Fermilab Test Beam Facility. Aria Soha All Experimenter’s Meeting October 20, 2014. 2014 Facility Upgrades. MCenter Beamline! Area for High Rate Trackers (M03) New Instrumentation Wire chamber tracking system Si strip telescope Improved Infrastructure Temperature control - PowerPoint PPT Presentation
Citation preview
FERMILAB TEST BEAM FACILITYFERMILAB TEST BEAM FACILITY
Aria SohaAll Experimenter’s Meeting
October 20, 2014
2014 Facility Upgrades
• MCenter Beamline!• Area for High Rate Trackers (M03)• New Instrumentation– Wire chamber tracking system– Si strip telescope
• Improved Infrastructure– Temperature control– Table control / new tables
http://www-ppd.fnal.gov/FTBF/ 2
2014 Statistics
• 18 Experiments• 321 Collaborators• 84 Institutions• 20 Countries• 9 New TSW’s
http://www-ppd.fnal.gov/FTBF/ 3
Beam Delivery
• 416,139 Total Fxd Trgt events
• 183,225 MTest beam pulses• 16,496 MCntr beam pulses• MTest Beam Sum: 7.9E15• MCntr Beam Sum: 2.4E16
http://www-ppd.fnal.gov/FTBF/ 4
Weekly Usage
MTest– 48 available beam-weeks– 78 experiment-weeks– 6 weeks of beam studies/
commissioning– 177% Usage
MCenter– 5 available beam-weeks– 0.5 experiment-weeks– 5 weeks of beam studies/
commissioning– 100% Usage
• http://www-ppd.fnal.gov/FTBF/ 5
Experiments (18)
• 9 new TSW’s approved• 11 new experiments started• 7 returning experiments
http://www-ppd.fnal.gov/FTBF/ 6
Experiment Types• T1015 DRO Calorimetry• T1037 FLYSUB-Consortium• T958 FP420 (CMS+ATLAS) Fast Timing Group• T979 Fast Timing w/Cherenkov Counters• T989 DAMIC• T1058 Secondary Emission Calorimeter • T1031 Atlas Tile Calorimeter Electronics• T1036 CMS High Rate Pixel Detector• T1041CMS Forward Calorimetry• T1049 ATLAS large scale TGC• T1056 ATLAS DBM Module Qualification• T992 Radiation-hard Sensors for the SLHC• T1042 Muon g-2 straw tracker• T1018 Spacordion Tungsten Fiber Calorimeter• T1044 sPHENIX• T1048 PHENIX fast TOF• T1054 sPHENIX Pre-Shower Calorimeter• T994 JASMIN
http://www-ppd.fnal.gov/FTBF/ 7
Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaTTwo Large Neutrino experiments on
schedule for FY15: MINERvA & LAriaT
Institutions (84)
http://www-ppd.fnal.gov/FTBF/ 8
Summary
• Facility is growing at an incredible rate, and is on track to continue
• 321 collaborators this year
• Will likely break 500 next year, with new beamline
• 1.4 FTE for facility management is not enough
http://www-ppd.fnal.gov/FTBF/ 9
ADDITIONAL SLIDES
http://www-ppd.fnal.gov/FTBF/ 10
Latest Experiments
http://www-ppd.fnal.gov/FTBF/ 11
T-10565 Users
T-104155 Users
SY Water Proble
m
So Far in FY 2014
• 70 Experiment Weeks• 1 Installation week• 6 weeks Facility beam studies
http://www-ppd.fnal.gov/FTBF/ 12
Current Status
MTest•T-1041 running now. (6 sub-experiments) •Wednesday they will uninstall•Thursday will be spent installing T-992, T-1058, T-1015, and T-958 (until Sept Shutdown)MCenter•LAriaT Commissioning•Characterization of Tertiary Beam •T- 979 will run parasitically with punch-through muons