FAIR PROJECT COST BOOK

FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

Embed Size (px)

Citation preview

Page 1: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

FAIR PROJECT

COST BOOK

Page 2: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

FAIR cost 1.2 mld euro

1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities 269 Meuro

Page 3: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

FAIR Baseline costbook (1)

Conceptual design Preliminary engineering design Vendor inquire R&D studies Expert estimates Technical and cost advisory committees Scientific and Technical Issues working group International Steering Committee

Page 4: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

FAIR Baseline costbook (2)

Civil construction and infrastructure

BUNG Beratende Ingenieure Heidelberg Accelerator

5000 subtasks detailed design and costs Experiments

Program Advisory Committees

Page 5: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

1. Civil construction and infrastructure

Peripheral supply systems Electric power supply systems Structural facilities Radiation protection

Page 6: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

Peripheral supply systems

Water Cooling Systems Air conditioning and ventilation systems Generation and distribution of compressed air Heating

Page 7: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

Electric power supply systems

20 kV power supply system Clean power (2MVA Transformer, distribution) Power supply 10 units of 50kVA Emergency power supply Cables Communication systems Lighting

Page 8: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

Structural facilities

General site installation Groundwater lowering Recultivation Additional building costs (design, expertises) 52 buildings

Page 9: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

Radiation protection

Experiment access Radiation protection interlock Dose monitoring Activation monitoring Laboratory equipment

Page 10: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

2. AcceleratorsTECHNICAL SYSTEMS

Magnets Power Converters RF Systems Injection/Extraction Beam Diagnostics Vacuum Particle Sources Electron Cooling Stochastic Cooling Insertions/ Collimators Cryogenics Common Systems

Page 11: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

MAGNETS

Dipole - 512 Quadrupole – 998 Sextupole – 256 Octupole – 38 Steering magnets – 411 Correctors – 118 Superconducting busbars - 13800

Page 12: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

POWER CONVERTERS

Dipole Power Converters – 137 Qudropole Power Converters – 537 Hexapole Power Converters – 69 Octupole Power Converters – 74 Quench Heaters – 420 Steerars -1146

Page 13: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

RF SYSTEMS

Klystron – 7 Circulator – 7 Water load – 7 500W solid state driver – 7 Tube amplifier – 2 Power lines – 9 Tank from stainless steal – 15 Copper plating – 16 Acceleration system - 28

Page 14: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

INJECTION / EXTRACTION

Extraction kickers – 11 Injection kickers – 14 Knock out system – 1 Transfer kicker – 6 Injection extraction – 8 Transfer kickers – 6 Emergency kickers - 13

Page 15: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

BEAM DIAGNOSTICS

Resonant transformer – 33 Pulse transformer – 19 Cryo current comparator – 6 Particle detector combination – 23 Beam position monitor – 56 SEM grid – 54 Multi wire gas detector – 32 Current grid – 32 DC transformer – 4 AC transformer – 4

Page 16: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

VACUUM

Pumps – 1906 Vacuum chambers – 12820 Valves – 802 Bakeout system – 3316

Page 17: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

PARTICLE SOURCES

Duoplasmatron – 1 Power supplies – 1 Capacitor – 1 Gas regulator – 1 Extractor – 1 PS – 3 HV transformer – 1 Local controls – 1 Terminal cage – 1 Lifting ramp – 1 Faraday room – 1 Local safety - 1

Page 18: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

ELECTRON COOLING

Electron gun/Collector – 1 High Voltage system – 1 Magnet system – 1 Vacuum system – 2 HV ps + accel. drift tube – 1 HV equipments + magnets – 1 Drift tube – 1 Toroids – 1 Return solenoid – 1 Electric and controls - 1

Page 19: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

STOCHASTIC COOLING

PU for Accumulation – 1 PU for transverse cooling – 2 Kicker tank – 3 Low noise amplifier – 1 Power amplifiers – 30 Cryogenics pickup tanks – 3 Warm corrector tanks – 3

Page 20: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

INSERTIONS / COLLIMATORS

Halo collimation system – 5 Charge collimation system – 96 Degrader and ion catcher – 13 Production target – 41 Emergency dumb – 1 Target – 6 Antiproton collection - 5

Page 21: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

CRYOGENICS

Cryogenics transfer lines – 1980 Warm gas infrastructure – 1080 Empty cryostats – 1291 Helium distribution – 550 Helium jumper lines - 150

Page 22: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

COMMON SYSTEMS

Cable – 227150 AC cable – 23970 Voltage signal cable – 60000 Cryogenics plant – 3 Cryogenics distribution system – 1 Alignments – 10 Optical fiber – 8000 Twisted pair – 240000 Electronic personal dosimeter – 120 Mobile contamination monitor - 10

Page 23: FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities

3. Experiments

Detectors Fast electronics Data acquisition Computing Mechanics Infrastructure