FAIR PROJECT
COST BOOK
FAIR cost 1.2 mld euro
1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities 269 Meuro
FAIR Baseline costbook (1)
Conceptual design Preliminary engineering design Vendor inquire R&D studies Expert estimates Technical and cost advisory committees Scientific and Technical Issues working group International Steering Committee
FAIR Baseline costbook (2)
Civil construction and infrastructure
BUNG Beratende Ingenieure Heidelberg Accelerator
5000 subtasks detailed design and costs Experiments
Program Advisory Committees
1. Civil construction and infrastructure
Peripheral supply systems Electric power supply systems Structural facilities Radiation protection
Peripheral supply systems
Water Cooling Systems Air conditioning and ventilation systems Generation and distribution of compressed air Heating
Electric power supply systems
20 kV power supply system Clean power (2MVA Transformer, distribution) Power supply 10 units of 50kVA Emergency power supply Cables Communication systems Lighting
Structural facilities
General site installation Groundwater lowering Recultivation Additional building costs (design, expertises) 52 buildings
Radiation protection
Experiment access Radiation protection interlock Dose monitoring Activation monitoring Laboratory equipment
2. AcceleratorsTECHNICAL SYSTEMS
Magnets Power Converters RF Systems Injection/Extraction Beam Diagnostics Vacuum Particle Sources Electron Cooling Stochastic Cooling Insertions/ Collimators Cryogenics Common Systems
MAGNETS
Dipole - 512 Quadrupole – 998 Sextupole – 256 Octupole – 38 Steering magnets – 411 Correctors – 118 Superconducting busbars - 13800
POWER CONVERTERS
Dipole Power Converters – 137 Qudropole Power Converters – 537 Hexapole Power Converters – 69 Octupole Power Converters – 74 Quench Heaters – 420 Steerars -1146
RF SYSTEMS
Klystron – 7 Circulator – 7 Water load – 7 500W solid state driver – 7 Tube amplifier – 2 Power lines – 9 Tank from stainless steal – 15 Copper plating – 16 Acceleration system - 28
INJECTION / EXTRACTION
Extraction kickers – 11 Injection kickers – 14 Knock out system – 1 Transfer kicker – 6 Injection extraction – 8 Transfer kickers – 6 Emergency kickers - 13
BEAM DIAGNOSTICS
Resonant transformer – 33 Pulse transformer – 19 Cryo current comparator – 6 Particle detector combination – 23 Beam position monitor – 56 SEM grid – 54 Multi wire gas detector – 32 Current grid – 32 DC transformer – 4 AC transformer – 4
VACUUM
Pumps – 1906 Vacuum chambers – 12820 Valves – 802 Bakeout system – 3316
PARTICLE SOURCES
Duoplasmatron – 1 Power supplies – 1 Capacitor – 1 Gas regulator – 1 Extractor – 1 PS – 3 HV transformer – 1 Local controls – 1 Terminal cage – 1 Lifting ramp – 1 Faraday room – 1 Local safety - 1
ELECTRON COOLING
Electron gun/Collector – 1 High Voltage system – 1 Magnet system – 1 Vacuum system – 2 HV ps + accel. drift tube – 1 HV equipments + magnets – 1 Drift tube – 1 Toroids – 1 Return solenoid – 1 Electric and controls - 1
STOCHASTIC COOLING
PU for Accumulation – 1 PU for transverse cooling – 2 Kicker tank – 3 Low noise amplifier – 1 Power amplifiers – 30 Cryogenics pickup tanks – 3 Warm corrector tanks – 3
INSERTIONS / COLLIMATORS
Halo collimation system – 5 Charge collimation system – 96 Degrader and ion catcher – 13 Production target – 41 Emergency dumb – 1 Target – 6 Antiproton collection - 5
CRYOGENICS
Cryogenics transfer lines – 1980 Warm gas infrastructure – 1080 Empty cryostats – 1291 Helium distribution – 550 Helium jumper lines - 150
COMMON SYSTEMS
Cable – 227150 AC cable – 23970 Voltage signal cable – 60000 Cryogenics plant – 3 Cryogenics distribution system – 1 Alignments – 10 Optical fiber – 8000 Twisted pair – 240000 Electronic personal dosimeter – 120 Mobile contamination monitor - 10
3. Experiments
Detectors Fast electronics Data acquisition Computing Mechanics Infrastructure