Upload
cloud-arch-studio
View
11
Download
0
Tags:
Embed Size (px)
Citation preview
11/14:Draft
Research
Timeline
12/12:Final
Research
4/17:Final
Design
2/20:Draft
Design
Research Design
All deliverables viewable at gudp.stanford.edu
○ Place: Land use and building development.
○ Movement: Streets, traffic, and transport.
○ Environment: Natural features and natural disaster concerns.
○ Health and Safety: Civic services (fire, police, etc), health care, and food sources.
○ Youth and Education: Schools and demographics of the area.
○ Housing: Homeownership, foreclosures, and property value.
○ Economic Development: Industry and opportunity.
Research Topics
Place
ProjectsIndustry
Revitalization
EnvironmentalResiliency
Airport WayRevitalization
CSU Stockton Proposal
Industry Revitalization
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Food Processing - employment• Food manufacturing accounts for 14% of all U.S. manufacturing
employees,• The US food industry represents around 16.5 million jobs, and the
population spends around $1 trillion per year on food products.• Average middle size factory in the industry employs 100-250
people.• Various sub-industries require different investments in equipment
and fulfillment of regulations; the number of employees and the investment : new jobs created ratio also vary
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Food Processing - why Stockton?
• Good location
• Proximity of inputs
• Connection to state roads
• Know how
• Affordable workforce
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Tire recycling
Waste tires:● export,● reuse,● ground rubber,● ADC,● civil engineering,● landfill disposal,● TDF.
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Tire recycling
● Benefits to the city: tax revenue, decreased unemployment, increased mean income
● Tire Incentive Program (grants up to 40 cents per pound)
● $1 million invested = 6 jobs● Synergies with logistics● Possible upgrade to tire manufacturing
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Logistics
• Fast-growing industry
• US logistics jobs growth by 2022 – 21.9%, 27,600 new jobs in total
• Large share of jobs with low requirements – opportunity for unskilled workers
• $1 million investment creates 3.8 jobs
• Multiplier effect – 1 job in logistics creates 3.47 jobs in the economy
• Synergy possibilities with CSU
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Logistics - why Stockton?
• Location – proximity to Bay Area, Greater Sacramento
• Lower operating costs than Bay Area
• Excellent transport links – highways, railways, intermodal yards, deep-water port
• Suitable workforce
• Less expensive and plentiful land
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton ProposalIndustry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Industry Growth Projections
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Environmental effects of industries
Food processing:● wastewater - recycling, reuse, effective water treatment
system● solid waste - source reduction, animal feed,
composting, small recycling plants on site● clean technologies - closed loop/zero emission systems● FDA and EPA regulations
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Waste tires:● problems - “overcrowded” landfills, toxin release, pest
issue● solutions - production of scrap tires (shredding)● usage - tire-derived fuel, civil engineering applications,
ground rubber applications
Environmental effects of industries
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Logistics:● occupying land due to transport and storage ● consuming fuel, transport and storage equipment ● producing loss and waste due to distribution processing● consuming material and processing waste
Environmental effects of industries
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Industries locationsThe selection was made upon:
● existing land use● location of existing nearby
industries● location of existing industries
in Stockton with similar program
● public transport/ cycling accessibility
● spatial needs of industry ● transportation requirements ● technology requirements● agricultural preservation
limitations● South Stockton Land Use
Strategy
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
● systematic development of land use
● infill, revitalization and mixed use
● compact shape ● coherent, heterogeneous
program● can be developed in
real development plan
Land Use Strategy
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
CSU Study Programmes
● creation of study programmes as a direct connection to the proposed industries
● chance for employment or working experience● generation of jobs demanding a higher education (“Job
Multiplier Effect”)● employment of young personnel from local student base
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Energy EfficiencyWhy energy efficiency?
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Social Equity
Environment & Resources
Economic Benefits
Energy Efficiency
Goal: Improve home energy efficiency to1. Help city meet Climate Action Plan goals2. Better meet needs of South Stockton / low-
mid income residents: affordability, comfort
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Model Context
Measure Typical difficulty Typical Payback
Seal small air leaks Average homeowner 1-2 years
Insulate water heater Average homeowner 1-2 years
Energy-saving showerhead
Average homeowner 1-3 years
Seal large air leaks Skilled homeowner 1-2 years
Seal ducts Skilled homeowner 1-2 years
Thermostat Skilled homeowner 1-2 years
Heating tune-up Expert technician 1-3 years
Source: https://www.xcelenergy.com/staticfiles/xe/Marketing/Files/SmartEnergyGuide.pdf
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Cases:●Old home (baseline)
●Only weatherstripping
●Only wall+roof insulation
●Only window improvement (film + insulation)
●Weatherstripping + insulation + window improvement
●New home
●Solar required to cover energy use of old home, improved home, and new home
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Characteristics of baseline home
● Built in 1970’s/80’s before energy codes● No wall/attic insulation● Furnace/water heater has poor efficiency● Very leaky (1 ACH)● ~1000 square feet
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Results
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Results cont’d
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Modeling Challenges and Shortcomings
● Limited data for comparison of lifecycle costs● Wide range in cost estimates● Replacement analysis not conducted ● No predictions made for changes in fuel or
electricity prices
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Community Engagement
“These homes have been here for over 50 years, these homes have been here for a while. How often do people check out these homes? ... Let’s do an evaluation of how homes are built, is there mold, are the heaters working? If people don’t come out and do that, that’s a big issue”
“There’s this mentality of ‘Keep the lights off!’ ‘Don’t turn that on!’”
“‘Who’s gonna pay for it?’ This committee of environmentalists and developers.. this has been one of the central things they’ve been fighting over”
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Community Engagement
Trust
Disconnect
Outreach
Priorities
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Stakeholder Analysis
Energy EfficiencyStakeholders
Residents
Contractors
City
Utility
Non Profits
Financial Institutions
Landlords
HomeownersRenters
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Existing incentives/assistance programsName Sponsor Benefits Requirements
San Joaquin County Weatherization Program
San Joaquin County Human Services Agency
Free weatherizations - measures include insulation, repairs, improved appliances, etc.
A member of the household receives temporary Aid for Needy Families (TANF), Food Stamps, SSI or SSP, Veterans and Survivors Pension or if the household income does not exceed a certain amount http://www.benefits.gov/benefits/benefit-details/1844
Energy Savings Assistance Program
PG&E Repair or replacement of refrigerators, furnaces or water heaters, insulation/ weatherproofing, efficient light bulbs, showerheads, etc
Home 5 years or older, meets CARE guidelineshttp://goo.gl/8zvcu3Valid through May 2015
Energy Upgrade California - whole house
PG&E Up to $2500 in rebates PG&E Customers with single family homes Choose measures from a menu of options
Appliance rebates
PG&E Depends on the appliance Purchase of Energy Star or approved appliance
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Financing OptionsProgram type Pro Con
PACE (HERO, Figtree) ●Approved in Stockton●No upfront cost- pay with additional property taxes●Vetted contractors (3 in Stockton)●Choice of payback (5/10/15/20 years)
●Higher property tax bills ●Must pay property tax
(ineligible to renters)
On-bill financing ●No upfront cost - pay using portion of energy savings
●Good for renters- financing can stay with the property
●Not currently available●Risk for utility if bills are not
paid
Loan (i.e. from the Golden State Finance Authority)
●Up to $50,000 financing, 6.5% interest for 15 yr loan
●Partner with approved contractor
http://www.chfloan.org/programs/energy/overview.shtml
●Only one Stockton based contractor
●No flexibility for loan length
Warehouse for Energy Efficiency Loans (WHEEL)
● More scalable than other approaches due to investments from large institutions
● Pool loans (investment grade capital)Source: WSGR White Paper
● New and unfamiliar● Public agency approval
needed
Crowdfunding (i.e. Village Power Finance, Mosaic)
● Community building● More flexible
● Requires strong community partner- may or may not exist
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Outreach strategy (ESA)
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Outreach cont’d
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Penetration - low● Only 1.1% of eligible customers actually
enrolled● 11% of spending on customer enrollment● Moderate income program unavailable in
the county Job training● YTD - 48 people trained for ESA program ● Typically from the local area
Demonstration Home Cases
● Better Buildings Neighborhood Program:o Chula Vista: 25% of tour participants in a demonstration
home signed up for energy assessment with a contractor
● Michigan: has 8 Energy Demonstration Centers● San Diego Center: tours, kiosks, library, rainwater
harvesting, demo garden, food service demo kitchen
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Chula Vista Home
Phoenix: Meritage Deconstructed Home
SDG&E Energy Innovation Center
SDG&E Energy Innovation Center
Detroit Ecoworks Center
Conclusions● Many efficiency projects with quick payback● Improved outreach necessary ● Demonstration home / Energy Center Potential
o Outreach and education o Access to subsidized materials for DIYo Potential community space for local groupso For residents ineligible for ESA: access to subsidized
materials for DIY projects and support may be useful Potential for building contractor-resident relationships
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Conclusions● Partnerships with other projects
o Integration w/ Airport Way temporary structures + tool sharing, potential for more permanent services Community garden, home improvement resource center
o CSU : potential to provide education in a growing fieldo Industry analysis of Stockton’s energy efficiency job
market
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Airport Way
Insights on Airport Way
What would you change about the community?”
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Case Studies
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
People’s St.Los Angeles
Federal Credit Union
Prostoroz, Ljubljana
Superkilen, Copenhagen
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Green Spaces
KaBOOM!KaBOOM! provides:
- Funding assistance- Experienced Project
Manager- Build Day
training/assistance
The Community provides:- 250 sf of land- Partial funding- Volunteers for Community
Build Day- Everyday play!- Maintenance
Promote playBuild a playground in a day
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Temporary Program Concept
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Street Art
Sports Areas
Outdoor Festivals
Temporary Structure Concept
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Option 1: Home Depot Shed Option 2: Shipping Containers
Community Center
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Master Plan Description
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Phase 1: 10%green areas:
● community gardens● children’s playground● public park
community area:● temporary sports court● community events● temporary structures
Phase 2: 50%● community center● police station● grocery store
Phase 3: 100%● commercial programs
10%
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
50% 100%
Proposed Phases for Development
Phase 1
Phase 3
Phase 2
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Community Engagement
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Having the physical campus in Stockton would visually reinforce the possibility of going to college to people driving by it every day.
Seeing Stocktonians who went to well-regarded schools and came back to Stockton served as an inspiration to students.
The CSU could offer cultural studies, since Stockton is a diverse city and help citizens learn more about the background of others.
Economic benefits of a CSU
Economic Benefits Impact on Regional Economy Spending
Supports Regional Jobs
Local Tax Revenue
CSU Stanislaus $169 million >2000 ~$8 million
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
L1: MLK / Highway 99
PROs: central location, close to residential areas, good accessibility, close to commercial activities, incoherent current land useCONs: less space for expansion, a few existing residents, no public transit route, safety may be an issue, close to industrial lands
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
L1: MLK / Highway 99 Alternative
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
L4: North Stockton PROs: a lot of space, close to residential areas, empty lot is not suitable for low residential housing, easily approachable by car, safe neighborhoodCONs: nowhere near city center, almost no commercial activities nearby, no transit options (only car oriented)
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Decision MatrixLocation 1:MLK + H99
Location 2:Airport Way
Location 3:R4 + FW5
Location 4:North Stockton
Location + - o o
Accessibility + - + +
Size o + + +
Public transport - + + +
Surrounding areas + - o o
Safety o o - +
Infrastructure + o - o
Place for expansion o + o +
Nearby residents + - o +
Close to services + o - o
Table of comparison of the three locations(+ means good, o means neutral, - means bad // parameters that are higher are more important)
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Breakdown of GSF of CSU StanislausInstructional GSF 623,482 Instructional GSF / student 51.96 gsf / student
Library 123,319 Library / student 10.28 gsf / student
Housing / Dining 226,292 Housing / Dining / student 18.86 gsf / student
Administrative / Student Services 227,642 Administrative / student 18.97 gsf / student
Other Support 66,939 Other Support / Student 5.58 gsf / student
Parking spots 2908 Parking / student 24.23%
# of beds 656 Beds / students 5.47%
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Calculated GSF of CSU Stockton Instructional 519,568.33 gsf
Library 102,765.83 gsf
Housing / Dining 188,576.67 gsf
Administrative / Student Services 189,701.67 gsf
Other Support 55,782.50 gsf
Parking spots 2423
# of beds 546.7
Grand total 1,056,395 gsf
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Table of construction costs Construction Costs per GSF
for CSUs General ContractorCosts
Classroom $352 $182,888,052.2
Library $311 $31,960,173.13
Housing / Dining $274 $51,670,007.58
Administration $354 $67,154,391.18
Structure and surface per parking space
$19,278 $46,710,594
Grand Total $380,383,218.1
Including Site Work Site Work assumed to be 3% of building costs
$391,794,714.6
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Table of example scheduling, based off of Stanford LBRE
Sample Project Type Typical Project Duration Typical Construction Duration
Large science / medical project ( ( ( |(>25k sf)
3-5 years 2-3 years
Large office / classroom project ( |(>25k sf)
3-4 years 1-2 years
Large housing project (>25k sf) 2-3 years 1-2 years
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Mock Schedule
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
eQuest data for MLK / Highway 99MLK / Highway 99 Classroom
Electricity Natural Gas
Yearly Energy Usage 419,660 kWh 3302 therms
Bill $62,792 $1988
Total Bill $64,780
MLK / Highway 99 Housing
Electricity Natural Gas
Yearly Energy Usage 181,200 kWh 0
Bill $26,929
Total Bill $26,929
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
eQuest data for MLK / Highway 99
MLK / Highway 99 Administrative
Electricity Natural Gas
Yearly Energy Usage 520,850 kWh 2061.8 therms
Bill $86,276 $1305
Total Bill $87,581
MLK / Highway 99 Library Electricity Natural Gas
Yearly Energy Usage 1,200,800 kWh 10,179 therms
Bill $195,832 $5748
Total Bill $201,580
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
eQuest data for North Stockton
North Stockton Housing Electricity Natural Gas
Yearly Energy Usage 364,060 kWh 0
Bill $53,533
Total Bill $53,533
North Stockton Classroom
Electricity Natural Gas
Yearly Energy Usage 817,310 kWh 6018.2 therms
Bill $121,398 $3483
Total Bill $124,881
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
eQuest data for North StocktonNorth Stockton Administration
Electricity Natural Gas
Yearly Energy Usage 1,081,600 kWh 3341.2 therms
Bill $175,767 $2005
Total Bill $177,772
North Stockton Library Electricity Natural Gas
Yearly Energy Usage 1,200,800 kWh 10,179 therms
Bill $195,832 $5748
Total Bill $201,580
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Comparison of Yearly Energy BillsTotal Energy Bill (MLK / Highway 99) Electricity Bill Natural Gas Bill
Housing $215,432 $0
Classroom $753,504 $23,856
Administrative $345,104 $5220
Library $195,832 $5748
Total $1,509,872 $34,824
Grand Total (per year) $1,544,696
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Comparison of Yearly Energy Bills
Total Energy Bill (North Stockton) Electricity Bill Natural Gas Bill
Housing $214,132 $0
Classroom $728,388 $20,898
Administrative $351,534 $4010
Library $195,832 $5748
Total $1,489,886 $30,656
Grand Total (per year) $1,520,542
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Architectural section (scheme)● Instructional ● Administration
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
List of Programming / Majors● Nursing● Business Administration/Management● Supply Chain Management/Operations Management● Education/Liberal Studies/Teaching● Psychology● Sociology/Social Work● Agricultural Studies/AgriBusiness● Food Science● Criminal Justice● Computer Science
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Budget / Financial Aid● < than $90 million for first few years● Close to 90% will qualify for financial aid● Average full-time student will have financial aid package around
$8,000● Undergraduates will qualify for around $6,700 for need-based
grants● Need-based loan amount around $4,300● Tuition for academic year around $5,472 for 6 or more units,
$3,174 fewer than 6● Credit Union along Airport Way can help with funding via loans
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Public Relations ● Communicate and advocate with the local community● Raise awareness on benefits of college education on what needs
to be done to apply to college● Partner with local elementary/middle schools, high schools, and
community colleges● Promote as commuter-based institution● Inform high school counselors ● Promote college fairs
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
CSU Stockton
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Conclusion● Ideally, this analysis serves as a jumping point for a
feasibility study of a CSU in Stockton. ● Currently, there is an assembly bill on the topic of the
feasibility of a CSU, and this study will hopefully push CSU Stockton as being chosen and built.
● Higher education attainment is crucial for achieving many of the other goals mentioned.
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal
Conclusion● Partnership with other projects
o CSU Study Program to stimulate development of industries.
o Promote green technologies and lifestyle with Environmental Resiliency.
o Long term stimulation of development in Stockton, including along Airport Way.
Industry Revitalization Environmental Resiliency Airport Way Revitalization CSU Stockton Proposal