Project description (Phase I) Eyang Atem Ako is a village in Upper Bayang Sub-division, Manyu Division, South West Region of Cameroon Problems o It is not grid-connected o It does not have access to potable pipe borne water o Health issues o Low economic development o Personal comfort Opportunity o Availability of suitable solar resource Project requirements o Design a solar photovoltaic (PV) micro-grid for electrification o Design a solar PV water pumping system for potable water
Citation preview
Eyang Atem Ako Electrification and Potable Water Project Proposal
Presented by:Dr Mody Ayompe LacourPresidentSustainable Technology Consulting, LLC 23rd October, 2015
Project Overview
• Project description
• Solar home systems
• Solar PV micro-grid
• Solar Water Pumping
• Scope of work and cost
• Project timeline
Project description (Phase I)• Eyang Atem Ako is a village in Upper Bayang Sub-division, Manyu
Division, South West Region of Cameroon
• Problemso It is not grid-connectedo It does not have access to potable pipe borne watero Health issueso Low economic developmento Personal comfort
• Opportunityo Availability of suitable solar resource
• Project requirementso Design a solar photovoltaic (PV) micro-grid for electrificationo Design a solar PV water pumping system for potable water
Solar Resource• Eyang Atem Ako
o Lattitude: 5°26'24" North; Longitude: 9°29'17" East; Elevation: 220 m a.s.l.o Min: 3.98 kWh/m2/day (Aug); Max: 6.80 kWh/m2/day (Jan); Avg: 5.45 kWh/m2/day
0
1
2
3
4
5
6
7
8
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Avg
Sola
r ra
dia
tion
(k
Wh
/m2 )
Month
3.0 kWh/m2/day for water pumping
SOLAR PHOTOVOLTAICSYSTEMS
Solar Home Systems
Solar & Wind Home System
Solar PV Micro-grid
Solar Micro-grid Contd.
SOLAR PHOTOVOLTAIC WATER PUMPING
SYSTEMS
Solar Water Pumping
Solar Water Pumping
Scope of Work
• Assessment of electricity and water demando Household appliances, lighting systems etc.o Spread of distribution networko Businesses, community services etc.o Total populationo Socio-economic characteristics of population
• Solar PV micro-grid and water pumping system design
• Project proposal reporto Electrical load analysis and recommendations for load reductiono Water consumption analysiso System designs and estimated costs
Milestone 1• Prepare
requirements & set up data collection team (1 week)
Milestone 2• Complete
data collection (2 weeks)
Milestone 3• Complete
solar PV micro-grid & water system designs (3 weeks)
Milestone 4• Complete
project proposal report (2 weeks)
Timeline
Cost
$2,000
Summary
Project
Phase I
Electricity demand analysis
Water demand analysis
Solar PV Micro-grid
design
Solar water
pumping system design
Report