Expanded Public Works Program – Overview

Mr. Gilberto MartinsB Arch [ Wits] MI Arch Arch SA

Deputy Director General: Public WorksGauteng Department of Public Transport, Roads and Works

6 May 2008

Page 2: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

GAUTENG EXPECTATIONS

Page 3: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

Innovation = Business Unusual

Page 4: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

4

Origin• Origin in Growth and Development Summit

[GDS] of 2003

• Four themes adopted one of which was ‘More jobs, better jobs, decent work for all’

Page 5: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

5

• The GDS agreed that the EPWP ‘can provide poverty and income relief through temporary work for the unemployed to carry out socially useful activities. The EPWP will be designed to equip participants with a modicum of training and work experience, which should enhance their ability to earn a living in the future.’ The GDS specified that the EPWP must be “large enough to have a substantial impact on employment and social cohesion, especially for young people, women and the rural poor” .

Page 6: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

Roads Pavement Forum (RPF)

• “Serves as a forum for the exchange of information and technologies, promoting best practice and to facilitate the discussion of issues of strategic importance to the road construction industry”

Page 7: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

SocialConsideration

s

Economic

Consideration

Page 8: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

• EPWP is integrated methodology where by :– Creation of assets (infrastructure provision

and maintenance)– Training and skills development (all levels)– Job creation (all levels)– Contractor development (CIDB level 1-4)– Sustainability, increase industry skills base

Page 9: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

0

25

50

75

100

125

150

175

200

No

Dat

a19

4819

5019

5219

5419

5619

5819

6019

6219

6419

6619

6819

7019

7219

7419

7619

7819

8019

8219

8419

8619

8819

9019

9219

9419

9619

9820

0020

0220

0420

06

Year

Len

gth

(km

)

• Length of road constructed per year• 82% of roads are older than design life of 20 years, 24% of roads have

reached more than twice design life – Are we in a crisis ?

Page 10: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

691 km, 17%

745 km, 18%

240 km, 6%

928 km, 23%

1,435 km, 36%

AADT <= 500 500 < AADT <= 2,0002,000 < AADT <= 5,000 5,000 < AADT <= 10,000AADT > 10,000

• More than 36% of road network is heavily congested

• A further 17% should be considered for capacity upgrading, and are congested during peak hours

• Congested roads contributing to maintenance problems (e.g. use of gravel road shoulders) and road safety problems

• Heavily congested roads are generally the older roads which needs rehabilitation

*AADT= Annual averagedaily traffic volume

Page 11: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

• Additional R5.4bn to Provinces for up-scaling of EPWP from 2007/08 (PIG).

• Gauteng decision to increase amounts even further from Provincial funding:– 2006/2007 amount from R52m to R170m– 2007/08 amount from R82m to R262m– 2008/09 amount from R103m to R320m– Total R 752m– Further funding bid 09/10 MTEF allocation

[ R 1 Bil ?]

Up-scaling of EPWP in Roads

Page 12: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of
Page 13: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

THE CHALLENGETHE CHALLENGE

Page 14: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

• Challenges • Backlog on provincial road network – 82% of

network older than design• App 3000km Gravel road – townships • Agreements on appropriate norms, standards,

designs • Resistance to change- innovative contracting

models, materials, construction methods required

Page 15: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

• SOSHANGUVE • ATTERIDGEVILLE • MAMELODI • MUNSIEVILLE • SOWETO • SEBOKENG • RATANDA • BOIPATONG • BOPHELONG • SHARPVILLE

• DAVEYTON • DUDUZA • THEMBISA • KAGISO • THOKOZA • KATLEHONG • MOHLAKENG • WATTVILLE • KWA-THEMA • TSAKANE

20 I

den

tifi

ed t

ow

nsh

ips

Page 16: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

• Challenges • Cost for township road less 500 car per day

currently ranging R6m to R10m per kilometre ?• Inexperienced contractors – tender process

and documentation not fully understood• Contractor access to finance, materials,

equipment problematic• Professional site management?• Skills development basket roads industry

Page 17: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

RE-DRESSRE-DRESS

Page 18: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

Innovation required• Reduce construction costs• New construction methods• Alternative construction materials• Innovative and appropriate pavement design• Research and testing• New contracting models• Appropriate norms and standards for all roads• Consistently applied across all metros/

municipalities

Page 19: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

Service Delivery Model ObjectiveService Delivery Model Objective

Effective, Efficient, Value For Money, Service Delivery

Economicconsideration

Socialconsideration

Page 20: Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of

Thank You

“In order to achieve real action you must yourself be a living part of Africa and of her thought; you must be an element of that popular energy which is entirely called forth for the freeing, the progress and the happiness of Africa.”Frank Talk , Steve Biko , I write what I like