Example Reports for Campaign 23rd May 13

Embed Size (px)

Citation preview

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    1/7

    Date:- 5/23/2013

    Management Inspection Supervision C/Hands Utility Men

    Area/Fire Zone. Job Card No.

    Job Location Operatives Names Expected Daily Task

    Area/Fire Zone. Job Card No.

    Job Location Operatives Names Expected Daily Task

    Area/Fire Zone. Job Card No.

    Job Location Operatives Names Expected Daily Task

    Area/Fire Zone. Job Card No.

    Job Location Operatives Names Expected daily task

    Area/Fire Zone. Job Card No.

    Job Location Operatives Names Expected Daily Task

    Daily Work Sheet (Painting)

    Comments

    Operatives

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    2/7

    Date Time Air Temp.C

    RH%

    Dew PointC

    Date Time Air Temp.C

    RH%

    Dew PointC

    12/5 0745

    12/5 1100

    12/5 1405

    Date Date

    5/12/2013

    5/13/2013

    5/15/2013

    DateBlast

    Profile (m)

    Surface

    Dust Level

    Mill Scale

    Clear Y/NDate

    Blast

    Profile (m)

    Surface

    Dust Level

    Mill Scale

    Clear Y/N

    5/12/2013 Max 85m Max 2 Yes

    Date TimeArea/Item

    Coated

    System

    Code

    Coat

    Number

    Batch No.

    Base

    Batch No.

    HardnerColour

    DFT

    (Average)

    12/5 1015 Structure P01 1 Grey 150m

    13/5 0850 Structure P01 2 Grey 300m

    15/5 0830 Structure P01 3 Yellow 400m

    Comments:-

    Company:

    N

    CAPE CAPE Total

    Total Ave. DFT 400m

    Protection Fitted to Supports: IF APPLICABLE

    PUT ANY APPLICABLE COMMENTS IF REQUIRED

    2000 TC 5 Mpa

    CoatingAdh

    (Pull o

    18FC

    18FC

    Coating Manufacturer: Carboline Coating Used: Carbomastic 18FC & Carboxane 2000TC

    Stripe Coating Performed:Yes Paint Application Method:Either Airless Spray or Brush

    MAX 30mg/m

    Pre-wash Complete:Yes Surface Degreased: IF APPLICABLE

    Surface Preparation Method:Dry Grit Blast Abrasive Used:Garnet or Aquagrit Cleaning Grade:SA 2

    Soluble Salt

    LevelSoluble

    PUT IN DRAWING NUMBER & LINE NUMBER IF

    APPLICABLE

    Drawing Number Line Number Drawing Number Line Numbe

    CREATE NEW WORKSHEET IF YOU RUN OUT OF

    SPACE BY RIGHT CLICK ON WORKSHEET TAB

    SELECT MOVE/COPY, SELECT CREATE A COPY

    BOX, SELECT OK. RENAME I.E. DAILY REPORT

    1, 2, 3 ETC BY RIGHT CLICK ON WORKSHEET &

    SELECT RENAME

    RECORD 3 TIMES DAILY (INCLUDE DAY &

    NIGHTSHIFT ON SAME REPORT. ENSURE

    UPDATED BEFORE END OF YOUR SHIFT

    Specification:GEN-W-SP-83202 Rev A01 Line Number: IF APPLICABLE Workpack No: 8LW3

    Inspector: J.Warren/P.Durin Area/Fire Zone: 8LW3 Date Work Started: 24th May 2013

    PROTECTIVE COATINGS INSPECTION REPORT

    DAILY INSPECTION REPORT

    Client: Total Installation: Elgin 2013 Painting Campaign Contract Ref: 4300002629

    Contractor: CAPE Drawing Number: IF APPLICABLE Job Card No: 8LW3-061

    Steel Temp.C

    Steel Temp

    Report Number: EL-13-?

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    3/7

    5/12/2013

    PUT READING IN HERE IN MPA

    ATTACH TESTEX TAPE HERE ATTACH TESTEX TAPE HERE

    ATTACH TESTEX TAPE HERE ATTACH TESTEX TAPE HERE

    Calibration Date: Put Calibration Due Date

    Inspection Equipment Used: Testex Tape and Micrometer Serial Number: Put Serial Number

    ATTACH SURFACE DUST TEST RESULTS:

    Inspection Equipment Used: Elcometer 108 Digital Adhesion Gauge Serial Number: Put Serial Number

    ATTACH SOLUBLE SALT TESTS: (DESCRIBE TEST CARRIED OUT)

    DESCRIPTION OF ADHESION TEST RESULTS:

    Inspection Equipment Used: Brestle Patch & Conductivity Meter

    Calibration Date: Put Calibration Due Date &(141 Solution)

    Location: Put JC Number Date: Put Date Location: Put JC Number Date: Put Date

    Location: Put JC Number Date: Put Date Location: Put JC Number Date: Put Date

    PUT DETAILS OF TEST AS ABOVE & READING IN

    HERE IN MG/M2

    Serial Number: Put Serial Number

    ATTACH SURFACE DUST TAPE HERE

    ATTACH SURFACE DUST TAPE HERE

    ATTACH SURFACE DUST TAPE HERE

    Salt test detection kit used was the conductivity meter and brestle patch

    PROTECTIVE COATINGS INSPECTION REPORT

    TEST RECORD

    ATTACH SURFACE PROFILE TEST RESULTS:

    Location: Put JC Number Date: Put Date Location: Put JC Number Date: Put Date

    ATTACH TESTEX TAPE HERE ATTACH TESTEX TAPE HERE

    Report Number: EL-13-???

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    4/7

    Testex tapes attached

    PROTECTIVE COATINGS INSPECTION REPORT

    PHOTOGRAPHIC RECORD

    Photo of Initial condition Photo of Pre-washing of vessel

    Photo of blasted area Photo of blasted area

    Test panel done in-situ

    Test panel done in-situ

    EXAMPLE

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    5/7

    Spray applied 18FC

    Test panel done in-situ

    Stripe coating C750V2Stripe coating C750V2

    PROTECTIVE COATINGS INSPECTION REPORT

    PHOTOGRAPHIC RECORD

    Salt test result (Final Result after blasting) Stripecoating performed for 1st coat of 18FC

    Stripecoating performed for 1st coat of 18FC

    EXAMPLE

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    6/7

    PROTECTIVE COATINGS INSPECTION REPORT

    PHOTOGRAPHIC RECORD

    Adhesion Test - Photo value recorded on adhesion test

    beside test plate

    Spray applied C750V2

    Test panel done in-situ

    Photo of completed job as per JC

    EXAMPLE

  • 8/13/2019 Example Reports for Campaign 23rd May 13

    7/7

    Statement:

    Deviations To Specifications:- Y/N

    Documentation Package Complete:- Y/N

    Company:

    Name:

    Position:

    Signature:

    Date:

    CAPE Total

    Site Manager Company Representative

    FINAL ACCEPTANCE

    FABRIC COMPLETION CERTIFICATE

    Work Order Number: 8260534 Contractor: CAPE

    Notification Number: 18187659 Date:

    Scope of Work:

    All work has been completed to the current Total approved specifications.

    Work orders have been updated and closed out in SAP

    Inspection records have recorded the environmental conditions, surface preparation, coating application, trace heating,

    Insulation and cladding (where applicable), all of which have been measured with inspection equipment traceable to

    national standards.

    Specification Used For Coatings:- GEN-W-SP-83202 Rev 1

    Specification Used For Insulation:- GEN-W-SP-83200 Rev A02