11
EDMS NO. REV. VALIDITY 2038214 0.2 DRAFT REFERENCE PS-LJ-EC-0009 Date: 2018-10-29 Note: When approved, an Engineering Change Request becomes an Engineering Change Order. This document is uncontrolled when printed. Check the EDMS to verify that this is the correct version before use. CERN CH-1211 Geneva 23 Switzerland ENGINEERING CHANGE REQUEST F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during the Long Shutdown 2 (LS2), the F61 line will be completely renovated. An overhaul of the associated infrastructure will also be performed. DOCUMENT PREPARED BY: DOCUMENT TO BE CHECKED BY: DOCUMENT TO BE APPROVED BY: Bard Carlsen (EN-EA) Erwan Harrouch (EN-EA) C. Bertone, S. Burger, D. Bodart, J. Borburgh, E. Grenier-Boley, M. Brugger, M. Calviani, J. P. Corso, J. Coupard, J. M. Cravero, H. Damerau, S. Deleval, I. Efthymiopoulos, S. Evrard, R. Folch, C. Gaignant, L. Gatignon, G. Georgiev, K. Hanke, M. Hourican, M. Lazzaroni, P. Lelong, R. Mompo, F. Pedrosa, S. Pittet, R. Steerenberg, J. Somoza, M. Tavlet, R. Veness + ECR-PS egroup, LIU-PS WP Holders (included due to potential impacts only – this change is not part of the LIU-Project) EATM Roberto Losito (on behalf of the IEFC) DOCUMENT SENT FOR INFORMATION TO: SUMMARY OF THE ACTIONS TO BE UNDERTAKEN: - Replace: All magnets, beam stoppers, mechanical supports - Renovate: Beam instrumentation, vacuum system, magnet interlock system (switch to WIC system) - Modify the b.352 / b.157 interface from concrete partition to an airtight wall - New cooling circuit for magnets - Remove obsolete cables and pull new cables (signals and DC) - Reorganize the F61 beam dump - Reorganize the shielding along the beam line

F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

EDMS NO. REV. VALIDITY

2038214 0.2 DRAFT

REFERENCE

PS-LJ-EC-0009

Date: 2018-10-29

Note: When approved, an Engineering Change Request becomes an Engineering Change Order.

This document is uncontrolled when printed. Check the EDMS to verify that this is the correct version before use.

CERN CH-1211 Geneva 23 Switzerland

ENGINEERING CHANGE REQUEST

F61 Transfer Line Modifications

BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S):

As part of the East Area renovation project during the Long Shutdown 2 (LS2), the F61

line will be completely renovated. An overhaul of the associated infrastructure will also

be performed.

DOCUMENT PREPARED BY: DOCUMENT TO BE CHECKED BY: DOCUMENT TO BE APPROVED BY:

Bard Carlsen (EN-EA)

Erwan Harrouch (EN-EA)

C. Bertone, S. Burger, D. Bodart,

J. Borburgh, E. Grenier-Boley,

M. Brugger, M. Calviani,

J. P. Corso, J. Coupard,

J. M. Cravero, H. Damerau,

S. Deleval, I. Efthymiopoulos,

S. Evrard, R. Folch, C. Gaignant,

L. Gatignon, G. Georgiev,

K. Hanke, M. Hourican,

M. Lazzaroni, P. Lelong,

R. Mompo, F. Pedrosa, S. Pittet,

R. Steerenberg, J. Somoza,

M. Tavlet, R. Veness

+

ECR-PS egroup,

LIU-PS WP Holders

(included due to potential impacts only – this

change is not part of the LIU-Project)

EATM

Roberto Losito

(on behalf of the IEFC)

DOCUMENT SENT FOR INFORMATION TO:

SUMMARY OF THE ACTIONS TO BE UNDERTAKEN:

- Replace: All magnets, beam stoppers, mechanical supports

- Renovate: Beam instrumentation, vacuum system, magnet interlock system (switch to

WIC system)

- Modify the b.352 / b.157 interface from concrete partition to an airtight wall

- New cooling circuit for magnets

- Remove obsolete cables and pull new cables (signals and DC)

- Reorganize the F61 beam dump

- Reorganize the shielding along the beam line

Page 2: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 2 of 11

1. EXISTING SITUATION AND INTRODUCTION

Figure 1 illustrates the existing layout in the area that is to be renovated. The area is highlighted

in Figure 2.

Figure 1: Existing layout of equipment it the area

2. REASON FOR THE CHANGE

The East Area renovation will cover the refurbishment of the East Hall with its beam lines and

infrastructure. A re-design of the beam lines is included to improve the magnet situation, the

radiation situation and maintainability in general. The performance of the new beam lines will

be improved in terms of maximum momentum and in choice of particle type. Considerable

energy savings will be possible due to a cycled powering mode of the magnets instead of a

steady state one. Therefore, several magnet families have to be re-designed to be in accordance

with the purposes of the project.

3. DETAILED DESCRIPTION

As part of the renovation of the East Zone, the F61 line will be completely renovated, this

includes the following activities:

1. Replacement of all magnets

2. Renovation of magnet interlock system (Switch to WIC system)

3. Renovation of the beam instrumentation

4. Replacement of beam stoppers

5. Renovation of the vacuum system

6. Replacement of mechanical supports

Page 3: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 3 of 11

The associated infrastructure will also be renovated:

7. Reorganization of the Dump F61

8. Reorganization of the shielding along the beam line

8. Modification of the interface b.352 / b.157 (Passage from a concrete partition to a

watertight wall)

9. New cooling circuit for magnets

10. Removal of obsolete cables and drawing of new cables (Signals and DC)

11. Surveyors will make a new survey network in b. 352 for F61 alignment

3.1 Removal

Listed is the equipment that is going to be removed:

- Magnets: Element Reference, Element Type

QFO 01 Q 74.03 DHZ 01 MNPA 25.05 QDE 02 Q 12.03

DVT 01 MEA 19.09 DVT 02 MEA 19.04 QFO 03 QFL 08 BHZ 01 M 101*

BHZ 02 M 226 QDE 04 Q 604 SMH 01 MEP 35.03 BHZ 01 MCB 04

QDE 01 Q 120.04B QFO 02 Q 120.01 DVT 01 MNPA 25.09 DHZ 01 M 105.02

- Instrumentation: F61.SEC01, LSD, TFA, MTV01, MTV02, MTV03

- Beam stoppers: F61.STP01, STP02

- Vacuum tubes, gauges, pumps

- Mechanical support of the equipment mentioned above

- Obsolete cables

- Flexible cooling magnet

Figure 2: Area after renovation. Shielding wall along beamline is missing from figure as at this

moment we await the RP simulation.

Page 4: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 4 of 11

3.2 Equipment to Install

Listed in Table 1, and illustrated in Figure 3, 4 & 5, is the equipment that is to be installed in

the area. It is listed adhering to the naming convention, ref. https://edms.cern.ch/document/1723747/.

Table 1: New equipment

Positional information relative to optics

Layout Component Name

Equipment Code Description

Start Point (m)

End Point (m)

Middle Point (m)

Length (m)

F61.000 Origin 0 0 0 0

F61.MQNCL007 MQNCL Q74L QFO 6.447 7.187 6.817 0.74

F61.BTV012 BTVMC BTV 12.3 0

F61.MCXCE013 MCXCE CR200 DHZ 12.72 12.92 12.82 0.2

F61.MQNEL014 MQNEL Q120 QDE 13.348 14.548 13.948 1.2

F61.MCXCE015 MCXCE CR200 DVT 15.012 15.212 15.112 0.2

F61.TBS016 TBS Beam Stopper #1 16

F61.TBS017 TBS Beam Stopper #2 17

F61.TBS018 TBS Beam Stopper #3 18

F61.TBS019 TBS Beam Stopper #4 19

F61.TBS020 TBS Beam Stopper #5 20

F61.MQNEF021 MQNEF QFL QFO 20.297 21.497 20.897 1.2

F61.BCGAA022 BCGAA LSD 22

F61.XSEC022 XSEC Secondary Emission Chamber 22

F61.BCTF023 BCTF Beam Current Transformer 23

F61.MBXHD025 MBXHD MCB BHZ 23.272 25.772 24.522 2.5

F61.MQNEG030 MQNEG QFS QDE 29.422 30.242 29.832 0.82

F61.MBXHD033 MBXHD MCB BHZ 31.262 33.762 32.512 2.5

F6D.BTV010 BTVMC BTV 10

F62.BTV002 BTVMC BTV 2.357 2.357 2.357 0

F62.MQNEL010 MQNEL Q120 QDE 9.1 10.3 9.7 1.2

F62.MCXCE011 MCXCE CR200 DHZ 10.7 10.9 10.8 0.2

F62.MQNEL012 MQNEL Q120 QFO 11.3 12.5 11.9 1.2

F62.MCXCE013 MCXCE CR200 DVT 12.9 13.1 13 0.2

T08.MBXHD005 MBXHD MCB BHZ 4.075 6.575 5.325 2.5

Page 5: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 5 of 11

Figure 3: Layout after renovation. Shielding wall along beamline not included, ref. Figure 2.

SmarTeam Item Number: ST0780788

Figure 4: First half the F61 beamline (opposite view from Figure 3)

Figure 5: Second half the F61 beamline (opposite view from Figure 3)

Page 6: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 6 of 11

Vent PS

To dismantle the Q74 magnet (F61.QFO01), it is necessary to vent the corresponding PS

vacuum sector.

Figure 6: Location of vacuum separation

Change in separation between b.352 and b.157

It is planned to change the separation between b.352 and b.157. An airtight wall will replace

the concrete block wall. As long as the wall is not installed, a concrete block will always be

kept in place to ensure that no access is possible through this passage.

Figure 7: Current (left) and future (right) separation of b.352 and b.157

Radioactive waste

All radioactive waste produced during the East Zone renovation project is listed in this

document: https://edms.cern.ch/document/1968497

Page 7: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 7 of 11

4. IMPACT ON OTHER ITEMS

4.1 IMPACT ON ITEMS/SYSTEMS

Dedicated cooling circuit The magnet cooling water is in a new closed circuit to contain activated water.

Building interface An airtight wall will replace the concrete block wall as the interface between b.157 and b.352

WIC-system Replaces the obsolete magnet interlock system

4.2 IMPACT ON UTILITIES AND SERVICES

Raw water: No

Demineralized water: Yes, dedicated circuit. https://edms.cern.ch/document/1991994/

Compressed air: Yes

Electricity, cable pulling (power, signal, optical fibres…):

Yes. Intend to re-use the DC cables and the terminal boxes on the walls of b.352.

DEC/DIC: Yes, DEC https://edms.cern.ch/document/1962098/ DIC: submitted by all the groups on SNOW

Racks (name and location):

No

Vacuum (bake outs, sectorisation…):

Yes. Description of the vacuum system after renovation:

https://edms.cern.ch/document/1737544

Special transport/ handling:

No. Notice: No overhead crane is available over the beamline.

Temporary storage of conventional/radioactive components:

Yes

Alignment and positioning:

Yes. Needs described in https://edms.cern.ch/document/1866785/

Scaffolding: No

Controls: Yes

GSM/WIFI networks: No

Cryogenics: No

Contractor(s): Yes

Surface building(s): No

Others: -

Page 8: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 8 of 11

5. IMPACT ON COST, SCHEDULE AND PERFORMANCE

5.1 IMPACT ON COST

Detailed breakdown of the change cost:

https://edms.cern.ch/document/1961307

Budget code: Detailed in document above

5.2 IMPACT ON SCHEDULE

Proposed installation schedule:

Schedule can be seen (MS Project file): https://espace.cern.ch/en-ea-planning/Shared%20Documents/LS2%20Plannings/LS2_East_Area.mpp

Proposed test schedule (if applicable):

See above

Estimated duration: From the 01/2019 to 08/2020

Urgency: Before closure of the PS (August 2020)

Flexibility of scheduling: Almost none

5.3 IMPACT ON PERFORMANCE

Mechanical aperture: Checked by EN-EA beamline physicist

Impedance: Checked by EN-EA beamline physicist

Optics/MADX File will be provided by EN-EA beamline physicist

Electron cloud (NEG coating, solenoid…)

Non-applicable

Insulation (enamelled flange, grounding…)

Non-applicable

Vacuum performance: 10-3 mbar on the east area side / <2e-8 mbar* after 24h of pumping on the PS side (No change to the PS side). *ref. EDMS 1752123

Others: -

Page 9: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 9 of 11

6. IMPACT ON OPERATIONAL SAFETY

6.1 ÉLÉMENT(S) IMPORTANT(S) DE SECURITÉ

[Indicate if the change will have an impact on an Elément Important de Sécurité (EIS).

The list of EIS components is available in EDMS document: 1182293 – “Définition et

Inventaire des EIS-Faisceau et EIS-Machine en Opération”.]

Requirement Yes No Comments

EIS-Access x No change to the access system in the PS

EIS-Beam X Beam stoppers: F61.STP01, F61.STP02 will be replaced by 5 new beam stoppers. These beam stoppers are part of the safety chain of EAST AREA EA1 (Described in https://edms.cern.ch/document/1946347/)

EIS-Machine x

6.2 OTHER OPERATIONAL SAFETY ASPECTS

Have new hazards been created or changed?

No

Could the change affect existing risk control measures?

Shielding in b.352 is still being studied (RP monitoring will have to be adapted)

What risk controls have to be put in place?

Standard safety measures. Coordination meetings between ACE and EA teams. Ref. https://indico.cern.ch/event/732724/

Safety documentation to update after the modification

Safety documentation are to be updated and can be found at https://edms.cern.ch/project/CERN-0000094170

Define the need for training or information after the change

N/A

7. WORKSITE SAFETY

[Refer to EDMS document: 1155899 – “Working on the CERN Site”.]

[Following the implementation of the change, the Safety File of the facility shall be

updated. In the temporary absence of the Safety File, the hazards inventory and risk

analysis of the concerned installation shall be established.]

The Launch Safety Agreement (https://edms.cern.ch/document/1731887) describes how

safety is managed in the project. (Provides the safety organization, regulatory tests to

be performed, and particular risks generated by the project).

Page 10: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 10 of 11

7.1 ORGANISATION

Requirement Yes No Comments

IMPACT – VIC: X Will be done in due time before intervention for each work-package

Operational radiation protection (surveys, DIMR…):

X The whole East Area Renovation project will be treated as ALARA lvl 3

Radioactive storage of material:

X Yes (Stored in b.157)

Radioactive waste: X Ref. https://edms.cern.ch/document/1968497

Non-radioactive waste: X Due to it being a Controlled Radiation Area, all waste is classified as radioactive.

Fire risk/permit (IS41) (welding, grinding…):

X Needed for piping works

Alarms deactivation/activation (IS37):

X Needed for piping works

Others: X

7.2 REGULATORY TESTS

Requirement Yes No Responsible Group

Comments

Pressure/leak tests: X New piping will be tested. Leak tests on vacuum system will be performed

Electrical tests: X All the new cables will be tested

Others: X

7.3 PARTICULAR RISKS

Requirement Yes No Comments

Hazardous substances (chemicals, gas, asbestos…):

X Asbestos might be found during work.

Work at height: X

Confined space working: X

Noise: X

Cryogenic risks: X

Industrial X-ray (tirs radio):

X X-ray tests to check the piping works is foreseen.

Page 11: F61 Transfer Line Modifications - indico.cern.ch€¦ · F61 Transfer Line Modifications BRIEF DESCRIPTION OF THE PROPOSED CHANGE(S): As part of the East Area renovation project during

REFERENCE EDMS NO. REV. VALIDITY

PS-LJ-EC-0009 2038214 0.2 DRAFT

Page 11 of 11

Ionizing radiation risks (radioactive components):

X [Traceability by TREC.]

Others: X

8. FOLLOW-UP OF ACTIONS BY THE TECHNICAL COORDINATION

Action Done Date Comments

Carry out site activities:

Carry out tests:

Update layout drawings:

Update equipment drawings: PS_LM___0136 to be updated

Update layout database: Existing F61 line in layout database to be removed. Future configuration of F61 will be fully integrated to the layout database: Ref.

https://edms.cern.ch/document/1855540

Update naming database: New naming convention for the East Area (Applicable for F61): Ref.

https://edms.cern.ch/document/1723747

Update optics (MADX)

Update procedures for maintenance and operations

Update Safety File according to

EDMS document 1177755:

Others:

9. REFERENCES

[1] E. Harrouch et al., WPA PS - F61 line modification pendant le long shutdown 2,

EDMS2007648