5
P.O. B NOT Rec 1 2 Box 837 * 259 OTE: ALWA commende 1. Refer to 2. Sight and location a bottom o bottom fo the overa good inst Murdock Road Lo AYS BE A ed Installa drawings for d stake out th approximate of the pit. For or the sand c all height of tallation. See Figure 1A d, Troutman, N ng Jum INSTA AWARE OF ation: Pleas r overall lay he outside pe ely 32” wide rm and pour catchers. IM the rubber c e Figure 1A. NC 28166 * Pho Flex mp Pit ALLATIO OF THE FIN se read entir yout and pit d erimeter of t e for the side r a 2”-3” min PORTANT: curbs that wi one: (800) 334xEdge w/ Sa ON INSTR NISHED C re Installati dimensions. the long jum e sand catche nimum concr : Level the c ll be installe 6057 www.sp eand Ca RUCTION CURB HEI ion Notes be mp pit layout. ers, and 10” rete mud sla concrete slab ed on top. A portsedge.com atchers NS EIGHT REQ efore beginn . Grade the l wide for the ab as the bas b to the corre properly ins m F: (704) 528s QUIREME ning installa long jump pi e end curbs a e for rubber ect height ac stalled base w 0179 1 ENTS ation it curb at the top and curbs and counting for will ensure a d r a

FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

Embed Size (px)

Citation preview

Page 1: FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

P.O. B

NOT Rec

1

2

Box 837 * 259 

OTE: ALWA

commende1. Refer to

2. Sight andlocation abottom obottom fothe overagood inst

Murdock Road

Lo

AYS BE A

ed Installadrawings for

d stake out thapproximate

of the pit. Foror the sand call height of tallation. See

Figure 1A

d, Troutman, N

ng JumINSTA

AWARE OF

ation: Pleas

r overall lay

he outside peely 32” widerm and pourcatchers. IMthe rubber c

e Figure 1A.

NC 28166 * Pho

Flexmp PitALLATIO

OF THE FIN

se read entir

yout and pit d

erimeter of te for the sider a 2”-3” minPORTANT:

curbs that wi

one: (800) 334‐

xEdgew/ Sa

ON INSTR 

NISHED C

re Installati

dimensions.

the long jume sand catchenimum concr: Level the cll be installe

‐6057  www.sp

e™  and CaRUCTION

CURB HEI

ion Notes be

mp pit layout.ers, and 10” rete mud sla

concrete slabed on top. A

 

portsedge.com

atchersNS 

EIGHT REQ

efore beginn

. Grade the lwide for the

ab as the basb to the corre

properly ins

m  F: (704) 528‐

QUIREME

ning installa

long jump pie end curbs ae for rubber

ect height acstalled base w

‐0179       1 

ENTS

ation

it curb at the top and

curbs and counting forwill ensure a

d

r a

Page 2: FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

 

P.O. Box 837 * 259 Murdock Road, Troutman, NC 28166 * Phone: (800) 334‐6057  www.sportsedge.com  F: (704) 528‐0179       2 

3. Place a rubber curb on top of concrete base; check the outer ledge (taller) of the rubber curb to be sure it

is at the desired finished height requirement.

4. Installation of furring strips for added stability during construction: On the concrete base, measure and mark the location for the furring strips that will fit inside the notch on the bottom of the rubber curbs. The furring strips should fit comfortably inside the notch. Mechanically fasten furring strips to the concrete base.

5. Start by placing the pre-manufactured rubber 90° corner curb at one corner of the pit to get the 90 degree

angle set. Work out from this point. Apply construction adhesive to the concrete slab under the rubber curb and to the wood furring strips, then set the rubber curb.

Always follow the sight string line carefully, so the side of the curb is straight, not

Page 3: FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

P.O. B

1

Box 837 * 259 

BETASEThe Betabe a littlethat warmproduct.

1. Once a cuBetaseal

Murdock Road

EAL ADHEaseal adhesive difficult to ms 6 tubes atThe warmer

urb is correcadhesive on

d, Troutman, N

ESIVE PREve is used to pump out w

t a time. If or it is the eas

ctly located, n the end of t

NC 28166 * Pho

P bond the en

with the caulkone is not avasier it spread

apply Betasthe already a

one: (800) 334‐

nd of each ruking gun in cailable at yo

ds.

seal adhesiveanchored cur

‐6057  www.sp

ubber curb tocolder weathur site, pleas

e to the end. rb.

 

portsedge.com

o the next. Bher. If availase find some

Place about

m  F: (704) 528‐

etaseal is thiable, use a tue way to war

t 5 passes ¼”

‐0179       3 

ick and can ube heater rm the

” bead of the

e

Page 4: FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

 

P.O. Box 837 * 259 Murdock Road, Troutman, NC 28166 * Phone: (800) 334‐6057  www.sportsedge.com  F: (704) 528‐0179       4 

2. Have at least two people pick up the next curb and carefully place it tightly against the curb that’s already in place. Smooth any Betaseal that oozes from the joints when being squeezed together. Apply an additional bead of Betaseal at the seam on the exterior, and then smooth out with a putty knife or trowel.

3. Be sure the curb is level, in-line and even with the previously installed curb. Periodically, during installation have your surveyor sight check the curb heights, to make sure that everything is staying at the required elevation.

4. With a putty knife or trowel screed off any excess adhesive that may have pushed out from the joints. Have a plastic container and rag with you to wipe away any build up on the trowel. Once the curbs have been installed or during installation, periodically go back over the joints, before the adhesive totally cures and see if any of them need additional adhesive or have an excess . You want the seam to be as unnoticeable as possible.

5. After all the curbs are properly installed and in place: • Using the (2 Part) Top Coat Urethane, paint all top areas of the curb that will be exposed to sunlight

in the finished installation. It is not necessary to coat areas that will not be exposed to sunlight. • Two coats are required. The material will goes much further in the second application.

 PLEASE NOTE: Be careful not to move or misalign the curbs during construction or when backfilling up to the curbs to maintain proper alignment of the rubber and for an first‐rate finished installation.  

2 Part

UV Top Coat

Page 5: FlexEdge LJ Pit SAND CATCHERS INSTALL - … · 2016-06-06 · URB HEI on Notes be p pit layout. rs, and 10” rete mud sla concrete slab d on top. A ortsedge.com tchers S EIGHT REQ

 

P.O. Box 837 * 259 Murdock Road, Troutman, NC 28166 * Phone: (800) 334‐6057  www.sportsedge.com  F: (704) 528‐0179       5