55
Government of India विय मंालय Ministry of Power के रीय विय ाधिकरण भारत सरकार Feb-19 Central Electricity Authority Executive Summary on Power Sector File No.CEA-CH-14-11/4/2018-Coordination Division I/4383/2019(1) 823

Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Government of India

विदयत मतरालयMinistry of Power

कनदरीय विदयत पराधिकरण

भारत सरकार

Feb-19

Central Electricity Authority

Executive Summary on Power Sector

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

823

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Feb-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for Feb-2019 (MW) 2

3 List of Projects Commissioned in Feb-2019 3

4 All India Installed Capacity (MW) Region-wise as on 28-02-19 3

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19 4

6 Transmission Lines Added during Feb-2019 (Ckms) 5

7 Transformation Capacity Addition during Feb-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Feb-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Feb-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Feb-2019

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019

1 Programme and Achievements of Sub-Stations in Feb-2019

2 List of Sub Stations commissionedready for commisssioning in Feb-2019

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

1 Power Supply Position (Provisional) for Feb-2019 23

2 Peak Demand and Peak Met (Provisional) for Feb-2019 24

3 Power Supply Position (Revised) for Jan-2019 25

4 Peak Demand and Peak Met (Revised) for Jan-2019 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Feb-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

824

SN Contents Page

1Electricity Generation (Conventional Sources) for Feb-2019 (BU) 1

2 Generating Capacity Addition for Feb-2019 (MW) 2

3 List of Projects Commissioned in Feb-2019 3

4 All India Installed Capacity (MW) Region-wise as on 28-02-19 3

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19 4

6 Transmission Lines Added during Feb-2019 (Ckms) 5

7 Transformation Capacity Addition during Feb-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Feb-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Feb-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

825

Achievement

Feb-19

Thermal 8124 -199

Nuclear 278 -1764

Hydro 713 2556

Bhutan Import 0046 DIV0

All India 9120 -081

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

8289

9414

1 Electricity Generation for Feb-2019 (BU)

Feb-19

TypeAchievement

Feb-18

Targets Change of

Achievement

wrt Feb-2018

8676

0

3558

9723

568

338

6726

3771142011005

9195

0184

9770

344

379

Change wrt Apr-17 to Feb-18

Electricity Generation During Apr-17 to Feb-18 amp Apr-18 to Feb-19 (BU)

Apr-17 to Feb-18 Apr-18 to Feb-19

1262

4448

-234352

5961191

-831

9195

9120

9080

9100

9120

9140

9160

9180

9200

9220

BU

Feb-18 Feb-19

1100511420

00

2000

4000

6000

8000

10000

12000

BU

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

826

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

91206 9000 100206 91952 7496 99448 -081 2006 076

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Jan-2019 Jan-2018 Apr-18 to Jan-19 Apr-17 to Jan-18

1 Wind 2851890 2007530 55975980 47486460

2 Solar 3392660 2547770 30977480 19882440

3 Biomass 230980 261690 2266790 2860150

4 Bagasse 2351840 2159550 9803030 8151390

5 Small Hydro 428570 383390 7839060 6975620

6 Others 35110 29330 353690 294140

Total 9291050 7389260 107216030 85650200

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Generation details for Punducherry and Sikkim of the month ofJan 2019 is provisionally taken as that of Jan 2018

Electricity Generation (Conventional and Renewable Sources)

Feb-2019 Feb-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

827

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 2: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Section A - Highlights of Power Sector Page

1 Electricity Generation for Feb-2019 (BU) 1A amp 1B

2 Generating Capacity Addition for Feb-2019 (MW) 2

3 List of Projects Commissioned in Feb-2019 3

4 All India Installed Capacity (MW) Region-wise as on 28-02-19 3

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19 4

6 Transmission Lines Added during Feb-2019 (Ckms) 5

7 Transformation Capacity Addition during Feb-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Feb-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Feb-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 13

3 Installed Capacity in various Regions including their shares 14-19

1 Programme and Achievements of Transmission Lines in Feb-2019

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019

1 Programme and Achievements of Sub-Stations in Feb-2019

2 List of Sub Stations commissionedready for commisssioning in Feb-2019

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

1 Power Supply Position (Provisional) for Feb-2019 23

2 Peak Demand and Peak Met (Provisional) for Feb-2019 24

3 Power Supply Position (Revised) for Jan-2019 25

4 Peak Demand and Peak Met (Revised) for Jan-2019 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

1 Growth of Installed Capacity since 6th Plan 29

2 Growth of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since 2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

1 Rate of sale of power for the year 2016-17 33-41

Section H - Rate of sale of power for the year 2016-17

Executive Summary for the Month of Feb-2019

32

11

20

21

31

Section B - Capacity Addition

Section C - Transmission Lines

Section D - Sub Stations

Section E - Electricity Generation

Section F - Power supply position

Contents

Section G - Growth of Power Sector

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

824

SN Contents Page

1Electricity Generation (Conventional Sources) for Feb-2019 (BU) 1

2 Generating Capacity Addition for Feb-2019 (MW) 2

3 List of Projects Commissioned in Feb-2019 3

4 All India Installed Capacity (MW) Region-wise as on 28-02-19 3

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19 4

6 Transmission Lines Added during Feb-2019 (Ckms) 5

7 Transformation Capacity Addition during Feb-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Feb-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Feb-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

825

Achievement

Feb-19

Thermal 8124 -199

Nuclear 278 -1764

Hydro 713 2556

Bhutan Import 0046 DIV0

All India 9120 -081

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

8289

9414

1 Electricity Generation for Feb-2019 (BU)

Feb-19

TypeAchievement

Feb-18

Targets Change of

Achievement

wrt Feb-2018

8676

0

3558

9723

568

338

6726

3771142011005

9195

0184

9770

344

379

Change wrt Apr-17 to Feb-18

Electricity Generation During Apr-17 to Feb-18 amp Apr-18 to Feb-19 (BU)

Apr-17 to Feb-18 Apr-18 to Feb-19

1262

4448

-234352

5961191

-831

9195

9120

9080

9100

9120

9140

9160

9180

9200

9220

BU

Feb-18 Feb-19

1100511420

00

2000

4000

6000

8000

10000

12000

BU

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

826

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

91206 9000 100206 91952 7496 99448 -081 2006 076

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Jan-2019 Jan-2018 Apr-18 to Jan-19 Apr-17 to Jan-18

1 Wind 2851890 2007530 55975980 47486460

2 Solar 3392660 2547770 30977480 19882440

3 Biomass 230980 261690 2266790 2860150

4 Bagasse 2351840 2159550 9803030 8151390

5 Small Hydro 428570 383390 7839060 6975620

6 Others 35110 29330 353690 294140

Total 9291050 7389260 107216030 85650200

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Generation details for Punducherry and Sikkim of the month ofJan 2019 is provisionally taken as that of Jan 2018

Electricity Generation (Conventional and Renewable Sources)

Feb-2019 Feb-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

827

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 3: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1Electricity Generation (Conventional Sources) for Feb-2019 (BU) 1

2 Generating Capacity Addition for Feb-2019 (MW) 2

3 List of Projects Commissioned in Feb-2019 3

4 All India Installed Capacity (MW) Region-wise as on 28-02-19 3

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19 4

6 Transmission Lines Added during Feb-2019 (Ckms) 5

7 Transformation Capacity Addition during Feb-2019 (MVA) 6

8 Power Supply Position (Energy amp Peak) in Feb-2019 7

9 Peak Shortage of Power Supply (MW) in Different Regions 8-9

10 All India PLF Sector-wise for Feb-2019 10

11 T amp D and AT amp C Losses ()

12 All India Village Electrification

13 Average cost of Power amp Average Realisation

14 All India Coal consumption for Power Generation (MT)

Section A - Highlights of Power Sector

11

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

825

Achievement

Feb-19

Thermal 8124 -199

Nuclear 278 -1764

Hydro 713 2556

Bhutan Import 0046 DIV0

All India 9120 -081

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

8289

9414

1 Electricity Generation for Feb-2019 (BU)

Feb-19

TypeAchievement

Feb-18

Targets Change of

Achievement

wrt Feb-2018

8676

0

3558

9723

568

338

6726

3771142011005

9195

0184

9770

344

379

Change wrt Apr-17 to Feb-18

Electricity Generation During Apr-17 to Feb-18 amp Apr-18 to Feb-19 (BU)

Apr-17 to Feb-18 Apr-18 to Feb-19

1262

4448

-234352

5961191

-831

9195

9120

9080

9100

9120

9140

9160

9180

9200

9220

BU

Feb-18 Feb-19

1100511420

00

2000

4000

6000

8000

10000

12000

BU

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

826

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

91206 9000 100206 91952 7496 99448 -081 2006 076

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Jan-2019 Jan-2018 Apr-18 to Jan-19 Apr-17 to Jan-18

1 Wind 2851890 2007530 55975980 47486460

2 Solar 3392660 2547770 30977480 19882440

3 Biomass 230980 261690 2266790 2860150

4 Bagasse 2351840 2159550 9803030 8151390

5 Small Hydro 428570 383390 7839060 6975620

6 Others 35110 29330 353690 294140

Total 9291050 7389260 107216030 85650200

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Generation details for Punducherry and Sikkim of the month ofJan 2019 is provisionally taken as that of Jan 2018

Electricity Generation (Conventional and Renewable Sources)

Feb-2019 Feb-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

827

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 4: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Achievement

Feb-19

Thermal 8124 -199

Nuclear 278 -1764

Hydro 713 2556

Bhutan Import 0046 DIV0

All India 9120 -081

Type

Thermal

Nuclear

Hydro

Bhutan Import

All India

1A

8289

9414

1 Electricity Generation for Feb-2019 (BU)

Feb-19

TypeAchievement

Feb-18

Targets Change of

Achievement

wrt Feb-2018

8676

0

3558

9723

568

338

6726

3771142011005

9195

0184

9770

344

379

Change wrt Apr-17 to Feb-18

Electricity Generation During Apr-17 to Feb-18 amp Apr-18 to Feb-19 (BU)

Apr-17 to Feb-18 Apr-18 to Feb-19

1262

4448

-234352

5961191

-831

9195

9120

9080

9100

9120

9140

9160

9180

9200

9220

BU

Feb-18 Feb-19

1100511420

00

2000

4000

6000

8000

10000

12000

BU

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

826

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

91206 9000 100206 91952 7496 99448 -081 2006 076

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Jan-2019 Jan-2018 Apr-18 to Jan-19 Apr-17 to Jan-18

1 Wind 2851890 2007530 55975980 47486460

2 Solar 3392660 2547770 30977480 19882440

3 Biomass 230980 261690 2266790 2860150

4 Bagasse 2351840 2159550 9803030 8151390

5 Small Hydro 428570 383390 7839060 6975620

6 Others 35110 29330 353690 294140

Total 9291050 7389260 107216030 85650200

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Generation details for Punducherry and Sikkim of the month ofJan 2019 is provisionally taken as that of Jan 2018

Electricity Generation (Conventional and Renewable Sources)

Feb-2019 Feb-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

827

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 5: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Generation from

Conventional

Sources

Generation

from

Renewable

Sources

Total Generation from

Conventional Sources

Generation from

Renewable SourcesTotal

Growth in

Conventional

Generation

Growth in

Renewable

Generation

Growth in

Total

Generation

(BU) (BU) (BU) (BU) (BU) (BU) () () ()

91206 9000 100206 91952 7496 99448 -081 2006 076

Note Tentative

SlNo

Source-Wise All

India

Generation

from

Renewables Jan-2019 Jan-2018 Apr-18 to Jan-19 Apr-17 to Jan-18

1 Wind 2851890 2007530 55975980 47486460

2 Solar 3392660 2547770 30977480 19882440

3 Biomass 230980 261690 2266790 2860150

4 Bagasse 2351840 2159550 9803030 8151390

5 Small Hydro 428570 383390 7839060 6975620

6 Others 35110 29330 353690 294140

Total 9291050 7389260 107216030 85650200

Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department

2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro

3) Generation details for Punducherry and Sikkim of the month ofJan 2019 is provisionally taken as that of Jan 2018

Electricity Generation (Conventional and Renewable Sources)

Feb-2019 Feb-2018 Growth

1B

For the Month of Cummulative for the period

All India Generation From Renewables (All Figures are in MU)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

827

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 6: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Achievement Targets Achievement

Feb-18

Thermal 0 69615 0 NA

Hydro 0 0 0 NA

Nuclear 0 0 0 NA

All India 0 69615 0 NA

Apr-17 to Feb-18 Apr-18 to Feb-19 Change wrt Previous Year

Thermal 5300 2130 -60

Hydro 465 140 -70

Nuclear 0 0 NA

All India 5765 2270 -61

2

2 Generating Capacity Addition for Feb-2019 (MW)

Generating Capacity Addition during Apr-17 to Feb-18 amp Apr-18 to Feb-19

NA- Not Applicable

Achivement

wrt Feb-2018Type

Feb-19

00 000

01

02

03

04

05

06

07

08

09

1

1Feb-18 Feb-19

0

1000

2000

3000

4000

5000

6000

7000

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

828

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 7: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(i)

(ii)

(iii)

Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total

Northern 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Western 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

Southern 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Eastern 2720164 000 10000 000 2730164 000 494212 138809 3363185

North-East 52002 000 177581 3600 233183 000 142700 29482 405365

Islands 000 000 000 4005 4005 000 000 1256 5261

ALL INDIA 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31012019 3

Thermal

Nuclear

3 List of Projects Commissioned During Feb-2019

4 All India Installed Capacity (MW) Region-wise as on 28-02-19

NIL

NIL

Thermal

NIL

Hydro

22292734

678000

4539922

7505592

35016248

51529

000

5000000

10000000

15000000

20000000

25000000

30000000

35000000

40000000

Thermal Nuclear Hydro RES Total Captive

Thermal Nuclear Hydro RES Total Captive

Total = 350162479

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

829

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 8: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Sector

Coal Lignite Gas Diesel Total

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

All India 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

State 10403876

Private 16148709

Central 8463663

Electricity Generation (MU) Targets and Achievements for 2016-17

5 All India Installed Capacity (MW) Sector-wise as on 28-02-19

4

Grand TotalTHERMAL

Nuclear Hydro RES

RES as on 31012019

State 10403876 30

Private 16148709 46

Central 8463663 24

All India Installed Capacity(MW) (Sector-Wise)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

830

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 9: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 500 KV HVDC

+- 800 KV HVDC

765 KV

400 kV

220 KV

All India

5

4087 6086

19532 19569

0 0

3038 5814

12407 7669

0 0

0 1182

1853 1123

632 943

2485 3248

Transmission Lines Added duringApr-17 to Feb-18 ampApr-18 to Feb-19 (Ckms)

Apr-17 to Feb-18 Apr-18 to Feb-19

0 0

6 Transmission Lines Added during Feb-2019 (Ckms)

Feb-18 Feb-19

0 0

2485

3248

0

500

1000

1500

2000

2500

3000

3500

All India

Ckm

s

Feb-18 Feb-19

19532

19569

19510

19520

19530

19540

19550

19560

19570

19580

All India

Ckm

s

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

831

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 10: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

Voltage Level

+- 800 KV HVDC

+- 500 KV HVDC

765 KV

400 KV

220 KV

All India

6

3000 0

All India Transformation Capacity Addition during Apr-17 to Feb-18 amp Apr-18

to Feb-19 (MVA)

60735

0

17500

27455

15780

73303

22000

33550

14753

0

Apr-17 to Feb-18 Apr-18 to Feb-19

7438

0

3000

9290

4700

1590

7 Transformation Capacity Addition During Feb-2019 (MVA)

0

1500

2945

2993

0 0

Feb-18 Feb-19

7438

9290

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MV

A

Feb-18 Feb-19

73303

60735

0

74520

149040

1

MV

A

Apr-17 to Feb-18 Apr-18 to Feb-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

832

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 11: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 25681 25306 25213 24958 -18 -14

Western 28356 29328 28356 29321 00 00

Southern 26685 27432 26656 27430 -01 00

Eastern 10045 9770 9962 9770 -08 00

North Eastern 1136 1301 1114 1277 -19 -19

All India 91903 93137 91301 92756 -07 -04

Feb-2018 Feb-2019 Feb-2018 Feb-2019 Feb-2018 Feb-2019

Northern 47171 45848 46578 45227 -13 -14

Western 48797 54536 48691 54292 -02 -04

Southern 45426 48000 45326 48000 -02 00

Eastern 18810 20341 18797 20341 -01 00

North Eastern 2387 2480 2333 2480 -23 00

All India 158505 162242 157037 161422 -09 -05

Feb-2019 Figures are Provisional

7

8 Power Supply Position (Energy amp Peak) in Feb-2019

Peak Demand Peak Met

Requirement Availability

Energy (MU)Region

Surplus(+)

Deficit (-) in

Surplus(+)

Deficit (-) in Region

Power (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

833

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 12: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Feb-2018 0 0 0 0 549 0 53 373 0

Feb-2019 0 12 0 0 608 0 0 0 0

Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa

Feb-2018 4 5 0 8 0 0 0

Feb-2019 4 0 0 59 0 1 0

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Feb-2018 18 15 23 138 52 0 0

Feb-2019 0 0 0 8 0 2 0

8

9 Peak Shortage of Power Supply (MW) in Different Regions in Feb-2019

0 12

0 0

608

0 0 0 00 0 0 0

549

0

53

373

0

0

400

800

Ch

an

dig

ar

h Delh

i

Ha

rya

na

HP

Jamp

K

Pu

nja

b

Ra

jasth

an

UP

Utr

akhan

d

MW

Northern States (MW) Feb-2019 Feb-2018

4 0 0

59

0 1 04 5 0

8

0 0 0

0

50

100

Ch

attis

gar

h

Guja

rat

MP

Mah

ara

str

a

Da

man amp

Diu

Da

dar

Na

gar G

oa

MW

Western States (MW) Feb-2019 Feb-2018

0 0 0 8 0 2 018 15 23

138

520 0

0

200

AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep

Southern State (MW) Feb-2019 Feb-2018

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

834

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 13: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island

Feb-2018 10 0 0 0 3 0 4

Feb-2019 0 0 0 0 0 0 4

Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura

Feb-2018 5 20 6 1 9 28 1

Feb-2019 0 0 0 0 0 0 0

9

0 0 0 0 0 0

4

10

0 0 0

3

0

4

0

5

10

15

Bih

ar

DV

C

Jha

rkh

an

d

Od

ish

a

We

st

Be

ng

al

Sik

kim

Aamp

NIs

land

MW

Eastern States (MW) Feb-2019 Feb-2018

0 0 0 0 0 0 0

5 6

1

9

28

1

0

10

20

30

Aru

na

cha

l

Assa

m

Ma

nip

ur

Me

gh

ala

ya

Miz

ora

m

Na

gala

nd

Trip

ura

MW

North-Eastern States (MW)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

835

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 14: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Sector Feb-2018 Feb-2019

Central 7606 7470

State 6082 5692

Private Sector IPP 5268 5268

Private Sector UTL 6038 6125

ALL INDIA 6230 6051

Month PLF 2018 PLF 2019

Jan 6215 6054

Feb 6230 6051

For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment

10

PLF of Thermal Power Plants

All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise

10 All India Thermal PLF Sector-wise for Feb-2019

5950

6000

6050

6100

6150

6200

6250

Jan Feb

Months

All India PLF Month-wise

PLF 2018 PLF 2019

7606

60825268

6038 6230

7470

5692 5268

6125 6051

00010002000300040005000600070008000

Central State Private Sector IPP Private SectorUTL

ALL INDIA

All India Thermal PLF

Feb-2018 Feb-2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

836

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 15: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

2012-13 2013-14 2014-15 2015-16 2016-17

TampD Losses 2304 2284 2277 2181 2142

ATampC Losses 2548 2258 2462

Note As per PFC for utilities selling directly to consumers

Total Number of Villages

597464

Note From the year 2004-05 onwards Definition of Village Electrification-

A village would be declared Electrified if

Without

Subsidy

Gap ACS-

ARR(

Without

Subsidy)

Paiseunit

Gap ACS-

ARR (on

subsidy

booked

basis)

paiseunit

Gap ACS-

ARR (on

subsidyrece

ived basis)

paiseunit

2013-14 400 118 76 77

2014-15 412 108 58 60

Source- PFC Reports on the performance of State Power Utilities

2013-14 4894

2014-15 5304

2015-16 5459

2016-17 5743

2017-18 6080

11

11 T amp D and ATampC Losses ()

12 All India Village Electrification

Villiages Electrified (Nos)

10000All villages as per census 2011 has

been electrified on 28042018

Villages electrified

Average cost of supply(ACS)

(paiseunit)

i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality

as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a

Distribution Transformer may not be necessary)

14 All India Coal consumption for Power Generation (MT)

520

Average Revenue Realization(paiseunit)

518

Year

ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community

Centres etc and

iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be

obtained

13 Average cost of Power amp Average Realisation

iii) The number of households electrified should be at least 10 of the total number of households in the village

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

837

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 16: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1 Capacity Addition Targets and Achievements in 12th Plan 12

2 Capacity Addition Targets amp Achievements during Feb-2019 and Apr-18 to Feb-19 13

3 Installed Capacity in various Regions including their shares 14-19

Section B - Capacity Addition

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

838

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 17: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Figures in MW

TARGET ACH TARGET ACH TARGET ACH TARGET ACH

CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453

STATE 13922 22201 1608 2276 0 0 15530 24477

PRIVATE 43540 53661 3285 619 0 0 46825 54280

ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209

Figures in MW

Thermal Hydro Nuclear Total

Target Ach Target Ach Target Ach Target Ach

Central 4880 3170 800 390 500 6180 3560 5761

State 3546 1760 300 200 0 3846 1960 5096

Private 2940 3780 205 205 0 3145 3985 12671

Total 11366 8710 1305 795 500 0 13171 9505 7217

12

2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)

1 Capacity Addtion Targets and Achievements in the 12th Plan

SECTORTHERMAL HYDRO NUCLEAR TOTAL

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

839

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 18: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(MW)

Cummulative

Deviation

Target Achievement Target Achievement (+) (-)

Central 2760 0 0 1710 0 -1710

State 450615 69615 0 384615 1529755 -2316395

Private 0 0 0 0 600 600

Total 726615 69615 0 555615 2129755 -3426395

Central 710 0 0 710 110 -600

State 130 0 0 12999 30 -9999

Private 0 0 0 0 0 0

Total 840 0 0 83999 140 -69999

Nuclear Central 0 0 0 0 0 0

Central 3470 0 0 2420 110 -2310

State 463615 69615 0 397614 1559755 -2416385

Private 0 0 0 0 600 600

Total 810615 69615 0 639614 2269755 -4126385

Electricity Generation (MU) Targets and Achievements for 2016-17

13

Hydro

All India

Capacity Addition TargetsAchievements during the Month of Feb-2019

Thermal

2 Capacity Addition Targets Achievements During Feb-2019

Schemes Sector

Target 2018-19

Apr-18 to Feb-19Feb-19

55

56

84

0

0

63

96

21

30

14

0

0

22

70

0

1000

2000

3000

4000

5000

6000

7000

Thermal Hydro Nuclear Total

MW

Targets and Achievement during 2018-19Target Achievement

0

100

200

300

400

500

600

700

Thermal Hydro Nuclear Total

69615

0 0

69615

0 0 00

MW

Target Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

840

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 19: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Coal Lignite Gas Diesel Total

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Sub Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Sub Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Sub Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Sub Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Sub Total 52002 000 177581 3600 233183 000 142700 29482 405365

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Sub Total 000 000 000 4005 4005 000 000 1256 5261

State 6305650 129000 711871 36393 7182913 000 2987880 233082 10403876

Private 7431600 183000 1058060 27370 8700030 000 339400 7109279 16148709

Central 5372000 314000 723791 000 6409791 678000 1212642 163230 8463663

Total 19109250 626000 2493722 63763 22292734 678000 4539922 7505592 35016248

Figures at decimal may not tally due to rounding off

Note -

(As per latest information available with MNRE)

Break up of RES all India as on 31012019 is given below (in MW)

452805 3528810 2602597 7505592

A 0 MW

B 100 MW

C 0 MW

D Feb 2019 A-B-C -100 MW

Sector wise breakup of RES capacity as shown is provisional

Capacity Retired during Feb 2019

U-7 of NEYVELI TPS- I (100 MW) has been retired from central sector of Southern Region

Capacity removed due to change Feb 2019

Net Capacity Added during

BM PowerCogen Waste to Energy

907550 13830

Capacity Added during Feb 2019

Islands

ALL INDIA

Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources

1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31012019

Small

Hydro PowerWind Power

Bio-PowerSolar Power

Total

Capacity

RES

(MNRE)

Northern Region

Western Region

Southern Region

Eastern Region

North Eastern

Region

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 28022019)

(UTILITIES)

Region Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

841

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 20: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Coal Lignite Gas Diesel Total

State 13500 000 180040 000 193540 000 000 000 193540

Private 86922 000 10800 000 97722 000 000 17621 115343

Central 311272 000 20701 000 331973 10283 72309 000 414565

Sub-Total 411694 000 211541 000 623235 10283 72309 17621 723448

State 272000 000 15000 000 287000 000 110282 6930 404212

Private 408078 000 000 000 408078 000 20000 34019 462097

Central 129472 000 53561 000 183034 10094 66370181 500 259998

Sub-Total 809550 000 68561 000 878112 10094 196652 41449 1126306

State 000 000 000 000 000 000 69460 25661 95121

Private 000 000 000 000 000 000 99200 60850 160050

Central 18340 000 6201 000 24541 2895 122388 000 149824

Sub-Total 18340 000 6201 000 24541 2895 291048 86511 404995

State 000 000 17500 000 17500 000 123000 12903 153403

Private 000 000 000 000 000 000 000 6438 6438

Central 50639 000 12907 000 63547 6798 109188 000 179533

Sub-Total 50639 000 30407 000 81047 6798 232188 19341 339374

State 176000 000 15000 000 191000 000 259770 12780 463550

Private 511550 000 000 000 511550 000 28800 115462 655812

Central 85458 000 26401 000 111859 19681 92342 000 223882

Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244

State 560000 25000 60380 000 645380 000 109618 2385 757383

Private 280200 108000 000 000 388200 000 10400 721691 1120291

Central 95625 25000 22110 000 142735 55674 73901 34400 306710

Sub-Total 935825 158000 82490 000 1176315 55674 193919 758476 2184384

State 546900 000 000 000 546900 000 72410 2510 621820

Private 871433 000 000 000 871433 000 84200 282983 1238616

Central 379639 000 54949 000 434588 28948 180253 3000 646789

Sub-Total 1797972 000 54949 000 1852921 28948 336863 288493 2507225

State 000 000 000 000 000 000 125215 6787 132002

Private 9900 000 45000 000 54900 000 8800 52372 116072

Central 34324 000 6966 000 41290 3124 47554 000 91968

Sub-Total 44224 000 51966 000 96190 3124 181569 59159 340042

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 3240 3240

Central 3815 000 1503 000 5317 801 10171 000 16289

Sub-Total 3815 000 1503 000 5317 801 10171 3240 19529

124953 000 29105 000 154058 23703 75145 000 252907

State 1568400 25000 287920 000 1881320 000 869755 69956 2821031

Private 2168083 108000 55800 000 2331883 000 251400 1294676 3877959

Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465

Grand Total 4970020 158000 578126 000 5706146 162000 1970777 1402532 9241455

Chandigarh

Central - Unallocated

Total (Northern

Region)

Delhi

Haryana

Himachal Pradesh

Jammu amp Kashmir

Punjab

Rajasthan

Uttar Pradesh

Uttarakhand

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

(As on 28022019)

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

842

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 21: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 005 005

Private 000 000 4800 000 4800 000 000 169 4969

Central 45478 000 1967 000 47445 2600 000 000 50045

Sub-Total 45478 000 6767 000 52245 2600 000 174 55019

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 1447 1447

Central 12663 000 4334 000 16997 700 000 000 17697

Sub-Total 12663 000 4334 000 16997 700 000 1447 19144

State 371000 104000 217782 000 692782 000 77200 4910 774892

Private 726567 50000 396000 000 1172567 000 000 778750 1951317

Central 309051 000 42400 000 351451 55900 000 24330 431681

Sub-Total 1406618 154000 656182 000 2216800 55900 77200 807990 3157890

State 474000 000 000 000 474000 000 170366 8396 652762

Private 617400 000 10000 000 627400 000 000 399013 1026413

Central 279441 000 25700 000 305141 27300 152000 30000 514441

Sub-Total 1370841 000 35700 000 1406541 27300 322366 437409 2193616

State 228000 000 000 000 228000 000 12000 1105 241105

Private 849000 000 000 000 849000 000 000 52430 901430

Central 195344 000 000 000 195344 4800 10000 000 210144

Sub-Total 1272344 000 000 000 1272344 4800 22000 53535 1352679

State 1017000 000 67200 000 1084200 000 285084 38813 1408097

Private 1245600 000 56800 000 1302400 000 48100 879043 2229543

Central 433475 000 227273 000 660748 69000 000 12300 742048

Sub-Total 2696075 000 351273 000 3047348 69000 333184 930155 4379687

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 546 546

Central 17444 000 6634 000 24078 900 000 000 24978

Sub-Total 17444 000 6634 000 24078 900 000 546 25524

211400 000 19759 000 231159 22800 000 000 253959

State 2090000 104000 284982 000 2478982 000 544650 53229 3076861

Private 3438567 50000 467600 000 3956167 000 48100 2111398 6115665

Central 1504295 000 328067 000 1832362 184000 162000 66630 2244992

Grand Total 7032862 154000 1080649 000 8267511 184000 754750 2231256 11437517

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

WESTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Goa

Daman amp Diu

Gujarat

Madhya Pradesh

Chhattisgarh

Maharashtra

Dadra amp Nagar

Naveli

Central - Unallocated

Total (Western

Region)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

843

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 22: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(As on 28022019)

Coal Lignite Gas Diesel Total

State 501000 000 23540 000 524540 000 167360 5618 697518

Private 387388 000 381318 3680 772386 000 000 722303 1494689

Central 154683 12773 000 000 167456 12727 000 25000 205183

Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 752921 2397390

State 588250 000 000 000 588250 000 247993 4122 840365

Private 83945 000 83182 000 167127 000 000 392796 559923

Central 180685 14927 000 000 195612 14873 000 1000 211485

Sub-Total 852880 14927 83182 000 950989 14873 247993 397918 1611773

State 502000 000 000 12792 514792 000 358660 19389 892841

Private 195850 000 000 2520 198370 000 000 1283306 1481676

Central 242780 40140 000 000 282920 69800 000 000 352720

Sub-Total 940630 40140 000 15312 996082 69800 358660 1302694 2727236

State 000 000 000 15996 15996 000 185650 17290 218936

Private 61500 000 17400 000 78900 000 000 19011 97911

Central 86142 28180 35958 000 150280 36200 000 5000 191480

Sub-Total 147642 28180 53358 15996 245176 36200 185650 41301 508327

State 432000 000 52408 000 484408 000 217820 12270 714498

Private 458767 25000 50310 21170 555247 000 000 1171783 1727030

Central 302532 136420 000 000 438952 144800 000 23190 606942

Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1207243 3048470

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 000 10000 000 000 10000 000 000 000 10000

Sub-Total 000 10000 000 000 10000 000 000 000 10000

State 000 000 3250 000 3250 000 000 000 3250

Private 000 000 000 000 000 000 000 180 180

Central 14080 10760 000 000 24840 8600 000 000 33440

Sub-Total 14080 10760 3250 000 28090 8600 000 180 36870

142600 35800 000 000 178400 45000 000 000 223400

State 2023250 000 79198 28788 2131236 000 1177483 58688 3367407

Private 1187450 25000 532210 27370 1772030 000 000 3589379 5361409

Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650

Grand Total 4334202 314000 647366 56158 5351726 332000 1177483 3702257 10563466

Kerala

Tamil Nadu

NLC

Puducherry

Central - Unallocated

Total (Southern

Region)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

SOUTHERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

Andhra Pradesh

Telangana

Karnataka

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

844

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 23: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 000 000 000 000 7070 7070

Private 28100 000 000 000 28100 000 000 25545 53645

Central 362433 000 000 000 362433 000 11000 000 373432

Sub-Total 390533 000 000 000 390533 000 11000 32615 434147

State 42000 000 000 000 42000 000 13000 405 55405

Private 73000 000 000 000 73000 000 000 3241 76241

Central 39374 000 000 000 39374 000 6100 000 45474

Sub-Total 154374 000 000 000 154374 000 19100 3646 177120

State 540000 000 10000 000 550000 000 98600 12195 660795

Private 242500 000 000 000 242500 000 000 34611 277111

Central 76077 000 000 000 76077 000 41000 000 117077

Sub-Total 858577 000 10000 000 868577 000 139600 46806 1054983

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 000 000

Central 698504 000 000 000 698504 000 18620 000 717124

Sub-Total 698504 000 000 000 698504 000 18620 000 717124

State 42000 000 000 000 42000 000 206192 2630 250822

Private 293900 000 000 000 293900 000 000 46900 340800

Central 163390 000 000 000 163390 000 8900 1000 173290

Sub-Total 499290 000 000 000 499290 000 215092 50530 764912

State 000 000 000 000 000 000 36000 5211 41211

Private 000 000 000 000 000 000 39900 001 39901

Central 8703 000 000 000 8703 000 6400 000 15103

Sub-Total 8703 000 000 000 8703 000 82300 5212 96215

110183 000 000 000 110183 000 8501 000 118684

State 624000 000 10000 000 634000 000 353792 27511 1015303

Private 637500 000 000 000 637500 000 39900 110298 787698

Central 1458664 000 000 000 1458664 000 100520 1000 1560184

Grand Total 2720164 000 10000 000 2730164 000 494212 138809 3363185

Total (Eastern

Region)

Bihar

Jharkhand

West Bengal

DVC

Odisha

Sikkim

Central - Unallocated

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

EASTERN REGION

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

845

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 24: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 32821 000 32821 000 10000 501 43322

Private 000 000 2450 000 2450 000 000 2275 4725

Central 27902 000 43556 000 71458 000 35708 2500 109666

Sub-Total 27902 000 78827 000 106729 000 45708 5276 157713

State 000 000 000 000 000 000 000 10710 10710

Private 000 000 000 000 000 000 000 539 539

Central 2470 000 4682 000 7152 000 11655 000 18807

Sub-Total 2470 000 4682 000 7152 000 11655 11249 30056

State 000 000 000 000 000 000 32200 3103 35303

Private 000 000 000 000 000 000 000 012 012

Central 3040 000 10969 000 14009 000 7227 000 21236

Sub-Total 3040 000 10969 000 14009 000 39427 3115 56551

State 000 000 16950 000 16950 000 000 1601 18551

Private 000 000 000 000 000 000 000 009 009

Central 3740 000 43695 000 47435 000 6849 500 54784

Sub-Total 3740 000 60645 000 64385 000 6849 2110 73344

State 000 000 000 3600 3600 000 000 545 4145

Private 000 000 000 000 000 000 000 323 323

Central 3140 000 7157 000 10297 000 9534 000 19831

Sub-Total 3140 000 7157 3600 13897 000 9534 868 24299

State 000 000 000 000 000 000 000 3067 3067

Private 000 000 000 000 000 000 000 100 100

Central 2140 000 4893 000 7033 000 5733 000 12766

Sub-Total 2140 000 4893 000 7033 000 5733 3167 15933

State 000 000 000 000 000 000 000 3647 3647

Private 000 000 000 000 000 000 000 050 050

Central 2070 000 4046 000 6116 000 9794 000 15910

Sub-Total 2070 000 4046 000 6116 000 9794 3697 19607

7500 000 6362 000 13862 000 14000 000 27862

State 000 000 49771 3600 53371 000 42200 23174 118745

Private 000 000 2450 000 2450 000 000 3308 5758

Central 52002 000 125360 000 177362 000 100500 3000 280862

Grand Total 52002 000 177581 3600 233183 000 142700 29482 405365

Assam

Arunachal Pradesh

Meghalaya

Tripura

Manipur

Nagaland

Mizoram

Central - Unallocated

Total (North-

Eastern Region)

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

NORTH-EASTERN REGION

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

846

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 25: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(As on 28022019)

Coal Lignite Gas Diesel Total

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 146 146

Central 000 000 000 000 000 000 000 510 510

Sub-Total 000 000 000 4005 4005 000 000 1181 5186

State 000 000 000 000 000 000 000 000 000

Private 000 000 000 000 000 000 000 075 075

Central 000 000 000 000 000 000 000 000 000

Sub-Total 000 000 000 000 000 000 000 075 075

State 000 000 000 4005 4005 000 000 525 4530

Private 000 000 000 000 000 000 000 221 221

Central 000 000 000 000 000 000 000 510 510

Grand Total 000 000 000 4005 4005 000 000 1256 5261

Andaman amp

Nicobar

lakshadweep

Total (Islands)

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN

ISLANDS

INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES

State Ownership Sector

Modewise breakup

Grand TotalThermalNuclear Hydro

RES

(MNRE)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

847

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 26: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SrNo Contents Page

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19

20(1)

2 List of Transmission Lines CommissionedReady for commissioning during Feb-2019 20(2)

Section C - Transmission Lines

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

848

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 27: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

1 Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on 28-02-19

(All figures in circuit kms)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Pri

va

te S

ecto

r

To

tal

Ce

ntr

al

Se

cto

r

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647

Feb19 Programme 0 0 0 0 0 0 0 0 0 0 0 0 775 894 0 1669 52 109 0 161 827 1003 0 1830

Achievement 0 0 0 0 0 0 0 0 1182 0 0 1182 540 583 0 1123 301 632 10 943 2023 1215 10 3248

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 4692 766 699 6157 3045 4773 562 8380 553 5705 0 6258 8290 11244 1261 20795

Achievement 0 0 0 0 0 0 0 0 5026 0 788 5814 2289 3692 1688 7669 476 5600 10 6086 7791 9292 2486 19569

20(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

849

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 28: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Line

1 2 3 4 5 6

1 765 Banaskanta - Chittorgarh line DC PGCIL 604

2 765 Bhuj Pool - Banaskanta line DC PGCIL 578

3 400 Banaskanta - Sankhari line DC PGCIL 43

4 400 Cuddapah - Madhugiri (QM) (PSITL - TBCB) DC PGCIL 486

5 400 LILO of Farakka - Jeerat line at Baharampur SC PGCIL 3

6 400 LILO of Subhashgram - Jeerat at Rajarhat SC PGCIL 8

7 220 LILO of Agra - Bharatpur at Agra line SC PGCIL 111

8 220 NLC - Karaikal line DC PGCIL 190

2023

9 400

LILO of both Ckt of Suryapet -

Shankarpally(ckt-II) Kethireddypalli

(Manikonda) SS

DC TSTRANSCO 42

10 400LILO of both Ckts of Nagda - Rajgarh at

BadnawarDC MPPTCL 16

11 400LILO of one ckt of 400 kV DC Kosamba -

Chorania line at 400 kV Pachchham SsDC GETCO 46

12 400 LILO of one ckt Ukai - Kosamba at Vav Ss DC GETCO 62

13 400LILO of Rewa (Allahabad) - Meja lie at

MasauliDC UPPTCL 65

14 400Pithampur - Badnawar DCDS (Quad Moose

) lineDC MPPTCL 71

15 400Shri Singaji TPS - Pithampur DCDS (QM)

lineDC MPPTCL 281

16 230 Kamudhi - Kavanoor Ckt-II DC TANTRANSCO 56

17 220 Bahraich - Gonda (400) Ckt-II DC UPPTCL 74

18 220 Chandrapur-II - Chandrapur MIDC (Tadali) MC MSETCL 80

19 220 Gaurichak - Bihta (New) line DC BSPTCL 82

20 220Inter-connector between Sailana - Ratlam

switching (GEC-I)DC MPPTCL 67

21 220LILO of Badarpur TPS - Mehrauli at

TughlakabadDC DTL 3

22 220

LILO of both ckts Sec-72 - Roj-ka-Meo line

on MC and DC towers at Gurugram Sec-

69 SS

DC HVPNL 3

23 220LILO of one Ckt Jabalpur - Amarkantak at

Gorabazar JBPDC MPPTCL 12

24 220 LILO of Parli - Osmanabad line at Parli (PG) DC MSETCL 5

25 220 Okhla - Tughlakabad DC DTL 3

26 220Rewa Road Allahabad - Pahari Chitrakoot

lineDC UPPTCL 182

27 220 Sirohi-Pindwara line SC RVPNL 23

28 220 Tanda (NTPC) - Tanda (New) line DC UPPTCL 42

1215

29 220 LILO of 220 kV SC KTPS - Modak line DC APL 5

30 220 LILO of Kota - Badod lineat Ranpur GSS DC APL 5

10

3248

20(2)

Grand Total

2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Feb-2019

Voltage

Level (kV)Name of Transmission Lines

Circuit

Type

Executing

Agency

CENTRAL SECTOR

Total of CENTRAL SECTOR

STATE SECTOR Sector

Total of STATE SECTOR

PRIVATE SECTOR

Total of PRIVATE SECTOR

SlNo

Length(CKm)

As on 28-02-19

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

850

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 29: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)

2Sub Stations (220 kV and above) commissionedready for commisssioning during

Feb-201921(2)

Section D - Sub Stations

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

851

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 30: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

1 Executive summary of Target and Achievement of Substations during 2018-19 As on 28-02-19

(All figures in circuit MVA)

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ecto

r

Sta

te S

ecto

r

JV

Priva

te S

ecto

r

To

tal

Ce

ntr

al S

ec

tor

Sta

te S

ec

tor

JV

Pri

va

te S

ec

tor

Gra

nd

To

tal

3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600

Feb19 Programme 0 0 0 0 0 0 0 0 3000 0 0 3000 0 315 0 315 320 480 0 800 3320 795 0 4115

Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1685 3015 0 4700 0 1380 210 1590 4685 4395 210 9290

Upto Feb-19 Programme 0 0 0 0 0 0 0 0 22200 0 0 22200 8185 11955 630 20770 320 14760 0 15080 30705 26715 630 58050

Achievement 0 0 0 0 0 0 0 0 17500 0 0 17500 14130 12695 630 27455 0 15570 210 15780 31630 28265 840 60735

21(1)

220 kV Grand Total 800 kV 500 kV

Programme 2018-19

Programme

Achievement

HVDC765 kV 400 kV

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

852

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 31: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

As on 28-02-19

Sl Voltage Ratio Capacity

No (kVkV) (MWMVA)

1 2 3 4 5

1 Banaskanta SS 765400 PGCIL 3000

2Rajarhat (GIS) SS (2x500 MVA)1st

Unit400220 PGCIL 500

3 Cuddapah (Extn) 400220 PGCIL 500

4Patna (Replacement of ICT-II) (500-

315)400220 PGCIL 185

5 Rewa (ICT-III) 400220 PGCIL 500

Total of CENTRAL SECTOR 4685

6 Jagdalpur Ss (ICT-II) 400220 CSPTCL 315

7 Sanand (ICT-II) 400220 GETCO 1000

8 Jaisalmer -2 SS 400220 RVPNL 500

9 Chandrapur (ICT-II) 400220 MSETCL 1000

10 Basti (Aug) TF-II (200-160) 400132 UPPTCL 40

11 Masauli (Prayagraj) (New) TF-I 400132 UPPTCL 200

12 Gummidipoondi (IIIrD Auto) 230110 TANTRANSCO 100

13Lalru SS (Replacement of 100 MVA

TF by 160 MVA22066 PSTCL 60

14 KB Cross Spare (Aug) 220110 KPTCL 100

15 Barhi (GIS) SS 220132 HVPNL 100

16 Ghazipur (Aug) TF-II (160-100) 220132 UPPTCL 60

17 Hardoi Road (Aug) TF-II (200-160) 220132 UPPTCL 40

18Muradnagar Ghaziabad (Aug) TF-II

(200-160)220132 UPPTCL 40

19 Pahari (Chitrakoot) (New) TF-I 220132 UPPTCL 100

20 Domjur 220kV (Aug) (160-100) 220132 WBSETCL 60

21 RGEC Sonipat SS 22033 HVPNL 100

22 Tughlakabad SS 22066 DTL 320

23 Kawant SS 2nd TF 22066 GETCO 160

24 BBagewadi (Aug) 220110 KPTCL 100

TOTAL STATE SECTOR 4395

25 GSS Ranpur Kota SS 22013233 APL 210

Total of PRIVATE SECTOR 210

GRAND TOTAL 9290

21(2)

PRIVATE SECTOR

CENTRAL SECTOR

STATE SECTOR

2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Feb-2019

Name of Sub StationsExecuting

Agency

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

853

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 32: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1 Electricity Generation (MU) Targets and Achievements for 2018-19 22

Section E - Electricity Generation

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

854

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 33: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Programme Achievement Ach Programme Achievement Ach

Central Sector 35160700 2850900 2891267 10142 32047400 33468278 10443

State Sector 35132000 2812100 2531848 9003 31918200 30565043 9576

PvtIPP Sector 36999700 2873800 2554017 8887 33766700 31916221 9452

PvtUTL Sector 1857600 139300 147223 10569 1693400 1753089 10352

Total 109150000 8676100 8124355 9364 99425700 97702631 9827

Central Sector 5617600 246800 275106 11147 5286900 5170122 9779

State Sector 6110600 390600 399690 10233 5655200 6142287 10861

PvtIPP Sector 1141800 25400 27129 10681 1108700 1165668 10514

PvtUTL Sector 130000 9800 11452 11686 118100 143914 12186

Total 13000000 672600 713377 10606 12168900 12621991 10372

Central Sector 3850000 355800 278278 7821 3456800 3436043 9940

Total 3850000 355800 278278 7821 3456800 3436043 9940

Bhutan Import 500000 18400 4652 2528 483100 438144 9069

Central Sector 44628300 3453500 3444651 9974 40791100 42074443 10315

State Sector 41242600 3202700 2931538 9153 37573400 36707330 9769

Pvt Sector 40129100 3048300 2739821 8988 36686900 34978892 9534

Total 126500000 9722900 9120662 9381 115534500 114198809 9884

Provisional based on actual-cum-Assesment

Figs in MU

Cummulative

Achievement

Cummulative

Achievement

Jan-19 Jan-18 Upto Jan-2019 Upto Jan-2018

929105 738926 10721603 8565020

22

1 Electricity Generation (MU) Targets and Achievememts for 2018-19

All India Energy Generation During Apr-18 to Feb-19 (MU)

Target (2018-19)Apr-18 to Feb-19

Sector

Hydro

Thermal

Nuclear

Renewable Energy Generation

Achievement

Feb-2019

994257

121689

34568

1155345

977026

126220

34360

1141988

0

200000

400000

600000

800000

1000000

1200000

1400000

Thermal Hydro Nuclear Total

Programme

Achievement

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

855

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 34: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1 Energy Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 23

2 Peak Power Supply Position (Provisional) for Feb-2019 and during Apr-18 to Feb-19 24

3 Energy Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 25

4 Peak Power Supply Position (Revised) for Jan-2019 and during Apr-18 to Jan-19 26

5 Notified Power cuts Restrictions on Industries during Feb-2019 27

6 Power Supply to Agricultural Sector during Feb-2019 28

Section F - Power supply position

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

856

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 35: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 97 97 0 00 1465 1465 0 00

दिलली Delhi 1856 1855 0 00 30368 30352 16 01

हरियजणज Haryana 3310 3310 0 00 50006 50006 0 00

दहमजचल परिश Himachal Pradesh 801 801 0 00 9018 8788 230 25

रमम कशमीि Jammu amp Kashmir 1588 1320 268 169 17826 14454 3372 189

परजब Punjab 2881 2881 0 00 51703 51690 13 00

िजरसथजन Rajasthan 6483 6480 3 00 73052 72867 185 03

उतति परिश Uttar Pradesh 7253 7177 76 10 108347 107427 921 08

उततिजखड Uttarakhand 1038 1037 1 01 12778 12686 92 07

उततरी कषतर Northern Region 25306 24958 348 14 354564 349736 4828 14

छततीसगढ़ Chhattisgarh 2195 2187 8 03 23666 23620 46 02

गरिजत Gujarat 8595 8595 0 00 106698 106682 15 00

मधय परिश Madhya Pradesh 6119 6119 0 00 69431 69429 2 00

महजिजषटर Maharashtra 11378 11378 0 00 144654 144517 137 01

िमन औि दिउ Daman amp Diu 199 199 0 00 2336 2336 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 525 525 0 00 5764 5764 0 00

गोवज Goa 319 319 0 00 3921 3918 3 01

पशचिमी कषतर Western Region 29328 29321 8 00 356470 356266 204 01

आनधर परिश Andhra Pradesh 5011 5011 0 00 57663 57606 57 01

तलगजनज Telangana 5453 5453 0 00 59767 59706 61 01

कनजाटक Karnataka 6218 6218 0 00 64145 64078 67 01

किल Kerala 2055 2053 2 01 22540 22423 117 05

तममल नजड Tamil Nadu 8484 8484 0 00 99127 99028 100 01

पडचिी Puducherry 211 211 0 00 2509 2500 9 03

लकष-दवीप Lakshadweep 4 4 0 0 43 43 0 0

दकषकषणी कषतर Southern Region 27432 27430 2 00 305750 305341 409 01

बबहजि Bihar 1945 1945 0 00 27732 27508 224 08

िजमोिि घजटी ननगम DVC 1562 1562 0 00 20592 20223 369 18

झजिखणड Jharkhand 615 615 0 00 7984 7764 220 28

ओडडशज Odisha 1779 1779 0 00 29227 29199 28 01

पशशचम बगजल West Bengal 3830 3830 0 00 47652 47494 158 03

मसशककम Sikkim 39 39 0 00 472 472 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 317 296 21 67

परवी कषतर Eastern Region 9770 9770 0 00 133659 132660 999 07

अरणजचल परिश Arunachal Pradesh 77 77 0 05 804 795 9 11

असम Assam 635 622 13 21 8852 8548 305 34

मणणपि Manipur 95 95 1 08 848 838 10 11

मघजलय Meghalaya 188 188 0 00 1781 1780 1 01

ममज़ोिम Mizoram 71 70 1 07 619 611 7 12

नजगजलड Nagaland 86 77 8 97 844 752 92 109

बिपिज Tripura 148 147 1 06 1709 1687 21 12

उततर-परवी कषतर North-Eastern Region 1301 1277 24 19 15456 15011 444 29

समपणण भारत All India 93137 92756 382 04 1165900 1159014 6886 06

23

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied

Excludes energy exported to Bangladesh

Energy not Supplied

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)

राजयStateफररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

857

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 36: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 194 194 0 00 369 369 0 00

दिलली Delhi 4398 4386 12 03 7016 7016 0 00

हरियजणज Haryana 6946 6946 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1679 1679 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3041 2433 608 200 3080 2464 616 200

परजब Punjab 5716 5716 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12650 12650 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14908 14908 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2182 2182 0 00 2216 2216 0 00

उततरी कषतर Northern Region 45848 45227 621 14 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 4094 4090 4 01 4416 4270 146 33

गरिजत Gujarat 15409 15409 0 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13505 13505 0 00 13815 13815 0 00

महजिजषटर Maharashtra 21079 21020 59 03 23864 23254 610 26

िमन औि दिउ Daman amp Diu 331 331 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01

गोवज Goa 595 594 0 00 596 596 0 00

पशचिमी कषतर Western Region 54536 54292 244 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8936 893589 0 00 9459 9453 6 01

तलगजनज Telangana 10166 10166 0 00 10815 10815 0 00

कनजाटक Karnataka 11959 11959 0 00 11959 11959 0 00

किल Kerala 3841 3833 8 02 4050 3997 53 13

तममल नजड Tamil Nadu 15144 15144 0 00 15144 15144 0 00

पडचिी Puducherry 401 399 2 05 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 48000 48000 0 00 48000 48000 0 00

बबहजि Bihar 4204 4204 0 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2950 2950 0 00 2958 2957 1 00

झजिखणड Jharkhand 1140 1140 0 00 1339 1291 48 36

ओडडशज Odisha 5053 5053 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 7300 7300 0 00 9130 9123 7 01

मसशककम Sikkim 101 101 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 20341 20341 0 00 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 138 138 0 00 138 138 0 01

असम Assam 1417 1417 0 00 1865 1809 56 30

मणणपि Manipur 192 192 0 00 219 216 3 12

मघजलय Meghalaya 355 355 0 00 374 372 1 04

ममज़ोिम Mizoram 102 102 0 00 121 119 2 17

नजगजलड Nagaland 130 130 0 00 156 138 18 116

बिपिज Tripura 231 231 0 00 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2480 2480 0 00 2967 2850 117 39

समपणण भारत All India 162242 161422 820 05 177022 175528 1494 08

24

मजग की पनता म कमी Demand not Met

Excludes the supply to Bangladesh

राजयStateफररवरी2019 February2019

मजग की पनता म कमी Demand not Met

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)

आकड़ मगज वजट नट Figures in MW netअपरल2018 -फररवरी2019 April2018 to February2019

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

858

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 37: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

आकड़ मममलयन यननट नट Figures in MU net

ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied

कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )

चडीगढ़ Chandigarh 115 115 0 00 1368 1368 0 00

दिलली Delhi 2141 2140 1 01 28513 28497 16 01

हरियजणज Haryana 3939 3939 0 00 46696 46696 0 00

दहमजचल परिश Himachal Pradesh 901 892 9 10 8217 7987 230 28

रमम कशमीि Jammu amp Kashmir 1893 1545 348 184 16238 13134 3104 191

परजब Punjab 3417 3417 0 00 48822 48809 13 00

िजरसथजन Rajasthan 7280 7261 20 03 66569 66387 182 03

उतति परिश Uttar Pradesh 8682 8628 54 06 101095 100250 845 08

उततिजखड Uttarakhand 1192 1189 3 02 11740 11649 91 08

उततरी कषतर Northern Region 29559 29125 433 15 329258 324778 4480 14

छततीसगढ़ Chhattisgarh 1990 1983 7 04 21471 21433 39 02

गरिजत Gujarat 9376 9376 0 00 98103 98087 15 00

मधय परिश Madhya Pradesh 7593 7593 0 00 63312 63310 2 00

महजिजषटर Maharashtra 12201 12201 0 00 133276 133139 137 01

िमन औि दिउ Daman amp Diu 208 208 0 00 2137 2137 0 00

िजिि व नगि हवली Dadra amp Nagar Haveli 540 540 0 00 5239 5239 0 00

गोवज Goa 343 343 0 00 3603 3599 3 01

पशचिमी कषतर Western Region 32251 32244 7 00 327142 326945 197 01

आनधर परिश Andhra Pradesh 4994 4991 2 00 52652 52595 57 01

तलगजनज Telangana 5405 5403 2 00 54314 54253 61 01

कनजाटक Karnataka 6460 6458 3 00 57927 57860 67 01

किल Kerala 2002 2001 1 01 20485 20370 115 06

तममल नजड Tamil Nadu 8499 8495 4 00 90644 90544 100 01

पडचिी Puducherry 223 223 0 00 2298 2289 9 04

लकष-दवीप Lakshadweep 4 4 0 0 39 39 0 0

दकषकषणी कषतर Southern Region 27582 27570 12 00 278318 277911 408 01

बबहजि Bihar 2311 2305 6 03 25787 25563 224 09

िजमोिि घजटी ननगम DVC 1973 1966 7 04 19029 18660 369 19

झजिखणड Jharkhand 797 738 59 74 7369 7149 220 30

ओडडशज Odisha 2244 2243 1 00 27448 27420 28 01

पशशचम बगजल West Bengal 3615 3609 7 02 43821 43664 158 04

मसशककम Sikkim 52 52 0 00 433 433 0 01

अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 288 269 19 67

परवी कषतर Eastern Region 10992 10912 80 07 123889 122889 999 08

अरणजचल परिश Arunachal Pradesh 78 77 0 05 726 718 8 11

असम Assam 682 673 10 14 8217 7926 291 35

मणणपि Manipur 92 92 1 06 752 743 9 12

मघजलय Meghalaya 197 196 0 01 1593 1592 1 01

ममज़ोिम Mizoram 54 53 1 10 548 541 7 12

नजगजलड Nagaland 79 71 8 106 758 674 84 110

बिपिज Tripura 148 147 0 01 1560 1540 20 13

उततर-परवी कषतर North-Eastern Region 1329 1309 20 15 14155 13734 420 30

समपणण भारत All India 101713 101161 552 05 1072762 1066258 6504 06

Excludes energy exported to Bangladesh

राजयState

ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)

25

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Energy not Supplied Energy not Supplied

रनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

859

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 38: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met

कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )

चडीगढ़ Chandigarh 258 258 0 00 369 369 0 00

दिलली Delhi 4472 4472 0 00 7016 7016 0 00

हरियजणज Haryana 7078 7078 0 00 10270 10270 0 00

दहमजचल परिश Himachal Pradesh 1686 1686 0 00 1700 1700 0 00

रमम कशमीि Jammu amp Kashmir 3078 2463 615 200 3080 2464 616 200

परजब Punjab 6309 6309 0 00 12638 12638 0 00

िजरसथजन Rajasthan 12921 12921 0 00 13276 13276 0 00

उतति परिश Uttar Pradesh 14928 14928 0 00 20498 20062 436 21

उततिजखड Uttarakhand 2216 2216 0 00 2216 2216 0 00

उततरी कषतर Northern Region 47779 47210 569 12 63166 61726 1440 23

छततीसगढ़ Chhattisgarh 3949 3858 91 23 4416 4270 146 33

गरिजत Gujarat 14897 14891 6 00 17053 16963 90 05

मधय परिश Madhya Pradesh 13815 13815 0 00 13815 13815 0 00

महजिजषटर Maharashtra 20242 20242 0 00 23864 23254 610 26

िमन औि दिउ Daman amp Diu 339 339 0 01 357 356 1 02

िजिि व नगि हवली Dadra amp Nagar Haveli 799 798 1 01 816 815 1 01

गोवज Goa 577 577 0 00 596 596 0 00

पशचिमी कषतर Western Region 53737 53544 193 04 56675 55821 853 15

आनधर परिश Andhra Pradesh 8487 8461 26 03 9459 9453 6 01

तलगजनज Telangana 9323 9323 0 00 10815 10815 0 00

कनजाटक Karnataka 11819 11783 36 03 11819 11783 36 03

किल Kerala 3720 3699 21 06 4050 3997 53 13

तममल नजड Tamil Nadu 13998 13952 45 03 15029 14981 47 03

पडचिी Puducherry 395 395 0 01 420 400 19 46

लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0

दकषकषणी कषतर Southern Region 44754 44615 139 03 45946 45684 262 06

बबहजि Bihar 4251 4249 2 00 5115 5084 31 06

िजमोिि घजटी ननगम DVC 2873 2871 2 01 2958 2957 1 00

झजिखणड Jharkhand 1260 1260 0 00 1339 1291 48 36

ओडडशज Odisha 4198 4198 0 00 5357 5357 0 00

पशशचम बगजल West Bengal 6555 6538 17 03 9130 9123 7 01

मसशककम Sikkim 106 106 0 00 106 106 0 00

अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7

परवी कषतर Eastern Region 18783 18702 81 04 23141 22733 408 18

अरणजचल परिश Arunachal Pradesh 126 124 2 15 138 133 5 37

असम Assam 1491 1468 23 15 1865 1809 56 30

मणणपि Manipur 219 216 3 12 219 216 3 12

मघजलय Meghalaya 374 372 1 04 374 372 1 04

ममज़ोिम Mizoram 121 119 2 17 121 119 2 17

नजगजलड Nagaland 140 138 3 19 156 138 18 116

बिपिज Tripura 224 223 1 05 298 293 5 17

उततर-परवी कषतर North-Eastern Region 2575 2552 23 09 2967 2850 117 39

समपणण भारत All India 164018 162349 1669 10 177022 175528 1494 08

26

अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)

आकड़ मगज वजट नट Figures in MW net

राजयStateरनरवरी2019 January2019 अपरल2018 -रनरवरी2019 April2018 to January2019

मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met

Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability

Excludes the supply to Bangladesh

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

860

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 39: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh

दिलली Delhi

हरियजणज Haryana

दहमजचल परिश Himachal Pradesh

रमम कशमीि Jammu amp Kashmir

परजब Punjab

िजरसथजन Rajasthan

उततर परिश Uttar Pradesh

उततराखड Uttarakhand

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh

Restriction on continous process

HTLT industries during 1730-1904

Hrs on daily

Maximum Demand cut-3420MW

Energy cut- 0002 MUsday

Apr-Nov 2018- No cuts

Maximum Demand cut-58MW

Energy cut- 00024-00032 MUsday

गरिजत Gujarat

मधय परिश Madhya Pradesh

महजिजषटर Maharashtra

गोवज Goa

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh

तलगजनज Telangana

कनजाटक Karnataka

किल Kerala

तममल नजड Tamil Nadu

पडचिी Puducherryपरवी कषतर Eastern Region

बबहजि Bihar

झजिखणड Jharkhand

ओडडशज Odisha

पशशचम बगजल West Bengal

27

फररवरी 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during February2019

राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

No N

otifie

d Cu

ts

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

861

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 40: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

फररवरी2019 February2019 अपरल2018 -फररवरी2019 April2018 to February2019

उततरी कषतर Northern Region

चडीगढ़ Chandigarh Data not received Data not received

दिलली Delhi Data not received Data not received

हरियजणज Haryana Data not received 0709 - 0950 hrsday

दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted

power is being supplied to agriculture sector

HPSEBL has only 2 agriculture consumers and uninterrupted

power is being supplied to agriculture sector

रमम कशमीि Jammu amp Kashmir Data not received Data not received

परजब Punjab 0430 hrsday 0349 - 0844 hrsday

िजरसथजन Rajasthan 0630 hrsday 0630 hrsday

उततर परिश Uttar Pradesh 1821 hrsday 1722 - 1859 hrsday

उततराखड Uttarakhand 2355 hrsday 2128 - 2357 hrsday

पशचिमी कषतर Western Region

छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday

गरिजत Gujarat 800 hrsday 805 hrsday

मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-953 hrs day

Three-Phase (Mixed) Supply - 2336 hrs day

Three-Phase Supply(Irrigation)- 0933 - 0954 hrs day Three-

Phase (Mixed) Supply - 2300 - 2336 hrs day

महजिजषटर Maharashtra Three-Phase (Mixed) Supply - 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day

Three-Phase (Mixed) Supply - 24 hrs day

गोवज Goa No restriction No restriction

दकषकषणी कषतर Southern Region

आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday

तलगजनज Telangana 24 hoursday 24 hoursday

कनजाटक Karnataka 6 hrsday 6 hrsday

किल Kerala No Restrictions No Restrictions

तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)

पडचिी Puducherry No Restrictions No Restrictions

परवी कषतर Eastern Region

बबहजि Bihar About 18 hrsday About 18 hrsday

झजिखणड Jharkhand About 20 hrsday About 20 hrsday

ओडडशज Odisha 24 hrsday 24 hrsday

पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday

28

फरवरी 2019 कषि कषतर को षवदयत आपरति का षववरण Power Supply to Agricultural Sector during February2019

राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply

On segregated feeders

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

862

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 41: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SNo Contents Page

1 Growth of Installed Capacity since 6th Plan 29

2 Progress of Transmission Sector since 6th Plan 30

3 All India Yearly Coal consumption for Power Generation (Utilities)

4 All India Annual Per Capita Consumption of Electricity since -2006

5 Average cost of power supply amp Average realisation (Paisakwh)

6 Growth of Rural Electrification amp Pump Sets Energisation

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Section G - Growth of Power Sector

31

32

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

863

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 42: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

(In MW)

Coal Gas Diesel Total

End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472

End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634

End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537

End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596

End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921

End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703

End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630

Up to Feb-2019 19735250 2493722 63763 22292734 678000 4539922 7505592 35016248

Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW

Electricity Generation (MU) Targets and Achievements for 2016-17

Coal Gas Diesel Nuclear Hydro Res Total

1973525 2493722 637629 678000 453992 75055915 22925174

29

1 Growth of Installed Capacity Since 6th Plan

Plan YearThermal

Nuclear Hydro RES (MNRE) Total

1973525

2493722637629

678000

4539922

75055915

Total Installed Capacity 35016248 MW

Coal Gas Diesel Nuclear Hydro Res

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

864

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 43: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Progress of Transmission Sector in the Country up to Feb 2019

1 TRANSMISSION LINES (All fig in CKM)

At the end of

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

Ce

ntr

al

Sta

te

JV

Pri

va

te

To

tal

6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034

7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455

8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376

9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269

10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123

11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481

12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851

Plan Period

2017-2022 (Up

to Mar2018)

6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970

Plan Period

2017-2022 (Up

to Feb 2019)

6124 0 0 6124 5948 1504 1980 9432 33692 1512 5669 40873 100536 57978 20755 179269 11734 162097 1010 174841 158034 223091 29414 410539

27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total

75050

47900

24000

99050

30

Grand Total

Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read

as 187555 after adjusting with (-) 10852 Ckm

Inter-regional Power Transfer Capacity (MW)

plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV

IR addition in 12th

Plan (up to March

2017)

Inter-regional

Transmission

Capacity at the end

of Plan Period 2017-

22 (as on Feb19)

IR at the end of 11th

PlanIR at the end of 12th

Plan

IR Capacity Addition

at the end of Plan

Period 2017-22 (Till

Feb 19)

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

865

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 44: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

2004-05 27800

2005-06 28100

2006-07 30200

2007-08 33000

2008-09 35500

2009-10 36700

2010-11 38700

2011-12 41756

2012-13 45460

2013-14 48940

2014-15 53040

2015-16 54590

2016-17 57430

2017-18 60800

Year

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2004-05 254 209 7568

2005-06 260 221 7636

2006-07 276 227 7423

2007-08 293 239 7727

2008-09 340 263 8713

2009-10 355 268 8870

2010-11 398 303 11975

2011-12 455 330 13514

2012-13 501 376 14867

2013-14 518 175

2014-15 520

Source- PFC Reports on the performance of State Power Utilities 31

1149

7335

7786

91441

8188

88363

957

1010

1075

1122

(GrossGen+ Net Import) Mid-year population

5 Average cost of power supply amp average realization ( paiseKWH )

Yearcost of supply

(paiseunit)

Realization(paiseunit)

Including AgricultureOnly

Agriculture

6719

7171

3 All India yearly Coal Consumption for Power Generation (Utilities)

YEARCoal Consumption

Million Tonnes

4 All India Annual per Capita consumption of Electricity Since 2006

Per Capita Consumption ( kWh)

6314

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

866

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 45: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Sl

NoExecuting Agency

Installed

Capacity (MW)Cost (Rs crore)

Date of

Clearance

32

Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as

Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received

from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made

available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified

villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is

independent of the earlier published reports

No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during Feb 2019

7 Status of Hydro Schemes Cleared by the CEA in Feb-2019

Name of Scheme

1999-002000-01

297594

010408 to 310309010409 to 310310

10th Plan

2005-062006-07

322968331020

6 Growth Of Rural Electrification amp Pumpsets Energisation

Plan Year

9th Plan2002-03

134092626

4111

Pump Sets Energised Villages Electricfied (Nos)

2001-02

284064367244

1218

27801997-981998-99

3207

482864

12632

1576036

4451722594

15455554

2314176

397343611750

2093311060316074

65109527813884

46708

18423975

499150

2003-042004-05

5743

9769

Cumu upto End of 10th Plan

010407 to 310308

010410 to 310311557976840909

010411 to 310312

412667

86293726

No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification

since 2004-05

65291374575 296361511th Plan

Cumu upto End of 11th Plan

596556 21212860

557439Cummulative up to end of 12th Plan

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

867

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 46: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

SN Contents Page

1 Rate of sale of power for the year 2016-17 33-41

RATE OF SALE OF POWER FOR THE YEAR 2016-17

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

868

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 47: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) NORTHERN REGION

CENTRAL SECTOR

BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800

CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600

CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600

CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600

PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800

DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000

CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800

DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400

SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000

TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600

URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000

URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600

NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200

SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400

ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400

AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100

BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800

DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300

DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300

DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000

FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800

RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500

RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600

RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600

SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400

TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800

UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800

UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900

UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000

KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600

NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841

RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374

NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820

RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260

TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800

KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400

IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490

NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040

STATE SECTOR

PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200

PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400

PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600

PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800

DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000

RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200

WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900

GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600

ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900

BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700

GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500

BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500

BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300

ANNEXURE-I

RATE OF SALE OF POWER FOR THE YEAR 2016-2017

Page 33

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

869

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 48: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700

BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200

HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500

THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500

KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500

LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700

NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000

CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300

RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400

SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500

KILLAR HPSEB HYDRO-HYDRO 030 050 22500

BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500

BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500

GUMMA HPSEB HYDRO-HYDRO 300 423 22500

GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300

PPS-I PPCL THERMAL-GAS 33000 175905 38300

PPS-III PPCL THERMAL-GAS 137120 196879 36100

LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100

UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300

UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500

GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700

KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000

CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600

CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300

CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200

IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500

IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700

PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900

MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800

HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700

SANJAK JampKPDD HYDRO-HYDRO 126 441 36000

SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200

BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900

BAZGO JampKPDD HYDRO-HYDRO 030 108 33300

SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400

HUNDER JampKPDD HYDRO-HYDRO 040 176 26200

STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100

KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360

SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730

CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700

CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700

CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700

RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800

RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800

DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110

MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192

MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800

KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000

KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000

KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200

MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500

OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300

RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500

ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000

ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700

ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800

HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200

HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600

OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000

OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900

Page 34

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

870

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 49: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300

PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400

PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600

PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400

CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290

CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390

DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080

DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520

KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330

KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420

KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320

TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460

MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110

RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550

MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200

PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200

GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500

PRIVATE SECTOR

MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940

SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800

GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000

PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500

MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792

MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580

ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079

KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200

BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600

KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600

RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700

RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900

RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000

TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548

ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400

KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400

BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600

MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800

UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500

KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800

LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300

PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595

KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438

WESTERN REGION

CENTRAL SECTOR

INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892

OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001

GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700

KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000

KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500

KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600

SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800

SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500

VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800

VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800

VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600

VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900

VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700

MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500

MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900

RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000

KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729

TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740

Page 35

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

871

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 50: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069

TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324

STATE SECTOR

GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200

GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300

GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800

AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100

KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880

DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570

KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420

HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410

CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300

MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000

MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000

SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790

BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900

MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190

SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870

DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500

DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500

GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600

GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300

KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900

KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400

SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800

UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900

UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200

WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300

WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100

KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800

UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100

TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500

BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900

BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500

JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500

RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400

GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600

SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900

MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000

PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100

RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900

AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100

SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700

SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300

SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600

SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000

SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300

BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100

CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700

KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100

KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000

NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000

PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600

PARAS MSPGCL THERMAL-COAL 50000 267931 38700

URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600

KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100

SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500

BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400

TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100

SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500

SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500

PRIVATE SECTOR

Page 36

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

872

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 51: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750

JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310

MB POWER MB POWER THERMAL-COAL 120000 345632 38310

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495

ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090

ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124

AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827

SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129

ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000

ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600

VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000

VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000

PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000

165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390

145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349

SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776

SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567

MUNDRA UMPPCOASTAL GUJARAT POWER

LTD THERMAL-IMP COAL 400000 2530300

23900

LANCO AMARKANTAK TPP PATHADIH

U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500

29200

LANCO AMARKANTAK TPP PATHADIH

U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900

27600

BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200

JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900

JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500

DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700

TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000

TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000

TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000

BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100

BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300

KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300

CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900

BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900

SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500

SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000

SOTHERN REGION

CENTRAL SECTOR

NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820

NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880

NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510

NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070

NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200

VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350

R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300

RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400

RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800

SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800

SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400

KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324

MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764

KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948

MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600

KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600

AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600

ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600

KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600

AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600

KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600

KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600

CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600

BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600

BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600

Page 37

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

873

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 52: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) STATE SECTOR

Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500

Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500

RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500

RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500

RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500

SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500

UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500

LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500

DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500

PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500

CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500

MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500

NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500

TUNGABHADRA HES amp HAMPI(AP

Share)

APGENCO HYDRO-HYDRO 7200 6100 46500

KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600

KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500

KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500

RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300

KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000

KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300

SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600

NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300

PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300

POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800

POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700

NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400

RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800

RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200

BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100

BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600

BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400

BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900

GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000

GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300

KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800

NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800

KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200

MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900

SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400

ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600

VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600

IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300

IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300

KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300

KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300

KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300

KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300

LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300

MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300

MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300

MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300

CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300

URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300

LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300

NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300

PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300

PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300

PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300

PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300

PEPPARA KSEB HYDRO-HYDRO 300 395 15300

POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300

Page 38

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

874

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 53: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300

RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300

SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300

SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300

SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300

VILANGAD KSEB HYDRO-HYDRO 750 1578 15300

BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300

VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300

CHIM0NY KSEB HYDRO-HYDRO 250 156 15300

ADYANPARA KSEB HYDRO-HYDRO 350 501 15300

BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300

KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300

KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800

ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280

METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280

METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280

NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280

NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280

TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280

KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280

VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280

KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280

BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280

PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280

PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280

MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280

MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280

KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280

KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280

KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280

KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280

KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280

KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280

METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280

METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280

BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280

BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280

BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280

BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280

BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280

POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280

SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280

MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280

THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280

PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280

VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280

SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280

PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280

SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280

SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280

ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280

KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280

SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280

SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280

KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280

KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280

ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280

PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280

AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280

BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280

BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280

PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280

Page 39

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

875

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 54: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300

PRIVATE SECTOR

KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770

SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100

JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500

SBU 1 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100

43300

SBU 2 JSW ENERGY LTD

VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900

42800

LANCO KPLLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36814 85060

25776

LANCO KPL STG -IILANCO KONDAPALLI POWER

LTDTHERMAL-GAS 36600 12979

46330

LANCO KPL STG -IIIALANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 85710

46330

LANCO KPL STG -III BLANCO KONDAPALLI POWER

LTDTHERMAL-GAS 37100 43639

46330

HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200

MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940

UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500

SPECTRUM POWER GENERATION

LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812

34952

TAQA NEYVELI POWER COM PVT

LTD TAQA NEYVELI THERMAL-LIG 25000 5840

34500

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000

ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800

GMR VEMAGIRI POWER GENERATION

LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117

46450

EASTERN REGION

CENTRAL SECTOR

MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113

MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138

BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539

MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552

MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997

MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976

MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991

DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323

DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416

RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326

MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984

CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095

CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987

KODERMA TPS DVC THERMAL-COAL 100000 380180 38131

PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984

TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984

RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400

TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200

TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000

TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600

FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700

FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000

BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600

KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200

KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200

BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500

TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100

TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600

TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700

STATE SECTOR

BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700

BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602

HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482

CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605

RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033

UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637

Page 40

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

876

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877

Page 55: Executive Summary on Power Sector Feb-19cea.nic.in/reports/monthly/executivesummary/2019/exe... · 2019-03-19 · SN Section A - Highlights of Power Sector Page 1 Electricity Generation

Name of UtilityPower Station UTILITY

Energy Source-

CoalGas

NapthaLSHS

DieselHydro

Installed

Capacity(MW)

Net Gen

(Mkwh)

Rate of Sale of

Power as

approved by

Gen Utilities

(Gen Tariff)

(PaiseKwh)

iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519

IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000

J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100

MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100

TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200

DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321

KOLAGHAT THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603

BAKRESHWAR THERMAL POWER

PLANT

WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154

BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299

SANTHALDIH THERMAL POWER

STATION

WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932

SAGARDIGHI THERMAL POWER

PROJECT

WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705

JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900

RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900

TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900

PURULIA PUMPED STORAGE

PROJECT

WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900

MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900

PRIVATE SECTOR

CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230

CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200

HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400

DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400

KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670

33300

ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060

ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250

VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622

JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250

JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030

JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920

JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870

JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560

JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840

IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500

IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500

MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100

HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340

HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340

HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310

NORTH EASTERN REGION

CENTRAL SECTOR

LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600

AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210

ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310

DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801

KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491

KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237

KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968

RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945

TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000

STATE SECTOR

HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL

PRADESHHYDRO-HYDRO 6971 6217270

24600

KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337

LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810

NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290

MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776

LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200

LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200

DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200

TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200

UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000

UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000

UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600

UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000

SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000

MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800

KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400

TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400

MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400

MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400

KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400

SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400

LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400

BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000

ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200

GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100

Note

LIG Lignite N Naptha WHR Waste Heat Recovery

Page 41

File NoCEA-CH-14-1142018-Coordination DivisionI43832019(1)

877