6
7/23/2019 Final Test Water Treatment Plant (Communcation Model)4 http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 1/6 DLP – Water Treatment Plant (WTP) Final Evaluation Communication Model Date: _______________ Name/ NIK: ____________________________ Department:____________________________ - 1 -

Final Test Water Treatment Plant (Communcation Model)4

Embed Size (px)

Citation preview

Page 1: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 1/6

DLP – Water Treatment Plant (WTP)

Final Evaluation

Communication Model

Date: _______________  

Name/ NIK: ____________________________ 

Department: ____________________________ 

- 1 -

Page 2: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 2/6

Final Evaluation

Objective:

This is an evaluation of your pre no!led"e a#out $vaporator and other thin"simportant for #ein" a !orld class operator% The dia"nostic evaluation is a tooldesi"ned to assist you and the coach in selectin" the appropriate trainin" and self-learnin" support you in the process of &ualifyin" to "et a Drivin" 'icense%

Instructions on how you take the evaluation:

The evaluation is separated into four parts( ans!er the &uestions #ased on your #esta#ility% )emem#er that the evaluation is a dia"nostic evaluation and you are note*pected to not no! everythin"%If you have difficulties understandin" the &uestion + as the coach and he !ill clarify

it% Most of the &uestions re&uire a !ritten ans!er% ,or some &uestions you need acalculator% No notes or reference material is allo!ed durin" the evaluation% If youneed more space for your ans!er use the #acside of the evaluation sheet%

Allowed material:

• $mpty aper( notes to #e left to the evaluation facilitator 

• en/pencil

• Non pro"ramma#le calculator .!ill #e provided

 A) Communication (Part 1)

1% 0hat ind of on"oin"/e*ecuted 0or and trou#les/distur#ances should #e !rittendo!n in the Daily report

2% lease e*plain the Communication route if there are any safety issues in the0ater Treatment lant .0T area

- 2 -

Page 3: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 3/6

3% 0hat is your responsi#ility in handlin" 4afety issues in the 0ater Treatment lant.0T area

5% 0hat is the information that you should !rite do!n durin" the shift

6% 0hat is the information that you should "ive to the ne*t shift

7% 0hat information should you provide to your superior durin" the shift time

- 3 -

Page 4: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 4/6

8% 0hat information should you "ive to your co!orers durin" the shift time

9% 0hen and to !hom should you communicate if there is a ris situation

% 0ho should you as for assistance in order to identify or find a solution to apro#lem

1;%0hat ind of 0arnin" si"n.s should you use in order to !arn others if there is asafety issue/ris

11% 0ith !hom from other departments do you communicate durin" shift hours if there is need of assistance or information

- 5 -

Page 5: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 5/6

12% <ou are out !alin" in the process and you find out there is a leaa"e of 0aterpipe in your department that can #e harmful to others and to the process e&uipment%0hat are your communication actions .!hat do you communicate to !hom and!hen

13% =s a DC4 operator to !hom are you reportin"

15% >o! do you ensure your field operator is doin" the ?field checs? correctly

16% 0hat are the emer"ency situations that can happen in the 0ater Treatment plantand !hat steps do you tae

- 6 -

Page 6: Final Test Water Treatment Plant (Communcation Model)4

7/23/2019 Final Test Water Treatment Plant (Communcation Model)4

http://slidepdf.com/reader/full/final-test-water-treatment-plant-communcation-model4 6/6

17% 0hat ind of information and to !hom should preventive maintenance issues iscommunicated

18% 0hat !ould you do #efore turnin" over the e&uipment to maintenance

19% 0hat ind of information and in !hat !ay( should you communicate on"oin"maintenance !ors to the follo!in" shift

- 7 -