FEED THE FUTURE CAMBODIA HARVEST II
QUARTERLY PERFORMANCE REPORT:
FY17 QUARTER 3
JULY 30, 2017
Recommended Citation: Abt Associates. “Feed the Future Cambodia Harvest II Quarterly
Performance Report.” Prepared by Abt Associates, Bethesda, Maryland,
July 30, 2017.
Submitted to: Vuthy Theng, Contracting Officer’s Representative (COR)
USAID/Cambodia Food Security and Environment Office
Phnom Penh, Cambodia
+855-23-728-362
Abt Associates Inc. 1 4550 Montgomery Avenue 1 Suite 800 North 1 Bethesda,
Maryland 20814 1 T. 301.347.5000 1 F. 301.913.9061 1 www.abtassociates.com
With iDE and EMC
DISCLAIMER
The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development (USAID) or the United States Government.
FEED THE FUTURE CAMBODIA HARVEST II
QUARTERLY PERFORMANCE REPORT:
FY17 QUARTER 3
Contract No.: AID-442-C-17-00003
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report i
CONTENTS Acronyms ....................................................................................................................................... ii
1. Introduction ............................................................................................................................ 1
The Feed the Future Cambodia Harvest II Project ................................................................................. 1
Purpose of This Document ........................................................................................................................... 1
2. Mobilization & Start-up ......................................................................................................... 2
Mobilization Plan .............................................................................................................................................. 2
Start-Up Activities ........................................................................................................................................... 3
3. Foundational Activities .......................................................................................................... 5
Subsector Selection......................................................................................................................................... 5
Conduct Buyer Identification........................................................................................................................ 6
4. Activity By Sub-Purpose........................................................................................................ 7
5. Cross-Cutting Issues .............................................................................................................. 8
Gender and Youth .......................................................................................................................................... 8
Environment ..................................................................................................................................................... 8
6. Plans for the Next Quarter ................................................................................................... 9
Start-Up and Operations ............................................................................................................................... 9
Foundational Activities ................................................................................................................................. 10
Sub-Purposes .................................................................................................................................................. 11
Cross-Cutting ................................................................................................................................................. 15
Annex A. Monitoring & Evaluation ............................................................................................ 16
Annex B. Financial Report (Provided separately) .................................................................... 19
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report ii
ACRONYMS
AMIS Agricultural Market Information System
COP Chief of Party
COR Contracting Officer’s Representative
EMC Emerging Markets Consulting EMMP Environmental Mitigation and Monitoring Plan
HARVEST Helping Address Rural Vulnerabilities and Ecosystem Stability
HO Home Office
IEE Initial Environmental Examination KIA Key Intervention Area
MAFF Ministry of Agriculture, Forestry and Fisheries
M&E Monitoring and Evaluation
MLC Market Linkage Coordinator
MOU Memorandum of Understanding NDC Negative Determination with Conditions
NGO Non-Governmental Organization
PF Provincial Facilitator
PMEP Performance Monitoring and Evaluation Plan PSDS Private Sector Development Specialist
RGC Royal Government of Cambodia
RFQ Request for Quotes
SME Small and Medium Enterprise
TOR Terms of Reference USAID United States Agency for International Development
VAT Value Added Tax
ZOI Zone of Influence
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 1
1. INTRODUCTION
THE FEED THE FUTURE CAMBODIA HARVEST II PROJECT
Feed the Future Cambodia Harvest II (“Harvest II”) builds upon years of USAID investment, including
the Helping Address Rural Vulnerabilities and Ecosystem Stability (HARVEST) program, which
demonstrated success in increasing horticultural production and strengthening private input supply
networks. Continuing to work across the Feed the Future zone of influence (ZOI) in the provinces of
Pursat, Battambang, Siem Reap, and Kampong Thom, Harvest II will devote particular attention to
building market linkages. It will use a buyer-led approach and will support expansion of commercial
partnerships that will ultimately allow horticultural producers and buyers to compete more effectively in
domestic and international markets. To increase sustainable economic opportunities within a market-
based and inclusive horticulture sector, Harvest II has three interconnected sub-purposes:
Improve capacities for market participation: Leveraging the success of other USAID
programs, Harvest II will work with buyers, producers, and other actors in the sector to
increase financial and business capacity, as well as to stimulate the use of market and climate
information toward more informed decision making and greater market competitiveness.
Improve market linkages: In Cambodia, relationships between value chain actors – in
particular producers and buyers (usually wholesalers or collectors) – can often be tenuous. In
order to help build trust and mutually profitable commercial relationships in the sector, Harvest
II will first identify buyers interested in expanding their supply of horticultural products from the
ZOI. From there, Harvest will help establish commercial partnerships where buyers and sellers
can gradually work to expand their business with each other over time, partly by improving
their mutual understanding, partly through better planning and coordination, partly through
increased investment.
Improve governance and enabling environment: Harvest II will work with private sector
and producer organizations at the national and provincial levels to strengthen their advocacy
capacity and ability to engage in public-private dialogue. At the same time, Harvest II will also
support the Cambodian government to develop a private-sector friendly horticulture growth
strategy.
PURPOSE OF THIS DOCUMENT
This quarterly report serves to update USAID on Harvest II’s activities from its inception on April 18, 2017 through June 30, 2017. The document will outline the project’s progress against its proposed
mobilization plan, objectives achieved toward the project’s foundational activities, as well as preparation
of strategies and activities toward achieving its three sub-purposes.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 2
2. MOBILIZATION & START-UP
MOBILIZATION PLAN
Per the contract requirements, Harvest II submitted a mobilization plan within 15 days of the effective
award date. The plan listed 28 items for Quarter 3. These are shown below, along with the status of
each. Achievements include recruitment and deployment of staff, the start-up workshop, procurement,
and submission of initial deliverables. We have yet to hire the Private Sector Development Specialist and
Ag Policy Expert – we will submit a request for these individuals in August. We were slightly ahead of
schedule in signing a lease and beginning make-ready work for our permanent office space; this was
scheduled for July, but accomplished in June.
Table 1: Harvest II Mobilization Plan
# Mobilization Plan Date Status
1 COP employment agreement signed April 23 Completed on time
2 Job postings for staff April 25 Completed on time
3 Job offers sent to named staff April 28 Completed on time
4 Abt HO Project Director arrives (until May 24) May 1 Completed on time
5 Consent requests for iDE and Emerging Markets Consulting
(EMC) subcontracts submitted
May 1, May 3 Completed on time
6 Post-award conference May 4 Completed on time
7 Issue RFQ for computers May 8 Completed on time
8 Abt HO Finance & Contracts Manager arrives May 16 Completed on time
9 COP arrives May 17 Completed on time
10 Initial COP meeting with COR et al. May 19 Completed on time
11
Submit request for restricted goods waiver for vehicles and
motorcycles
Week of May
29
In lieu of this, agreed
to accept 2 vehicles
from a closing project
12 iDE’s initial staff begin work (subject to subcontract consent) Week of May
29
Completed on time
13 Foundational activities begin: review existing analyses, current
sit.
Week of May
29
Completed on time
14 Holiday – Children’s Day, office closed June 1 N/A
15 Temporary office space in Phnom Penh becomes available June 2 Completed on time
16 Abt’s initial staff begin work June 2 Completed on time
17 Local elections Sunday, June 4 N/A
18
Foundational activities continue: begin identifying sub-sectors
of greatest promise, begin consultations with key partners
(collaboration)
June 5 Subsector
identification
completed on time;
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 3
# Mobilization Plan Date Status
consultations to begin
next quarter
19 Team building/work planning facilitator arrives On/about June
5
Completed on time
20 HO M&E specialist arrives for 3 weeks to work on M&E On/about June
5
Completed on time
21 iDE’s key personnel begins work (subject to subcontract
consent)
June 8 Pending
22 Start-up workshop (internal discussions and a half day with
USAID)
June 12-14 Completed on time
23 Foundational activities continue: meet with potential buyers June 15-June 23 Started on time,
continuing as planned
24
Foundational activities continue: Assess the current and
potential capacity of value chain actors to meet buyer
demands in each sector
Week of June
19
Started on time,
continuing as planned
25 Foundational activities continue: present initial subsectors for
discussion with USAID
Week of June
26
Completed on time
26 Begin Gender Action Plan due October 18 Late June Started on time
27 Submit FY 17 Work Plan (July-September) July 2 Completed on time
28 Submit M&E and Learning Plan (PMEP) July 2 Completed on time
START-UP ACTIVITIES
2.2.1 Work Plan
Harvest II submitted its initial work plan within 75 calendar days of the start date of the contract. This
initial work plan included all activities from the effective start date till the end of the USG fiscal year
(September 30, 2017). In addition to the work plan, Harvest II also submitted its Performance
Monitoring and Evaluation Plan (PMEP), Gender Implementation Plan, Communications and Outreach
Plan and Environmental Mitigation and Monitoring Plan (EMMP).
2.2.2 Operations
Office and Equipment Procurement
Harvest II will establish project offices in Phnom Penh, Siem Reap and Battambang. During this period,
Harvest II signed a lease for the Phnom Penh office at #11A, Street 370, Boeng Keng Kang 1 and
selected a design firm to make the office ready and outfit it for a late-August move-in. In Siem Reap,
Harvest II has identified an office and will secure a lease and outfit the office in the next quarter. Initial
office scoping is underway for the Battambang office and the space will also be secured in the next
quarter. Equipment and furniture procurement for all offices is on-going. In addition, Harvest II has
verbally agreed to accept two vehicles via disposition by the USAID-funded Cambodia Supporting
Forests and Biodiversity project.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 4
Recruitment, Hiring, and Training
During this initial period, staff recruitment was initiated to complement staff identified during the
proposal process. Staff hired during this period were trained on Harvest II administrative policies,
programmatic approaches and tools. While Harvest II proposed three satisfactory candidates for key
personnel positions (Chief of Party; Private Sector Development Specialist; and Technical Expert (Ag
Policy and Enabling Environment), neither the PSDS nor the Technical Expert for Policy were available
upon award. In mid-May, it was agreed with USAID to put the policy position on hold until no later than
September 1, pending an assessment of how the project could best achieve impact in the enabling
environment component and what the appropriate staffing would be in order to achieve that impact.
During this reporting period, Harvest II began this assessment and also conducted numerous interviews
for the PSDS. The project intends to submit a candidate for the PSDS position in early August.
Subcontract Management
Abt Associates executed subcontracts with iDE and EMC and staff from all three companies continue to
work together to build a cohesive project team. Following initial meetings with subcontractors on
financial, contractual, and operational requirements, Abt will continue to work with them to ensure
proper compliance with USAID rules and regulations as well as Abt procedures.
Legal and Tax Considerations
With local legal counsel and local registration in place prior to project inception, the project is in the
process of updating the registration address to the new office location. The project submitted a tax
exemption request to the Ministry of Economy and Finance and is working to ensure proper compliance
and tracking of all VAT payments and other taxation requirements.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 5
3. FOUNDATIONAL ACTIVITIES
In order to achieve results during the project’s initial start-up period (till September 30, 2017), Harvest
II defined six key milestones to ensure that the team is working from a sound understanding of the
project context, is fully apprised of the constellation of opportunities for commercial horticulture in the
ZOI, and is systematically selecting the most promising clients to work with in FY18. The milestones
included:
Milestone 1: Select subsectors of greatest promise in each corridor and prepare presentation
for discussion with USAID.
Milestone 2: Identify and meet with potential buyers in key subsectors; create an initial table
showing promising buyers for the project to work with and what the buyers want to buy.
Milestone 3: Assess the current and potential capacity of value chain actors to meet the
demands of promising buyers.
Milestone 4: Taking into account the results of foundational work through the end of July,
develop an initial list of priority commercial partnerships for the project to support in FY18.
Present to USAID for discussion.
Milestone 5: Develop draft MOUs or roadmaps for five commercial partnerships.
Milestone 6: Develop initial policy agenda linked to the needs of the priority commercial
partnerships.
Work toward these milestones is proceeding according to plan. Two of the six milestones were
completed as of June 30, 2017. The following paragraphs present the work under these milestones.
SUBSECTOR SELECTION
As a first step, Harvest II conducted a subsector selection process to identify opportune and high-
potential horticultural sub-sectors where buyers were potentially interested in significantly expanding
their sourcing from producers in the ZOI. This selection will by no means constrain the project to
working only in the identified subsectors; the priority subsectors will ultimately be determined by
demonstrated buyer demand and suppliers who can fulfill that need. The subsector selection will,
however, serve as a guide to potential opportunities.
The team used a methodology based on USAID’s guidelines for value chain selection and considered the
following three high-level criteria consistent with our project indicators:
Sales potential – Potential demand and potential buyers’ interest, i.e., potential for increased
sales, both at the farmgate and at the buyer level Employment potential – Expected contribution to job creation
Investment potential – Potential for investment, at the farmer and buyer level
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 6
The preliminary results of the selection were presented at Harvest II’s start-up workshop on June 13,
2017. The selection process identified a number of likely horticultural products for future focus of
project activities:
Common wet market vegetables (e.g.
cucumbers, long beans, tomatoes, onion
family, leafy greens, eggplant, water
convolvulus, chili, cabbage, cauliflower,
various gourds, sweet corn, etc.) Niche market vegetables with emerging
market demand (e.g. sweet peppers,
cherry tomatoes, okra, broccoli,
asparagus, French beans, baby corn)
Sweet melon
Passion fruit
Dragon fruit / pineapple
Slow-maturity fruits (standing crop,
only) Papaya / banana
Cashew (standing crop, only)
Ginger family
Culinary mushrooms
Medicinal and nutraceutical plants
CONDUCT BUYER IDENTIFICATION
Taking into account the results of the subsector selection process, Harvest II identified a pool of
approximately 100 “first cut” potential buyers to further evaluate and engage as clients under the buyer-
led approach. Immediately following the start-up workshop, the Harvest II team used available
information from HARVEST, existing market information, and networks to draft a list of 25 “second
cut” initial buyers. The buyers ranged from large supermarket chains based in Phnom Penh to provincial
level wholesalers or collectors. Buyers were prioritized according to those who demonstrated demand,
expressed willingness to work via a supply agreement and/or to invest in processing or value addition.
The majority of the “second cut” potential buyers were interviewed by the team; discussions focused on
buyers’ problems, potential solutions, and amount and value of (unmet) product demand.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 7
4. ACTIVITY BY SUB-PURPOSE
Harvest II aims to accelerate growth in Cambodia’s commercial horticulture sector by achieving three
Sub-Purposes: (1) improving the capacities of market actors to participate fully in the value chain, (2)
creating linkages between value chain actors and improving overall market chain coordination, and (3)
improving the economic governance and enabling environment that support the horticulture sector.
Activities will support the development of a private sector-led, demand-driven horticulture sector, with
economic benefits for market participation clearly communicated throughout the value chain. Harvest II
must increase the capacity of value chain actors to link with one another and promote trust within the
horticulture market system.
During the initial reporting period, activity focused on establishing the foundations for success across
the Sub-Purposes and relevant Key Implementation Areas (KIAs):
Sub-Purpose 1: Improved Capacities for Market Participation
KIA 1.1: Financial and Business Skills Improved
KIA 1.2: Access to and Use of Market and Climatic Information Increased
KIA 1.3: Financial Opportunities Increased
Sub-Purpose 2: Improved Market Linkages
KIA 2.1: Create Linkages between Value Chain Actors
KIA 2.2: Develop Market Incentives for Private Sector Engagement and Investment
KIA 2.3: Improve Market Chain Coordination
Sub-Purpose 3: Improved Governance and Enabling Environment
KIA 3.1: Horticulture Sector Advocacy and Coordination Platforms Strengthened
KIA 3.2: RGC Capacity to Address Horticulture Constraints Improved
KIA 3.3: Public-Private Dialogue Encouraged
As described in the initial Harvest II work plan, activity under these sub-purposes will begin in FY17
Quarter 4 and will be reported on in the FY17 annual performance report.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 8
5. CROSS-CUTTING ISSUES
GENDER AND YOUTH
Consistent with USAID’s gender and women’s empowerment policy, the Harvest II will promote gender
equality, women’s empowerment and youth empowerment in all its activities. To that end, the Harvest II
project engaged a part-time gender specialist to participate in the foundational work and lead the design
of activities that will ensure gender considerations are integrated into all aspects of project
implementation, including the design and implementation of commercial partnerships, monitoring and
evaluation and, communications and outreach under the supervision of Chief of Party (COP). During
this period, the gender specialist completed the Gender Implementation Plan, submitted with the
project’s initial work plan, which includes the buildings blocks for the project’s Gender Action Plan to be
submitted to USAID within six months of the project’s effective date (October 18, 2017).
ENVIRONMENT
As determined in Section V of USAID’s Initial Environmental Examination (IEE) for Harvest II, most if
not all of Harvest II’s proposed activities under sub-purposes 1, 2 and 3 are justified under Categorical
Exclusion. However, the IEE has identified potential activities which could receive a negative
determination with conditions (NDC) and therefore need to be examined and potentially included in
Harvest II’s Environmental Monitoring and Mitigation Plan (EMMP). The initial EMMP was submitted with
the initial work plan.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 9
6. PLANS FOR THE NEXT QUARTER
START-UP AND OPERATIONS
During this reporting period, the project began its activities. These activities primarily included
identification of office space in Phnom Penh and Siem Reap, and recruitment and hiring of staff. The table
below provides an overview of the operational start-up timeline for the next quarter.
Table 2. Management and Operations Timeline, July-September 2017
Activity Description July August September
1 2 3 4 1 2 3 4 1 2 3 4
Staff hiring
FY18 work planning workshop
Phnom Penh office fit-out
Siem Reap office identification and fit-out
Battambang office identification and fit-out
IT equipment procurement
FY17 Quarter 3 performance report
FY18 work plan submission
Harvest II also plans to hold a launch event on September 27, 2017 to introduce the project goals,
convene potential partners and government officials, and discuss in detail a roadmap for collaboration
among partners working on horticulture and related projects in Cambodia.
In addition, Harvest II will continue to make progress and complete mobilization milestones as
presented in Section 3, Foundational Activities.
Table 3: Mobilization Tasks to be Achieved in the Next Quarter
# Mobilization Plan Date
29 Develop TOR for baseline survey, solicit proposals, and select and hire survey firm July-August
30 Sign lease for permanent office space, begin make ready, begin procuring supplies Late July
31 Establishment of permanent Siem Reap and Battambang offices Late August
32 Work planning workshop (internal discussions, half-day meeting with USAID, and
half day with key players in the horticulture space to discuss how we can cooperate)
Last week of
July
33 Submit first quarterly report July 30
34 Move into permanent office in Phnom Penh Late August
35 Submit FY18 Work Plan September 1
36 Carry out and write up baseline survey September-
October 18
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 10
FOUNDATIONAL ACTIVITIES
6.2.1 Assess Capacity of Supply-Side Value Chain Actors
To investigate the other major player in the commercial partnership – the supplier – a team was formed
to: 1) identify producers/suppliers with potential to meet buyer demands, 2) assess the capacity
development needs of producers/suppliers and, 3) test and refine the supply-side assessment
process/tools for future use on Harvest II.
The 25 opportunities resulting from the buyer analysis were prioritized
based on size of unmet demand, high value, potential to add value
through processing, and off season production potential. Over the course of three weeks (beginning in early July), two Harvest II teams
will test the supply-side assessment tools, as follows:
Week One: Wet market vegetables in Siem Reap; pineapple in Battambang
Week Two: Cashew in Kampong Thom; long maturity fruit in Pursat
Week Three: Reconvene, consolidate information, discuss lessons learned/course corrections, set work plan for remainder of FY17
The field assessment will start from wholesalers and work towards producers via collectors to identify
value-chain connections for the specific buyer-identified commodities. Where possible, existing
information sources and networks will be used, e.g., Provincial Departments of Agriculture, NGOs and
ongoing donor projects, and businesses such as input sellers.
6.2.2 Prioritize Commercial Partnerships
After having identified promising buyers, the Harvest II team will dig deeper with relevant producer
groups to ascertain whether or not producer groups are able to meet the buyer’s requirements (with or
without technical assistance from the project) and then perform a
matchmaking function. At the same time, the Harvest II team will
analyze each potential partnership for key results such as expected
sales, employment opportunities, and private sector investment
potential, as well as amount of project resources required and
likelihood of success. Having done this, the project will rank the
prospective partnerships in order to identify the top 16 most
promising cases for formal consideration. These cases will be
presented to USAID after, Harvest II’s FY18 work planning workshop.
6.2.3 Formalize Commercial Partnerships
Having identified the most promising commercial partnerships per the criteria stated above, Harvest II
staff will formalize five of these relationships into formal arrangements, most likely through Memoranda
of Understanding. The MOUs will set forth the perceived problems, solutions, roles/responsibilities,
expected results, and actions that the parties will take. The agreement
will also include information on the project’s role beyond facilitation
(in the case of technical or business assistance, for example) as well as
all parties’ roles in monitoring and reporting.
Milestone 3: Assess the
current and potential capacity
of value chain actors to meet the demands of promising
buyers.
Milestone 4: Taking into
account the results of
foundational work through
the end of July, develop an
initial list of priority commercial partnerships for
the project to support in
FY18. Present to USAID for
discussion.
Milestone 5: Develop draft
MOUs or roadmaps for five
commercial partnerships.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 11
6.2.4 Develop Initial Policy Agenda
During the next reporting period, a consultant engaged by Harvest II will finalize an approach to the
enabling environment as pertains specifically to the horticulture sector in Cambodia. This will result in a
policy agenda and approach to the enabling environment that is
linked to the needs of the priority commercial partnerships, as well
as broader sector-wide issues that are constraining commercial
horticulture sector growth in Cambodia. Activities under the policy
agenda will align with Sub-Purpose 3 and its three key intervention
areas.
Findings will be presented for discussion at the FY18 work planning workshop planned for July 26-28.
The consultant will also help Harvest II consider the most effective staffing structure according to the
policy agenda and approach, as the key personnel position of Technical Expert, Ag Policy and Enabling
Environment is currently vacant pending further definition of this component.
SUB-PURPOSES
Sub-Purpose 1: Improved Capacities for Market Participation
Harvest II will build the capacity of buyers and sellers within commercial partnership to do what’s
needed to meet the goals of the partnership (i.e., to expand sales, employment, and/or investment). The
most in-depth capacity building work will be directed to these commercial partners. Harvest II will also
provide some broad assistance to other value chain actors, such as private, public, and civil society
actors, to facilitate capacity building while building on existing programming and best practices in
Cambodia.
KIA. 1.1: Financial and Business Skills Improved To coordinate effectively with others to increase sales, commercial partners must be able to understand
their costs and current and potential revenue, as well as the costs and risks that others in the
partnership are taking on. In addition to basic financial literacy and agribusiness training, targeted
capacity building on negotiation, marketing, and financial management will prepare commercial partners
and other value chain actors to increase their engagement in the market. With these improved
capacities, all parties will form a better understanding of others’ incentives and motivations to build trust
and negotiate with others within the sector.
During the next quarter, Harvest II will begin planning activities under this KIA, and undertake the
following tasks:
Hire Financial and Marketing Skills Specialist.
Plan trainings in the buyer-led approach, problem solving using Human Centered Design, and
sales (through Whitten & Roy) for Harvest II staff and commercial partners (as appropriate), as
well as other topics. Develop an initial landscape analysis of service providers for finance and business development
services.
Assess priority commercial partnerships for bottlenecks related to finance and marketing.
Milestone 6: Develop initial
policy agenda linked to the needs of the priority
commercial partnerships.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 12
KIA 1.2: Access to and Use of Market and Climatic Information Increased Better access to market and climate information and knowledge about how to use that information will
increase producers’ resilience to price fluctuations and extreme weather events. Many Cambodian
producers choose which crops to grow and when based on their neighbors’ planting decisions.
Collectors are more familiar than producers with market demand because of their frequent interaction
with wholesalers and buyers at district- and province-level markets. With more accurate and timely
access to market information, including seasonal demand and price fluctuations, producers will be able
to plan their cropping cycles based on actual market demand. Collectors will be able to offer producers
higher prices for growing more competitive crops.
During the quarter, Harvest II will begin planning activities under this KIA, and undertake the following
tasks:
Hire Market and Climate Information Specialist.
Develop a status update for AMIS and identify other public and private market and climate information systems.
Assess priority commercial partnerships for bottlenecks related to market and climate
information.
KIA 1.3: Financial Opportunities Increased Cambodian businesses throughout the horticulture sector are constrained by limited financial
opportunities and products. For producers, loan terms are often prohibitive (either because of interest
rates, payback periods, or requirement of collateral) and for larger actors, it is often difficult to find
working capital or purchase order financing. These are critical needs to growing a business and
becoming more competitive in any sector. Experience shows that training financial institutions on
working with and supporting value chain actors is effective in increasing access to tailored financial
products. In addition, many SMEs need support completing loan applications to give them a greater
chance of receiving financing support.
During the next reporting period, Harvest II will begin planning for implementation of activities under
this KIA:
Identify and engage partner financial institutions (both micro and traditional) to identify
opportunities for and to begin to developing specialized financial products such as purchase-
order finance and factoring.
Assess priority commercial partnerships for bottlenecks related to finance and identify plausible products and approaches for linkages.
Sub-Purpose 2: Improved Market Linkages
Cambodia’s domestic agricultural markets have become increasingly sophisticated in recent years;
however horticultural competitiveness has lagged due to weak vertical and horizontal linkages in the
value chain, a lack of incentives for investment and innovation, and low levels of coordination.
Accelerating growth of Cambodia’s horticulture sector will require increased organization, investment,
and cooperation between and among value chain actors. Efforts under this Sub-Purpose will be centered
on the commercial partnerships. The main work during the rest of FY17 will be to select the most
promising partnerships to work with in FY18 and map out the support that each one will need in FY18.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 13
KIA 2.1: Linkages between Value Chain Actors Created Weak linkages at all points along the value chain prevent large market actors from purchasing local
produce; retail outlets or large institutional buyers favor working with import wholesalers because they
can aggregate large quantities. With stronger linkages throughout the market chain in Cambodia, large
market actors will be better able to access Cambodian produce. This KIA is the starting point for the
buyer-led approach, and where Harvest II will focus a large amount of effort in terms of linking
commercial horticulture clients with adequate and appropriate supply. Harvest II will work to develop
commercial partnerships between buyers, suppliers, and supporting actors and foster trust.
During the next quarter, Harvest II will undertake the following milestones and tasks:
Hire and orient the Private Sector Development Specialist (PSDS), the final Market Linkage
Coordinator (MLC), and at least three (of six, one for each office) Provincial Facilitators (PF).
Organize workshop for staff to discuss application of the buyer-led approach. Complete Milestone 3: Supplier identification. Conduct field-based analysis and verification to
ensure a complete understanding of HARVEST beneficiaries and producers of horticulture in the
ZOI, particularly in terms of land availability, production quantities and qualities, and willingness
to grow.
Complete Milestone 4: Prioritize commercial partnerships based on agreed-upon criteria such as sales to project cost ratio.
Complete Milestone 5: Formalize at least five commercial partnerships through the execution of
MOUs that outline the business case, objectives, constraints, and solutions to be implemented
by the project and client.
KIA 2.2: Market Incentives for Private Sector Engagement and Investment Developed Private sector investment by value chain actors and external entities generally leads to increased sales
and jobs. In Cambodia’s horticulture sector, however, value chain actors are slow to invest in upgrading.
Similarly, external investors are interested in Cambodia’s horticulture sector but need to be convinced
that the opportunities and benefits outweigh the risks and costs.
During the next reporting period, Harvest II will undertake the following task:
Identify an initial set of new investment opportunities and discuss with potential investors.
Harvest II has identified groups interested in opportunities to facilitate social impact investment in Cambodia’s horticulture sector. The Finance and Investment Specialist will follow up on these
and other leads and work with EMC, Private Sector Development Specialist, and Market Linkage
Coordinators to develop new commercial partnerships around investments.
KIA 2.3: Market Chain Coordination Improved Coordination in the horticulture sector is sorely lacking, with producers sometimes selling to their local
producer groups as well as to collectors, wholesalers, and even retail customers. This approach is
economically rational under the circumstances, as buyer demand can shift, and prices vary depending on
where produce is sold. Harvest II must work with value chain actors to improve communication,
understanding of costs and value addition along the value chain, and encourage new approaches to
collaboration and coordination. Aligning incentives within the value chain and bringing together
stakeholders to discuss overarching challenges will improve market chain coordination.
During the next reporting period, Harvest II will undertake the following task:
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 14
In the context of commercial partnerships and the supplier identification process, MLCs and PFs
will start identifying opportunities to form Market Coordination Groups among producers that
will be able to respond to buyer demands.
Sub-Purpose 3: Improved Governance and Enabling Environment
Robust, effective and efficient regulatory systems are essential components of well-functioning
agriculture and food markets. To that end, Harvest II aims to work on policy and enabling environment
through Sub-Purpose 3 in order to strengthen advocacy and coordination platforms for horticulture
sector; improve capacity of relevant RGC counterparts to address horticulture constraints; and
encourage public and private dialogue.
KIA 3.1: Horticulture Sector Advocacy and Coordination Platforms Strengthened Coordination is key for the stakeholders and market participants (buyers, retailers, traders, collectors,
transporters, input suppliers, etc.) in the horticulture sector to actively engage and push reform agendas.
Proper and reliable mechanisms and platforms help stakeholders and market participants coordinate
their concerns and feedback and advocate for reform effectively. The project will seek to strengthen
existing platform to address the constraints, as well as encourage its partners to play an active role in
platforms that are relevant to them. The proposed activities for the next three months are as follows:
Consult with potential public and private sector partners (and other relevant sector actors) to identify and compile a prioritized list of existing coordination mechanisms and platforms.
Consult with partners to propose the priorities for the project engagement and develop
implementation plan. The timeframe, resources, and expected impacts will be taken into
consideration.
KIA 3.2: RGC Capacity to Address Horticulture Constraints Improved Many government agencies have limited technical skills to address the various policy constraints
particularly around areas for either policy analysis, development, implementation and/or evaluation.
Improved policy capacity within these offices/agencies will enable RGC officials to effectively understand
private sector and civil society concerns, and develop a coherent policy and regulatory framework that
responds to stakeholders' needs. At the same time, the private sector players need to understand the
related policies and regulations and be able to comply or provide feedback. The proposed activities for
the next three months are:
Review and consult with potential public and private sector partners to identify relevant
policies/regulations, and immediate capacity needs.
Prioritize key policy constraints, the capacity needs for both the RGC and private sector, and
develop action plan for engagement.
KIA 3.3: Public-Private Dialogue Encouraged Effective policy reform takes into account the unique needs of all stakeholders. Many horticulture value
chain actors feel that Cambodia’s public sector does not understand, or try to understand, their
constraints and opportunities for growth, and effectively implementing existing policies that could
support the sector. In addition, although there are policy and enabling environment constraints unique
to the horticulture sector, many of the relevant policy implementation issues are common to all
agriculture sector actors. The strategy of the project is to support private sector actors, civil society,
and public sector stakeholders to discuss and understand one another’s needs through organizing
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 15
forums for public-private dialogue at the national and sub-national levels to create space for these
discussions.
In the next quarter, the project will:
Facilitate private sector participation in sector specific working groups or other platforms
including the on-line forums. Harvest II will then prioritize key interests, issues/constraints,
strategies, and create action plans.
CROSS-CUTTING
6.4.1 Gender and Youth
In the next reporting period, the Harvest II gender specialist will continue her desk and field research
toward the preparation of the Gender Action Plan for submission to USAID in October 2017. She will
work with Harvest staff to apply a gender lens to the completion of foundational activities as well as help
identify buyers, analyze current and potential of value chain actors to meet their needs, and develop
gender-sensitive strategies for commercial partnerships. In addition, the gender specialist will work with
the Harvest II M&E team to review indicators and ensure inclusion of sex-disaggregation as appropriate.
The gender specialist will develop and conduct gender training for the Harvest II staff to better identify
gender constraints among value chain actors.
6.4.2 Environment
In the next three months, Harvest II will not conduct any activities that would create negative
environmental impact in these areas, since work will focus on analysis and planning. However, as
Harvest II identifies particular commercial partnerships for project support, the team will have more
information about potential negative impacts and needs for mitigation or management. For that reason,
Harvest II will update its EMMP for submission with its next work plan, due September 1, 2017. Harvest
II will examine its full range of planned activities (over the life of project) and assess them in terms of
environmental impact. The revised EMMP will lay out mitigation and monitoring measures in the form of
specific actions that will be carried out by Harvest II staff to ensure environmental compliance.
6.4.3 Coordination
In a concerted effort to identify areas for cooperation with other USAID-funded projects, initiatives
under other donors, and RGC activities, Harvest II staff will embark on a set of meetings to better
understand ongoing opportunities and constraints in the horticulture sector in Cambodia – with a focus
on those in the ZOI – and spearhead a “mapping” exercise designed to identify the best areas for
collaboration and how to leverage existing resources.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 16
ANNEX A. MONITORING & EVALUATION
Harvest II proposed the following six milestones to allow USAID to judge its performance during FY17
Quarter 3 and 4 (the first five and a half months of implementation):
Milestone 1: Select subsectors of greatest promise in each corridor and prepare presentation
for discussion with USAID.
Milestone 2: Identify and meet with potential buyers in key subsectors; create an initial table
showing promising buyers for the project to work with and what the buyers want to buy.
Milestone 3: Assess the current and potential capacity of value chain actors to meet the
demands of promising buyers.
Milestone 4: Taking into account the results of foundational work through the end of July,
develop an initial list of priority commercial partnerships for the project to support in FY18.
Present to USAID for discussion.
Milestone 5: Develop draft MOUs or roadmaps for five commercial partnerships.
Milestone 6: Develop initial policy agenda linked to the needs of the priority commercial
partnerships.
In Quarter 3, as discussed in Section 3, the team completed Milestones 1 and 2 and made progress
toward the others.
Harvest II’s Project Year indicators and targets are shown in Table 4, below. Harvest II anticipates
reporting results toward these performance indicator targets by FY18, Quarter 1.
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 17
Table 4. Cambodia Harvest II Performance Indicator Tracking Table (PITT)
# Indicator Description Disaggregatio
n
Baselin
e
Annual Targets Life of
Project Year 1 Year 2 Year 3 Year 4 Year 5
1
Value of annual sales of farms and
firms receiving USG assistance
(EG.3.2-19)
Sub-Sector TBD $1,426,613 $3,567,358 $6,497,010 $10,645,504 $15,137,477 $37,273,961
2
Number of for-profit private
enterprises, producers organizations,
water users associations, women’s
groups, trade and business
associations and community-based
organizations (CBOs) that applied
improved organization-level
technologies or management
practices with USG assistance
(EG.3.2-20)
Type of
Organization;
Type of
Management
Practice
0 165 298 455 544 572 2,034
3
Number of people using climate
information or implementing risk-
reducing actions to improve resilience
to climate change as supported by
USG assistance (EG.11-6)
Sex 0 1,092 2,671 4,788 6,136 6,872 10,134
4
Number of firms (excluding farms) or
civil society organizations (CSOs)
engaged in agricultural and food
security-related manufacturing and
services that have increased profits or
become financially self- sufficient with
USG assistance (EG.3.2-21)
Type of Entity
(Firm, CSO) 0 90 157 233 274 285 835
5
Number of full-time equivalent (FTE)
jobs created with USG assistance
(EG.3-9)
Location,
Duration, Sex of
Job-Holder
0 94 229 499 634 365 1,819
6
Value of new private sector
investment leveraged by the USG to
support food security and nutrition
(EG.3.2-22)
0 $624,000 $1,524,000 $3,324,000 $4,224,000 $2,430,000 $12,126,000
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 18
# Indicator Description Disaggregatio
n
Baselin
e
Annual Targets Life of
Project Year 1 Year 2 Year 3 Year 4 Year 5
7
Number of agricultural and nutritional
enabling environment policies
analyzed, consulted on, drafted or
revised, approved and implemented
with USG assistance (EG.3.1-12)
Policy Area;
Process/Step 0 1 3 4 5 4 17
8
Number of individuals in the
agriculture system who have applied
improved management practices or
technologies with USG assistance
Value Chain
Actor Type;
Technology
Type; Sector
0 300 800 1,400 1,850 650 2,500
9
Number of public-private
partnerships formed as a result of
USG assistance
Partnership
Focus 0 9 13 17 18 16 73
10 Value of agricultural and rural loans as
a result of USG assistance
Type of Loan
Recipient; Sex of
Recipient
0 $60,000 $150,000 $250,000 $250,000 $290,000 $1,000,000
11
Number of micro, small, and medium
enterprises (MSMEs), including
farmers, receiving agricultural-related
credit as a result of USG assistance
Size of Firm;
MSME Type; Sex
of Owner/
Producer
0 21 51 88 100 115 375
12
Percentage of female participants in
USG-assisted programs designed to
increase access to productive
economic resources (GNDR-2)
0 15% 17% 20% 22% 25% 25%
13
Percentage of participants in USG-
assisted programs designed to
increase access to productive
economic resources who are youth
(15-29) (GFSS-24)
0 10% 12% 15% 17% 20% 20%
14 Number of individuals participating in
USG food security programs (EG.3-1)
Rural, Urban/Peri-
urban; New,
Continuing
0 400 1,100 2,000 2,600 900 3,500
Feed the Future Cambodia Harvest II: FY17 Quarter 3 Performance Report 19
ANNEX B. FINANCIAL REPORT (PROVIDED