Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
RS
P
MM
LM2
LM3
LM1
3.82
0
.
8
8
0
.7
1
0.78
0.74
0.65
0.62
0
.6
2
3
.
9
1
3
.
9
2
3
.
8
3
3
.9
6
0
.4
3
1
.
8
1
1
.
7
8
0
.5
4
1
.
7
9
0.47
0.47
1
.
6
6
1.50
0
.
4
3
1.66
2
.
5
2
.0
1
.
5
1
.
5
1
.0
1
.0
0
.
5
0
.5
0
.
5
3
.5
3.0
2.5
2
.
0
1
.5
1
.0
0
.
5
0
.0
4
.0
4
.0
4
.
5
4
.
0
6
.
5
6
.
0
5
.
5
5
.
0
4.5
4
.5
4
.
5
4
.
5
4.0
4.0
3
.5
4
.
5
4
.5
R
u
b
b
le
C
o
n
c
r
e
t
e
R
e
t
a
i
n
i
n
g
W
a
l
l
Concrete
Reta
ining Wall
C
o
n
c
re
te
R
e
ta
in
in
g
W
a
ll
AMCO CP6
YEAR 3
MTL2 103 / 015
INNER LEVEN
PROPOSED SCOUR WORKS - PLAN
A01
AS SHOWN
B.J.Hunter
T.Rogerson 15/03/21R.S.Tosh 15/03/21
5202175 - ATK - DRG - EST - 015200
A01 BJH TR RST15/03/21 FOR APPROVAL
WORKFLOW ONLYP01 GW GW GW24/02/21
FOR APPROVAL
M. Guy 23.02.2112/03/21
MTL2 6M 0440Y
DateDate
DateDateDrawn Designed
Checked Approved
Revision
Scale Location
Drawing Number
DrawIng Title
Project Title
Drawing Status
Description of Change
Issue HistoryDateRev AppdChkdDrawn
Tel:
Fax:
200 Broomielaw
Glasgow
G1 4RU
+44 (0)141 220 2000
+44 (0)141 220 2001
Millim
etres
100
10
0
Date
:17
:52
:59
HO
WI49
12
1
5/3
/21
Usernam
e:
File
nam
e:
C:\p
rojectw
ise\m
ffanglia\ho
wi49
12\dm
s4
16
15
\5
20
217
5-A
TK
-D
RG
-E
ST
-01
52
00
.d
wg
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED
OTHERWISE. ALL LEVELS ARE IN METRES TO
ORDNANCE DATUM.
2. MTL2 UB 103 / 015 IS LOCATED AT 6m 0440yds, BETWEEN
THORNTON NORTH JN & METHIL POWER STATION.
OS GRID REFERENCE: NO 380 003.
3. DETAILS AND DIMENSIONS ARE TAKEN FROM ARCHIVE
DRAWINGS, TOPOGRAPHICAL SURVEY CARRIED OUT
BY L&M IN JANUARY 2021 AND INSPECTION BY ATKINS
IN FEBRUARY 2021.
4. BASE OF EXISTING CONCRETE WALL AT LM ABUTMENT
ASSUMED TO EXTEND BELOW BASE OF FOUNDATION
LEVEL OF LM ABUTMENT. TRIAL PIT DIG REQUIRED TO
CONFIRM BASE OF WALL. SHOULD BASE OF WALL
LEVEL BE HIGHER THAN BASE OF FOUNDATION OF LM
ABUTMENT, RIP-RAP IS TO EXTEND ACROSS TO TIE IN
WITH THE EXISTING WALL
5. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
ALL DRAWINGS IN 5202175-ATK-DRG-EST-015000
SERIES.
6. FOR SECTIONS 1-1, 2-2 & 3-3 REFER TO DRAWING
5202175-ATK-DRG-EST-015201.
PLAN LAYOUT
1 : 200
1
1
1
6
0
0
4
0
0
0
4
0
0
0
4
8
0
0
8
0
0
0
8
0
0
0
8
8
0
0
1
6
0
0
LOW MILEAGE
ES1 ABUTMENT
(DOWN)
HIGH MILEAGE
ES2 ABUTMENT
(UP)
PIER IS1
EXISTING
CONCRETE WALL
EXISTING
MASONRY WALL
EXISTING
MASONRY WALL
4
0
0
0
4
0
0
0
3
2
0
0
3
2
0
0
2
2
F
L
O
W
F
L
O
W
RIP-RAP TOE ACROSS
UPSTREAM EDGE
RIP-RAP TOE ACROSS
DOWNSTREAM EDGE
COMPLETE EXTENTS OF RETAINING WALL TO BE DEMOLISHED
TO FOUNDATION LEVEL, EARTHWORKS TO BE REGRADED TO A
1:3 SLOPE USING SITE WON MATERIAL, REFER TO SECTION 3
FOR REQUIRED SCOUR STRENGTHENING WORKS.
3
3
4
0
0
0
1
6
0
0
B2
B3
B4
B8
B6, B7
SAFETY HEALTH AND ENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARDS / RISKS NORMALLY ASSOCIATED WITH THE TYPES
OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING:
THE INTENT IS TO DEMONSTRATE COMPLIANCE WITH THE PROVISION OF THE
CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015 GUIDANCE ON
REGULATIONS AND IN PARTICULAR BUT NO LIMITED TO THE PROVISION OF
PARAGRAPHS 81-92. THESE STATEMENTS MUST BE REVIEWED AND UPDATED AS
NECESSARY ALONG WITH THE RISK ASSESSMENT AS AND WHEN SIGNIFICANT
DESIGN CHNAGES OCCUR.
DESIGN AND CONSTRUCTION
B2
LIMITED HEADROOM UNDER SOUTH SPAN FOR EXCAVATION AND
INSTALLATION OF RIP-RAP AROUND PIER 1.
B3
B4
THIS SHE BOX IS TO BE READ IN CONJUNCTION WITH THE DESIGNER'S RISK
ASSESSMENT (REF: 5202175-ATK-RAR-EST-015001).
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY A COMPETENT
CONTRACTOR, WHERE APPROPRIATE, WORKING TO AN APPROVED METHOD
STATEMENT.
B6
DEEP EXCAVATION REQUIRED IN CENTRAL OF CHANNEL.
POLLUTION OF WATERCOURSE AS A RESULT OF EXCAVATIONS.
B7 WORKING IN TIDAL ENVIRONMENT
B8
DEMOLITION AND REMOVAL OF UNSTABLE MASONRY RETAINING
WALL.
RISK OF EXPOSURE OF BASE OF FOUNDATIONS DURING EXCAVATION
AND INSTALLATION OF RIP-RAP..
0.0m
+5.0m
-5.0m
0.0m
+5.0m
-5.0m
0.0m
-5.0m
0.0m
-5.0m
0.0m
+5.0m
0.0m
+5.0m
AMCO CP6
YEAR 3
MTL2 103 / 015
INNER LEVEN
PROPOSED SCOUR WORKS - SECTIONS
A01
AS SHOWN
B.J.Hunter
T.Rogerson 15/03/21R.S.Tosh 15/03/21
5202175 - ATK - DRG - EST - 015201
A01 BJH TR RST15/03/21 FOR APPROVAL
WORKFLOW ONLYP01 RH RH RH12/03/21
FOR APPROVAL
M. Guy 23.02.2112/03/21
MTL2 6M 0440Y
DateDate
DateDateDrawn Designed
Checked Approved
Revision
Scale Location
Drawing Number
DrawIng Title
Project Title
Drawing Status
Description of Change
Issue HistoryDateRev AppdChkdDrawn
Tel:
Fax:
200 Broomielaw
Glasgow
G1 4RU
+44 (0)141 220 2000
+44 (0)141 220 2001
Millim
etres
100
10
0
Da
te:
17:53:41
HO
WI491
2 15
/3/2
1U
sernam
e:
Filen
am
e:
C:\p
rojectw
ise\m
ffanglia\ho
wi49
12\dm
s4
16
15
\5
20
217
5-A
TK
-D
RG
-E
ST
-01
52
01
.d
wg
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED
OTHERWISE. ALL LEVELS ARE IN METRES TO
ORDNANCE DATUM.
2. MTL2 UB 103 / 015 IS LOCATED AT 6m 0440yds, BETWEEN
THORNTON NORTH JN & METHIL POWER STATION.
OS GRID REFERENCE: NO 380 003.
3. DETAILS AND DIMENSIONS ARE TAKEN FROM ARCHIVE
DRAWINGS, TOPOGRAPHICAL SURVEY CARRIED OUT
BY L&M IN JANUARY 2021 AND INSPECTION BY ATKINS
IN FEBRUARY 2021.
4. BASE OF EXISTING CONCRETE WALL AT LM ABUTMENT
ASSUMED TO EXTEND BELOW BASE OF FOUNDATION
LEVEL OF LM ABUTMENT. TRIAL PIT DIG REQUIRED TO
CONFIRM BASE OF WALL. SHOULD BASE OF WALL
LEVEL BE HIGHER THAN BASE OF FOUNDATION OF LM
ABUTMENT, RIP-RAP IS TO EXTEND ACROSS TO TIE IN
WITH THE EXISTING WALL
5. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH
ALL DRAWINGS IN 5202175-ATK-DRG-EST-015000
SERIES.
6. BASE OF FOUNDATION LEVELS DERIVED FROM CORING
INVESTIGATIONS UNDERTAKEN BY HENDERSON
THOMAS ASSOCIATES IN 2017 AND 2021. FOUNDATION
LEVEL TO BE CHECKED PRIOR TO INSTALLATION OF
WORKS DUE TO VARIANCE IN FOUNDATION LEVEL
ALONG EACH BRIDGE ELEMENT.
SECTION 1 - 1
1 : 100
4800
4000
1317
1200
200
0
1200
1600
LOW MILEAGE
ES1 ABUTMENT
(DOWN)
EXISTING CONCRETE WALL
AROUND ABUTMENT. EXTENTS
TO BE CONFIRMED
NON-WOVEN GEOTEXTILE UNDER RIP-RAP
NON-WOVEN GEOTEXTILE
UNDER RIP-RAP
Dn50=400mm RIP-RAP
PLACED IN MIN 3 LAYERS
AROUND PIER
Dn50=400mm RIP-RAP PLACED IN
MIN 2 LAYERS THROUGH CHANNEL
Dn50=400mm RIP-RAP PLACED IN
MIN 3 LAYERS AROUND PIER
300mm MINIMUM ABOVE BASE
OF FOUNDATION
PIER IS1
HIGH MILEAGE
ES2 ABUTMENT
(UP)
SECTION 2 - 2
1 : 100
3200 3200
1600 1600
160
0
80
02
000
EXISTING BED LEVEL
NON-WOVEN GEOTEXTILE LAID
UNDER RIP-RAP
SECTION 3 - 3
1 : 100
SITE WON FILL MATERIAL
3200
160
0
8
0
0
BIODEGRADABLE GEOTEXTILE
- SALIX BIONET OR SIMILAR
APPROVED
EXISTING MASONRY
RETAINING WALL REPLACED
WITH 1:3 EARTH EMBANKMENT
WITH RIP-RAP TOE.
RIP-RAP
NON-WOVEN
GEOTEXTILE
Dn50 = 400mm
RIP-RAP TOE.
BASE OF TOE
AT -1.6mAOD
TOP OF TOE
AT 0.0mAOD
1600 4000
300mm MINIMUM ABOVE BASE OF FOUNDATION
UPSTREAM BASE OF FOUNDATION LEVEL = -1.41mAOD
DOWNSTREAM BASE OF FOUNDATION LEVEL = -2.35mAOD
DECK SOFFIT
LEVEL = 3.60mAOD
800
1600
DECK SOFFIT LEVEL
= 3.50mAOD
UPSTREAM BASE OF FOUNDATION
LEVEL = 1.01mAOD
UPSTREAM BASE OF FOUNDATION
LEVEL = 1.15mAOD
GEOTEXTILE
SECURED USING
500mm HIGH x 300mm
WIDE BACKFILLED
ANCHOR TRENCH
160
0
B2
B3
B4
B3
B4
B8
PROPERTY REQUIREMENTS
TESTED IN
ACCORDANCE WITH
A
APPARENT SPECIFIC
GRAVITY
2.5-2.7 t/m
3
EN 13383-2:2002
B WATER ABSORPTION 0.5-2.0 % EN 13383-2:2002
C
AGGREGATE
ABRASION VALUE
(MICRO-DEVAL)
10-20% EN 13383-2:2002
D
SCHMIDT IMPACT
INDEX (% REBOUND)
50-60
ISRM (1988)
E
POINT LOAD
STRENGTH
4-8ISRM (1985)
F
UNCONFINED
COMPRESSIVE
STRENGTH
120-80 MPa EN 1926:1999
G
SOUNDNESS LOSS
(MgSO4)
2-10% EN1367
TYPICAL SPECIFICATION FOR FLUVIAL REVETMENTSMATERIALS
RIP RAP
1. RIP-RAP SHALL BE HARD, DENSE, DURABLE, UN-WEATHERED NATURAL ROCK,
COMPATIBLE WITH THE LOCAL GEOLOGY AND FREE FROM LAMINATIONS, WEAK
CLEAVAGE PLANES OR CHEMICAL DECOMPOSITION. IT SHALL BE ABLE TO WITHSTAND
LONG EXPOSURE TO WEATHERING, IN PARTICULAR WETTING / DRYING,
FREEZING/THAWING AND ABRASION WITHOUT BEING LIABLE TODECOMPOSITION OR
DISINTEGRATION. ONLY CLEAN STONE SHALL BE USED IN THE WORKS AND IT SHALL BE
CAPABLE OF BEING HANDLED AND PLACED WITHOUT UNDUE FRACTURE OR DAMAGE.
2. ALL RIP-RAP SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS
3. WHERE INCLUSIONS OCCUR WITHIN AN OTHERWISE HOMOGENEOUS PIECE OF ROCK,
THE MATERIAL COMPRISING THE INCLUSIONS SHALL ALSO COMPLY WITH THESE
REQUIREMENTS.
4. RIP-RAP SHALL BE CUBIC/PRISMOIDAL IN SHAPE WITH LENGTH/BREADTH RATIOS
(MAXIMUM DIMENSION/MINIMUM DIMENSION) NO GREATER THAN 2.5 FOR 70% OF THE
STONES; 3.0 FOR 85% OF THE STONES; AND 3.5 FOR ALL STONES. ANGULAR, BLOCKISH
SHAPES ARE PREFERRED.
5. CARE SHALL BE TAKEN IN THE SELECTION OF A SUITABLE QUARRY TO ENSURE
CONSISTENCY IN THE QUALITY OF THE ROCK AND IN THE SHAPE, SIZE AND GRADING OF
THE RIP-RAP.
6. PRIOR TO THE AGREEMENT TO THE USE OF A PROPOSED SOURCE, THE CONTRACTOR
SHALL PROVIDE EVIDENCE OF ROCK SELECTION PROCEDURES IN OPERATION AT THE
QUARRY. PRIMARILY THIS EVIDENCE SHALL RELATE TO THE PROCEDURES IN PLACE FOR
CONSISTENTLY PRODUCING ANGULAR, BLOCKISH STONES OF THE REQUIRED ROCK
QUALITY, FREE OF DEFECTS AND TO THEREQUIRED GRADING. IT MAY ALSO INCLUDE:
(i) ASSESSMENTS OF ANY CHANGES ANTICIPATED IN THE GEOLOGY OF THE PRODUCTION
FACES DURING THE PROGRESSION OF THE CONTRACT THAT WOULD BE LIKELY TO
AFFECT COMPOSITION OR INTEGRITY.
(ii) EVIDENCE OF THE SELECTION OF A BLASTING PATTERN THAT MINIMISES THE
PRODUCTION OF LATENT FRACTURES.
(iii) EVIDENCE OF ORIENTATION OF STONE PRODUCTION FACES TO MINIMISE THE
INFLUENCE OF FRACTURES AND DISCONTINUITIES.
(iv) LENGTH OF TIME ROCK IS STOCKPILED I.E. “CURING TIMES”
(v) EVIDENCE OF REJECTION OF OUT-OF-SIZE AND FLAWED MATERIALS PRIOR TO
DESPATCH.
(vi) ANTICIPATED INCIDENCE OF BLOCK FRACTURE ON SITE, BASED EITHER ON
CONTROLLED DROP TESTS OR ROCK BREAKAGE DURING TRANSIT.
7.THE MEDIAN NOMINAL DIAMETER (Dn50) OF THE RIP-RAP SHALL BE 400mm. GRADING LM
60-300kg ACCORDING TO BS EN 13383 - 1:2013. GRADING SHALL COMPLY WITH 'THE ROCK
MANUAL, CIRIA C683'.
8. RIP-RAP SHALL HAVE A SMOOTH LINEAR GRADING CURVE AND BE WELL GRADED
WITHOUT GAPS OR ANY EXCESS OF FINE MATERIAL.
9. THE BED TO BE PROTECTED SHALL BE GRADED AS NECESSARY TO FORM THE SUB
GRADE FOR THE SCOUR PROTECTION. ALL VEGETATION SHALL BE REMOVED.
10. THE RIP-RAP LAYER SHALL BE CAREFULLY SELECTED AND PLACED (NOT TIPPED) IN
ORDER TO KEEP VOIDS TO A MINIMUM, WITH THE FINER STONES WITHIN THE RIP-RAP
BEING USED TO FILL THE VOIDS. THE FALL AND LINE OF THE RIP-RAP SHALL BE SMOOTH
AND REGULAR AND THE MATERIAL SHALL BE PLACED AND COMPACTED BY APPROPRIATE
PLANT AS WORK PROGRESSES. THE FINAL SURFACE LAYER OF STONES SHALL BE
PLACED TO PRODUCE A COMPACT FINISH TO THE LINES AND LEVELS SHOWN ON THE
DRAWINGS.
SAFETY HEALTH AND ENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARDS / RISKS NORMALLY ASSOCIATED WITH THE TYPES
OF WORK DETAILED ON THIS DRAWING, NOTE THE FOLLOWING:
THE INTENT IS TO DEMONSTRATE COMPLIANCE WITH THE PROVISION OF THE
CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015 GUIDANCE ON
REGULATIONS AND IN PARTICULAR BUT NO LIMITED TO THE PROVISION OF
PARAGRAPHS 81-92. THESE STATEMENTS MUST BE REVIEWED AND UPDATED AS
NECESSARY ALONG WITH THE RISK ASSESSMENT AS AND WHEN SIGNIFICANT
DESIGN CHNAGES OCCUR.
DESIGN AND CONSTRUCTION
B2
LIMITED HEADROOM UNDER SOUTH SPAN FOR EXCAVATION AND
INSTALLATION OF RIP-RAP AROUND PIER 1.
B3
B4
THIS SHE BOX IS TO BE READ IN CONJUNCTION WITH THE DESIGNER'S RISK
ASSESSMENT (REF: 5202175-ATK-RAR-EST-015001).
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY A COMPETENT
CONTRACTOR, WHERE APPROPRIATE, WORKING TO AN APPROVED METHOD
STATEMENT.
B6
DEEP EXCAVATION REQUIRED IN CENTRAL OF CHANNEL.
POLLUTION OF WATERCOURSE AS A RESULT OF EXCAVATIONS.
B7 WORKING IN TIDAL ENVIRONMENT
B8
DEMOLITION AND REMOVAL OF UNSTABLE MASONRY RETAINING
WALL.
RISK OF EXPOSURE OF BASE OF FOUNDATIONS DURING EXCAVATION
AND INSTALLATION OF RIP-RAP..
1200