FERMILAB TEST BEAM FACILITY Aria Soha All Experimenter’s Meeting October 20, 2014

Fermilab Test Beam Facility

Embed Size (px)

DESCRIPTION

Fermilab Test Beam Facility. Aria Soha All Experimenter’s Meeting October 20, 2014. 2014 Facility Upgrades. MCenter Beamline! Area for High Rate Trackers (M03) New Instrumentation Wire chamber tracking system Si strip telescope Improved Infrastructure Temperature control - PowerPoint PPT Presentation

Citation preview

Page 1: Fermilab Test Beam Facility

FERMILAB TEST BEAM FACILITYFERMILAB TEST BEAM FACILITY

Aria SohaAll Experimenter’s Meeting

October 20, 2014

Page 2: Fermilab Test Beam Facility

2014 Facility Upgrades

• MCenter Beamline!• Area for High Rate Trackers (M03)• New Instrumentation– Wire chamber tracking system– Si strip telescope

• Improved Infrastructure– Temperature control– Table control / new tables

http://www-ppd.fnal.gov/FTBF/ 2

Page 3: Fermilab Test Beam Facility

2014 Statistics

• 18 Experiments• 321 Collaborators• 84 Institutions• 20 Countries• 9 New TSW’s

http://www-ppd.fnal.gov/FTBF/ 3

Page 4: Fermilab Test Beam Facility

Beam Delivery

• 416,139 Total Fxd Trgt events

• 183,225 MTest beam pulses• 16,496 MCntr beam pulses• MTest Beam Sum: 7.9E15• MCntr Beam Sum: 2.4E16

http://www-ppd.fnal.gov/FTBF/ 4

Page 5: Fermilab Test Beam Facility

Weekly Usage

MTest– 48 available beam-weeks– 78 experiment-weeks– 6 weeks of beam studies/

commissioning– 177% Usage

MCenter– 5 available beam-weeks– 0.5 experiment-weeks– 5 weeks of beam studies/

commissioning– 100% Usage

• http://www-ppd.fnal.gov/FTBF/ 5

Page 6: Fermilab Test Beam Facility

Experiments (18)

• 9 new TSW’s approved• 11 new experiments started• 7 returning experiments

http://www-ppd.fnal.gov/FTBF/ 6

Page 7: Fermilab Test Beam Facility

Experiment Types• T1015 DRO Calorimetry• T1037 FLYSUB-Consortium• T958 FP420 (CMS+ATLAS) Fast Timing Group• T979 Fast Timing w/Cherenkov Counters• T989 DAMIC• T1058 Secondary Emission Calorimeter • T1031 Atlas Tile Calorimeter Electronics• T1036 CMS High Rate Pixel Detector• T1041CMS Forward Calorimetry• T1049 ATLAS large scale TGC• T1056 ATLAS DBM Module Qualification• T992 Radiation-hard Sensors for the SLHC• T1042 Muon g-2 straw tracker• T1018 Spacordion Tungsten Fiber Calorimeter• T1044 sPHENIX• T1048 PHENIX fast TOF• T1054 sPHENIX Pre-Shower Calorimeter• T994 JASMIN

http://www-ppd.fnal.gov/FTBF/ 7

Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaTTwo Large Neutrino experiments on

schedule for FY15: MINERvA & LAriaT

Page 8: Fermilab Test Beam Facility

Institutions (84)

http://www-ppd.fnal.gov/FTBF/ 8

Page 9: Fermilab Test Beam Facility

Summary

• Facility is growing at an incredible rate, and is on track to continue

• 321 collaborators this year

• Will likely break 500 next year, with new beamline

• 1.4 FTE for facility management is not enough

http://www-ppd.fnal.gov/FTBF/ 9

Page 10: Fermilab Test Beam Facility

ADDITIONAL SLIDES

http://www-ppd.fnal.gov/FTBF/ 10

Page 11: Fermilab Test Beam Facility

Latest Experiments

http://www-ppd.fnal.gov/FTBF/ 11

T-10565 Users

T-104155 Users

SY Water Proble

m

Page 12: Fermilab Test Beam Facility

So Far in FY 2014

• 70 Experiment Weeks• 1 Installation week• 6 weeks Facility beam studies

http://www-ppd.fnal.gov/FTBF/ 12

Page 13: Fermilab Test Beam Facility

Current Status

MTest•T-1041 running now. (6 sub-experiments) •Wednesday they will uninstall•Thursday will be spent installing T-992, T-1058, T-1015, and T-958 (until Sept Shutdown)MCenter•LAriaT Commissioning•Characterization of Tertiary Beam •T- 979 will run parasitically with punch-through muons