FG_Construction Documents_07-003.pdf

Embed Size (px)

Citation preview

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    1/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    2/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    3/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    4/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    5/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    6/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    7/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    8/19

    16 DN A-01-12

    Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    1

    1 1 1

    3 1 1

    1

    2

    1

    1

    42' - 0"

    4' - 6" 7' - 0" 6' - 0" 7' - 0" 6' - 0" 7' - 0" 4' - 6"

    42' - 0"

    4' - 6" 7' - 0" 6' - 0" 7' - 0" 6' - 0" 7' - 0" 4' - 6"

    32'-0"

    7'-111/2"

    R.O.

    3'-1"

    9'-11"

    R.O.

    3'-1"

    7'-111/2"

    32'-0"

    7'-111/2"

    R.O.

    3'-1"

    9'-11"

    R.O.

    3'-1"

    7'-111/2"

    1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2" 1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2" 1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2"

    1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2" 1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2" 1' - 11 1/2"

    R.O.

    3' - 1"

    1' - 11 1/2"

    2-6x6-8

    2-6x6-8

    2-6x6-8

    2-6x6-8

    2-6x6-8

    2-6x6-8

    3-0x6-8 3-0x6-8 3-0x6-83-0x6-8

    BATH 2 BATH 1

    BED 1

    BED 2

    BED 3

    WALL LEGEND

    NOTE:

    DIMENSIONS TO EXTERIOR WALLSREFERENCE FACE OF STUD.

    DIMENSIONS TO INTERIORPARTITIONS REFERENCE CENTEROF 2x4 OR 2x6 STUD.

    2x4 OR 2x6 STUD WALLOR 2x_ RAFTERSW/ INSULATION

    2x4 OR 2x6 STUD WALLUN-INSULATED

    4'-5

    3/4"

    11'-61/4"

    10'-61/4"

    2'-41/2"

    3'-11/4"

    16' - 9" 7' - 7" 16' - 9"

    10' - 8 3/4"

    6' - 0 1/4"

    9' - 2 1/2" 2' - 4 1/2" 12' - 9"

    ALIGNED TO END

    ALIGNED TO END

    2

    3

    3

    TEMPERED

    TEMPERED

    EGRESS EGRESS

    EGRESS

    4

    5

    READINGNOOK

    D

    D

    D

    D

    1

    A-03-1

    2

    A-03-1

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    1/4" = 1

    A-02-2

    UPPER LEVELFLOOR PLAN

    07-0

    SEASIDE BARN

    07 APRIL, 20

    BU,

    D = COMBINA TION SMOKE & CARBON MONOXIDE DETECTOR DETECTORS SHALL BE INSTALLED OUTSIDE EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY BEDROOMS AND ON EACH STORY OF THE DWELLING INCLUDING BASEMENTS. ALL DETECTORS SHALL BE CONNECTED TO A SOUNDING DEVICE OR OTHER DETECTORS TO PROVIDE AN ALARM AUDIBLE IN ALL SLEEPING AREAS. ALL DETECTORS SHALL BE APPROV AND LISTED AND SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

    FLOOR TO FLOOR HEIGHTS WILL VARY BASED ON DEPTH OFLOOR FRAMING AS DETERMINED BY STRUCTURALENGINEER. STAIR RISERS MUST NOT EXCEED 7 3/4", STAITREADS MUST NOT BE LESS THAN 10" AS PER IRC 2006.

    WALL MOUNT STAIR RAIL. MAX PROJECTION MUST NOTEXCEED 4 1/2" FROM FACE OF FINISH WALL AS PER IRC 20

    1

    2

    No. Description Dat

    1/4" = 1'-0"1

    UPPER LEVEL FLOOR PLAN

    PROVIDE TEMPERED GLASS SHOWER ENCLOSURE.3

    PROVIDE STATIONARY LADDER UP TO READING NOOK.4

    SAFTY RAILS REQUIRED IN READING NOOK. TOP RAIL TO BMIN OF 36" ABOVE T.O. FINISH FLOOR.

    5

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    9/19

    T.O. FOOTING EL: (-) 5'-0" (OR AS REQ)

    T.O. FOUNDATION WALL EL: (-) 1'-3"

    T.O. ENTRY LEVEL SUB FLR EL: 0'-0"

    B.O. FLOOR FRAMING EL: 9'-1"

    T.O. UPPER LEVEL SUB FLR EL: 10'-1"

    T.O. GABLE WALL PANEL EL: 17'-2"

    B.O. CEILING JOISTS / RAFTER TIES EL: 18'-2"

    T.O. RIDGE RAFTER EL: +/- 24'-5 1/8"

    +/-24'-51/8"V.I.F.

    8'-1"

    10'-1"

    (-)5'-0"

    1'-3"

    9'-1"

    1'-0"

    1'-0"

    7'-1"

    +/-6'-31/8"V.I.F.

    T.O. BEAM EL: 8'-4 1/8" ABOVET.O. ENTRY LEVEL SUB FLR

    PT BEAM AS REQ W/ 1/2" CEDAR COVER BOARDS

    6x6 POST ON GALV STEEL POSTANCHOR TYPICAL TO EXTERIOR

    12" DIA CONC SUPPORTW/ FOOTING BELOWFROST DEPTH TYP (OR AS REQ)

    6

    12

    6

    12

    20

    12

    20

    12

    312

    312

    DECK CONSTRUCTION: (TOP DOWN)TROPICAL HARDWOOD, PT WOOD OR COMPOSITE DECKING -

    2x8 PT DECK JOISTS @16" O/C -

    MASONRY CHIMNEY

    DECK RAILS @36" MIN ABOVE DECK SURFACE

    CRAWL SPACE- CONDITIONED CRAWL SPACE- SPRAY FOAM INSULATION ON INSIDE OFPERIMETER WALLS W/ IGNITION BARRIER- CONT POLYETHYLENE VAPOR BARRIER- COMPACTED SOIL

    S PR AY FO AM IN SU LA TI ON W/ IG NI TI ON BA RR IE R C ON T P OL YE TH YL EN E V AP OR BA RR IE R

    3/4" T&G SHEATHING OVER11 1/4" OPEN WEB FLR TRUSS

    3/4" T&G SHEATHING OVER11 1/4" OPEN WEB FLR TRUSS

    RAISED HEARTH

    A-05-43

    A-05-44

    7' - 8 1/2"

    36"

    5'-01/2"

    V.I.F.

    5'-01/2"

    3'-0"

    1 2

    3

    4

    16 UP

    T.O. ENTRY LEVEL SUB FLR EL: 0'-0"

    T.O. UPPER LEVEL SUB FLR EL: 10'-1"

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    1/4" = 1

    A-03-1

    BUILDING SECTIONS

    07-0

    SEASIDE BARN

    07 APRIL, 20

    BU,

    No. Description Dat

    1/4" = 1'-0"1 SECTION 1

    1/4" = 1'-0"

    2STAIR SECTION

    FLOOR TO FLOOR HEIGHTS WILL VARY BASED ON DEPTH OFLOOR FRAMING AS DETERMINED BY STRUCTURALENGINEER. STAIR RISERS MUST NOT EXCEED 7 3/4", STAITREADS MUST NOT BE LESS THAN 10" AS PER IRC 2006.

    WALL MOUNT STAIR RAIL. MAX PROJECTION MUST NOTEXCEED 4 1/2" FROM FACE OF FINISH WALL AS PER IRC 20

    1

    2

    PROVIDE STATIONARY LADDER UP TO READING NOOK.3

    SAFTY RAILS REQUIRED IN READING NOOK. TOP RAIL TO BMIN OF 36" ABOVE T.O. FINISH FLOOR.

    4

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    10/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    11/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    12/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    13/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    14/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    15/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    16/19

    D

    D

    3

    3 3

    3

    3

    3 3

    S

    R

    M

    M

    GFI-WP

    GFI-WP

    GFI

    GFI

    GFI

    240

    A-01-12

    Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    42' - 0"

    32'-0"

    42' - 0"

    32'-0"

    17' - 4 1/4" 7' - 3 1/2" 17' - 4 1/4"

    7'-53/4"

    8'-41/2"

    16'-13/4"

    FRAMING PAGE LEGEND

    COLUMN SUPPORT BELOW

    POINT LOAD FROM ABOVE

    PLUMBING DROP

    OPEN WEB FLOOR TRUSS

    WOOD BEAM

    STEEL BEAM

    STRUCTURAL FRAMINGMEMBER AS NOTED

    2x_ SOLID BRIDGING

    LOAD BEARING PARTITION

    JOIST OR BEAM HANGER

    BOTTOM CHORD BEARING 11 1/4" OPEN WEB TRUSSES@16" O/C OR AS REQ PER STRUCTURAL ENGINEER

    2x12 RIM JOIST2x12 RIM JOIST

    2x12 RIM JOIST2x12 RIM JOIST

    DBL 2x12 RIM JOIST

    DBL 2x12 RIM JOIST

    1 1

    BEAM AS REQ BEAM AS REQ

    T.O. BEAM EL: 8'-4 1/8" ABOVET.O. ENTRY LEVEL SUB FLR

    PT BEAM AS REQ W/ 1/2" CEDAR COVER BOARDS

    T.O. BEAM EL: 8'-4 1/8" ABOVET.O. ENTRY LEVEL SUB FLR

    PT BEAM AS REQ W/ 1/2" CEDAR COVER BOARDS

    BEAM AS REQ

    BEAM AS REQ

    6'-0"

    6'-0"

    5 1/2"41' - 1"

    5 1/2"

    6'-0"

    6'-0"

    5 1/2"41' - 1"

    5 1/2"

    1

    A-03-1

    2

    A-03-1

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    GENERAL:

    THE FRAMING LAYOUT ON THIS PAGE IS INTENDED TO BE ASUGGESTED LAYOUT ONLY. DESIGN LOADS & WEATHERCONDITIONS VARY BY REGION. AS A RESULT THE SIZE, SPACINGLAYOUT OF ALL STRUCTURAL ELEMENTS IN THIS HOME DESIGNMUST BE APPROVED BY A STRUCTURAL ENGINEERAND CODEOFFICIAL BASED ON YOUR SPECIFIC SITE LOCATION PRIOR TOCONSTRUCTION.

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    MATERIAL SPECIFICATIONS: ( VERIFY W/ LOCAL CODE)

    FLOOR SHEATHING:3/4" APA-RATED EXPOSURE 1, T&G,48/24 SPAN RATING, EXPOSURE 110d COMMON NAILS @6" O/C B.N. & E.N.,10d COMMON NAILS @10" O/C INT. FRAMING

    ROOF SHEATHING:5/8" APA-RATED EXPOSURE 1,24" MINIMUM SPAN RATING,8d COMMON NAILS @6" O/C B.N. & E.N.,8d COMMON NAILS @10" O/C INT. FRAMING

    SAWN STRUCTURAL FRAMING MEMBERS:MEMBERS GRADE2x_ WALL STUDS D.F. #22x_ FLOO R JOI ST S & RO OF RA FT ER S D .F . #2BEAMS & HEADERS D.F. #1

    POSTS (4x,6x,8x) D.F. #1

    WOOD BEAM MINIMUM ALLOWABLE BENDING STRESS:MEMBERS Fb (PSI)GLUED LAMINATED TIMBERS 2400LAMINATED VENEER LUMBER 2700

    INTERIOR HEADERS:INTERIOR NON-BEARING SPANS USE:2x4 FLAT FOR SPANS UP TO 3'-0"4x4 D.F. #2 FOR SPANS UP TO 5'-0"4x6 D.F. #2 FOR SPANS UP TO 8'-0"

    NOTES:

    1/4" = 1

    A-05-3

    UPPER LEVEL FLRFRAMING PLAN

    07-0

    SEASIDE BARN

    07 APRIL, 20

    BU,

    No. Description Dat

    1/4" = 1'-0"1

    UPPER LEVEL FLOOR FRAMING PLAN

    1 PROVIDE 2x6 SOLID BRIDGING. SE CURELY FASTEN AT EATRUSS AND AT END WALLS.

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    17/19

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    18/19

    16% OFWINDOWHEIGHT

    D

    H

    16% OFWINDOWHEIGHT

    D

    H

    H

    D

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    ABOUT THIS PAGE:

    EXTERNAL WINDOW SHADING DEVICES ARE AN EFFECTIVE METHFOR REDUCING HEAT GAINS THROUGH WINDOWS DURING SUMMIN FACT, EXTERNAL SHADING DEVICES CAN REDUCE HEAT GAINSUP TO 80% IF SIZED AND BUILT PROPERLY. WI TH THIS IN MIND,FREEGREEN HAS CREATED THIS PAGE TO ASSIST HOME BUILDERCONSTRUCTING EFFECTIVE WINDOW SHADING DEVICES. THEINFORMATION WE PROVIDE INCLUDES A ZONING MAP OF THE UNSTATES, ZONING CHARTS FOR PROPER SIZING OF SHADING DEVAND A VARIETY OF SHADING DEVICE STYLES AND MATERIALS TOSUITE DIFFERENT TASTES AND DIFFERENT HOME DESIGNS.

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    OVERHANGDEPTH(ZONE4)

    OVERHANGDEPTH(ZONE2)

    OVERHANGDEPTH(ZONE3)

    OVERHANGDEPTH

    (ZONE1)

    OVERHANGDEPTH(ZONE5)

    STEP 1: FIND YOUR ZONESTEP 2: FROM THE TABLE, DETERMINE OVERHANG DEPTH FOR YOUR WINDOWSSTEP 3: CHOOSE YOUR WINDOW SUN SHADING DEVICESTEP 4: CHOOSE YOUR MATERIALS

    OVERHANG DEPTH (INCHED), D

    WINDO

    WH

    EIGHT(INCHED),H

    6 12 18 24 30 36 42 48 54 60 66 72 780

    6

    12

    18

    24

    30

    36

    42

    48

    54

    60

    66

    72

    78

    84

    90

    OVERHANG DEPTH (INCHED), D

    WINDOWH

    EIGHT(INCHED),

    H

    6 12 18 24 30 36 42 48 54 60 66 72 780

    6

    12

    18

    24

    30

    36

    42

    48

    54

    60

    66

    72

    78

    84

    90

    OVERHANG DEPTH (INCHED), D

    WINDO

    WH

    EIGHT(INCHED),H

    6 12 18 24 30 36 42 48 54 60 66 72 780

    6

    12

    18

    24

    30

    36

    42

    48

    54

    60

    66

    72

    78

    84

    90

    OVERHANG DEPTH (INCHED), D

    WINDOWH

    EIGHT(INCHED),H

    6 12 18 24 30 36 42 48 54 60 66 72 780

    6

    12

    18

    24

    30

    36

    42

    48

    54

    60

    66

    72

    78

    84

    90

    OVERHANG DEPTH (INCHED), D

    WINDOWH

    EIGHT(INCHED),H

    6 12 18 24 30 36 42 48 54 60 66 72 780

    6

    12

    18

    24

    30

    36

    42

    48

    54

    60

    66

    72

    78

    84

    90

    1" = 1

    A-06-1

    WINDOW SHADINGDETAILS

    07-0

    SEASIDE BARN

    07 APRIL, 20

    Aut

    Chec

    MATERIAL SPECIFICATION:

    WOOD TYPES:

    PRES SUR E TREA TED WE STER N RE D CE DAR TROPICAL HARDWOOD (FSC CERTIFIED REQUIRED)

    MAHOGANY M AS SA RA ND UB A

    HARDWARE:

    ALL HARDWARE MUST BE EITHER HOT DIPPED GALVANIZEDSTEEL OR STAINLESS STEEL. FREEGREEN RECOMMENDSONLY STAINLESS STEEL FOR HOUSE LOCATIONS IN CLOSEPROXIMITY TO THE OCEAN.

    FINISHES:

    IF USING PRESSURE TREATED WOOD SEAL & FINISH TO MATCHEXTERIOR WINDOW TRIM.

    IF USING WESTERN RED CEDAR SEAL & FINISH TO MATCHEXTERIOR WINDOW TRIM

    IF USING TROPICAL HARDWOOD FINISH MAY NOT BE REQUIREDSEALING AND FINISHING OF TROPICAL HARDWOODS WILLVARY BY SPECIES. CONS ULT WITH YOUR PROVIDER FORRECOMMENDED FINISHES FOR ALL TROPICAL HARDWOODPRODUCTS.

    1" = 1'-0"1

    BENCH WINDOW SHADING DEVICE

    1" = 1'-0"2

    BENCH WINDOW SHADING DEVICE

    1" = 1'-0"3

    BENCH WINDOW SHADING DEVICE

    No. Description Dat

  • 8/10/2019 FG_Construction Documents_07-003.pdf

    19/19

    240

    GFI

    GFI-WP

    M

    R

    UC

    S

    3

    D

    F

    2

    16 UP

    D

    D

    3

    3 3

    3

    3

    3 3

    S

    R

    M

    M

    GFI-WP

    GFI-WP

    GFI

    GFI

    GFI

    240

    16 DN3

    GFI

    GFI

    GFI

    ELECTRICAL OUTLET LEGEND

    110VRECEPTICAL

    SWITCHRECEPTICAL

    GROUND FAULT CURRENTINTERRUPTER RECEPTACLE

    GFI AND WATER PROOFRECEPTACLE

    MICROWAVE OVENRECEPTICAL

    RANGERECEPTICAL

    UNDER COUNTERRECEPTICAL

    240VRECEPTICAL

    110V FLOORRECEPTICAL

    ELECTRICAL SWITCH LEGEND

    LIGHT SWITCH

    DOUBLE LIGHT SWITCH

    KEY ROOMMASTER CONTROL

    KEY SCENEMASTER CONTROL

    GRAPHIC EYE

    3-WAY LIGHT SWITCH

    DIMMER LIGHT SWITCH

    OCCUPANCY SENSORFAN SWITCH

    KR

    KS

    G

    LIGHTING LEGEND

    RECESSED DOWN LIGHTENERGY STAR RATED

    CEILING BOX

    BATHROOM EXHAUST FAN

    WALL MOUNTED FIXTURE

    RECESSED WALL WASHER

    RECESSED ACCENT

    DIRECTIONAL

    RECESSED GLASS

    F

    RD

    RW

    RA

    RG

    RD-ES

    RECESSED DOWN LIGHT

    LED LINEAR

    IN-WALL LED STEP LIGHTW/ REMOTE TIMER CONTROL

    FLUORESCENT STRIP

    DRBL

    CHIME

    TEL

    H20

    #C#P

    MICELANEOUS ELECTRICAL SYMBOL LEGEND

    SMOKE & CARBONMONOXIDE DETECTOR

    DOOR BELL

    DOOR BELL CHIME

    ICE MAKER

    NATURAL GAS/PROPANEHOOKUP

    MULTIMEDIA JACK(NETWORK/TV)

    TELEPHONE JACK

    THERMOSTAT

    CEILING FAN

    T

    D

    27.

    28.

    29.

    30.

    31.

    32.

    33.

    34.

    35.

    36.

    37.

    38.

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    14.

    15.

    16.

    17.

    18.

    19.

    20.

    21.

    22.

    23.

    24.

    25.

    26.

    WH240V OR GAS INSTALLATIONTANKLESS WATER HEATER

    D

    D

    RD-ES

    RD-ES

    RD-ES

    RD-ES

    RD-ES

    RD-ES

    RD

    RD

    RD

    RD

    RD

    #C#P

    #C#P

    F

    WH

    CHIME

    DRBL

    TEL

    T

    H20

    D

    D

    D

    D

    RD RD

    RD F

    RD F

    RD

    #C#P

    #C#P

    #C#P

    RD

    T

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    1/4" = 1

    E-01-1

    ELECTRICAL PLAN

    07-0

    SEASIDE BARN

    07 APRIL, 20

    BU,

    1/4" = 1'-0"ELECTRICAL SYMBOL LEGEND

    No. Description Dat

    1/4" = 1'-0"1

    ENTRY LEVEL ELECTRICAL PLAN

    1/4" = 1'-0"2

    UPPER LEVEL ELECTRICAL PLAN