   During his  tenure  in NHPC Ltd., he has  risen  from  the post of Manager upto 

Executive Director.   As  a Chief Engineer, he was  in  charge of Dulhasti Hydro Power 

Project  (3  x  130  MW).    As  an  Executive  Director,  Contract  Division,  managed  all 

procurement activities and Civil E & M Works Contracts.   Under R & D wing, he has 

evolved cost analysis of complicated works, suggested various means  for cost cutting.  

He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in 

Sweden,  under  went  Advanced  International  Hydro  Power  Develop  Project;  in 

Germany / Netherland attended Advanced Management Development Training. 

 

In  India,  under went  specialized  technical  training  in  Reflection Photo  elasticity  and 

strain gauge  technique,  Dam Safety, Geotechnical  instrumentation etc.   He has visited 

number of Foreign Countries. Deputed to Pakistan, participated in technical discussions, 

on Indus Watering Treatment. Had meeting with Arbitrators in connection with Internal 

Arbitration Tribunal on Chamera HEP Contract disputes.  He has 44 technical papers to 

his credit.  His research paper on De‐silting basin, won a special Certificate of merit by 

Central Board of Irrigation and Power, New Delhi. 

 

Since, his retirement, his services, as  freelance consultant  is being used by major Civil 

Contractors for dispute redressal and Arbitration. 

Page 98: Ex Stream Eng Design Group Corporate Profile

Advisor 95

Mr. M.C. Rangarajan, is a free lance Electrical Engineering Consultant for various 

organisation including M/s. Design Group Project Consultants Pvt Ltd. 

 

Mr. M.C. Rangarajan,  after  obtaining  Bachelor  of Engineer degree  from  Indian 

Institute  of  Science,  in  the  year  1969,  joined Karnataka  Power Corporation  as 

Electrical  Engineer,  and  retired  in  the  year  2005,  after  36  years  of  rich  in 

experience Hydro Power  generation.  Important  assignment  to name  as Design 

and  Layout  of  Hydro  and  Thermal  Projects  sizing  of  units,  firming  up  of 

technical  specification,  bid  documents,  bid  processing,  contract  management, 

project monitoring,  inspection of components, Vendors Plant. He was  involved 

in  construction  of  following Hydro Projects  to name  a  few, Nagjhani  (6  x  135 

MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x 

60 MW), Kadra Dam  Power House  (3  x  50 MW),  and Kodasalli Dam  Power 

House  (3 x 40 MW).  In addition  looked after O & M of Sharavathy HEP  (1035 

MW), Varahi underground Power House (230 MW), R & M works etc. 

 

As a senior executive Chairman of Core group for Q & AC of EPC Contract for 

500 MW  Bellary  Thermal  Power  Plant,  Power  Purchase  agreement with  State 

level  distribution  Companies.  He  has  presented  several  technical  papers  in 

National and  International Conference; visited difference type of Power Houses 

and manufacturer units in India and Abroad. 

Page 99: Ex Stream Eng Design Group Corporate Profile

Advisor 96

 

S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975 

to 1984, after a brief stinct, as lecture in NIE Mysore.  Joined NHPC, in the year 1985, and 

retired in the year 2009, as General Manager. 

 

He had an exposure in all branches of Hydro Power Project, from Survey, Investigation, 

Preparation of PFRs and DPRs, bid documents,  to Civil designs, construction of HEPs.  

He was past as GM Consulting and Bussiness Development Division, dealt with Tidal 

Power  Project,  Infrastructure    development  in Andaman  and Nicobar  Island, Varzab 

Power  Plant  in Tajikistan  and  raising  of Dhankari  dam  in  Port  Blair, Andaman  and 

Nicobar  Island.   Till his  retirement, he had handled over  5000 MW of Hydro Power 

development in various capacities sparing across the length and breadth of India for 10 

HEPs in total.  He had a short stint in design and engineering of Power transmission line 

in  North  East  State.    He  is  a  freelance  consultant  advising  various  IPPs  in 

implementation of small Hydro Projects. 

Page 100: Ex Stream Eng Design Group Corporate Profile

Advisor 97 

 

Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in 

Power Plants, and complicated heavily loaded structural steel works. Presently advisor 

to Design Group. 

 

Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and 

retired in the year 2009, as Deputy General Manager. As a steel structural designer, he 

was actively involved in design of Steel Plants of large capacity in India, such as Bokaro 

Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant 

in Kerala, Defence Project  – NSTL  at Vizag A.P., Kudremukh  Iron Ore Project, Essar 

Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external 

Coal handling system  for TNEB at Chennai, Birla Copper expansion phase  II. HGPL – 

Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka, 

Essar Integrated Steel Plant at Hazira. More than half million tones of Steel design and 

fabrication of steel structure has been done under his guidance. He has been deputed to 

foreign  countries  by MECON  for  inspection  and  fabrication  in Countries  like China, 

Germany,  Korea,  he  has  also  attended  several work  shops  conducted  in  India  and 

Abroad. 

Page 101: Ex Stream Eng Design Group Corporate Profile

Advisor 98

 

Mr. V. Narayanan,  is  a  transmission  line design  and  construction  expert.   Advisor  to 

Design Group on assignments pertaining to transmission lines, as and when required. 

 

After his Bachelor degree  in Civil Engineering, obtained Masters degree  in Civil  and 

Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the 

year 1963.  soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission 

Tower, Civil Foundation and other allied works.  He has involved designs and drawings 

for various voltages from 66 kV to 220 kV to many Electricity Boards in India. 

 

Subsequently  1973 onwards  assumed  the  change of Production Manager  in M/s. SAE 

Factory  at  Jabalpur.   He was deputed  to M/s.  SAE, Milano,  for being  trained  in  their 

works at Lecco, on production engineering, design and drawings, Testing Stations.   In 

the year 1978 was sent to Australia to acquaint with the working of Testing Station.  At 

Jabalpur  Plant, made  a  commercially  viable  Testing  Station  in  par with  International 

Testing Station.  He was responsible for increasing the production capacity to 30,000 MT 

per annum from 8000 MT.  As a General Manager responsible for design and testing of 

many 400 kV and 500 kV DC lines.  After his retirement worked in several International 

Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc.  He has wide 

technical knowledge in Transmission lines from concept to commissioning. 

Page 102: Ex Stream Eng Design Group Corporate Profile

Advisor 99 

 

Mr. C. Channakeshava, Ph.D, is an freelance advisor to Design Group on Computer aided 

Mathematical modeling  for  3D  complicated  structures  for  carrying out precision  analysis 

and design of Dams etc. 

 

Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of 

Science, Bangalore, obtain his Ph.D  in  the same  Institution  in the year 1988.   He was Post 

Doctral  Research  Associates  in  University  of  Cincinnati  Ohio,  USA,  Louisiana  State 

University,  USA,  extensively  worked  on  Finite  Element  Method  applied  to  Civil 

Engineering works.  He has illustrious academic background, topper in Universities in India 

and Abroad. 

 

In  Bangalore,  joined  a  reputed  EMRC  Software Company  (USA)  team  to  develop world 

class NISA Software tool used extensively for Non‐linear analysis.  His field of interests are 

computational mechanics, Finite Element Analysis, Boundary Element Analysis, Analysis 

and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design. 

 

Page 103: Ex Stream Eng Design Group Corporate Profile

Advisor 100

 

Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory 

Affairs and Compliance. Design Group is availing in services in PPA related matter. 

 

Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of 

Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise related 

to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of 

Karnataka  Chamber  of  Commerce  and  Industries,  Advisor  to  India Wind  Turbine 

Manufacturers  Association.  Advisor  Renewable  Energy  Developer  Association, 

Karnataka  (REDAK).  Former  State Council Member  –  IWPA,  in  addition  during  his 

practice, he has represented India’s Wind Energy Sector, before the Supreme Court; first 

and  only  representative  of  the Wind  Energy  Sector  to  represent  before  the Central 

Electricity  Regulatory  Commission  (CERC),  New  Delhi.  Represented,  on  several 

occasions,  on  behalf  of  IPP’s,  he  has  argued  before  REC’S  on  fixation  of  Tariff, 

standardization of PPA’s renewable Power Purchase obligations for Wind Project. 

 

Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services 

Company  with  a  market  capitalization  of  over  US$  30  Billion  for  Green  Power 

procurements  in  Southern  States.  Engaged  for  advisory  and  tariff  filing  by  first  ever 

electric cooperative society and distribution license in Karnataka. 

Page 104: Ex Stream Eng Design Group Corporate Profile

Advisor 101 

Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers 

on  environmental  and  sustainable Development Areas  including  climate  change  and 

CDM  aspects  etc., Design Group  seek his  advice on  specific  field  like  Environmental 

impact assessment, CDM due diligence and Environmental Protection project. 

 

Mr. Srinath N. Anekal after obtaining Bachelor / Master degrees in Civil Engineer from 

Bangalore University pursued higher studies  in University of Florida, Gainsville, USA, 

was  awarded Master degrees  in Environmental Engineering  Science  in  the year  1993.  

Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO 

14000  Environmental Management  System  CII  India,  hazardous  waste management 

operational practice, USA.  He has traveled widely in USA, Inida, Banglaesh, Maruitius 

and Mozambique.   Where he worked  extensively  in  the  field of Environment, Energy 

and Water.   He  demonstrated  experience  in  conceptualizing,  design,  promoting  and 

implementing innovative projects in the area of waste minimization, clean Technologies, 

Environmental protection, Urban Water Supply and sanitation, Renewable Energy and 

clean Development Mechanism.   He was with  executing Agencies  for  implementing 

reform oriented projects funded by world Bank, DflD, KfW, European Commission and 

Danida.  He has contributed to the development of country level strategies; especially on 

mainstream new development concepts, through conduct and participation in seminars 

and workshops  and  effective  interaction with  all  stake holders  in Government, Non‐

Governmental Organization and Private Sectors. 

Page 105: Ex Stream Eng Design Group Corporate Profile

Consultant 102

(b) Consultants  

 Mr.  C.S. Hebli,  B.E.  (Hons),  after  obtaining  Bachelor  degree  in  Civil  Engineer with 

distinction, joined Bombay public works Department, in the year 1954, worked as Junior 

Engineer Planning Minor  Irrigation Project, after reorganization of Karnataka state, his 

services  were  lent  to  Hydro  Electrical  Civil  Projects  in  the  year  1959,  as  Assistant 

Executive Engineer,  involved  in  investigation and preparation of Bedthi, Aghanashini, 

Mahadayi, Kalinadi  (910 MW) Projects.   HECP was converted  into a dedicated power 

generation  company  called  Karnataka  Power  Corporation  Limited,  fully  owned  by 

Government of Karnataka to execute.  He raised from ranks upto first Technical Director 

of the Company, retired in the year 1988 with 37 years of rich power project experience.  

During his  service,  activity  involved  in Kalinadi HEP  (910 mw),  Sharavathi HEP  (835 

MW), Varahi HEP  (239 MW).   Raichur TPS  (5 X 210 MW)  from concept to completion, 

involved  in  long  term  planning  of  Projects,  Hydro  policy  in  the  state  etc.    After 

retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro 

and  Gas  based  Power  Plant  aggregating  to  2000 MW,    joined  as Chairman,  Design 

Group Project Consultants Pvt Ltd., Company established  in 1979,  technically guiding 

staff    strength  of  52  technocrates  effectively  involved  in  technical  advise.    Policy 

decisions, Company affairs etc. 

Page 106: Ex Stream Eng Design Group Corporate Profile

Consultant 103

Mr.  B.L.  Lakshminarasimha,  B.Sc.,  B.E.,  M.E.,  M.I.E.,  F.I.V.,  M.A.S.C.E.,  after 

obtaining  Master  degree  in  Civil  Engineer  from  Birla  Institute  of 

Technology,  Pilani,  premier  educational  Institution  of  India 

(collaboration with M.I.T., USA,) after a short stint in Messers. Gerame 

and Binny Limited, joined Karnataka Power Corporation Limited, as a Civil Engineer in 

1975, resigned after 20 years of  service,  acquired technical knowledge in drafting of bid 

documents for large Hydro Power Projects, interpretation of Contract Clauses, resolved 

disputes, formulated schedule of rates, design of Surface Power House, framed structure 

through 3 D modeling etc. Designed and constructed KPCL Corporate office building.  

Assisted Company’s  legal advisors  in Arbitration proceeding/Contract disputes,  in  the 

Court of Law etc Founder member Design Group, established in 1979.  What turned out 

to be one man show in 1979 has grown to a large consultancy firm of repute in India and 

Abroad.    Over  3  decades  of  existence,  developed  an  exclusive  team  of  dedicated 

consultants having 40 years and above experience in Power and Irrigation Projects from 

concept to completion. 

 

Recently developed a dedicated team of engineers to extend design engineering services 

in  Water  and  Waste Water  Treatment  Plants.  Successfully  steered  the  company  in 

obtaining KEMA ISO Certification, maintained consistent profitability over the decades.  

Executed  number  of  Joint  Venture  Partnership  in  India  and  Abroad,  such  as  CPRI, 

WAPCOS,  ILF,  for  implementation of Large Projects successfully, signed a  few design 

engineering  assignment  contract  in  neighbouring  countries  such  as,  Saudi  Arabia, 

Dubai, Muscat, Ghana, Nepal, Sri Lanka. 

 

 

 

 

Page 107: Ex Stream Eng Design Group Corporate Profile

Consultant 104 

 

Mr.  P.R. Mallikarjuna,  after  obtaining M.E.,  from  prestigious  Indian 

Institute of Science  in  the year 1969, worked  in various capacities  in a 

Public  Sector  /  Private  Companies,  before  joining  Karnataka  Power 

Corporation in the year 1971, as Group Engineer (AEE), and retired in 

the  year  2000  as  Technical  Director, with  an  illustrious  career  spanning  34  years  in 

various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years, 

after his retirement. During his tenure in the KPCL, he was the head of Design wing and 

handled  all  major  Hydro  Projects,  Thermal  Power  Plants  from  concept  to 

commissioning.  Over  1200  MW  of  Power  Projects  has  been  investigated  under  his 

guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of 

Power Projects have been  implemented under his guidance. He has  attended  several 

National and International seminars, and contributed dozens of technical papers. After 

his retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira 

Sagar  Polavaram  Hydro  Electric  Project  in  Andhra  Pradesh,  on  behalf  of  Andhra 

Pradesh  Irrigation Department,  including obtaining clearances  from Central Electricity 

Authorities, New Delhi. He was  involved  in detailed  engineering of Nagarjuna  Sagar 

Tail Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage 

II (2 x 115 MW). 

 

 From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for 

planning and design of Hydro Electric Projects and Large Irrigation Projects, etc. 

Page 108: Ex Stream Eng Design Group Corporate Profile

 

Consultant 105 

 

Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University 

College of Engineering, Bangalore  in  the year  1971 worked  in  State 

Government  Organisation,  before  joining  Karnataka  Power 

Corporation in the year 1972 as Engineer and retired in the year 2004 

as Chief Engineer with  an  illustrateous  carrier spanning  32 years  in 

various cadres. During his tenure in the KPCL, he was head of Design wing consisting 

of  engineers  of  all  discipline,  handled  all major Hydro,  Thermal  Power  Plants  from 

concept  to  completion.  Attended  several  National  and  International  seminars,  and 

contributed  several  technical  papers.  He  is  member  of  Gate  Committee  since  1996, 

formed by  the Govt. of Karnataka  for design,  fabrication erection & commissioning of 

prestigious  Alamatti  Dam  Gates  and  hoists.  Even  to  date,  he  is  in  the  panel  for 

inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty 

member on  the  continuing  education  to  the Engineers of  the State, organized by The 

Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale 

dams, of Sharavati Hydel Scheme assigned to him by the Karnataka Power Corporation. 

After his retirement, he was also  involved  in detailed engineering of Nagarjuna Sagar 

tail pond Dam and Varahi underground Power House – Stage  II  (2 x 115 MW) and a 

major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation Company.  

 

From 2010 onwards he is associated with DG responsible for implementation of Hydro 

Electric and Irrigation Projects.  

Page 109: Ex Stream Eng Design Group Corporate Profile

Consultant 106

Mr.  Chikkaguddappa  (C.G.  Appa),  joined  Design  Group  Project 

Consultants  Pvt  Ltd.,  in  2005,  as  a  Director  Hydro  Power  Project 

Planning  and  river  basin  study.    He  has  travelled  neighbouring 

countries, to advice IPP’s on Planning of Hydro Power Project. 

 

Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the 

year  1973,  as  an  Engineer,  raised  to  the  level  and  retired  in  the  year  2005,  from 

Corporation after 38 years of long services.  From the day one, he was involved in river 

basin development in the Corporation, identifying and Planning Hydro Power Projects 

in  entire  length  and  breadth  of Karnataka  state.   Mostly  dealt with  Investigation  of 

HEP’s  like Shivana Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti 

Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data 

collection  for Hydrology,  surface  and  sub‐surface  details  for  preparation  of DPR  for 

major HEP’s    like MahadayI  (318 MW),   Cauvery  Scheme  (270 MW), Tamankal  (800 

MW), Almati Dam Power House (280 MW),  (Mekedath 1400 MW), Kali stage – III (1200 

MW) Bedsti  stage  II  (400 MW), Aghanashini  (600 MW), Gundiya High heads  scheme 

(400)  conceived  if,  as  a  run of  the  river  scheme, study proposed  for Pumped  storage 

scheme at the existing Sharavathy complex (1000 MW) AND Kali Complex (1200 MW). 

He was one of the Authorities in river basin studies in Karnataka.  In addition, identified 

and prepared DPR’s for Mini Hydel Scheme of less than 25 MW. 

 

He joined Design Group Project Consultants Pvt Ltd.,  in the year 2005, responsible  for 

identifying and preparation of Desk Study Report for over 12,000 MW of Hydro Power 

Projects in neighbouring Country Nepal. 

 

Page 110: Ex Stream Eng Design Group Corporate Profile

Consultant 107 

 

Mr.  Raghavendra  Rao  H  after  obtaining  BE  degree  in  Electrical 

Engineering  from  National  Institute  of  Engineering,  Mysore  in  the 

yarer  1972  worked  in  Medium  Voltage  Switch  Gear  industry  as 

development  and  production  Engineer  till  1977  before  joining 

Karnataka  Power  Corporation  Ltd,  the  premier  organization  carrying  out  design, 

construction, operation  and maintenance of power plants  in  the state of Karnataka,. He 

retired  as  Superintendent Engineer  (Electrical)  from KPCL  in  the year  2006. During his  

tenure in KPCL he worked in the areas of design, construction, testing and commissioning 

and maintenance of Hydro  and Thermal power plants mainly  in  the  areas of Electrical 

equipments and systems of power plants and the tenure included working at both power 

plants and the corporate design office.     

 

The  specialized  areas  are  control  and  protection  and  he was  a member  of  Protection 

committee of Southern Regional Electricity Board.  

 

After  joining DG  in 2008 he  is  in charge of Engineering of Electro Mechanical systems of 

Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of 

Energy Efficiency, India.   

 

 

 

Page 111: Ex Stream Eng Design Group Corporate Profile

Consultant 108 

Mr. M.M. Reddy  is expert  in substation Layout and Electricals designs 

from 33 kV upto 400 kV. His services are being used by Design Group in 

substation segment of Electrical Engineering. 

 

Mr.  M.M.  Reddy  after  obtaining  Bachelors’  degree  in  Electrical  Engineering  from 

Bangalore  University,  in  the  year  1968,  worked  in  various  capacities  in  various 

organizations.  He  has  worked  in  NGEF  from  1968  to  1997  for  29  years  and  taken 

voluntary  retirement  in  the  year  1997,  as  Divisional Manager.  During  his  tenure  in 

NGEF, he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV 

from  designing  to  commissioning  of  sub‐stations  on  EPC  basis. Under  his  guidance, 

about  600 MW  outdoor  Switchyard  from  33  kV  to  220  kV  have  been  designed  and 

commissioned. He has undergone training in high voltage outdoor yard sub‐stations in 

AEG – Telefunken, Germany for 6 months. 

 

In  May  1997,  he  joined  M/s.  Design  Group  Project  consultant  Pvt  Ltd.,  and  he  is 

responsible  for designing  of  out door yard  substation  and  transmission  lines. He has 

designed  and  commissioned  various  switchyards  and  transmission  line  for  Hydro 

Power Project, to name a few major Projects: 

 

i) Varahi Tail Race (37 MW – 110 kV ODY) 

ii) Narayanpur Project Phase – I and II (18 MW ‐ 66 kV ODY) 

iii) Singatallur – Hulligudda (18 MW – 110 kV ODY) 

 

He has designed and commissioned balance of equipment for 15 MW Windmill 

Project. 

 

Page 112: Ex Stream Eng Design Group Corporate Profile

Consultant 109 

Mr R. Vasudevan is a water utility management specialist with over 40 

years  of  experience  in  Design  Construction  &  Operation  of Water 

utility  services  from  the source  to  the  consumer, presently  full  time 

consultant of Design Group. 

 

He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining 

Bangalore Water Supply and Sewerage Board  in  the same year, he worked  in various 

capacities  and  retired  as  the Chief Engineer during  2010. He was  involved  in  all  the 

major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of 

Bangalore  in  1971,  and  had  become  a  giant  utility  by  2010  supplying  over  900 MLD 

water to over 7 Million residents. 

He was associated  in Cauvery water supply Scheme stage  I  to supply 135 MLD water 

from River Cauvery,  in establishing pipe  fabrication and  laying activities; Later  in  the 

stage  II of another 135 MLD Project he was  in charge of Electrical system Design and 

Construction;  In the III stage which was a  larger 270 MLD Project he was  in charge of 

complete Electrical and Hydro‐Mechanical components of the project from tendering to 

completion. In the subsequent Stage IV‐Phase I Project which was with external funding, 

He was  responsible  for  total  cross‐country steel pipeline of  1950mm Diameter  and  90 

Kilometers  long,  and  later  in  the  installation  of  Sewerage  pumping  stations  and  the 

electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years 

of his service he was responsible for Securing ODA loan of INR 34000 Million from JICA 

for  Stage  IV Phase  II projects of  500 MLD,  selection of project  consultants,  tendering 

selection and award of contracts for all water supply components.  

 

In the course of his service he has participated  in various workshops and seminars on 

pumps  ,  cavitation,  cross‐country pipeline design, water‐hammer studies  and  control, 

water  treatment,  wastewater  treatment  and  sludge  disposal,  project  management, 

Page 113: Ex Stream Eng Design Group Corporate Profile

Consultant 110 

international  contracts,    leakage  reduction  and  distribution  improvement,  flow 

measurement, tariff structuring, urban planning , reuse and conservation, etc.  

 

He  led  the  Technical  team  which  presented  ‘Innovative  Practices  in  Revenue 

Management’  initiative  by  BWSSB  to  the  Department  of  Urban  Development  and 

Secured  the  First  Prize  in  National  Urban Water  Awards,  2009,  from  the  Hon’ble 

President of India, in August 2009. 

 

Vasudevan has designed pumping systems  for several  lift  irrigation pumping systems, 

electrical  substations  and  surge  protection  to  pipeline  for  the Consultancy Centre  of 

BWSSB  from 1995  to 2007. Many such projects have been commissioned  in  the  last 10 

years and are in operation. 

 

He  also  handled  an  assignment  on  ‘alternative methods  of  infrastructure  finance  by 

Private  Sector,  Infrastructure  Bonds,  and  developing  Public‐Private  Partnerships’  in 

2009.  

 

He  also secured  an MBA  from  ICFAI Dehradun with Finance  as optional  subject. On 

retirement  from  Service  he  joined  Design  Group  as  Water  Supply  Consultant  in 

September 2010. 

Page 114: Ex Stream Eng Design Group Corporate Profile

Consultant 111

 

 Mr. U.R. Raghotham after obtaining M.Tech from Mysore University    in 

the year 1974 worked as design engineer with the architects M/s Karekar 

and  Sundaram  for  one  year  and  joined  Karnataka  Power  Corporation 

Ltd., in 1975.   

 

During  the  service in KPC Ltd., he has worked in  the design  team  for Supa Dam for 5 

years  and  then worked  as AEE  (Construction)  in Supa Dam  for  7 years starting  from 

foundation level of the spillway and power blocks to the completion of the Dam.   

 

Further  he was  in  charge  of  construction  of Ghataprabha  Power House.    From  1989 

onwards he worked in the design office as AEE and EE  for the planning and design of 

various Hydro Electric  projects  including Kadra dam  and Sharavathi Tailrace  Project.  

Since 2003, he is working as a consultant and was involved in the design  of Nagarjuna 

Sagar Tail  Pond Dam Project, Gandikota dam  project, Lower  Jurala  project  of Andhra 

Pradesh, Varahi Underground Power House (2x115MW) and many other projects.    He 

was  involved  in  the preparation of DPR  for  Indira  Sagar Polavaram     Hydro Electric 

Project (960MW) and in obtaining clearance from CWC and CEA. 

 

Page 115: Ex Stream Eng Design Group Corporate Profile

Advisor 112 

Mr.  G.  Penchalaiah,  after  retirement  works  as  free  lance  Consultants,  for  various 

investigation agencies in flow monitoring in river regime pre‐construction Investigation 

works in large Irrigation Projects.  Design Group is utilizing his services for overseeing, 

Fielding investigation works in large Irrigation Projects in India and Abroad. 

   

Mr. G. Penchalaiah after his graduation  in Civil Engineering  from Sri. Venkateshwara 

University  in 1970, joined Central Water Commission, as Civil Engineer and retired  in 

the year 2007, as Director.  He has vast experience in Water Resources Project Planning, 

specially  large  Irrigation  Project  investigation,  Hydrology,  Computation  of  yield, 

Development  of  Irrigation  dam  and  associated  Irrigation  Networks,  preparation  of 

Detailed Project  Report. He was  posted  to  various  States  in  India, was  familiar with 

available  yield  in  various  river  for  Irrigation  utilization  to  improve  the Agricultural 

Sector and Water Management.   He was deputed  to CEA, New Delhi, responsible  for 

design of structures and cost estimates  for Thermal Power Project.  He had made topo 

map studies, interlinking river, water balance study, etc.  As a Senior Engineer worked 

on  Indo‐Nepal  Joint Projects, namely Pancheshwar Multipurpose Project, head quarter 

at Kathmandu, Nepal.    Involved  in preparation of DPR, cost estimates, preparation of 

Infrastructure Planning  for major Power  / Multipurpose Projects,  such  as Poornagiri, 

Rupaligad etc. 

Page 116: Ex Stream Eng Design Group Corporate Profile

Consultant 113

Mr.  Suryanarayana,  after  his  retirement on Deputy General Manager  ‐ Geology  from 

Karnataka Power Corporation Limited, works as freelance  Consultant.   He  is a part of 

Design Group being extensively used his expertise   in Engineering Geology  in various 

assignments undertaken,  on job to job basis. 

 

My.  Suryanarayana,  after  obtaining  Masters’  degree  in   Geological  Science,  joined 

Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007, 

as Deputy General Manager – Geology.   During his tenure, he was involved in most of 

the  Hydro  Power  Project  implemented  by  Karnataka   Power  Corporation  Limited  in 

Karnataka, to  name a few Rammam HEP (120  MW), Rolep HEP (60  MW) and Chakung 

Cha  HEP (60 MW) all in  Sikkim; 80 meter high Chakra  Rock‐fill Dam: Varahi HEP (460 

MW).    Involved  in  preparation  of  DPR  for  Gundiya  Hydel  Scheme  (400   MW), 

Shivasamundram  Seasonal  Scheme  (270  MW), Mekedatu  Multipurpose  Project  (360 

MW).   He  is also involved in ongoing Himagiri HEP (280  MW), Upper Tunga Irrigation 

Project  involved 4   km  of  tunneling  etc.   Apart  from   this,  he  has wide experience  in 

advising developers  /  IPPs  in  implementation  of Mini Hydel  Scheme of  25 MW  and 

below all over India. 

Page 117: Ex Stream Eng Design Group Corporate Profile

Consultant 114

Mr.  K.T.Sreedhara,  after  obtaining  B.E  (Civil),  degree  from  Vikram 

University,  Ujjain,  in  the  year  1970.  worked  as  design  Engineer  in 

M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971 

to November 1973. The works dealt in this period are Designs of Bridges 

and  Industrial  Structures  and  Buildings.  Then  joined M/s. Karnataka 

Power  Corporation  Ltd.,  a    public  sector  undertaking  of  government  of  Karnataka  on  

28.11.1973 and worked Up to 31.01.2006 i.e. 32 years and 2 months in various capacities as 

AE,  AEE,  EE,  SE  &finally    retired  as    I/C  Chief  Engineer  on  superannuation  from  the 

Karnataka  Power  Corporation  service.  During  this  tenure  in  KPCL worked  in  the  civil 

designs wing  on  the  design  of Gravity  dam  (concrete),  Earthen  dams, water  conducting 

System and in construction wing worked in Precision survey works at Varahi under ground 

Power & Varahi Schemes and Sharavathi Schemes as AEE. As Executive Engineer worked 

in  the  investigation  of  Power  Project  especially  High  Head  Scheme  and  Mini  Hydel 

Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric 

Project  and  consultancy  work  of  Markandeya  Dam  Project,    Kalasa  &  Bandurnala 

Consultancy work. for KNNL. 

 

 Further  in  construction wing  as  Executive  Engineer  (Safety)  at  Raichur  Thermal  Power 

Station  Shakthinagar  In  addition  to  the  Safety  Engineering  of    Raichur  Thermal  Power 

Station worked on deputation  to KPCL  civil  designs wing    involved  in  the  investigation 

work of Bridge cum Barrage Project across River Krishna near Gugal. for KBJNL As Super 

Intending   Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power Station 

(7X210 MW Installed Capacity as on 2006)  involved  in the civil maintenance works  of the 

Thermal  Power Generation Station. After retirement on 31/1/2006 after serving 32 for years 

with KPCL joined on 7/4/2006 as Consultant  in   M/s Subhadra Consulting Engineers who 

are also Associate  Consultants to M/s STUP consultants Pvt Ltd., Bangalore and worked up 

to 31/3/2010. During this tenure as Associate  Consultants to M/s STUP consultants  Pvt Ltd., 

Bangalore    involved  in  the    Detailed  Engineering  of  Nagarjunasagar  Tail  Pond  dam  , 

Page 118: Ex Stream Eng Design Group Corporate Profile

Consultant 115

Gandikota   Dam  and Lower  Jurala Hydro Electric Project   which  are under  construction, 

Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with 

12X80MW(960MW) Installed Capacity . 

  

Currently from 1.4.2010 to till date working with Design Group Project Consultant Pvt Ltd., 

as Deputy Director (designs) in the planning, design of Hydro Power Projects and Irrigation 

Project and other Structure   

 

Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2) 

Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics 

Page 119: Ex Stream Eng Design Group Corporate Profile

Consultant 116

 

Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian 

Institute  of  Technology  in  the  year  1996  and  has  since  15  years  of 

exclusive experience  in design of various components of hydroelectric 

Projects. He started his career in Design Group Project Consultants Pvt. 

Ltd., Bangalore as Design Engineer (Civil) and was involved in Harangi 

HEP  (2x4.5MW)  in Karnataka. He  joined NHPC  ltd., A Govt. of  India Enterprise  in year 

1998  and was  involved  in Planning  and Construction  stage Design of Dhauliganga HEP 

(4x70MW),  Uttaranchal  and  Chamera‐III  HEP  (3x77MW),  Himachal  Pradesh.  He  was 

associated with  the  preparation  of  DPR  of  Siyom  HEP  (1000MW),  Arunachal  Pradesh, 

Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III 

HEP, Kishanganga HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was 

also  involved  in  Pre‐feasibility  reports  of  7  projects  in Arunachal Pradesh  under  “Prime 

Minister  50000MW  Initiative”  totaling  to  2581  MW.  He  was  also  associated  with  the 

consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link 

Project. He has also  few  technical papers presented  in various National Seminars. He  is a 

member  of  Indian  Society  of  Rock Mechanics  and  Tunneling  Technology  (ISMRTT)  and 

International  Society  for  Rock  Mechanics  (ISRM)  and  Indian  Hydropower  Association 

(INHA). 

 

He joined TCE, Bangalore  in 2007‐2008 and was associated with 100MW Augmentation of 

Bhira Power station and Gokak SHEP. 

 

Since later half of 2008, he is working as Deputy Director (Designs) in Design Group Project 

Consultants  Pvt.  Ltd.  and  has  been  responsible  for  various  construction  stage  Hydel 

Projects, DPR’s and Pre‐tendering Services for various projects.   

 

 

Page 120: Ex Stream Eng Design Group Corporate Profile

 

Consultant 117 

Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution 

PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and 

B.E.  from National  Institute of Engineering College, Mysore, Karnataka 

in  the year 1984, worked  in various capacities  in a Public Sector/Private 

companies.  He  has  worked  In  Public  sector  Karnataka  Urban Water 

Supply & Drainage Board  (KUWS&DB)  from 1986  to 2006  for 21 years. He took voluntary 

retirement  from KUWS&DB  and worked  in  private  organizations  such  as M/s  Secon  as 

Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).  

 

He was head of Design Wing while working with KUWS&DB, was involved in preparation 

of many DPRs comprising of Planning, Design, Estimating,  implementation of number of 

water supply and sewerage schemes  including Water treatment plants(WTPs) and Sewage 

Treatment  Plants(STPs)in  urban  areas  of  Karnataka  State.  He was  involved  with  water 

supply & sewerage schemes’ proposals to second major city in the state viz., Hubli‐Dharwar 

city  under World  Bank  Project. He was  also  involved with National  River Conservation 

Projects for prevention of river pollution in the state. 

 

While working with M/s. Secon, he was involved with water supply and sewerage projects 

in different towns of Libya country. While working with M/s. Jurong Infrastructure Ltd., he 

was  involved with Design  and  implementation  of  Infrastructure  facilities  such  as  roads, 

water  supply, sewerage,  storm water drainage, Electrical & Communication  facilities  to  a 

number of town ship development projects including some of the SEZs. 

 

From 2009 onwards he heads the Water Division of DGPCL responsible  for  implementing 

water supply and sewerage projects. Presently he is involved with detail Civil Engineering 

Design  of Rafha gas based Power Plant Project in Saudi Arabia. 

Page 121: Ex Stream Eng Design Group Corporate Profile

Consultant 118 

 

Mr.  P  Sudarshan  Rao,  after  obtaining  B.E.  (E&E)  from Malnad  College  of 

Engineering, Hassan  (Mysore University)  in 1987 worked  in  the same college 

and Regional College  of  Education, Mysore  as  a  Lecturer  for  a brief  period 

before joining KPCL in 1989. 

 

He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power 

Corporation  Limited,  a  State  owned Public  Sector Undertaking with  dedication  for Power 

Generation  to  the  State  with  ISO  9001  and  ISO  14001  certification.  He  has  experience  in 

Operation, Maintenance and Design wings of 210/250 MW coal based Thermal Power Plant. 

He  also  has  experience  across  domains  like  Inventory  Management,  Tendering,  Tender 

Evaluation,  Study  of  various  Control  System  drawings,  Planning  of  Preventive  and 

Breakdown Maintenance of 210 MW Generator & Auxiliaries, Erection & Commissioning of 

Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear, 

220kV &  400kV Outdoor  Switchyard,  and  Station Battery  System. He was  also  involved  in 

preparation of cable schedules,  interconnection schedules and commissioning of  210 MW & 

250MW coal fired thermal Units. 

 

After joining DG in February 2011, he is the group lead of Electrical Design team carrying out 

detail Engineering for gas based generating plants and hydro electric plants.