55
Government of India विय मंालय Ministry of Power के रीय विय ाधिकरण भारत सरकार Apr-19 Central Electricity Authority Executive Summary on Power Sector

Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Government of India

विदयत मतरालयMinistry of Power

कनदरीय विदयत पराधिकरण

भारत सरकार

Apr-19

Central Electricity Authority

Executive Summary on Power Sector

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Apr-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for Apr-2019 (MW) 2

3 List of Projects Commissioned in Apr-2019 3

4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4

6 Transmission Lines Added during Apr-2019 (Ckms) 5

7 Transformation Capacity Addition during Apr-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Apr-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Apr-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Apr-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Apr-2019

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019

1 Programme and Achievements of Sub-Stations in Apr-2019

2 List of Sub Stations commissionedready for commisssioning in Apr-2019

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

1 Power Supply Position (Provisional) for Apr-2019 23

2 Peak Demand and Peak Met (Provisional) for Apr-2019 24

3 Power Supply Position (Revised) for Mar-2019 25

4 Peak Demand and Peak Met (Revised) for Mar-2019 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Apr-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1

2 Generating Capacity Addition for Apr-2019 (MW) 2

3 List of Projects Commissioned in Apr-2019 3

4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4

6 Transmission Lines Added during Apr-2019 (Ckms) 5

7 Transformation Capacity Addition during Apr-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Apr-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Apr-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Apr-19

Thermal 9442 152

Nuclear 318 -390

Hydro 1109 4680

Bhutan Import 024 94659

All India 10893 485

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

9300

9300

1 Electricity Generation for Apr-2019 (BU)

Apr-19

TypeAchievement

Apr-18

Targets Change of

Achievement

wrt Apr-2018

9896

002

3673

11235

756

331

9539

48510891039

10389

018

9442

3177

152

Change wrt Apr-18 to Apr-18

Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)

Apr-18 to Apr-18 Apr-19 to Apr-19

11092

024002

-390331

4680756

94247

10389

10893

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

BU

Apr-18 Apr-19

10391089

00

200

400

600

800

1000

1200

BU

Apr-18 to Apr-18 Apr-19 to Apr-19

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

108929 9900 118829 103889 8443 112332 485 1726 578

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018

1 Wind 2965930 2906760 62036380 52666090

2 Solar 4307980 3311530 39268200 25871070

3 Biomass 255320 270430 2763820 3404950

4 Bagasse 1814860 1794220 13562670 11847350

5 Small Hydro 473060 376850 8702750 7691580

6 Others 30700 33120 425280 358450

Total 9847850 8692910 126759100 101839490

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

Apr-2019 Apr-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 2: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Apr-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for Apr-2019 (MW) 2

3 List of Projects Commissioned in Apr-2019 3

4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4

6 Transmission Lines Added during Apr-2019 (Ckms) 5

7 Transformation Capacity Addition during Apr-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Apr-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Apr-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Apr-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Apr-2019

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019

1 Programme and Achievements of Sub-Stations in Apr-2019

2 List of Sub Stations commissionedready for commisssioning in Apr-2019

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

1 Power Supply Position (Provisional) for Apr-2019 23

2 Peak Demand and Peak Met (Provisional) for Apr-2019 24

3 Power Supply Position (Revised) for Mar-2019 25

4 Peak Demand and Peak Met (Revised) for Mar-2019 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Apr-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

SN Contents Page

1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1

2 Generating Capacity Addition for Apr-2019 (MW) 2

3 List of Projects Commissioned in Apr-2019 3

4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4

6 Transmission Lines Added during Apr-2019 (Ckms) 5

7 Transformation Capacity Addition during Apr-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Apr-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Apr-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Apr-19

Thermal 9442 152

Nuclear 318 -390

Hydro 1109 4680

Bhutan Import 024 94659

All India 10893 485

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

9300

9300

1 Electricity Generation for Apr-2019 (BU)

Apr-19

TypeAchievement

Apr-18

Targets Change of

Achievement

wrt Apr-2018

9896

002

3673

11235

756

331

9539

48510891039

10389

018

9442

3177

152

Change wrt Apr-18 to Apr-18

Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)

Apr-18 to Apr-18 Apr-19 to Apr-19

11092

024002

-390331

4680756

94247

10389

10893

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

BU

Apr-18 Apr-19

10391089

00

200

400

600

800

1000

1200

BU

Apr-18 to Apr-18 Apr-19 to Apr-19

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

108929 9900 118829 103889 8443 112332 485 1726 578

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018

1 Wind 2965930 2906760 62036380 52666090

2 Solar 4307980 3311530 39268200 25871070

3 Biomass 255320 270430 2763820 3404950

4 Bagasse 1814860 1794220 13562670 11847350

5 Small Hydro 473060 376850 8702750 7691580

6 Others 30700 33120 425280 358450

Total 9847850 8692910 126759100 101839490

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

Apr-2019 Apr-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 3: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1

2 Generating Capacity Addition for Apr-2019 (MW) 2

3 List of Projects Commissioned in Apr-2019 3

4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4

6 Transmission Lines Added during Apr-2019 (Ckms) 5

7 Transformation Capacity Addition during Apr-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Apr-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Apr-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

Achievement

Apr-19

Thermal 9442 152

Nuclear 318 -390

Hydro 1109 4680

Bhutan Import 024 94659

All India 10893 485

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

9300

9300

1 Electricity Generation for Apr-2019 (BU)

Apr-19

TypeAchievement

Apr-18

Targets Change of

Achievement

wrt Apr-2018

9896

002

3673

11235

756

331

9539

48510891039

10389

018

9442

3177

152

Change wrt Apr-18 to Apr-18

Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)

Apr-18 to Apr-18 Apr-19 to Apr-19

11092

024002

-390331

4680756

94247

10389

10893

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

BU

Apr-18 Apr-19

10391089

00

200

400

600

800

1000

1200

BU

Apr-18 to Apr-18 Apr-19 to Apr-19

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

108929 9900 118829 103889 8443 112332 485 1726 578

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018

1 Wind 2965930 2906760 62036380 52666090

2 Solar 4307980 3311530 39268200 25871070

3 Biomass 255320 270430 2763820 3404950

4 Bagasse 1814860 1794220 13562670 11847350

5 Small Hydro 473060 376850 8702750 7691580

6 Others 30700 33120 425280 358450

Total 9847850 8692910 126759100 101839490

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

Apr-2019 Apr-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 4: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Achievement

Apr-19

Thermal 9442 152

Nuclear 318 -390

Hydro 1109 4680

Bhutan Import 024 94659

All India 10893 485

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

9300

9300

1 Electricity Generation for Apr-2019 (BU)

Apr-19

TypeAchievement

Apr-18

Targets Change of

Achievement

wrt Apr-2018

9896

002

3673

11235

756

331

9539

48510891039

10389

018

9442

3177

152

Change wrt Apr-18 to Apr-18

Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)

Apr-18 to Apr-18 Apr-19 to Apr-19

11092

024002

-390331

4680756

94247

10389

10893

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

BU

Apr-18 Apr-19

10391089

00

200

400

600

800

1000

1200

BU

Apr-18 to Apr-18 Apr-19 to Apr-19

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

108929 9900 118829 103889 8443 112332 485 1726 578

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018

1 Wind 2965930 2906760 62036380 52666090

2 Solar 4307980 3311530 39268200 25871070

3 Biomass 255320 270430 2763820 3404950

4 Bagasse 1814860 1794220 13562670 11847350

5 Small Hydro 473060 376850 8702750 7691580

6 Others 30700 33120 425280 358450

Total 9847850 8692910 126759100 101839490

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

Apr-2019 Apr-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 5: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

108929 9900 118829 103889 8443 112332 485 1726 578

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018

1 Wind 2965930 2906760 62036380 52666090

2 Solar 4307980 3311530 39268200 25871070

3 Biomass 255320 270430 2763820 3404950

4 Bagasse 1814860 1794220 13562670 11847350

5 Small Hydro 473060 376850 8702750 7691580

6 Others 30700 33120 425280 358450

Total 9847850 8692910 126759100 101839490

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Previous month generation has been taken as SLDC has not furnished generation data for the current month

Electricity Generation (Conventional and Renewable Sources)

Apr-2019 Apr-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 6: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Achievement Targets Achievement

Apr-18

Thermal 69755 1160 0 000

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 69755 1160 0 000

Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year

Thermal 69755 0 00

Hydro 0000 0 NA

Nuclear 0000 0 NA

All India 69755 0 00

2

2 Generating Capacity Addition for Apr-2019 (MW)

Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19

NA- Not Applicable

Achivement

wrt Apr-2018Type

Apr-19

698

000

10

20

30

40

50

60

70

80

1Apr-18 Apr-19

0000

10000

20000

30000

40000

50000

60000

70000

80000

Apr-18 to Apr-18 Apr-19 to Apr-19

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 7: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

1

2

3

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724

North-East 77002 000 177581 3600 258183 000 142700 32429 433311

Islands 000 000 000 4005 4005 000 000 1773 5778

ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3

Thermal

Nuclear

3 List of Projects Commissioned During Apr-2019

4 All India Installed Capacity (MW) Region-wise as on 30-04-19

NIL

NIL

Thermal

NIL

Hydro

22627934

678000

4539922

7764163

35610019

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 356100189

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 8: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Sector

Coal Lignite Gas Diesel Total

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

State 10507586

Private 16442770

Central 8659663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 30-04-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31032019

State 10507586 30

Private 16442770 46

Central 8659663 24

All India Installed Capacity(MW) (Sector-Wise)

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 9: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

481 401

763 474

0 0

242 53

40 20

0 0

242 53

40 20

481 401

763 474

Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)

Apr-18 to Apr-18 Apr-19 to Apr-19

0 0

6 Transmission Lines Added during Apr-2019 (Ckms)

Apr-18 Apr-19

0 0

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 Apr-19

763

474

0

100

200

300

400

500

600

700

800

900

All India

Ckm

s

Apr-18 to Apr-18 Apr-19 to Apr-19

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 10: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

0 0

All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19

to Apr-19 (MVA)

4600

0

500

2795

1305

5470

4000

185

1285

0

Apr-18 to Apr-18 Apr-19 to Apr-19

5470

0

500

4600

2795

1305

7 Transformation Capacity Addition During Apr-2019 (MVA)

0

4000

185

1285

0 0

Apr-18 Apr-19

5470

4600

4000

4200

4400

4600

4800

5000

5200

5400

5600

MV

A

Apr-18 Apr-19

5470 4600

0

74520

1

MV

A

Apr-18 to Apr-18 Apr-19 to Apr-19

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 11: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 28590 30094 28170 29786 -15 -10

Western 33235 34875 33233 34868 00 00

Southern 29211 31111 29166 31109 -02 00

Eastern 11752 12851 11650 12850 -09 00

North Eastern 1225 1300 1174 1228 -42 -55

All India 104013 110231 103393 109842 -06 -04

Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019

Northern 48824 54476 48367 53985 -09 -09

Western 50654 56242 50434 56222 -04 00

Southern 45946 49155 45684 49103 -06 -01

Eastern 21320 23349 21275 23349 -02 00

North Eastern 2600 2848 2552 2780 -18 -24

All India 162492 177411 161286 176810 -07 -03

Apr-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Apr-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 12: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0

Apr-2019 0 0 0 0 565 0 0 0 0

Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa

Apr-2018 13 11 3 99 0 0 0

Apr-2019 22 6 0 8 1 0 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Apr-2018 22 0 2 0 0 20 0

Apr-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019

0 0 0 0

565

0 0 0 00 0 0 0

546

0 0

247

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Apr-2019 Apr-2018

22

6 0 8 1 0 0

13

11

3

99

0 0 0

0

50

100

150

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

shtr

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Apr-2019 Apr-2018

0 0 08

0 2 0

22

0 2 0 0

20

00

50

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Apr-2019 Apr-2018

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 13: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Apr-2018 0 39 0 0 7 0 4

Apr-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Apr-2018 5 30 7 0 9 29 4

Apr-2019 3 45 9 0 3 26 1

9

0 0 0 0 0 0

4

0

39

0 0

7

0

4

01020304050

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Apr-2019 Apr-2018

3

45

9

0 3

26

1

5 7

0

9

29

4

0

10

20

30

40

50

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 14: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Sector Apr-2018 Apr-2019

Central 7634 7459

State 6438 6142

Private Sector IPP 5525 6005

Private Sector UTL 6815 6440

ALL INDIA 6454 6471

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

March 6452 6340

April 6454 6471

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

(excluding gas based power plants)

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019

5800

6000

6200

6400

6600

Jan Feb March April

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7634

64385525

6815 6454

7459

6142 60056440 6471

000

2000

4000

6000

8000

10000

Central State Private Sector IPP Private Sector UTL ALL INDIA

All India Thermal PLF

Apr-2018 Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 15: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18

TampD Losses 2304 2284 2277 2181 2142 2104

ATampC Losses 2548 2262 2572 2398 NA NA

Provisional

Note As per PFC for utilities selling directly to consumers NA- Not Available

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

2018-19 6289

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 16: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12

2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 17: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

THERMAL HYDRO NUCLEAR

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 4880 3170 800 390 500 6180 3560

STATE 3546 1760 300 200 0 3846 1960

PRIVATE 2940 3780 205 205 0 3145 3985

ALL INDIA 11366 8710 1305 795 500 0 13171 9505

(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 2760 1960 710 110 0 0 3470 2070

STATE 4506 2850 130 30 0 0 4636 2880

PRIVATE 0 972 0 0 0 0 0 972

ALL INDIA 7266 5782 840 140 0 0 8106 5922

12

SECTOR

SECTOR

TOTAL

TOTALNUCLEARHYDROTHERMAL

1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019

SECTORTHERMAL HYDRO NUCLEAR TOTAL

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 18: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 6040 500 0 500 0 -500

State 425615 660 0 660 0 -660

Private 0 0 0 0 0 0

Total 1029615 1160 0 1160 0 -1160

Central 600 0 0 0 0 0

State 21099 0 0 0 0 0

Private 379 0 0 0 0 0

Total 118999 0 0 0 0 0

Nuclear Central 700 0 0 0 0 0

Central 7340 500 0 500 0 -500

State 446714 660 0 660 0 -660

Private 379 0 0 0 0 0

Total 1218614 1160 0 1160 0 -1160

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Apr-2019

Thermal

2 Capacity Addition Targets Achievements During Apr-2019

Schemes Sector

Target 2019-20

Apr-19 to Apr-19Apr-19

11

60

0 0

11

60

0 0 0 0

0

200

400

600

800

1000

1200

1400

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2019-20Target Achievement

0

200

400

600

800

1000

1200

Thermal Hydro Nuclear Total

1160

0 0

1160

0 0 00

MW

Target Achievement

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 19: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Coal Lignite Gas Diesel Total

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1773 5778

State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586

Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770

Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663

Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31032019 is given below (in MW)

459315 3562597 2818071 7764163

A 0 MW

B Apr 2019 0 MW

C

Apr 2019 0 MW

D Net Capacity Added during Apr 2019 A-B-C 0 MW

Sector wise breakup of RES capacity as shown is provisional

Share of installed capacity of BBMB Stations is included in state sector of partner states

BM PowerCogen Waste to Energy

910350 13830

Capacity Added during Apr 2019

Capacity Retired during

Capacity removed due to change

from Conventional to RES during

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

(As on 30042019)

(UTILITIES)

Region Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 20: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17889 115611

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34512 462590

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 62668 161868

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6483 6483

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 626000 25000 60380 000 711380 000 109618 2385 823383

Private 280200 108000 000 000 388200 000 10400 730181 1128781

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 288760 1244393

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52620 116320

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3471 3471

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760

124953 000 29105 000 154058 23703 75145 000 252907

State 1634400 25000 287920 000 1947320 000 869755 69956 2887031

Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825

Delhi

Haryana

Himachal Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 30042019)

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

Chandigarh

Central - Unallocated

Total (Northern

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 21: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 392 5192

Central 46959 000 1967 000 48926 2600 000 000 51526

Sub-Total 46959 000 6767 000 53726 2600 000 397 56723

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 14141 000 4334 000 18475 700 000 000 19175

Sub-Total 14141 000 4334 000 18475 700 000 1447 20622

State 371000 104000 217782 000 692782 000 77200 6470 776452

Private 726567 50000 396000 000 1172567 000 000 833180 2005747

Central 324243 000 42400 000 366643 55900 000 24330 446873

Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072

State 540000 000 000 000 540000 000 170366 8396 718762

Private 617400 000 10000 000 627400 000 000 418040 1045440

Central 334238 000 25700 000 359938 27300 152000 30000 569238

Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440

State 228000 000 000 000 228000 000 12000 1105 241105

Private 885000 000 000 000 885000 000 000 52430 937430

Central 211075 000 000 000 211075 4800 10000 000 225875

Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 880441 2230941

Central 466780 000 227273 000 694053 69000 000 12300 775353

Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 19560 000 6634 000 26194 900 000 000 27094

Sub-Total 19560 000 6634 000 26194 900 000 546 27640

233300 000 19759 000 253059 22800 000 000 275859

State 2156000 104000 284982 000 2544982 000 544650 54789 3144421

Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743

Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992

Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

ThermalNuclear Hydro

RES

(MNRE)

State Ownership Sector

Mode wise breakup

Grand Total

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 22: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(As on 30042019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 743342 1515728

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429

State 558250 000 000 000 558250 000 247993 4122 810365

Private 83945 000 83182 000 167127 000 000 393644 560771

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1363591 1561961

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19021 97921

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1229228 1784475

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 314 314

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004

142600 35800 000 000 178400 45000 000 000 223400

State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407

Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227

Kerala

Andhra Pradesh

Telangana

Karnataka

Total (Southern

Region)

Tamil Nadu

NLC

Puducherry

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 23: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 384933 000 000 000 384933 000 11000 000 395932

Sub-Total 413033 000 000 000 413033 000 11000 32615 456647

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3495 76495

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3900 177374

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 243700 000 000 000 243700 000 000 35250 278950

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 47346 341246

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50976 765358

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

112683 000 000 000 112683 000 8501 000 121184

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 638700 000 000 000 638700 000 39900 111637 790237

Central 1483664 000 000 000 1483664 000 100520 1000 1585184

Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

HydroOwnership Sector

Mode wise breakup

Grand TotalThermalNuclear

RES

(MNRE)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 24: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2650 5100

Central 40852 000 43556 000 84408 000 35708 2500 122616

Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038

State 000 000 000 000 000 000 000 10711 10711

Private 000 000 000 000 000 000 000 2939 2939

Central 3705 000 4682 000 8387 000 11655 000 20042

Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692

State 000 000 000 000 000 000 32200 3253 35453

Private 000 000 000 000 000 000 000 012 012

Central 4560 000 10969 000 15529 000 7227 000 22756

Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 5610 000 43695 000 49305 000 6849 500 56654

Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 344 344

Central 4710 000 7157 000 11867 000 9534 000 21401

Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 3210 000 4893 000 8103 000 5733 000 13836

Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 3105 000 4046 000 7151 000 9794 000 16945

Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642

11250 000 6362 000 17612 000 14000 000 31612

State 000 000 49771 3600 53371 000 42200 23325 118895

Private 000 000 2450 000 2450 000 000 6104 8554

Central 77002 000 125360 000 202362 000 100500 3000 305862

Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 25: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(As on 30042019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 663 663

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1698 5703

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 738 738

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1773 5778

Andaman amp

Nicobar

Lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Mode wise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 26: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)

Section C - Transmission Lines

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 27: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621

Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012

Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 28: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Line

1 2 3 4 5 6

1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53

53

2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20

3 220 Banda-Chitrakoot Line DC UPPTCL 226

4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82

5 220 Hapur(765) - Faridnagar line SC UPPTCL 11

6 220 Kalikiri - Madanapalli line DC APTRANSCO 60

7 220LILO of Gr Noida -Noida Sec-129 at Noida

Sec-148DC UPPTCL 1

8 220LILO of one Ckt of Badshahpur Pali at Sec-

65 GurgaonDC HVPNL 3

9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18

421

0

474

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 30-04-19

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 29: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-

201921(2)

Section D - Sub Stations

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 30: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716

Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800

Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2019-20

Programme

Achievement

HVDC765 kV 400 kV

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 31: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

As on 30-04-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500

2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500

3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315

Total of CENTRAL SECTOR 1315

4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240

5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240

6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185

9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160

14 A-5 Faridabad Ss 22066 HVPNL 60

15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160

17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60

18 Gola Gorakhpur (New) 220132 UPPTCL 160

19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40

20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60

21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160

22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160

23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60

TOTAL STATE SECTOR 3285

GRAND TOTAL 4600

21(2)

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019

Name of Sub Stations Executing Agency

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 32: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2019-20 22

Section E - Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 33: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Programme Achievement Ach Programme Achievement Ach

Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848

State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881

PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875

PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394

Total 114213000 9896100 9441607 9541 9896100 9441607 9541

Central Sector 5661700 386100 481390 12468 386100 481390 12468

State Sector 6680500 498200 536514 10769 498200 536514 10769

PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032

PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886

Total 13693200 953900 1109239 11628 953900 1109239 11628

Central Sector 4472000 367300 317765 8651 367300 317765 8651

Total 4472000 367300 317765 8651 367300 317765 8651

Bhutan Import 621800 17500 24396 13941 17500 24396 13941

Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993

State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127

Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964

Total 133000000 11234800 10893007 9696 11234800 10893007 9696

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018

984785 869291 12675910 10183949

22

1 Electricity Generation (MU) Targets and Achievememts for 2019-20

All India Energy Generation During Apr-19 to Apr-19 (MU)

Target (2019-20)Apr-19 to Apr-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Apr-2019

98961

95393673

112348

94416

11092

3178

108930

0

20000

40000

60000

80000

100000

120000

Thermal Hydro Nuclear Total

Programme

Achievement

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 34: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23

2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24

3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25

4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26

5 Notified Power cuts Restrictions on Industries during Apr-2019 27

6 Power Supply to Agricultural Sector during Apr-2019 28

Section F - Power supply position

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 35: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00

दिलली Delhi 2698 2698 1 00 2698 2698 1 00

हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00

दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00

रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192

परजब Punjab 3646 3646 0 00 3646 3646 0 00

िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00

उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03

उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00

उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10

छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03

गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00

मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00

महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00

िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00

गोवज Goa 388 388 0 00 388 388 0 00

पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00

आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00

तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00

कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00

किल Kerala 2402 2400 2 01 2402 2400 2 01

तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00

पडचिी Puducherry 263 263 0 00 263 263 0 00

लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0

दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00

बबहजि Bihar 2589 2589 0 00 2589 2589 0 00

िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00

झजिखणड Jharkhand 689 689 0 00 689 689 0 00

ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00

पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00

मसशककम Sikkim 37 37 0 00 37 37 0 00

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7

परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00

अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05

असम Assam 766 709 57 75 766 709 57 75

मणणपि Manipur 68 67 1 15 68 67 1 15

मघजलय Meghalaya 170 160 10 59 170 160 10 59

ममज़ोिम Mizoram 54 53 0 08 54 53 0 08

नजगजलड Nagaland 54 54 0 08 54 54 0 08

बिपिज Tripura 122 120 1 12 122 120 1 12

उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55

समपणण भारत All India 110231 109842 389 04 110231 109842 389 04

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयState

अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 36: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00

दिलली Delhi 5664 5664 0 00 5664 5664 0 00

हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00

दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00

रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200

परजब Punjab 7015 7015 0 00 7015 7015 0 00

िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00

उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00

उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00

उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09

छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05

गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00

मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00

महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00

िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00

गोवज Goa 594 594 0 00 594 594 0 00

पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00

आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00

तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00

कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00

किल Kerala 4309 4300 8 02 4309 4300 8 02

तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00

पडचिी Puducherry 482 480 2 05 482 480 2 05

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01

बबहजि Bihar 5357 5357 0 00 5357 5357 0 00

िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00

झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00

ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00

पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00

मसशककम Sikkim 100 100 0 00 100 100 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00

अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22

असम Assam 1712 1667 45 26 1712 1667 45 26

मणणपि Manipur 197 188 9 46 197 188 9 46

मघजलय Meghalaya 336 336 0 00 336 336 0 00

ममज़ोिम Mizoram 116 113 3 26 116 113 3 26

नजगजलड Nagaland 157 131 26 166 157 131 26 166

बिपिज Tripura 292 291 1 03 292 291 1 03

उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24

समपणण भारत All India 177411 176810 601 03 177411 176810 601 03

24

मजग की पनत ा म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateअपरल 2019 April2019

मजग की पनत ा म कमी Demand not Met

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 37: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00

दिलली Delhi 1931 1930 1 00 32299 32282 17 01

हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00

दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24

रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190

परजब Punjab 3585 3585 0 00 55288 55275 13 00

िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02

उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08

उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07

उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14

छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02

गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00

मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00

महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01

िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00

गोवज Goa 362 362 0 00 4283 4280 3 01

पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01

आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01

तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01

कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01

किल Kerala 2489 2488 1 00 25029 24911 118 05

तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01

पडचिी Puducherry 252 251 1 04 2761 2751 10 03

लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0

दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01

बबहजि Bihar 2319 2318 1 00 30052 29827 225 07

िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17

झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25

ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01

पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03

मसशककम Sikkim 41 41 0 00 513 512 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67

परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07

अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10

असम Assam 680 656 23 34 9532 9204 328 34

मणणपि Manipur 68 68 1 09 916 906 10 11

मघजलय Meghalaya 173 173 0 03 1955 1953 1 01

ममज़ोिम Mizoram 50 49 0 09 668 661 8 12

नजगजलड Nagaland 58 57 1 20 902 809 93 103

बिपिज Tripura 150 150 0 00 1859 1837 21 11

उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28

समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06

Note The revised data for March 2019 is not avaliable

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 38: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00

दिलली Delhi 4016 4016 0 00 7016 7016 0 00

हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200

परजब Punjab 6564 6564 0 00 12638 12638 0 00

िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39

गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00

महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 538 538 0 00 596 596 0 00

पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15

आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01

तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00

कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00

किल Kerala 4264 4228 36 09 4264 4228 36 09

तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00

पडचिी Puducherry 427 412 15 34 427 412 15 34

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00

बबहजि Bihar 4633 4633 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00

झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36

ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01

मसशककम Sikkim 100 100 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01

असम Assam 1539 1508 31 20 1865 1809 56 30

मणणपि Manipur 204 199 5 25 219 216 3 12

मघजलय Meghalaya 357 357 0 00 374 372 1 04

ममज़ोिम Mizoram 108 105 3 28 121 119 2 17

नजगजलड Nagaland 127 125 2 16 156 138 18 116

बिपिज Tripura 249 249 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39

समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08

Note The revised data for March 2019 is not avaliable 26

अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW net

राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019

मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 39: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data

Not Received)परजब Punjab

िजरसथजन Rajasthanउतति परिश Uttar Pradesh

उततिजखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00020-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

No N

otifie

d Cu

ts

27

मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

tsNo

Notifie

d Cu

ts

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 40: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana 0811 hrsday 0811 hrsday

दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 379 hrsday 379 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday

उततिजखड Uttarakhand 2359 hrsday 2359 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday

गरिजत Gujarat 8 hrsday 8 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase

(Mixed) Supply - 2334 hrs day

महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hrsday 24 hrsday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar 18 hrsday 18 hrsday

झजिखणड Jharkhand 20 hrsday 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal 23 hrsday 23 hrsday

28

मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019

राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply

On segregated feeders

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 41: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Section G - Growth of Power Sector

31

32

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 42: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

2007045 2493722 637629 678000 453992 77641625 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

2007045

2493722637629

678000

4539922

77641625

Total Installed Capacity 35610019 MW

Coal Gas Diesel Nuclear Hydro Res

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 43: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Progress of Transmission Sector in the Country up to April 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

13th Plan (Up

to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407

13th Plan (Up

to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on April19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

April 19)

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 44: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

2018-19 62890

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1181

7335

7786

91441

8188

88363

957

1010

1075

1122

1149

(GrossGen+ Net Import) Mid-year population Provisional

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 45: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019

7 Status of Hydro Schemes Cleared by the CEA in Apr-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 46: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 47: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 48: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 49: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 50: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 51: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 52: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 53: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 54: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

Page 55: Executive Summary on Power Sector Apr-19 · 2019-06-06 · Executive Summary on Power Sector. SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Apr-2019

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41