FIMS Specification: Outline Agenda

• 24 August: 10:00 - 18:00, 25 August 09:00 - 15:45?

– IPR Policy

– Outline Agenda - main issues:

• Review/complete Specification v1.0 and WSDL• Review/complete White Paper for IBC2011• IBC Demo planning - status update

Page 3: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

FIMS - Intellectual Property Rights Rules

"This meeting is being held under the Intellectual Property Rights Policy of the Advanced Media Workflow Association.  By signing in and attending this meeting, you have agreed to be bound, and your employer, if a member of the AMWA, is already bound, by that policy.  If you are unfamiliar with that policy, please ask the Chair of this meeting, and s/he will provide you with a copy of that Policy.

At this time, I would ask that anyone in attendance inform me if they are personally aware of any claims under any patent applications or issued patents that would be likely to be infringed by an implementation of the specification or other work product which is the subject of this meeting.

You need not be the inventor of such patent or patent application in order to inform us of its existence, nor will you be held responsible for expressing a belief that turns out to be inaccurate."

Page 4: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

FIMS Specification group: Day 1

• 24 August: 10:00 - 18:00– IPR Policy– Agenda– Introductions– Overview of Actions remaining from Previous meetings– Status of current specification draft

• currently v0.62 (see later slide). V0.61:• - 9.3.3.8.13 TimeMarkAbstractType added• - Figure 3 replaced• - 8.2.1.2 Use Cases on Time Constraints added• - Appendix 1 modified

– Remaining issues• a) time constraints• b) review Section 7 (Day 2 - Lewis present)• c) Review Section 8.2• d) Service consumer Interface (Section 9.4)• e) Review Section 9 • f) 9.3.2.5 TransformFaultNotificationType• g) Appendix 2 - needed?

– LUNCH: 13:00 - 14:15

– Document editing

Page 5: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

FIMS Specification group: Day 2

• 25 August 09:00 - approx 15:45?– Summary of outcome of Day 1

• continue discussion as needed

– IBC Demo Planning• review Actions from July meeting

• demo status

• IBC presentation planning

• organise preparation of CD with v1.0 spec, WSDL, White Paper

– White Paper

– LUNCH: 13:00 - 14:15 (approx)

– Final document editing

Page 6: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Actions from 25-27 July 2011 (1)

– Relationship between FormatID and techMetadata (Lewis)

–  Output Filename Pattern 8.2.1 needs examples in spec 1.0 Frank/Praveen

–  What does it mean to be 'FIMS Compliant'? (Jean-Pierre/Giorgio) ON-GOING

–  Harmonise the use of Tech 3293 with RP224: JPE to propose a solution for a RP224 CS Schema compatible with Tech 3293 metadata schema / attributes adopted by FIMS - ON-GOING, Lewis & J-P

– Service Lifecycle cleanup (done?)

Page 7: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Actions from 25-27 July 2011 (2)

– Diagrams: several to be modified by IBM (inc. Fig. 7: states associated with long-running job) - Section 9

– 7.2.1.4 Mapping of fields for Vendor: define fields after discussing with J-P (Lewis)

– 6.2.8 update BaseProfileType to include Atom list KOJIMA-SAN TO REVIEW

– include following diagrams in the ProposedCaptureRequest_rev4.ppt to the FIMS specification with text slide14: Proposed Stream Time Constraints - Kojima-san

Page 8: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Changes v0.61 > v0.62

– 9.2.5.10.3 added availability to QueuInfoType

– Index - removed spurious entry "4. Framework extensions"

– p41 "StopProcessAbstractType" in Service Configuration Inquiry Message Types sshould be "QueryCapabilityResponseType"

– 9.2.3.10.7.6.2 "AncillaryFormatType" should be "AncillaryDataFormatType"

– 9.2.3.10.7.1 Type of frameRate in the table: "xs:EditRateType" should be "EditRateType"

– 9.3.3.8.13 TimeMarkAbstractType - this section is a repeat (9.2.4.16) - Deleted

Page 9: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Review of baseMediaSercie-V1_0_0.xsd (1)

- No definition of element of "queryCapabilityRequest" and "queryCapabilityResponse" in Global Elements

- minOccurs of startJob in BaseRequestType should be 1

- Types where existed in the schema and not existed in the document

- RequestContainerType - QueryJobInfoAbstractType - QueryJobExtendedInfoType - JobListType - JobEstimateRequestType - JobEstimateResponseType - BMContentType - BMAVContentType - BMImageContentType - FormatRefType - ResourceIDType

(Do we need to add followings in the document?) - EditUnitNumberType - UserDefinedTimeType - Smpte12MTimeCodeType - TimeCodeType - StorageEnumType - ContainerFormatType - NotificationContainerType - UID - TrackCategoryType - MetadataTagType - EditRateType - MapOneToManyType - MapManyToOneType

Page 10: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Review of baseMediaSercie-V1_0_0.xsd (2)

- formatGroup # attribute group which is not existed in the document, but may be used in the other Types

- Types where existed in the document but not existed in the schema - No definition of HashFunctionType (9.2.3.10.3) - No definition of CaptioningFormatType (9.2.3.10.7.6.1)

Page 11: FIMS Specification Group EBU-AMWA FIMS 24-25 August 2011

Actions from 25-27 July 2011 (3)

• IBC demo planning:

– Kojima to create a strawman draft of the FIMS white paper.

• Target date to circulate draft: 19th August

– RadiantGrid to provide their transform service to IBM and Sony for the connection test

• install copy to Sony and IBM

• IBM server to go online for testing

– John Footen to update the 'Generic FIMS PowerPoint presentation' used at the NAB Show.

• generic FIMS presentations only - every hour? Alternate languages ok

• decide schedule at August meeting

– Giorgio to make a first draft ready for IBC announcing Phase 2.