FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W www.lwpb.com 128 East Main Street, Suite 100 Norman, Oklahoma 73069 T 405 701 5972 F 405 701 5979 W www.lwpb.com Project: _______________________________________________________________________________ Location: _____________________________________________________________________________ Report Number:________ Date: ______________ Arrival time: __________Departure Time: _________ Weather: ______________ Temp: ______ºF Photographs Taken: Owner Contacted: Personnel present: F Owner F Sup't F QC F Safety F CM F PM F AHJ F AE1 Trades: F Excavation F Utilities F Paving F Landscaping F Irrigation F Concrete F Reinforcing F Formwork F Masonry F Carpentry F Ironworkers F Membrane Roofers F Metal Roofers F Sheet Metal F EIFS F Carpentry F Casework F Millwork F Metal Doors F Wood Doors F Windows F Hardware F Storefront F Glazing F Skylights F Drywall F Painters F Hard Tile F Resil. Flrng F Carpet F Ceilingwork F Gym Flooring F Special Coatings F Electricians F Plumbers F Ductwork F HVAC F Fire Suppression F ____________ F _____________ F _____________ F _____________ F _____________ F _____________ F _____________ Stored Materials: Observations: Report by: ____________________________ Date: ____________ Copy to: __________________ __________________ __________________ ______________ Mooreland High School & Storm Shelter Mooreland Oklahoma 18 7-24-19 10:00 am 11:45 am Clear 76.00 Framers Metal roofing panels, roofing moisture barrier, roofing insulation boards, metal stud framing, electric conduit/accessories, interior plumbing piping/accessories, ductwork/accessories, fire suppression piping/accessories, batt insulation, gravel, tile, millwork. CM - James Rose LWPB - Jeff Osburn, Greg Yeary Mooreland Public Schools - None HIGH SCHOOL Ford-Roofer: Installing metal roof panels. Kline-MEP: Installing interior piping/ducts/electrical conduit. Water standing on floor at various locations in building interior. Interior M/E/P installations are ongoing; duct insulation is ongoing. More exterior window frames set/some have glass. MEDIA CENTER ALUMINUM WINDOW IN ANGLED WALL INSTALLED AT WRONG HEIGHT-HEAD SHOULD BE AT 8'-0" PER THE CONTRACT DOCUMENTS. Fire suppression piping installation is ongoing. Drywall installation has begun and is ongoing. Drywall mud and tape installation is ongoing. Storefront glazing frames being set at Superintendent Reception 185. JR provided photographic evidence that the wet drywall had been cut out and replaced at locations where it contacted water. North shielding wall and masonry column surrounds at Entry Gallery 102 (west side) appear to be 100%; Slab-on-grade concrete is formed-cold joint expansive board with zip strip installed at building joint. Gravel base is installed. WEEP HOLES ARE COVERED. Exterior metal sheets installation is ongoing. North sidewalk adjacent to building is poured. LWPB DISCUSSED WITH JR. JR STATED THAT RANDY BROOKS TOLD HIM IT WAS ACCEPTABLE TO DRILL HOLES. LWPB TO RESEARCH. STORM SHELTER: NO NOTICABLE WORK HAS BEEN PERFORMED ON PUNCH LIST ITEMS. SITE: Dusty Shop concrete drive is poured/cured. Shop drive approach is formed and has rebar installed. Portions of west sidewalk along parking area are poured/cured. Next meeting date/time TBD. Greg Yeary 7/30/2019 MPS (TK) JDHGC (KR) LWPB (RB,TW) Consultants YES NO

FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,

  • Upload
    others

  • View
    17

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,

FIELD OBSERVATION REPORT

5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W www.lwpb.com 128 East Main Street, Suite 100 Norman, Oklahoma 73069 T 405 701 5972 F 405 701 5979 W www.lwpb.com

Project: _______________________________________________________________________________ Location: _____________________________________________________________________________Report Number:________ Date: ______________ Arrival time: __________Departure Time: _________Weather: ______________ Temp: ______ºF Photographs Taken: Owner Contacted: Personnel present: Owner Sup't QC Safety CM PM AHJ AE1

Trades: Excavation Utilities Paving Landscaping Irrigation Concrete Reinforcing Formwork Masonry Carpentry Ironworkers Membrane Roofers Metal Roofers Sheet Metal EIFS Carpentry Casework Millwork Metal Doors Wood Doors Windows Hardware Storefront Glazing Skylights Drywall Painters Hard Tile Resil. Flrng Carpet Ceilingwork Gym Flooring Special Coatings Electricians Plumbers Ductwork HVAC Fire Suppression ____________ _____________ _____________ _____________ _____________ _____________ _____________

Stored Materials:

Observations:

Report by: ____________________________ Date: ____________ Copy to: __________________ __________________ __________________ ______________

Mooreland High School & Storm Shelter

Mooreland Oklahoma18 7-24-19 10:00 am 11:45 am

Clear 76.00

✔ ✔

✔ ✔ Framers

Metal roofing panels, roofing moisture barrier, roofing insulation boards, metal stud framing, electric conduit/accessories, interior plumbing piping/accessories, ductwork/accessories, fire suppression piping/accessories, batt insulation, gravel, tile, millwork.

CM - James Rose LWPB - Jeff Osburn, Greg Yeary Mooreland Public Schools - None

HIGH SCHOOL Ford-Roofer: Installing metal roof panels. Kline-MEP: Installing interior piping/ducts/electrical conduit. Water standing on floor at various locations in building interior. Interior M/E/P installations are ongoing; duct insulation is ongoing. More exterior window frames set/some have glass. MEDIA CENTER ALUMINUM WINDOW IN ANGLED WALL INSTALLED AT WRONG HEIGHT-HEAD SHOULD BE AT 8'-0" PER THE CONTRACT DOCUMENTS. Fire suppression piping installation is ongoing. Drywall installation has begun and is ongoing. Drywall mud and tape installation is ongoing. Storefront glazing frames being set at Superintendent Reception 185. JR provided photographic evidence that the wet drywall had been cut out and replaced at locations where it contacted water. North shielding wall and masonry column surrounds at Entry Gallery 102 (west side) appear to be 100%; Slab-on-grade concrete is formed-cold joint expansive board with zip strip installed at building joint. Gravel base is installed. WEEP HOLES ARE COVERED. Exterior metal sheets installation is ongoing. North sidewalk adjacent to building is poured. LWPB DISCUSSED WITH JR. JR STATED THAT RANDY BROOKS TOLD HIM IT WAS ACCEPTABLE TO DRILL HOLES. LWPB TO RESEARCH. STORM SHELTER: NO NOTICABLE WORK HAS BEEN PERFORMED ON PUNCH LIST ITEMS. SITE: Dusty Shop concrete drive is poured/cured. Shop drive approach is formed and has rebar installed. Portions of west sidewalk along parking area are poured/cured. Next meeting date/time TBD.

Greg Yeary 7/30/2019MPS (TK) JDHGC (KR) LWPB (RB,TW) Consultants

YES NO

Page 2: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,
Page 3: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,
Page 4: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,
Page 5: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,
Page 6: FIELD OBSERVATION REPORT - Amazon S3 · FIELD OBSERVATION REPORT 5909 NW Expressway, Suite 600 Oklahoma City, Oklahoma 73132 T 405 722 7270 F 405 722 8373 W 128 East Main Street,